2020-12-08 Planning & Environment Committee Agenda

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                           AGENDA


   Planning & Environment
     Committee Meeting


             Tuesday, 8 December 2020


                     commencing at 9.30am
           Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Brian Stockwell (Chair), Karen Finzel, Clare Stewart, Tom Wegener




                       “Noosa Shire – different by nature”
Log in to download the original file

2020-12-08 Planning & Environment Committee Agenda(PDF, 7MB).pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 76 sections

Section 2

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA              8 DECEMBER 2020


TABLE OF CONTENTS

ITEM                                                                    PAGE

1      ATTENDANCE & APOLOGIES                                               3

2      CONFIRMATION OF MINUTES                                              3

3      PRESENTATIONS                                                        3

4      DEPUTATIONS                                                          3

5      REPORTS FOR CONSIDERATION OF THE COMMITTEE                           4

       1   MCU19/0001 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
           USE FOR COMMERCIAL BUSINESS TYPE 1- OFFICE, MULTIPLE HOUSING
           TYPE 4 CONVENTIONAL AND RETAIL BUSINESS TYPE 2 - SHOP & SALON
           AT 6-10 DIAMOND STREET, COOROY                                   4

       2   MCU20/0090 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE
           OF USE FOR AN EXTENSION TO SHOP/HIRE AND STORAGE BUILDING
           AT JETTY 256 GYMPIE TERRACE, NOOSAVILLE                         29

       3   PLANNING & ENVIRONMENT COURT APPEAL NO 2974 OF 2020 APPLICATION
           FOR EXTENSION TO CURRENCY PERIOD                               45

6      REPORTS FOR NOTING BY THE COMMITTEE                                 48

       4   PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY            48

       5   NOOSA COUNCIL CARBON FOOTPRINT REPORT 2019/2020                 58

7      CLOSED SESSION                                                77




                                                                  Page 2 of 77

Section 3

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                      8 DECEMBER 2020



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the Planning & Environment Committee Meeting held on 10 November 2020
    be received and confirmed.


3   PRESENTATIONS

    Nil.


4   DEPUTATIONS

    Nil.




                                                                           Page 3 of 77

Section 4

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                    8 DECEMBER 2020


5                        REPORTS FOR CONSIDERATION OF THE COMMITTEE

1                        MCU19/0001 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
                         COMMERCIAL BUSINESS TYPE 1- OFFICE, MULTIPLE HOUSING TYPE 4
                         CONVENTIONAL AND RETAIL BUSINESS TYPE 2 - SHOP & SALON AT 6-10 DIAMOND
                         STREET, COOROY
DOCUMENT INFORM AT ION




Author                              Development Planner, Glen Conforti
                                    Environment and Sustainable Development Department

Index                               ECM Reference/ Application/ MCU19/0001

Attachments                         1.    Proposal Plans



                   APPLICATION DETAILS

                   Applicant                      Heritage Motel Investments P/L TTE

                   Proposal                       Material Change of Use - Commercial Business - Type 1 Office,
                                                  Multiple Housing - Type 4 Conventional (4 small dwellings), Retail
                                                  Business - Type 2 Shop & Salon

                   Properly Made Date             8 January 2019

                   Information Request Date       30 January 2019

                   Information Response Date      30 May 2019

                   Decision Due Date              17 December 2020

                   Number of Submissions          1 not properly made submission

                   PROPERTY DETAILS

                   Property Address               6-10 Diamond St Cooroy Qld 4563

                   RP Description                 Lot 705 C 5602
                                                  Lot 703 C 5602
                                                  Lot 704 C 5602

                   Land Area                      1012m²
                                                  1012m²
                                                  1012m²
                                                  3036m² Total

                   Existing Use of Land           Former Energex Depot currently utilised as a shop

                   STATUTORY DETAILS

                   SEQRP Designation              Urban Footprint

                   Locality                       Cooroy and Lake Macdonald

                   Zone                           Community Services

                   Overlays                       N/A

                   Assessment Type                Impact assessment

                                                                                                           Page 4 of 77

Section 5

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 8 December 2020 regarding Application No. MCU19/0001 for a
Development Permit for Material Change of Use for Commercial Business - Type 1 Office, Multiple
Housing - Type 4 Conventional (4 small dwellings), Retail Business - Type 2 Shop & Salon situated
at 6-10 Diamond Street, Cooroy and
A.   Approve the application in accordance with the following conditions:
     PLANNING
           When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied with
           prior to the use commencing, and then compliance maintained at all times while the
           use continues.
           Approved Plans
     2.    Development undertaken in accordance with this approval must generally comply with
           the approved plans of development. The approved plans are listed in the following table
           unless otherwise amended by these conditions.

             Plan No.        Rev.        Plan/Document Name                              Date
             DA02            E           Proposed Site Plan, prepared by Verve           06.10.2020
                                         Building Design Co
             DA03            D           Building Elevations & Perspectives, prepared    06.10.2020
                                         by Verve Building Design Co
             DA04            D           Building Elevations & Perspectives, prepared    06.10.2020
                                         by Verve Building Design Co
             DA05            D           Building Elevations & Perspectives, prepared    06.10.2020
                                         by Verve Building Design Co
             DA06            C           Level 1 & Roof Plan, prepared by Verve          06.10.2020
                                         Building Design Co
             1854_SQMP       Rev 0.doc   Proposed development at 6-10 Diamond St -       26.08.2019
                                         Cooroy Stormwater Quality Management Plan,
                                         prepared by Callaghan and Toth
           Nature and Extent of Approved Use
     3.    The non-residential uses must not operate outside the hours of 7am to 10pm Monday
           to Sunday.
           Currency Period
     4.    The Currency Period for this development approval lapses if the use has not happened
           by 17 December 2026, unless an application to extend the currency period is approved
           by Council.
           Building Height
     5.    The maximum height of the development must not exceed 8 metres above the finished
           ground level and the natural ground level.
     6.    Certification must be submitted to Council from a Licensed Surveyor which certifies
           that the buildings do not exceed the maximum height requirement of this Decision
           Notice.
           Building Appearance
     7.    External finishes must be in accordance with that indicated on the approved plans. In
           this regard a colour palette (including roof and fence) must be submitted to Council for
           endorsement prior to the issue of an operational works approval. The colours must be
           muted environmental tones and reflect the character of Cooroy.

                                                                                        Page 5 of 77

Section 6

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              8 DECEMBER 2020


    8.    All air conditioning units and/or other mechanical equipment must be fully enclosed or
          screened such that they are not visible from the street frontages nor adjoining
          properties.
    9.    All deck and balcony areas above ground floor must not be enclosed by permanent
          fixtures such as shutters, louvres, glass panelling or the like, except where required to
          satisfy any privacy condition of this Decision Notice or if shown on the approved plans.
    10.   Each tenancy along the Diamond Street frontage must provide a minimum of 50% fully
          transparent shopfront glazing to allow passive surveillance and encourage social
          interaction.
    11.   Any security screens to the front of the premises must consist of grille or translucent
          screens and not solid shutters, screens, or roller-doors.
          Weather Protection
    12.   Street awnings must be provided for the full frontage to Diamond Street, except for
          across the driveway, as shown on the approved plans. The awning must be designed
          to provide maximum continuous solar and rain protection and promote all weather
          activity but provide opportunities for street tree planting and landscaping. The width of
          the awning must be determined in consultation with the Manager Development
          Assessment prior to the issue of the operational works approval. Any posts must be
          located to the outer most point of the awning so as not to impede pedestrian traffic.
          Performance Bond
    13.   To secure the performance of all conditions of this approval, security in the form of a
          cash bond or trading bank guarantee to the sum of $20,000 must be submitted to
          Council a minimum of 5 days prior to pre-start meeting. The cash bond or trading bank
          guarantee will be returned on performance of the conditions of approval less any costs
          incurred by Council in respect of enforcing performance of this permit. Council reserves
          the right to call upon the bond or guaranteed sum to effect compliance with conditions.
          Street Identification
    14.   The street address of the development must be clearly visible and discernible from the
          primary frontage of the site by the provision of a street number and, where appropriate,
          the building name.
          Water & Sewer Connections
    15.   An underground connection to reticulated water and sewerage must be provided to the
          development site in accordance with the standards and requirements of Northern SEQ
          Distributor–Retailer Authority (Unitywater).
    16.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to the development site.
          Community Management Statement
    17.   Any proposed Community Management Statement required for the development
          pursuant to the Body Corporate and Community Management Act 1997 must be
          submitted to Council for endorsement at the same time as submission of the Building
          Format Plan (or similar) to Council for compliance assessment.
          LANDSCAPING
    18.   The development site must be landscaped. The works must be undertaken in
          accordance with an Operational Works approval and Planning Scheme Policy PSP 3
          – Landscaping Plants and Guidelines and must include in particular:
          a.    Landscaping for the full length of both side and rear boundaries as shown on the
                approved plans. Shade trees must be included which grow to a minimum height

                                                                                     Page 6 of 77

Section 7

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020


               of 8m at maturity and provided at 3m centres. The trees must have a minimum
               pot size of 45 litres. Understory planting must be provided between the shade
               trees to help screen the development and shade the car parking area.
          b.   Two car parking spaces must be removed and replaced with landscaping. Two
               45 litre shade trees per replaced car space must be provided.
          c.   Each centre parking garden must be a minimum of 1.7m² and consist of 1 x 45
               litre shade tree.
          d.   Street trees - provision of 4 x 45 litre street trees evenly spaced to the western
               side of the driveway and 2 x 45 litre street trees to the eastern side of the
               driveway. The existing street tree on the eastern side of the driveway is in poor
               health and must be replaced. A plant schedule must be provided for operational
               works.
    19.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures healthy,
          sustained and vigorous plant growth. All plant material must be allowed to grow to full
          form and be refurbished when its life expectancy is reached.
          DEMOLITION
          Performance Bond
    20.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000
          must be submitted to Council prior to the issue of a Development Permit for Building
          Works for demolition, to secure the demolition conditions of this approval. The cash
          bond or trading bank guarantee will be returned on performance of the demolition
          conditions of this approval less any costs incurred by Council in respect of enforcing
          performance of these demolition conditions. Council reserves the right to call upon the
          bond or guaranteed sum to effect compliance with conditions.
          Works
    21.   Demolition must be undertaken in a manner that causes no detrimental effect upon the
          amenity of the neighbourhood by reason of the creation of excessive noise, lighting,
          air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
          other emissions in accordance with the nuisance provisions of the Environmental
          Protection Act 1994.
          Waste management
    22.   A Waste Management Plan (demolition) must be submitted in accordance with
          Planning Scheme Policy 11 - Waste Management Plan and approved by Council’s
          Waste Coordinator prior to issue of a development permit for Building Works for
          demolition, removal or relocation.
          The purpose of the Waste Management Plan is to facilitate the segregation of waste
          for the effective reuse and recycling of such materials. Segregated wastes attract
          significantly reduced disposal fees at the landfill with some items free. Higher gate
          fees are charged for mixed waste.
          Waste storage areas must provide for adequate separation of all reusable, recyclable
          and waste materials. These must be located so that they are convenient and safe to
          use.
          The Plan must contain the following information:
          a.   The areas for the storage and separation of waste shown on a site plan;
          b.   A waste management table as indicated below is to be completed showing how
               waste material is to be segregated - recycled – reused or disposed; and
          c.   Table – Waste Management Table

                                                                                   Page 7 of 77

Section 8

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                8 DECEMBER 2020


                 MATERIALS ON-SITE                                DESTINATION
                                                 Re-use and Recycling              Disposal
                 Expected        Estimated     On-site     Off-site      *specify contractor and
                 waste           volume(m³)    *specify    *specify      landfill site or other
                 materials                     proposed    contractor    disposal site
                                               re-use or   and recycling
                                               on-site     outlet
                                               recycling
                                               methods
                 Excavation
                 material
                 Green waste
                 Bricks
                 Concrete
                 Timber-
                 please
                 specify
                 Plasterboard
                 Metals -
                 please
                 specify
                 Asbestos
                 Other -
                 please
                 specify
                Note * If a demolition contractor is undertaking works, then the Waste Management
                table is to be completed by the demolition contractor.
          Damage to infrastructure
    23.   Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
          bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
          Vacant site
    24.   The site must be left clean and tidy free from debris such as concrete, wire, rubble,
          brick/s and the like. If the site remains vacant for more than 30 days the lot/s must be
          turfed or landscaped in accordance with Planning Scheme Policy PSP 3 – Landscaping
          Plants and Guidelines and to the satisfaction of Council so as to not cause nuisance to
          the surrounding area.
    25.   All waste materials must be removed from site.
          Litter, erosion and sediment control
    26.   Litter, erosion and sediment control measures must be installed and maintained until
          soils are stabilised by turf, vegetation or sealed.
          Note: it is an offence under the Environmental Protection Act 1994 to deposit or
          potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
          water drainage system (e.g. roadside gutter).
          Asbestos
    27.   Removal of building materials containing asbestos must be undertaken by a licensed
          asbestos removalist.
    28.   Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
          requires a licensed asbestos removalist to give notice to Workplace Health and Safety
          Queensland (WHSQ) of licensed asbestos removal work at least five days before the
          work commences. Notification must be made using Form 65: Notification of licensed
          asbestos removal work, demolition work or emergency demolition.



                                                                                       Page 8 of 77

Section 9

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020


    29.   All building materials containing asbestos products are wrapped and disposed of in
          accordance with the Public Health Regulation 2006 and the Environmental Protection
          Regulation 2008.
          Note: Asbestos is a Regulated Waste. The Department of Environment & Science
          licenses businesses that transport asbestos waste, and landfills that accept this waste.
    30.   All building materials containing asbestos, including asbestos cement sheeting or
          roofing and lagging are removed from the building prior to demolition/relocation.
          Plumbing and Drainage
    31.   It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
          demolition of a building, the existing sanitary drain upstream from the connection point
          for a service provider’s sewerage system must be sealed water tight. This work is
          deemed as notifiable Work and must be carried out by a suitably licenced plumber who
          must submit an As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC
          (Queensland Building Construction Commission) within 10 days of completing the
          work.
    ENGINEERING
          External Works
    32.   Diamond Street must be upgraded for the length of its frontage to the subject site. The
          works must be undertaken in accordance with an Operational Works approval and
          must include in particular:
          a.    Construction of a pedestrian footpath in accordance with the conditions of this
                Decision Notice.
          b.    Removal of any redundant property accesses and reinstatement of the kerb,
                footpath and verge area to match the balance of the site frontage.
          c.    Any required stormwater drainage works within the road reserve in accordance
                the conditions of this Decision Notice.
          d.    Any required road pavement correction due to the development works.
          e.    Relocation, and line marking of existing on-street parking spaces in accordance
                with the requirements of the Referral Agency and the conditions of this Decision
                Notice.
          f.    The required relocation of the existing power pole.
          g.    Any required alteration or adjustment to existing public services due to the
                proposed works.
    33.   Additional external roadworks as may be required by Department of Transport and
          Main Roads approval reference 1901-9327 SRA.
          Site Access and Driveways
    34.   A sealed access driveway must be provided to all parking and manoeuvring areas of
          the development generally in accordance with approved plans. The works must be
          undertaken in compliance with an Operational Works approval and the applicable
          requirements of the relevant utility provider/s, and must include in particular:
          a.    A driveway crossover generally in accordance with the approved plans, standard
                drawing RS-051 and with an overall maximum width of 6.5m at the property
                boundary.
    35.   Approval from the Department of Transport and Main Roads for the final design of the
          site access and driveway works must be submitted in writing to Council prior to the
          issue of any Development Permit for Operational Works by Council.


                                                                                    Page 9 of 77

Section 10

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020


          Car Parking
    36.   A minimum of 42 car parking spaces and 4 motor cycle spaces must be provided and
          signage and marked on the site generally in accordance with the approved plans and
          AS/NZS 2890.01, and made available and accessible at all times while the use is open
          for business. The works must be undertaken in accordance with an Operational Works
          approval and must include in particular:
          a.   4 covered parking spaces for the residential units within the total, which are
               clearly marked for this purpose
          b.   Pedestrian routes within the development site generally in accordance with the
               conditions of this permit and further details and levels for the pedestrian access
               to Diamond Lane.
          c.   4 motorcycle spaces.
          d.   Provision of vandal resistant public lighting with intensities to satisfy the
               requirements of Australian Standard AS1158: Public Lighting Code.
          e.   Linemarking, crossfalls and gradients in accordance with Australian Standard
               AS/NZS 2890.01: Parking Facilities
    37.   All car parking areas and access driveways must be maintained exclusively for vehicle
          parking and manoeuvring and kept in a tidy and safe condition at all times.
    38.   Directional signage must be provided to direct customers and drivers to the car parking
          spaces provided on site.
          On Street Carparking
    39.   On street carparking along the frontage of the site must be provided with signage and
          linemarking in compliance Australian Standard AS/NZS 2890.01. The works must be
          endorsed by the Department of Transport and Main Roads and undertaken in
          accordance with an Operational Works approval.
          Service Vehicles
    40.   Service vehicle parking, manoeuvring and standing spaces must be provided on the
          site. The works must be undertaken generally in accordance with the approved plans
          and an Operational Works approval. and must include in particular:
          a.   Manoeuvring for Council contractors waste collection vehicle.
          b.   1 SRV space.
          Pedestrian and Bicycle Facilities
    41.   Public pedestrian pathway must be provided for the development. The works must be
          undertaken in accordance with an Operational Works approval and must include in
          particular:
          a.   Concrete footpath for the entire length of the site’s frontage to Diamond Street.
               The width of the footpath must be determined in consultation with a Council
               Manager Development Assessment prior to the issue of the operational works
               approval. The width of the footpath must provide for safe pedestrian traffic and
               street tree planting and landscaping.
          This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary
          trunk infrastructure identified by Council’s LGIP to service the development.
    42.   Pedestrian and bicycle facilities must be provided within the development. The works
          must be undertaken in accordance with an Operational Works approval and must
          include in particular:



                                                                                  Page 10 of 77

Section 11

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


          a.    A 1.5 metre wide and some covered pathway within the development site
                generally in accordance with approved plans.
          b.    Adequate separation of all specific pedestrian routes from vehicle access and
                manoeuvring areas, and clear demarcation by pavement marking, signposts or
                changes in surface materials or levels.
          c.    Signage and lighting at strategic locations to direct people to building entries and
                public toilet facilities.
          d.    A total of 11 bicycle parking spaces/racks complying with the applicable
                standards and The Noosa Plan 2016.
          Easements
    43.   A 1.5 metre wide easement for “Public Thoroughfare” purposes must be registered
          against the title of the property in favour of Council. The easement must be located
          directly adjacent to the Diamond Lane frontage. The easement must:
          a.    be clearly shown on all plans submitted for Operational Works; and
          b.    be registered prior to the commencement of the use.
    44.   Unless otherwise agreed in writing by the relevant service provider, any public or third
          party infrastructure located on the subject site must be placed within an easement
          registered against the title of the property.
    45.   All easements must be designed in accordance with the planning scheme and granted
          at no cost to the Grantee. Where the Grantee is Council or a service authority, the
          easement documentation must be in accordance with the Grantee’s standard
          easement terms. Draft easement documentation must be submitted to Council for
          endorsement.
    46.   All works must be kept clear of any existing or proposed easements on the subject
          land, unless agreed otherwise in writing by the Grantee.
          ENVIRONMENTAL HEALTH
          Amenity
    47.   The development must be undertaken and operated in a manner that causes no
          detrimental effect upon the amenity of the neighbourhood by reason of the creation of
          excessive noise, lighting, air-borne hazards, atmospheric pollutants (including dust or
          odours) nuisance or any other emissions in accordance with the nuisance provisions
          of the Environmental Protection Act 1994.
          Noise Nuisance
    48.   Noise emission from mechanical equipment must comply with the following
          requirements:
          a.    Air-conditioning,    refrigeration,  fans   including      mechanical      exhaust
                fans/ventilation, plant rooms and refuse compactors:
                    7am to 10pm: Maximum background + 5dB(A)
                    10pm to 7am: Maximum background + 3dB(A)
    49.   Submission of written certification from a suitably qualified person confirming that the
          noise levels from all mechanical equipment comply with the noise requirements of this
          Decision Notice when measured at either the residential boundary or outside the most
          exposed part of an affected building, whichever is the closest to the equipment.
          The assessment and certification is required immediately after installation of the
          equipment and prior to any occupation of the building, and in a format approved by


                                                                                    Page 11 of 77

Section 12

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020


          Council. All equipment should be operating at the same time to test the overall noise
          level created.
          Waste Storage & Disposal
    50.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy 9 - Waste Management, including an external imperviously
          paved area correctly sized for all refuse and recycling containers and suitably screened
          from public places and neighbouring properties. The waste storage areas must be
          indicated on the plans and submitted with an operational works approval.
    51.   Separate waste storage facilities must be provided for the residential use onsite.
    52.   Waste collection services are limited to between 6.30am and 6.30pm Monday to
          Saturday and not permitted on Sunday or public holidays.
    53.   Service vehicle movements associated with the approved use (including loading and
          unloading) must not occur outside the hours of 7am to 6pm Monday to Saturday and
          not at all on Sundays or public holidays. The requirements of this condition must be
          included in the Community Management Statement for any body corporate for the
          subject site.
          HYDROLOGY
          Stormwater Drainage
    54.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval.
    55.   A primary stormwater quality treatment system must be provided for the development
          for the effective removal of gross pollutants. The works must be undertaken in
          accordance with an Operational Works approval.
    56.   All primary stormwater quality treatment devices must be routinely checked, serviced
          and cleaned in accordance with the manufacturer’s recommendations. Records of all
          maintenance activities undertaken must be kept and made available to Council upon
          request.
    57.   A stormwater quality treatment system must be provided for the development. The
          works must be undertaken in accordance with an Operational Works approval and the
          Bioretention Technical Design Guidelines (Water by Design, 2012), and must include
          in particular stormwater quality treatment devices of a size and location generally in
          accordance with the approved Stormwater quality management plan ver 0, prepared
          by Callahan and Toth, with the exception of the following:
          a.    The Operational Works application must include an amended drainage design,
                consistent with an updated MUSIC model that demonstrates that drainage from
                Catchment A1, C and B1 are filtered through a vegetated system, in lieu of the
                proposed GPT, to achieve the overall same reduction in pollutants prior to
                release to stormwater; and
          b.    Demonstrate required amendments to the Stormwater Quality treatment train
                continues to achieve overall development pollution reduction targets of 80%
                reduction in Total Suspended Solids, 60% Reduction in Total Phosphorous and
                45% reduction in Total Nitrogen compared to pre-development scenario, and
                that the peak 1-year ARI event discharge remains within pre-development peak
                1-year ARI discharge.
    58.   All stormwater quality treatment devices must be maintained in accordance with the
          Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version 1). A
          copy of this document must be retained on the site together with the approved
          Operational Works drawings for the stormwater quality treatment system and a detailed

                                                                                   Page 12 of 77

Section 13

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


           life cycle costing of the system attached as an addendum. Records of all maintenance
           activities undertaken must be kept and made available to Council upon request.
     59.   Any proposed Community Management Statement required for the development must
           include the Water by Design (2009) – Maintaining Vegetated Stormwater Assets
           (Version 1) document and must include the full cost of maintaining the system in
           accordance with that document.
     60.   All water quality treatment features must include signage that states “This stormwater
           Quality Feature reduces nutrients flowing to Mary River, which drains to the Great
           Barrier Reef.” The application for Operational Works must include signage design and
           demonstrates how it is consistent with Noosa Design Principles.
           Stormwater Harvesting
     61.   Operating rainwater collection and harvesting tanks must be provided as shown in
           Section 4.2.2 and Section 5 of the Stormwater Quality Management Plan version 0
           prepared by Callahan and Toth and dated August 2019. The tanks must be provided
           in accordance with a Building Works approval.
     62.   Operating stormwater harvesting tanks must be provided for the development. The
           tanks must be provided in accordance with approved plans and must include capacity,
           catchment, distribution and reuse as detailed in Section 4.2.2 and Section 5 of the
           approved Stormwater Quality Management Plan version 0, prepared by Callahan and
           Toth and dated August 2019.
B.   Find the following matters relevant to the assessment and sufficient reason to approve the
     application:
     1.    The previous infrastructure use has been abandoned and given the site is surrounded
           by business centre type uses, the mixed use development is a logical reuse of the land.
     2.    The proposed commercial, retail and residential uses are consistent with the
           surrounding zoning and land use pattern.
     3.     The proposed development is consistent with the Noosa Plan 2020, with the site now
           zoned District Centre.
C.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


REPORT
1.   PROPOSAL
The proposal seeks approval for a mixed use development consisting of a convenience shop and
offices on street level and 4 small dwelling units on the first floor. The proposal is split into 2
buildings separated by a vehicle access driveway.
To the east of the driveway is proposed 1 larger tenancy of 350m² for a convenience shop and to
the west of the driveway 5 x 66m² commercial tenancies with the multiple housing above. The 4
small dwellings are proposed between 80m² and 85m² gross floor area (GFA) each and would be
accessed from the rear of the building.
The development proposes a zero setback to the street boundary for ground floor tenancies and
between 1m and 3.3m to the small dwellings on the upper level. Ground floor side setbacks
proposed are 0.6m to the eastern boundary and 0.25m to the western boundary.
The proposal consists of a country style pitched corrugated iron roof with external materials
proposed, including a mix of face brick, horizontal expressed joint cladding, vertical timber look
battening, painted masonry, and a cantilevered 2.5m wide street awning with non-structural timber
feature posts.
Pedestrian access is provided to Diamond Lane with no vehicle access proposed to the Lane.

                                                                                    Page 13 of 77

Section 14

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                8 DECEMBER 2020


Forty four carparking spaces are proposed to the rear of the site and within the total are 4 covered
spaces for the residential units. Commercial waste storage and collection and general delivery
areas are to the rear of the larger tenancy and 1 staff car park. A separate residential waste area
is provided near the stair access to the units. Landscaping is proposed to the perimeter of the
carparking area and between centre parking.
Some of the landscaped areas consist of swales and biopods for water quality treatment. The
proposal includes rainwater harvesting to assist in achieving detention requirements of the relevant
standards.
The proposal is required to be assessed against The Noosa Plan 2006 (June 2018), now being
the superseded planning scheme. The application is before Council as the proposed uses are
identified as inconsistent uses under the superseded planning scheme.
Figures 1, 2, 3, and 4 below provide a site plan, floor plan and perspectives of the proposal.




                                         Figure 1 – Site Plan




                                                                                     Page 14 of 77

Section 15

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 DECEMBER 2020




                              Figure 2 – Upper level plan and site roof plan




                            Figure 3 – 3D perspective of the street elevation




                       Figure 4 – 3D perspective from the street north east corner.

2.    SITE DETAILS
2.1. Background
The 3 lots (the site) have been historically used as an Energex depot. The subject site has new
owners and the infrastructure use has been abandoned, with one of the existing buildings currently
being used as a shop. The Community Services zone reflects the infrastructure use that previously
occupied the site.
2.2. Site Description
The site has approximately a 60m frontage to Diamond Street and Diamond Lane and combined
form a rectangular shape. The lot is generally level but is slightly higher than Diamond Lane to the
rear of the site. An open swale drain within Diamond Lane runs parallel with the site’s boundary.
The site has a significant quantity of hard stand with a large shed and 2 office type buildings.
No significant vegetation exists on site except for 2 x eucalypt tereticornis (blue gums) and a small
stand of mature palm trees located in the north-west corner of the site. Figure 5 below identifies
the 3 lots subject of this application.



                                                                                          Page 15 of 77

Section 16

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                           8 DECEMBER 2020




                    Figure 5 – Subject site identified with a red perimeter over 3 lots

2.3. Surrounding Land Uses
The site is bounded by Diamond Street and Diamond Lane to the north and south.
Immediately to the west is a detached house and a newsagent and further to the west a service
station on the corner of Elm Street. Both these lots are zoned Business Centre.
To the east is a veterinary clinic zoned Detached Housing.
Opposite the site on Diamond Street are a variety of uses ranging from shops to mechanical
businesses and zoned Business Centre.
To the rear of the site and directly across Diamond Lane is Cooroy Bowls club, and diagonally
opposite are residential uses to the east and an approved commercial development to the west.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
   State Planning Policy;
   South East Queensland Regional Plan;
   Planning Regulation 2017;
   The Noosa Plan 2006.
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy has been deemed by the Minister for Local Government and Planning
as appropriately reflected in the Planning Scheme and therefore does not warrant a separate
assessment.




                                                                                              Page 16 of 77

Section 17

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


South East Queensland (SEQ) Regional Plan
The site is located within the Urban footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for an urban activity within the Urban Footprint and is consistent with the
assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the provisions
are relevant to the development.
Strategic Framework
The following Strategic Framework provisions are relevant to this application:
1.7.7 Commercial and Retail Development
     d)    The existing business centres of Noosa Junction, Noosaville, Tewantin and Cooroy will
           include some commercial and retail infill within the Business Zone to service the
           surrounding population. Cooroy particularly has scope for expansion to cater for the
           rural hinterland and passing visitors.
1.7.10 Community Services
     b)    The Community Service Zone caters for recreation, social interaction, community
           wellbeing, emergency services, infrastructure, health care, and educational facilities.
     c)    Multiple use and shared facilities are encouraged to ensure efficient provision of
           services. In village centres, community services are generally mixed with business and
           recreational functions, however in larger centres there is often clear delineation of
           business and community functions and spaces.
The development clearly conflicts with strategic provisions set out for Community Services as the
proposal is not providing for community services (e.g. wellbeing, health care, infrastructure etc.)
nor providing uses associated with community service/s.
The Commercial and Retail development strategic framework provision broadly provides some
support for the proposal as it envisages some infill development in the Business Centre zone and
scope for expansion in Cooroy. In this regard the site adjoins the Business centre zone to the west
and a commercial veterinary use to the east and is also opposite a range of commercial uses within
the Business Centre zone across Diamond Street.
Figure 6 below is a zone map and some surrounding land uses.




                                                                                    Page 17 of 77

Section 18

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     8 DECEMBER 2020




                        Figure 6 – Zone map of the site and the surrounding area.

It is important to note the site has been historically zoned Community Services to reflect the
previous electricity infrastructure use on site which has now been abandoned. The site adjoins a
State controlled arterial road and is a public transport route (631 & 632) with a bus stop and train
station within 100m of the site.
Given the Business Centre zone adjoins the site to the north and west and an existing commercial
use exists to the east, the proposed business uses complement those in the immediate vicinity and
is consistent with the surrounding zoning and land use pattern.
Furthermore, considering the sites proximity to transport services, the adjoining business zoning
and nearby business uses, the proposal is a logical use of the site.
It should be noted that a commercial development at 34 Elm Street has been approved which
departed from The Noosa Plan 2006 designated zone of Attached housing given the Noosa Plan
2020 supported commercial development. This site is similarly zoned for commercial development
under the Noosa Plan 2020.
Locality and Code Provisions
The subject site is located in the Cooroy and Lake Macdonald Locality and is zoned Community
Services. The proposed uses are inconsistent in the zone and the proposal does not comply with
some of the provisions the planning scheme seeks for community service development.
However, as discussed above, the proposed uses are considered compatible with the surrounding
uses, is a logical reuse of the site and therefore it is reasonable to apply the Business Centre zone
provisions given the proximity to the existing Business Centre zone and the surrounding
commercial uses.

                                                                                        Page 18 of 77

Section 19

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    8 DECEMBER 2020


The following Table compares the proposal with the development parameters for the Business
Centre zone.
 Criteria                               Planning Scheme             Proposal              Complies
 Site Area                              3036m²                      N/A                   
 Population density                     30.36                       9.6 persons           
 Gross floor area                       1900m²                      1011m²                
 Plot ratio                             0.8:1 for 2000 then         0.33:1                
                                        0.3:1 thereafter


 Site cover                             N/A                         31.2%                 
                                                                    950m²
 Landscaped open space                  10% of site min.            11% (332m²)           
 Landscape setbacks                     3m to residential zone      06m – 1.1m            X
 Building height
    storeys                           2 storeys max               2 storeys             
    metres                            8 metres                    8.35 metres           X

 Boundary setbacks
  Frontage                            0 metres min                0 metres              
  West Side                           0 metres min                0.25m /1m             
  East Side                           3 metres min                0.6m                  X
  Rear                                0 metres min                19m – 37m             

 Carparking                             Office – 16.5               44 plus               
 Office - 1 per 20m²                    Shop – 21.5                 4 motorcycle          
 Shop - 1 per 20m² to 100m² then 1      Multiple Housing - 4        (Includes 4 covered
 per 15m² thereafter                    covered plus 1 = 5          spaces)
 Multiple Housing – 1 space per         Total = 43 req min.
 dwelling unit plus 1 visitor

 Bicycle Spaces                         11 bicycle spaces           10 bicycle spaces     X
 End of Trip Facilities*                1 locker per 2 bicycle      0 locker/s            X
 *(required only where 5 + spaces are   spaces and;
 required)                              1 shower cubicle with       0 shower cubicles     X
                                        ancillary change room per
                                        10 bicycle spaces

The pertinent issues arising out of the assessment are discussed below.
Built form
The planning scheme seeks that development is compatible with surrounding development, and
maintains the character/heritage/country feel of Cooroy without necessarily mimicking those styles.
The proposal was extensively reviewed by Council’s external consultant architect, NRA
Collaboration Pty Ltd – Noel Robinson and Peter Cain. Roof form, setbacks, external finishes,
street awning and street trees were raised as key matters during the negotiations with the
applicant. As a result, each building has a different roof form with contemporary heritage elements
and has been purposely designed to complement the existing streetscape which is varied in
building form. The convenience shop building provides a central ridge with a raised semi gable
end. The office/multiple housing is one building with 2 different traditional roof forms and utilises a
contemporary screen to the front elevation to provide privacy, some weather protection, a vertical
element and reflects a traditional parapet element to the building.


                                                                                          Page 19 of 77

Section 20

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


The street awnings are also different for each building, one with the awning pitch seen while the
other is a parapet style with the pitch hidden. The awning wraps around the buildings to provide a
covered walkway to each side of the driveway for pedestrian access to the rear car parking area.
The applicant proposes a 2.5m wide street awning which allows approximately 1.5m to back of
kerb for street trees. Council’s consultant architect expressed the importance of street trees and a
wide awning in this location as the surrounding development provides only wide awnings and no
street trees. The proposal provides sufficient area for healthy street trees and gardens while a
reasonable width for a street awning. It is important to note that given the road reserve is controlled
by the State, the street awnings are required to be cantilevered. The proposal complies with this
provision and has provided non-structural posts for architectural merit.
The multiple dwellings on the upper level are defined as small dwellings being less than 90m². The
2 bedroom, 2 bathroom units range between 80m² and 85m² GFA and include a northern veranda
slightly greater than 12m² for outdoor open space. Privacy is provided to the street by the front
screen and a solid wall between units. Each unit has flow through ventilation with openings
provided to the north and south ends of the living space and 2 openings in each bedroom. The
residential waste collection container storage is located close to the units near the units’ covered
car parking.
Landscape and building setbacks
The proposal seeks a 0.6m/1.1m setback to a residential zone (eastern boundary) whereas the
code seeks a 3m setback. The proposed eastern elevation provides an interesting façade including
alternating spaced timber battening (suitable for a vine) and textured paint finish for a length of
approximately 19m. While the neighbouring property to the east is zoned residential, a veterinarian
business is currently operating from the site and the Noosa Plan 2020 has rezoned the site to
District Centre zone where a zero setback is required to this boundary.
Notwithstanding the new Noosa Plan 2020 zero setback requirements, the proposal is consistent
with the setback pattern in the street which consists of zero setbacks to some properties separated
by a driveway. Noting that the subject site is 3 lots, the proposal generally provides a similar
setback and streetscape outcome and is considered consistent with other development in the
street.
Building height
The planning scheme seeks an 8m building height whereas the proposal seeks a roof ridge height
of 8.35m. Development in the surrounding area is constructed to a maximum height of 8m and it
is considered the proposed encroachment would be out of character with surrounding development
and is not recommended to be supported.
Bicycle spaces/end of trip facilities
A condition could be imposed to ensure the proposal meets the requirements.
Site Cover and Plot ratio
The codes do not provide a site cover for the Business centre but seeks that the building scale be
compatible with that of surrounding development. The proposal seeks a site cover of 31.2% being
consistent with other development nearby as demonstrated in the Table below.
 Address – site cover expressed as %
 2 Diamond St (Servo) – 36%                         4 Diamond St - 33%
 12 Diamond St.(Vet) – 29%                          15 Diamond – 25%
 11 Diamond – 33%                                   9 Diamond – 43%
 7 Diamond – 22%                                    1 Diamond St - 44%
The codes seek a maximum Plot ratio for the Business Centre zone of 1900m² for the subject site.
The application seeks 1011m² over 2 buildings, significantly below that permitted for the Business
Centre zone. The proposed scale of the development is consistent with that on neighbouring and
surrounding properties.
                                                                                       Page 20 of 77

Section 21

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   8 DECEMBER 2020


Vegetation
Two gums are located in the north-west corner of the site. The trees have been poorly maintained
as the previous owners lopped the tops of the trees. This practice has led to poorly formed canopies
with weakly attached limbs, producing a large sail area with poor structural attachment. In high
winds these limbs are prone to failure which can impact on buildings, vehicles and pedestrians in
this high trafficable area. Given the trees poor form and choice of species for the location, it is
considered acceptable for the trees be removed and replaced with appropriate street trees to
enhance the overall streetscape for the full length of the development.
Car parking
The proposal provides 1 space in excess than required under The Noosa Plan 2016 and 6
additional spaces to that required by the Noosa Plan 2020. Carparking reduces landscaping
opportunities and given the excess, it is considered appropriate that additional landscaping is
provided in the car parking area to mitigate heat sink elements. A condition could be imposed to
reduce the car parking by 2 spaces and include as landscaping.
Traffic
The development is not utilising Diamond Lane for vehicle access. The applicant was requested
to investigate the opportunity to use Diamond Lane for vehicle access and traffic flow options. After
Council’s external consultant’s review of the applicant’s response, it was determined that there is
no advantage in terms of traffic flow to use Diamond Lane. Therefore, vehicle access including all
waste collection and commercial deliveries are proposed onsite with access from Diamond Street;
the front of the site.
Diamond Street is a State controlled road and the application was referred to SARA (TMR) for
assessment. The development is required to provide a median strip opposite the driveway which
provides for left in left out traffic movement to ensure safe vehicle movement.
Stormwater management and treatment
The stormwater drainage design includes a portion of the development site to be treated via a
Gross Pollutant Trap (GPT) to achieve the required pollutant reduction targets prior to water
release from site. This is inconsistent with the Healthy Land and Water Music Modelling Guidelines.
Additionally the applicant has not indicated the type of GPT proposed to be used.
Given the portion of the development using a GPT are primarily roofed areas, it is considered that
the applicant could make a small redesign to drain the roof water from the downpipes to anywhere
on site without changing the development layout or built form. A condition is recommended to
require all stormwater be treated via a vegetated system.

4.    NOOSA PLAN 2020
Since the application was lodged, the Noosa Plan 2020 has come into effect and the subject site,
the neighbouring lot to the east (veterinarian clinic) and the 3 lots to the south west of the site have
been rezoned to District Centre consistent with the surrounding zoning. The proposed uses are all
consistent uses in the zone and the provisions for the development are generally similar to that of
the now superseded planning scheme for the Business Centre zone.
Therefore the matters raised in the assessment under The Noosa Plan 2016 for the Business
Centre zone are generally applicable for assessment under the Noosa Plan 2020. The following
Table provides the key development parameters for the Noosa Plan 2020.

 Noosa Plan 2020 – District Centre    Planning scheme                Proposal            Comply
 zone
 Plot ratio                           1900m²                         1011m²              
                                      0.8:1 for 2000 then            0.33:1              
                                      0.3:1 thereafter




                                                                                        Page 21 of 77

Section 22

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                8 DECEMBER 2020


 Noosa Plan 2020 – District Centre   Planning scheme               Proposal         Comply
 zone
 Site Cover                          Compatible with surrounding   31.2%            
                                     development                   950m²
                                     2 Diamond St (Servo) – 36%
                                     4 Diamond St - 33%
                                     12 Diamond St.(Vet) – 29%
                                     15 Diamond – 25%
                                     11 Diamond – 33%
                                     9 Diamond – 43%
                                     7 Diamond – 22%
                                     1 Diamond St - 44%
 Landscaping                         10%                           11%              
 Building height                     8m                            8.35m            x
 Boundary setbacks
 Frontage                            0m                            0m               
 West side                           0m                            0.25/1m          
 East side                           0m                            0.6m             
 Rear                                0m                            19m – 37m        
 Carparking
 Offices 1 per 20m²                  Office – 16.5                 44 plus          
 Shop – 1 per 20m²                   Shop – 17.5                   4 motorcycle     
 Multiple dwellings – 1 per small    Multiple dwellings – 4        Includes 4       
 dwelling                            Total = 38 spaces req.        covered spaces
 Bicycle spaces and end of trip      15 spaces                     10               X
 facilities                          5 lockers                     0                X
                                     1 shower                      0                X
It is relevant to note the Cooroy Local Plan Code Performance Outcome PO17 seeks that where
a development is undertaken on a property with a laneway frontage and access is not taken, a 2m
wide easement for a public thoroughfare is provided for future widening or upgrading purposes. In
this instance the development is not taking access from Diamond Lane and has provided a 2m
wide landscaping strip which excludes a 0.5m bioswale along Diamond Lane suitable for an
easement. A condition is recommended to provide a public thoroughfare easement in accordance
with the planning scheme.
5.    CONSULTATION
5.1. Referral Agencies
The application was referred to the following Referral Agencies:
    Department of Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency as the lots have frontage to a State Controlled Road.
The Department has responded advising the development raises no concerns and have provided
conditions requiring a median strip and a left in left out access.
It should be noted the site is contaminated land and on the Environmental Management Register
(EMR) as it was previously an Energex depot. This application was not required to be referred to
the State as a Concurrence Agency, but the applicant is required to gain a separate approval from
the State.
5.2. Other Referrals
The application was reviewed by the following external consultants for Council:
Architecture
    NRA Collaborative - nra-co-lab – Noel Robinson/Peter Cain
Traffic
    Holland Traffic Consulting – Stuart Holland

                                                                                    Page 22 of 77

Section 23

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      8 DECEMBER 2020


The application was forwarded to the following internal Council officers:
    Strategic Planning Officer
    Engineering Officer
    Environment Officer
    Hydrology Officer
    Environmental Health Officer
    Waste Officer
    Infrastructure Design and Delivery Officer

5.3. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. No submissions were received.

6.    CONCLUSION & REASONS FOR DECISION
The proposed uses are inconsistent within the Community Services zone. However, the
infrastructure use which the zoning historically reflected has been abandoned. The Noosa Plan’s
strategic framework suggests that Cooroy has scope for commercial and retail expansion and
given the subject site adjoins several commercial and retail uses, the proposal is a logical and
good reuse of the site. The proposal is consistent with and unlikely to negatively impact the
adjoining and surrounding commercial and retail land uses. The proposal’s built form has been
externally reviewed by Council’s architectural consultant and is considered to reflect the character
of Cooroy. The scale and bulk of the development is consistent with other development in the area
with some road and frontage works required to provide safe vehicle access.
Furthermore, the site has been rezoned in the new Noosa Plan 2020 to District Centre zone and
the proposed uses are consistent with the relevant provisions in the new Planning Scheme. The
development is therefore recommended for approval subject to conditions listed in this report.
Departments/Sections Consulted:
     Chief Executive Officer      X   Community Services                          Corporate Services
     Executive Officer                Community Development                       Financial Services
     Executive Support                Community Facilities                        ICT
                                      Libraries & Galleries                       Procurement & Fleet
                                      Local Laws                                  Property
                                      Waste & Environmental Health                Revenue Services

     Executive Services           X   Environment & Sustainable Development   X   Infrastructure Services
     Community Engagement             Building & Plumbing Services                Asset Management
     Customer Service                 Development Assessment                      Buildings and Facilities
     Governance                       Economic Development                        Civil Operations
     People and Culture               Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 23 of 77

Section 24

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 24 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                                     8 DECEMBER 2020

   =               ’ Boe                   1,            3              II   crear ine varcne an rEDIAN ISLAND                                            .                    PROPERTY DESCRIPTION
                                   i                                    :                                                                                 >                                                cca
                                                                            SHOWN INDICATIVE ONLY. FINAL LAYOUT TO BE        e                                                 LOT 703, 704, 705 on C5602
                                                                            DESIGNED DURING OPERATIONAL WORKS STAGE,                                                           Cae ena                            |
                                                                                    ae                                                             +{
                                                                                                     t     :         i                                     -                   DEVELOPMENT ASSESSMENT
                                                             IF                                      Pa                                                                                   an
                                                                20000          a"                       {                                              \                       TOTAL SITE AREA   - 3,030m2
                              PROPOSED
5	1	1	1	10	2	649	723	48	30	91	STREET
5	1	1	1	10	3	697	723	40	30	92	TREES
5	1	1	1	10	4	737	723	21	30	86	TO
5	1	1	1	10	5	992	723	76	31	95	PEDESTRIAN
5	1	1	1	10	6	1070	723	34	31	85	SIGHT
5	1	1	1	10	7	1109	723	60	31	92	TRIANGLES
5	1	1	1	10	8	1173	723	22	31	43	TO.
5	1	1	1	10	9	1265	700	95	54	0	Jprovosen
5	1	1	1	10	10	1489	736	2	2	26	MOUNTABLE
5	1	1	1	10	11	1546	723	56	31	90	SPLITTER
5	1	1	1	10	12	1606	723	42	31	17	‘SLAND
5	1	1	1	10	13	1738	733	11	2	46	-
5	1	1	1	10	14	2023	713	13	21	26	‘
4	1	1	1	11	0	352	735	2312	57	-1	
5	1	1	1	11	1	352	759	106	24	96	DIAMOND
5	1	1	1	11	2	472	757	91	26	75	STREET
5	1	1	1	11	3	592	748	97	14	0	°“Sm
5	1	1	1	11	4	695	746	57	15	25	OH
5	1	1	1	11	5	994	735	20	47	66	OE
5	1	1	1	11	6	1017	735	32	47	29	KEP
5	1	1	1	11	7	1052	735	37	47	62	CLEAR
5	1	1	1	11	8	1092	735	16	47	55	OF
5	1	1	1	11	9	1107	735	91	47	36	OBSTRUCTIONS
5	1	1	1	11	10	1259	736	103	56	0	igarevcext
5	1	1	1	11	11	1532	768	43	14	36	ae
5	1	1	1	11	12	1656	750	101	31	0	——,
5	1	1	1	11	13	2013	759	23	11	43	a
5	1	1	1	11	14	2148	784	54	6	54	=
5	1	1	1	11	15	2291	743	117	21	96	LANDSCAPE
5	1	1	1	11	16	2419	743	53	21	31	AREA
5	1	1	1	11	17	2507	755	10	4	33	-
5	1	1	1	11	18	2529	743	57	21	92	319m2
5	1	1	1	11	19	2597	741	67	24	95	(10.5%)
4	1	1	1	12	0	677	782	1781	53	-1	
5	1	1	1	12	1	677	789	86	28	19	Pa
5	1	1	1	12	2	819	813	4	3	13	le
5	1	1	1	12	3	843	784	26	51	40	a
5	1	1	1	12	4	877	808	20	9	22	ee
5	1	1	1	12	5	906	784	18	51	42	|
5	1	1	1	12	6	1157	808	18	9	23	ne
5	1	1	1	12	7	1264	782	14	53	17	ba
5	1	1	1	12	8	1479	785	93	14	20	ti
5	1	1	1	12	9	2003	788	5	12	51	f
5	1	1	1	12	10	2274	776	107	51	53	BUILDING
5	1	1	1	12	11	2380	776	78	51	91	AREAS
4	1	1	1	13	0	373	820	2301	49	-1	
5	1	1	1	13	1	373	838	35	21	93	=
5	1	1	1	13	2	599	832	86	18	34	=
5	1	1	1	13	3	729	821	67	30	26	ct
5	1	1	1	13	4	842	820	386	31	35	dg
5	1	1	1	13	5	1138	816	99	49	25	crawl
5	1	1	1	13	6	1244	830	49	12	51	St
5	1	1	1	13	7	1317	841	14	10	33	cn
5	1	1	1	13	8	1383	840	23	12	38	Looe,
5	1	1	1	13	9	1433	837	33	14	49	|
5	1	1	1	13	10	1536	838	31	12	31	wisn
5	1	1	1	13	11	1684	829	22	21	28	i
5	1	1	1	13	12	2064	828	208	41	10	Ss
5	1	1	1	13	13	2291	837	69	8	42	+1
5	1	1	1	13	14	2370	832	37	16	58	toe
5	1	1	1	13	15	2416	831	101	18	15	tcowvewence
5	1	1	1	13	16	2525	831	51	18	39	stone)
5	1	1	1	13	17	2615	841	9	3	48	—
5	1	1	1	13	18	2625	828	49	20	2	35tn4
4	1	1	1	14	0	279	837	2387	55	-1	
5	1	1	1	14	1	319	837	189	49	8	Gea
5	1	1	1	14	2	637	833	64	63	24	oT
5	1	1	1	14	3	810	865	16	12	33	ee
5	1	1	1	14	4	927	854	127	33	30	ee
5	1	1	1	14	5	1125	833	64	63	22	RR
5	1	1	1	14	6	1325	853	165	34	33	a
5	1	1	1	14	7	1514	865	278	24	37	Sh
5	1	1	1	14	8	2228	856	71	32	26	CD.
5	1	1	1	14	9	2354	874	9	16	0	-
5	1	1	1	14	10	2363	874	99	16	19	comencal
5	1	1	1	14	11	2615	870	51	20	16	ae
4	1	1	1	15	0	276	874	2390	70	-1	
5	1	1	1	15	1	276	874	67	45	26	RD)
5	1	1	1	15	2	599	898	12	24	3	9
5	1	1	1	15	3	658	880	140	40	18	gt
5	1	1	1	15	4	856	888	151	31	38	ee
5	1	1	1	15	5	1045	880	352	64	22	oS
5	1	1	1	15	6	1269	875	49	73	13	|
5	1	1	1	15	7	1405	881	47	45	8	See
5	1	1	1	15	8	1462	880	396	49	43	ea
5	1	1	1	15	9	2016	891	36	20	19	et
5	1	1	1	15	10	2211	890	30	31	2	.
4	1	1	1	16	0	330	894	2374	58	-1	
5	1	1	1	16	1	330	910	175	42	26	ee
5	1	1	1	16	2	510	938	9	5	69	_
5	1	1	1	16	3	638	909	72	36	34	gers
5	1	1	1	16	4	777	912	108	32	43	a
5	1	1	1	16	5	1044	894	50	58	20	Be
5	1	1	1	16	6	1315	910	125	34	15	Beh
5	1	1	1	16	7	1525	906	47	46	35	op
5	1	1	1	16	8	1613	906	66	46	37	Mabe
5	1	1	1	16	9	1714	920	23	25	18	ge
5	1	1	1	16	10	1753	932	58	16	55	—
5	1	1	1	16	11	1903	919	220	32	16	Se
5	1	1	1	16	12	2135	932	103	18	36	res
5	1	1	1	16	13	2291	924	7	9	15	©
5	1	1	1	16	14	2349	919	14	16	21	-
5	1	1	1	16	15	2372	919	90	16	88	COMMERCIAL
5	1	1	1	16	16	2615	919	44	16	16	see
4	1	1	1	17	0	606	949	2060	28	-1	
5	1	1	1	17	1	606	949	67	14	49	a
5	1	1	1	17	2	1766	953	81	22	15	a
5	1	1	1	17	3	2039	958	2	10	0	/
5	1	1	1	17	4	2131	966	3	3	0	;
5	1	1	1	17	5	2216	971	3	4	7	‘
5	1	1	1	17	6	2290	966	8	9	51	©
5	1	1	1	17	7	2331	961	19	16	51	Th
5	1	1	1	17	8	2358	970	7	3	34	-
5	1	1	1	17	9	2373	961	90	16	93	COMMERCIAL
5	1	1	1	17	10	2615	970	6	3	22	~
5	1	1	1	17	11	2621	957	45	20	40	66m?
4	1	1	1	18	0	306	940	2397	103	-1	
5	1	1	1	18	1	306	995	5	3	45	-
5	1	1	1	18	2	424	977	6	7	0	,
5	1	1	1	18	3	448	940	151	103	37	oes
5	1	1	1	18	4	620	999	20	25	57	r
5	1	1	1	18	5	655	976	13	24	21	r
5	1	1	1	18	6	1294	961	12	49	69	|
5	1	1	1	18	7	1719	989	30	45	15	br
5	1	1	1	18	8	1789	965	13	28	35	5
5	1	1	1	18	9	1916	987	5	4	19	J
5	1	1	1	18	10	1932	954	38	59	49	<
5	1	1	1	18	11	2038	972	220	44	20	Pet)
5	1	1	1	18	12	2319	987	30	45	44	15
5	1	1	1	18	13	2357	1012	7	4	28	~
5	1	1	1	18	14	2372	987	87	45	95	COMMERCIAL
5	1	1	1	18	15	2626	999	40	20	0	86m?
5	1	1	1	18	16	2702	967	1	38	93	|
4	1	1	1	19	0	277	999	2389	69	-1	
5	1	1	1	19	1	277	999	36	69	0	~~
5	1	1	1	19	2	371	1025	101	42	83	NEWSAGENT
5	1	1	1	19	3	554	1017	23	28	40	Ai
5	1	1	1	19	4	655	1026	16	18	35	|
5	1	1	1	19	5	1300	1011	6	32	90	\
5	1	1	1	19	6	1710	1034	13	8	62	4
5	1	1	1	19	7	1959	1023	20	25	6	A
5	1	1	1	19	8	2002	1019	75	32	44	Se
5	1	1	1	19	9	2155	1040	9	7	19	.
5	1	1	1	19	10	2648	1040	18	20	0	.
4	1	1	1	20	0	604	1045	2043	60	-1	
5	1	1	1	20	1	604	1050	12	27	54	?
5	1	1	1	20	2	677	1056	2	43	88	|
5	1	1	1	20	3	1341	1053	12	52	69	|
5	1	1	1	20	4	1930	1051	3	5	4	aS
5	1	1	1	20	5	2082	1049	35	19	30	PS
5	1	1	1	20	6	2254	1049	44	27	40	P+
5	1	1	1	20	7	2316	1030	33	50	19	16
5	1	1	1	20	8	2356	1045	106	16	17	commerciaL
5	1	1	1	20	9	2615	1053	7	4	42	-
5	1	1	1	20	10	2625	1045	22	15	91	66
4	1	1	1	21	0	425	1074	2251	87	-1	
5	1	1	1	21	1	425	1084	5	7	67	.
5	1	1	1	21	2	677	1101	2	60	78	|
5	1	1	1	21	3	1720	1096	14	14	0	-
5	1	1	1	21	4	1931	1088	23	39	28	fs
5	1	1	1	21	5	2004	1074	87	57	38	4
5	1	1	1	21	6	2120	1106	25	11	20	Ps
5	1	1	1	21	7	2218	1078	38	48	56	tr
5	1	1	1	21	8	2291	1086	47	17	93	TOTAL
5	1	1	1	21	9	2346	1087	29	15	93	GFA
5	1	1	1	21	10	2616	1096	8	3	46	=
5	1	1	1	21	11	2632	1083	44	20	69	680n?
4	1	1	1	22	0	641	1128	1622	14	-1	
5	1	1	1	22	1	641	1135	4	1	43	:
5	1	1	1	22	2	1306	1131	10	7	45	5
5	1	1	1	22	3	1720	1128	3	14	62	|
5	1	1	1	22	4	2154	1134	3	3	0	:
4	1	1	1	23	0	325	1135	2088	48	-1	
5	1	1	1	23	1	325	1156	13	9	17	+
5	1	1	1	23	2	1272	1144	102	31	0	oononn0
5	1	1	1	23	3	1722	1135	12	48	7	Mm
5	1	1	1	23	4	2159	1136	25	38	9	cs
5	1	1	1	23	5	2291	1140	43	21	54	UNIT
5	1	1	1	23	6	2346	1140	67	21	54	AREAS
4	1	1	1	24	0	693	1139	1993	78	-1	
5	1	1	1	24	1	693	1162	40	47	30	Sig
5	1	1	1	24	2	841	1184	78	3	13	SP
5	1	1	1	24	3	1011	1175	27	28	11	AB
5	1	1	1	24	4	1067	1184	94	3	28	RIT
5	1	1	1	24	5	1189	1175	71	27	17	WC
5	1	1	1	24	6	1303	1139	26	74	0	Y
5	1	1	1	24	7	1703	1177	20	40	0	,
5	1	1	1	24	8	1899	1177	47	31	53	ey
5	1	1	1	24	9	2257	1189	41	21	46	ws
5	1	1	1	24	10	2331	1184	82	16	20	ur-26e0
5	1	1	1	24	11	2615	1193	8	4	21	~
5	1	1	1	24	12	2624	1175	62	39	56	80.60n?
4	1	1	1	25	0	639	1194	1884	62	-1	
5	1	1	1	25	1	639	1207	11	19	31	3
5	1	1	1	25	2	1014	1195	30	57	50	yy
5	1	1	1	25	3	1167	1194	66	53	39	He
5	1	1	1	25	4	1239	1211	24	32	74	Y
5	1	1	1	25	5	1312	1216	10	40	91	i
5	1	1	1	25	6	1703	1208	3	21	1	j
5	1	1	1	25	7	1955	1220	3	3	1

                                                                                                                                                                                  EXCL, PRIVATE BALCONY (12.02)
                                               Ta                 Y          7  Pay         i                                                   :        i                      Feet purer ered             —
                                  a               Li              f                                                                              ae     . a                    .    3                     “     2
                                                i.                |                                                                               Ky     ;                     .    7                     .     2
                                  at"   “: a    |Rerust                mt                   |                 Yi           |                             /             r          a mat BALCONY {1213021    ii
               =                     I          |                      =                     |                |               ”                                   hem ©           Ub -2BED                ~ 060m?
               al                 j     ep      |            a!                     fi       i                                                                   4a Ld           EXCL. PRIVATE BALCONY {12.19n2)  |
    eater        as               5        =} 1       ial 3    Ee Cee mS                   ’          ao         Yj)                                    |                      MISCELLANEOUS STRUCTURES
         |          >            3      Ms      '                                     4                                                                 :       —             TOTAL GFA                   = 33096n’
    2           /)                      wl                     Doce                              imimelimg                   i     S84                                      ieee stele
                Pf ert            3)    Ee                                |           H          Sh |    sw Vif                ’                    7k                         ©  THREFUSE ENCLOSURE      = en?
    5               Se             I                                              a              3            DELIVERY REFUSE                            -                     *  12 - Th REFUSE ENCLOSURE = Mn?
              a              ecg ag                               |   —=     owe)                Ss       rs        re                                 -                       + Ut~ Ub REFUSE ENCLOSURE  - 8x?   |
         el                     | 5 ae        .                   fo                             S                              ‘                      ‘   oy                  CAR PARKING
   1)                    sa       F                  2                                          ay         r                             We         oe      Fi        ©    |e TOTAL PARKING PROVIDED      = bb    |
   ie                      4        A                                                                |                                    aera.         / -                    «PARKING PRIVATE (UNITS)   -4
        i ;                        :                                                 x      X                          f                | ae             :               ne
      '     ae                wos                   SS                                               Ni      Ea are                   ~ Se                   ye 5              + Pantene pustic           =
   —       0 TOT Es               e  paeaneer a                cae             a         ee    Soe                —~Sy          i a         ae cei                mmm nmmmemms +  MOTORCYCLE PARKING      =4      |
          vn            er               as eee                     *        ees =                                                              ?     (tS        wks           © PRE SITE DEVELOPMENT     = 202m?
               Se.         a        —              J aoa Pe ay                                 ala!                   9     :             7      ;       a          —              CLUDES BUILOING ROOFED AREAS)
   (re                     a                   eee ee                                                           ee,                                                                                       =
                  Nee                reas               ‘        ,           d       on                ate                      Psi                             ao                —
                         bp           I be     a                                                   ; 7                                  ee “              ie    7 :

                                               MANGE                      ee                               gece seam                    P=                        freaacnaear               | FRGPoseD STE PLAN
                                                                                                                                       [scene pets                Tbe orn                      ewe
                                              Tp     ELSA an ERO SLIT          '                                                         ks a aor ace           geo                            18043-DA02             E
                                                                          Otravelcentre/ service stations > aeupirioerer ty aummmnlammeeael
                                              Se OE eee wceupan cei, «O project concept to completion       Ca sos te We reebok                                    a eee
                                                                                                                                               Page 24 of 77

Section 25

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 25 of 77

Oe                                                                                                                                                                                                                                                                                                                            I
                                                                                                                                                                                                                                                                                                DA           ISSUE

                                                                                                                                                                                                               DIAMOND STREET
                                                                            DIAMOND STREET
                   1000      3600                                         3600                3600                                          3400
                   ta         Pet                                         et                    RL                                          Re                                                                                                           >                     .          -
                                                                                                                                                                                              z                      SITE BOUNDARY                      ea                         UT        z        SL
                                                                                                                                          -                                                RET            '             ih                Ys      rh===-a]}   jj  smeentry, |                 Nl
                                                                                                                                                  x                                          A     120" FALL] 20° FALL   MN             SiN       '    Ly                                       l
                   |         Z                                                      Z                                                      2                                                      :     2        E         |       =     2         E          qt
                             x       LUNE OF ROOF OVER.                             x                  LUNE OF ROOF OVER,                  :                                                  20° FALL           aoe FALL! |) 20" FALL            aoe FALL 12" FALL        2 FALL
                             &         Se ee                                        &                  [eth    tirticee IRR                »                                                     >          ——___ Jae                 >       —_—_¥
       z            beer              erent                           Panes teatime                                                       I oar                                              UNIT 1              UNIT 2 |     WNIT 3              UNIT &                                      an
       it           (Pees                                             ees                                                                    at                                                         Z               i                Z
                    E       t            U1 BALCONY § U2 BALCONY            t         ii      t            U3 BALCONY J U4 BALCONY                     .                                  H             z                 '              b                                              (CONVENIENCE STORE)
            -       E                       2 a           22 a                        Ne                     22 at          22 a                       i         -                                                        !                                   |
            gle     |i                                                              zhi                                                                          B®                       !                               :         ===                                    |
                    p       BEDROOM 1                                 - eeoroo:        |!     BEDROOM                                    BEDROOM 1     r                                    STAR            :   |    TT    I                         —
                    fe                                                                WW                                                              5 e                                 e
            sly      |i hes 7    we                                   E Wi.      el   it  Et      wi.                                   wir    oe.     ;         elu                              |        |                   ]                          1                                                      ij
            gle         hes                +—vounce.| ff | vounce     r      os ee | (1   FE exc               LOUNGE     Louse —               Sa               ale                                       1    |          |                    |         !                                  j      Z
        =        «   [li <Je         E                                -    Sajal      ¢      ols<      7                                      BU] | ora.                              7]                          !OLORBOND ROOF &                                                                  ‘|
       &         Sy)          epee          unin 1        wir?      SHS                    jo                UNIT 3         unT 4     NUL    rey     ft                                |       erm               GUTTERS TYPICAL                                                                   yao             I.
            alz |i            Fibcruoy      8060 af       $4.89 n*   _           aS                choy      0489 of    1   8060 ni?   snort |         :         glz                   =|   —                                                                                                Z Fat                =
               * sep      ani                 owns. ff owns.         rs        BATH       Bare     r            OINNG.   ‘ONG.         P       pata    |            =                  2      CARPORT                                                                                                             z
                 2))    i                    SS                               ree       Story                 SSS                                 cas         I                        e                              f          7    7    7     T    T     4                                                     ¥
                    TH               mcd                            l                                 i                               ieee                                             |                                                                                           Ty                             :
            Ble      7! |   eeproom 2 Meg     Ged | Bet             bed EEDR00M 2.           BeDRooM 2. fog     CEE     PET       |   bad ccoroon 2    ‘3        Ble
                     1                                                                                                                                 ie
                        i            FY      wren       rcoen      FA                                 fy.     enon         roe        A            is                                      |                                          |      =
                     i              Hy      Tae                     §                                 Bc                 eS           Lo               3                                               ‘
                     ' :               ey                      ENTRY,                is                ENTRY                      ENTRY |    oe       ia                                            ey                                                                                           DeuverY
                     1]    stam access 4 i               =         =          |       =           7                    =        t                                                                                     |                                    |                                       FEFUSE
                     1]              |  1                                           OF ROOF OVER. |                                                                                         ———_++                              TF
                     ii                 \
                     L F Sa                                                             |        |                                                                                                     '
                                      |
                                      ——                          pool                  peey                          L         J                                                                          |               |                                                |       |
                   i                                                                                                                                                                                            |
                             3000                                            300            3000                                            3100                                                           PAL “tL,                                          —1         “|
                            Re.                                              RM2.           REZ.                                             RNG.                                             ot
                                                                                                                                                                                                                                                 ‘SITE BOUNDARY
                     T)\ LEVEL 1 - UNIT LAYOUTS                                                                                                                                           2) ROOF PLAN
                          1: 100                                                                                                                                                           J) 1%

                                                                                                                                                                                                                                                                                                INOTE: SHOPFRONT AWNINGS MUST
                                                                                                                                                                                                                                                                                                BE CANTILEVERED OUT FROM
                                                                                                                                                                                                                                                                                                BUILDING & MUST BE REMOVABLE.
   VERVE SCHEDULES DISCLAIMER:                      ENSNEER                                                                                                 :             ,                          [pave see approves                                                                    Drawing Tie
 «emt omaeson eres mt |                                                                                LT                                 gsemmercias        /inevetriat   retai)   gucwmema—        FET ef ep anon ren se oevcomnent                                                      LEVEL 1 & ROOF PLAN
 «asym qn: un uss se wees oa ostuct own                                                                                 VERVE             ERI                                       ee
 © SespowoBuTy if TaCEN #0R Tat ACCURACY OF OUANTITES                                                                                                              ;                                 ["e [muses [ro |esromt recone              |  | 6-10 DIAMOND STREET, COOROY, OLD
                                                                                                                                                                                    cesses eng
 3. ANY DREDGE SCHEDULE ADILD BE ENT ED To ATR                                                       |e                           BS © eve! centre | service erations                                 Ee                                                             Pree                  ee                           teen
(Sc ee mn ee                                                                                         iragines svedivacdetiyer o/rcitst concept se comsienion                        Suter           | Ff oe] 18043                                                                                            a0 | CE
                                                                                                                                                                                                   Page 25 of 77

Section 26

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 26 of 77

CO                                                                                                                                                                                                                                           ("DA            ISSUE          ]|

                                                       ALTERNATING SPACED TIMBER -ANTLEVERED SHOPFRONT AWNNG                                                                            ALUMINIUM GLAZED WINDOW SUITE     FEATURE VERTICAL POWDERCOAT CANTILEVERED SHOPFRONT AWNING
                                                      _ BATTEN WITH PLANTER TRELLIS (0 LENGTH OF DIAMOND ST FRONTAGE.         -_          ‘SHOP                                         WITH HORIZONTAL PRIVACY SCREEN    \LUMINUM BALUSTRADE    ‘TO LENGTH OF DIAMOND ST FRONTAGE.
                                                                     :                              |                me              (CONVENIENCE STORE)         .                                            ;
                                                 Tt  —RENDERED PRECAST WALL                          |     aa                                 as               r—FEATURE VERTICAL POWDERCOAT OLORBOND ROOF & GUTTERS TYPICAL: =               |
                                                  _——__~ TEXTURED PAINT FIN                         ee:  a                                     —                                        -                  aay                                                        i
                                                                            |                         Sea                                                                                 a          ere                     UNITS BEYOND
                                                        = ———                                                                                                    —           ——       ioe            =        =      .     Se
                                                     e                                                                                                                    ae                         SSS
           :           =            _Y¥                 |                               Ae                                                                                                    ===            a               ee                   a
                              a                         }                                                                                                                                     =a                                                  !           vie
                                    4                   i                                         =                                              -                                                    SS                        a              Ais
                                     |                  |                                                                                                       TD A                                           |                ee                   een          a
                                     |                  |                                                                                                                         aE                                    I
            NEIGHBORING SITE BUILDING                                                                                                                             rr]      , |    -                 |          i Lee                                       SS —
                                                                                                                                                                                  H.
             SHOWN INDICATIVELY ONLY                                                                          |       |                                           SS                                      eee                      ——
                            |         =                   ea                                                ly                  —————<——_—                                    ee                          SITE ENTRY
           a                                                          aa                             :    —                                               —<oo—
                                                    =        een         Ss        =           co                     —              ————~S                                                            ALUMINUM FRAMED:                 PAINTED FC FASCA TO SHOPFRONT AWNNG
                  :       at             Sa                                                   —————————<——                                                              ALUMINUM FRAMED                SHOPFRONT GLAZING
                      a                                           eee evan                                   eae nr con                                                 SrOrRON GAZA                                 DIAMOND STREET
         £  > PERSPECTIVE 2 - DIAMOND STREET
                           Sere ocean                                                                   Se            leg                        8)   eras ree)       wit               ITH HORLOATAL PRIVACY SCREEN           AUP BATE ADDN
                                                                                        =        =      =        =   \z    e                  .  =                    —_     S|)                        ORZONTAL EXPRESSED JONT “DESIGNATED UNT PARKING
                                                     ce      TT                 A                                                                A               eat                CABO — Pa                                  WITH CARPORT ROOF
           Pete                           :  sf                                                               (er             5	1	1	1	27	6	1712	1325	45	37	45	ee
5	1	1	1	27	7	1935	1339	3	1	0	f
5	1	1	1	27	8	2381	1309	76	98	51	in
5	1	1	1	27	9	2470	1333	101	22	1	CONVENIENCE
5	1	1	1	27	10	2579	1340	48	15	54	STORE.
4	1	1	1	28	0	337	1362	2242	28	-1	
5	1	1	1	28	1	337	1362	76	28	27	aes
5	1	1	1	28	2	679	1364	9	4	19	Za
5	1	1	1	28	3	1344	1362	11	20	33	a
5	1	1	1	28	4	1461	1365	40	20	3	a3
5	1	1	1	28	5	1717	1366	56	20	36	Th
5	1	1	1	28	6	1875	1365	312	21	3	SSN
5	1	1	1	28	7	2465	1372	40	15	15	~<
5	1	1	1	28	8	2515	1365	64	16	21	BEYOND
4	1	1	1	29	0	336	1351	2232	95	-1	
5	1	1	1	29	1	336	1367	128	50	19	can
5	1	1	1	29	2	558	1396	46	24	80	=
5	1	1	1	29	3	631	1383	323	30	0	,fa_
5	1	1	1	29	4	1384	1351	43	66	37	an
5	1	1	1	29	5	1446	1384	65	42	18	eo
5	1	1	1	29	6	1523	1389	33	36	47	ab
5	1	1	1	29	7	1573	1389	31	35	65	al
5	1	1	1	29	8	1708	1361	25	84	37	i
5	1	1	1	29	9	1744	1359	64	87	29	i
5	1	1	1	29	10	1872	1360	134	86	43	ee.
5	1	1	1	29	11	2026	1377	62	33	0	ie
5	1	1	1	29	12	2129	1378	25	64	61	|
5	1	1	1	29	13	2433	1390	135	21	19	oe
4	1	1	1	30	0	340	1402	2588	63	-1	
5	1	1	1	30	1	340	1420	68	26	28	Be
5	1	1	1	30	2	419	1419	43	30	44	ete
5	1	1	1	30	3	567	1402	118	52	62	[A__A
5	1	1	1	30	4	741	1447	10	1	26	ye
5	1	1	1	30	5	923	1429	2	2	29	1
5	1	1	1	30	6	1074	1414	111	48	0	mnrae
5	1	1	1	30	7	1191	1418	98	45	14	Grup
5	1	1	1	30	8	1366	1418	42	47	36	ih
5	1	1	1	30	9	1433	1416	74	34	18	oe
                                                                                                                                  2 134           UU               ee                           i eee ee                        CTT            es     =       —      lew
         Pap     Sa             f             ——                    |              He, sere a    SR oe     ee       | |                      7                          ee    ae              Hi                                                                        .
            im                     _——                 |                           (Seg         ew        ae  oe                                  ——_—— — aa                                           =
           i  Leonean tate                   it               mse   tata          ae 4 lig Tm  eel         li      et                   zi        rccaulecanenccuneesiesesanedi mach     aaa    if           AV VAPEE-Tr Tene vmTTHNNTETTMNTTSTPITTTITETPRHTTV2TpaneyeRreneyaRREARen ane
          ee ee TT it te                                                                              Geri      itil | a      .                   Tae Se                                       ni   i. A
         lala yal eT li UW bl                                i,   aS) Sh SB                              all         Pc = a                                                                      ee             MLM — cron eoor wr
                                                           aS                        = Ses =          Raa         See oe                                                                                                                                                006
          ZX  EAST ELEVATION      Te soc aonoury                        SIE ANEREREST RET             Tea ee WEE                   © WEST ELEVATION        scusvto 0° wom          bak CACOMs             To Soe somo
               1: 100                                                                                                                    1:90

                                _ FEATURE VERTICAL POWDERCOAT-      CANTILEVERED SHOPFRONT AWNING   HORIZONTAL EXPRESSED JOINT:   COLORBOND ROOF &                       *ALUMINIUM GLAZED WINDOW SUITES -ANTRLEVERED SHOPFRONT AWNING
                                _ ALUMINIUM BATTEN CLADDING         70 LENGTH OF DIAMOND ST FRONTAGE. | -CLADOING - PAINT FINISH  «GUTTERS TYPICAL             UNITS     WITH HORIZONTAL PRIVACY SCREEN TO LENGTH OF OIAMOND ST FRONTAGE.
                                 eee |                                                                                          ae                                                                |
                                                                                                                            Baie             ee                                         a
                                                        (CONVENIENCE STORE)                                             =                            —s              oy         sg  a
                                                                                   2                                    Tee                  Herth      AR                                                Aa
                                       a                                                                               HIE                                                                         Mae   EEL
          NEIGHBORING SITE BUILONG jj   qae                       rT           7                                            ee              4                                                                                 NEIGHBORING SITE BUILDING
          SHOWN INDICATIVELY ONLY |        !                          |  Pat                  e                         LL                ||                                    /                                  I          ISHOWN INDICATIVELY ONLY
                                           Pt             Te                                    rm                     LR                                           ae                            ae
                                                                              =       =            —=_
                                                                                                   SITE ENTRY                                                                                                                                        INOTE: SHOPFRONT AWNINGS MUST
                                                                                                                                                                                                                                                     BE CANTILEVERED OUT FROM
                                = i 3 - SITE ENTRY                   a               Seeman            DIAMOND STREET                    suo                                  farm                                                                   BUILDING & MUST BE REMOVABLE.
                                                                                                                                                 ;                       [emneeepeae Yd
                                                                                        FA                             @eommercisi /incusteisi /retsii    gmummawne     FET ep               “seer pppoe use oevevopvent                       | BUILDING ELEVATIONS &
                                                                                                      AVA SEP AVA SEE Gest toc restaurant cesign         Rapes gecetmras FSS at re
                                                                                                                                                          mec senaneeencemes [a | wen [os [PeomanrcsuenecoreT | 6-10 DIAMOND STREET, COOROY, OLD PERSPECTIVES
                                                                                       ieee. doe             BAIN       tr svel centre / service st3tlons — mammmamy     en on a                                                                 —                        —=
fe                                                                                                     OE              Dproject concept tocompletion      SSacmts*       a                                                     a                  18043          DA04 | D      j
                                                                                                                                                                       Page 26 of 77

Section 27

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 27 of 77

Ty                                                                                                                        U
                                                                                                                              rm
                                                                                                                              >
                                                                                                                              $
                                  es            ia                       :                                                    =
                          |       =f           I                                                     q                        a
                           |      3           i                          ]                            ’                       Q
                       se         Za         y /                                                      —
                       93         2a         j    =                                                   |                       $20
                  >    ze         Ee         f/   ae              2      i                       i    y    E  3               m
                  a    coal       26        y/    ze              a    ||                        |  i      HW
                  =    ie)        e         fis                   &                                        nee sé             =
                  2      3                      ne 2              Em                                   1   Elles              <
                  z                  i /) a                       =                                     )  git                a
                  2                     ia                        2 | ain                    Cam                              5
                  :         i      =              |               =   ie                     aa               °               =
                  S         ATA                                   =                                           a
                  |        Yee                                    a       |                  =a:                              a
                           mo Ve   i  =  =4                       <                                       ze
                           2 / >a     a. ce                                                              3
                          |      ==                                 ,     a                 |             a                   Qo
                         ea)           ..                           are   iY       eee ||   Ge        inane                   oO
                          \          f                                                 ,
                         sed         Be hy                          \i                 |                 )                    =
                        ‘Se                 ee                       i                                    EB                   |
                          Ces          ame Petes   8)"                2     ~-  -                         28
     i                        ee  NN    ee                          |e                           jay                          m
     31:               ‘                  A es SE ot                \}                 |  1     ia  nee
     A   <            > Te             eae oe                        ||  a             a.        go ey                        =
     |   au           - OSs            a                             |                         ey                             2
     ale                   Wed     |   Sa i etry  <A                        =                 ho   magn
     Al  a                ee)    en!   a                              | 7] SSeS                       =                       q)
     :| i            a                   pes                                  =          |     =o Se                          >
     o ooo            ae No r|    a                                   |          —             ao aay 7
     S508             vel                           ;                 0     =                   re                            @)
       iw             ‘af. |      |               a                    \                        Jit ‘
     Seat            ee |i               r/o      og                  ‘                       ees a                           m
     Said                Si                ;      ou                   \       Oy a                                           o
     oe gat          1                   |        uP              iz     \\     MU, 3. eee                                    >
     7 ese        ze    Ai    ee |                                =          ya       an               #  SE
     ee 5 4        5      as    ee |              oe              =             Ny Ae | %              g  32
       2 2 2      a8       agiaep 12 ra  m        ee              =]     a     iN  (ooss               a  BS
     2Ei:         i     eS          ee                            S      32    |G                      ae
     Ppti]        op oe         Meg               is              4      32     ja                     Pa
           3)     Ph            Rene                              Ab           Bw
     :     es         a              eo           a)                         a |                          A
     iil i                2S eae* ae                                               =    |    \    a                           ©
      it i 3             Pfs Sa Ee:                                      5     ——           2          I  3
     ii                  Sits.                                                |            ; W                                5
         Mj          ee              Pe   pe                                  |   —_i     =                                   O
 oo | EERE           (NSS                  ame                                              —_        |                       m
&                    Ds) |         Se eee                                              —=4           -                        =
 @       tt            |           ee                                uve                =            |                        oo
 nS |                                 ee                             :                  —                                     m
 “   ARLE :           yl    Hi     4    = Ss      Be                 28     | &         | =    or |    -                      a
 ©   Jerse             )  {{}      F  Bae 2       28                  s       \         |        [                            NO
 oe iE               ,     |       aes            5                   7                     ae                                3
     HABE              .   | Qa                                             —-                                                iS)
 SFT                                                                 .      =                  :                              8
                     BY    |          {                              i      i                   |   zl
                      yo      ]                                      Zn                7            §
                     Y      |                                        ic    Og         1 —              F
    CECT                Ai                                            7    |i                  F       Ba:
        tH                      ee | |                                     |   ae              5          EF
        g al          : ai         |                                           phere                   ne! oF
        3             2    Tee |                                           }   oot]     |      ae          3
        3 8                  The                   =                        \  NE      :      es      |
        3 f                                                                 \   }      oo     ia ad
        2 3                                                                 \   =       :     Bae
        2 3                                                                  7        a       we
     ail vo                                                                 \\    —— 4         is
     oils Si                                                                 |        =          _
     = |22'|   EEE                                                                                                 0
        56)    eee                                                                                                 -
     gs]  2|   |282                                                                                                n
          Ss   SS Soe
     S|   a]   |ea2                                                                                                2
          x0   =2
    oi         e  &                                                                                               iia
    ge

Section 28

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 28 of 77

;   |    8
1                                                                                                                  z
                     !               a   i       iéi eee                            i                              ©
               ee                    bog      AP        eneeuar cl    see          —                               Re
                      10             Bs          : =i   |   aes
                       mt   SITE BOUNDARY a 3  poe) §       a          alg 8               ss                      m
                —-— £ 2 eal          a   =,    ain           cy        z  8                   ara / sire pounoaRy   Zz
              pee Deere SL               2         a           =          a         caiiiemmmes: | es!
              ea ee                  a   ¢     ee           =.                Sai        =                         <
          =z 8 i.  Se          Ee    S         a             =                2/3   |     cd   T                   a
          Ea       See       jst                jae        < ,                  =   f (es      \! ee               O°
          <8       . ES      243            /\          4      =                a              '  i i
          5                  =88                fl          i                   =   |     Be   \  i                <
          e sy            q     i             ‘\              SS                =              NY ognse            =
          ay   eS     a    i    3         :    ia            ZE, =              rg aud    =     \ a e3             m
          =      =o  eae        .             He            See                 g = ps    deal ie a8               =
          2 3   =    Lee       25             in            ~—=s                g 2                  wes           s
         [se         ]  ie     °                          |   Lis MAY    =      5         a5
          ei         il                     {                Kod Se)            eae | a                            9
             =  eee            a3           i                 =a      —.       mA 3 |     Ee    f   5
             =  pas  i          5           i                i ETON               = =    | =]  i    a              =
               ia ue                                                ESN               |             aii            =
             be       al       i                                       ANG                 =)                      4
             3 We              82         Hl                           —       uu   | WE A          rk             m
             fa}               CE        HI                             =:             we                          m
 it          z       aes                i                   i           we     fs                                  =
 aN           ace | i)                               rl                  ™               |                         m
 sii          }      Taka    os ie                                                                                 m
 2)   aN      i      eke     (SFE                                                               al                 4
   BR        |       ee:                           |                              :             iu                 2
 AH  =       ey      ah,             2     = IE      \                            z             i a                Q
 Am          =       ss              3     2 |      ale] «                                      BF ge              >
 “|e         ‘=                             | =   \|     i+                                          ;             o
     a               eee?            5      sD:                                                                    m
 28           a      pe             fe      I         Noa                            = =                           =
 28h)        Bea                     5.           i                               :       [=
 253         3 le   ee               4     UE         =               :           = —]    ae
 P53         =       ie              a              gel               :           2 | ea
 2353         lt}   bes" ey    a     3    |       sa |   \            z           z       —        Hi
 a2 58         =    |       Bs a          |        A   a              8             No   | =a       a
 sig:                       tee                     =     |           d             im |       Saas
 a                          Bo 28         Hi         =    ‘           3                      4      ze
 2 3
5	1	1	1	43	3	303	1712	43	25	65	38
5	1	1	1	43	4	714	1722	29	29	65	58
5	1	1	1	43	5	769	1717	22	52	67	Be
5	1	1	1	43	6	959	1737	11	22	48	I
5	1	1	1	43	7	1205	1764	24	3	6	=e
5	1	1	1	43	8	1282	1760	5	11	61	\
5	1	1	1	43	9	1477	1749	10	28	0	z
5	1	1	1	43	10	1686	1766	15	16	77	3
5	1	1	1	43	11	1720	1774	2	4	0	P
5	1	1	1	43	12	1842	1759	76	46	47	=
5	1	1	1	43	13	2012	1761	28	37	57	28
4	1	1	1	44	0	240	1741	2086	115	-1	
5	1	1	1	44	1	240	1741	106	23	7	iol)
5	1	1	1	44	2	416	1745	41	39	52	yg
5	1	1	1	44	3	714	1743	85	55	8	a
5	1	1	1	44	4	952	1754	17	50	70	-
5	1	1	1	44	5	1118	1780	22	25	0	—
5	1	1	1	44	6	1284	1772	4	10	34	—
5	1	1	1	44	7	1685	1783	93	73	45	i=
5	1	1	1	44	8	1842	1790	69	30	35	-
5	1	1	1	44	9	2012	1793	31	49	63	et
5	1	1	1	44	10	2291	1794	35	23	0	Oo
4	1	1	1	45	0	238	1785	2088	109	-1	
5	1	1	1	45	1	238	1793	15	51	34	IE
5	1	1	1	45	2	295	1790	48	44	28	Wi|
5	1	1	1	45	3	416	1785	41	50	21	8
5	1	1	1	45	4	769	1799	30	30	18	8a
5	1	1	1	45	5	882	1817	30	39	21	a
5	1	1	1	45	6	946	1790	19	52	40	i}
5	1	1	1	45	7	1118	1806	23	31	33	S
5	1	1	1	45	8	1287	1813	12	13	49	B
5	1	1	1	45	9	1382	1817	106	43	27	fe:
5	1	1	1	45	10	1668	1817	34	50	84	=|
5	1	1	1	45	11	1844	1833	59	20	66	——
5	1	1	1	45	12	2012	1843	10	6	0	‘
5	1	1	1	45	13	2292	1835	34	59	36	a
4	1	1	1	46	0	239	1816	2077	115	-1	
5	1	1	1	46	1	239	1824	14	36	0	A
5	1	1	1	46	2	271	1816	6	30	53	i
5	1	1	1	46	3	294	1818	24	35	34	ik
5	1	1	1	46	4	335	1818	8	40	83	i
5	1	1	1	46	5	416	1827	41	39	20	22
5	1	1	1	46	6	882	1854	30	23	63	gs
5	1	1	1	46	7	941	1834	17	47	43	||
5	1	1	1	46	8	1300	1861	19	31	33	XY
5	1	1	1	46	9	1396	1854	29	42	43	aa
5	1	1	1	46	10	1457	1844	31	48	55	2
5	1	1	1	46	11	1685	1864	17	22	0	&
5	1	1	1	46	12	1719	1857	59	53	86	=
5	1	1	1	46	13	1842	1887	83	24	8	=a
5	1	1	1	46	14	2296	1893	20	38	26	OQ
4	1	1	1	47	0	239	1847	2081	114	-1	
5	1	1	1	47	1	239	1847	104	49	0	Hitpi)
5	1	1	1	47	2	416	1856	41	38	17	gg
5	1	1	1	47	3	882	1876	31	41	22	ee
5	1	1	1	47	4	936	1870	16	41	71	||
5	1	1	1	47	5	1289	1903	31	14	8	1)
5	1	1	1	47	6	1385	1888	102	55	40	ni
5	1	1	1	47	7	1813	1910	112	30	0	ames
5	1	1	1	47	8	1987	1910	16	24	46	(5
5	1	1	1	47	9	2288	1897	32	64	29	fn
4	1	1	1	48	0	246	1877	2079	118	-1	
5	1	1	1	48	1	246	1877	97	50	43	AE)
5	1	1	1	48	2	442	1895	15	9	29	Bh
5	1	1	1	48	3	882	1910	64	47	44	ve
5	1	1	1	48	4	1425	1918	38	52	5	mt
5	1	1	1	48	5	1640	1935	31	36	73	i;
5	1	1	1	48	6	1719	1937	90	28	39	Fm
5	1	1	1	48	7	2292	1962	33	33	94	=
4	1	1	1	49	0	159	1915	2167	113	-1	
5	1	1	1	49	1	159	1915	160	29	1	se
5	1	1	1	49	2	1285	1951	203	52	28	Ri
5	1	1	1	49	3	1640	1942	277	56	46	ie
5	1	1	1	49	4	2292	2000	34	28	94	=
4	1	1	1	50	0	149	1934	2177	128	-1	
5	1	1	1	50	1	149	1947	36	49	76	&
5	1	1	1	50	2	225	1934	117	46	15	EEEEEEER
5	1	1	1	50	3	538	1955	31	29	23	_|j
5	1	1	1	50	4	591	1981	39	22	35	ay
5	1	1	1	50	5	908	1955	30	60	44	il
5	1	1	1	50	6	1126	1970	12	28	35	eS
5	1	1	1	50	7	1288	1983	74	54	8	EY
5	1	1	1	50	8	1407	1985	61	38	42	in;
5	1	1	1	50	9	1640	1981	61	67	37	pia
5	1	1	1	50	10	1720	1992	58	34	58	=
5	1	1	1	50	11	1846	2004	78	31	43	=
5	1	1	1	50	12	2014	2005	29	57	23	4
5	1	1	1	50	13	2292	2033	34	26	74	m
4	1	1	1	51	0	158	1971	2168	146	-1	
5	1	1	1	51	1	158	2000	27	23	23	@
5	1	1	1	51	2	186	1967	41	79	30	|
5	1	1	1	51	3	233	1971	60	61	19	TE
5	1	1	1	51	4	591	2004	105	47	45	a
5	1	1	1	51	5	882	2012	50	50	47	ail
5	1	1	1	51	6	1130	2031	17	18	0	2
5	1	1	1	51	7	1297	2037	127	42	25	ce
5	1	1	1	51	8	1686	2045	15	29	15	el
5	1	1	1	51	9	1851	2055	192	43	31	me
5	1	1	1	51	10	2288	2060	38	57	32	ad
4	1	1	1	52	0	159	2034	2166	120	-1	
5	1	1	1	52	1	159	2039	34	23	0	R>
5	1	1	1	52	2	196	2019	22	62	29	|
5	1	1	1	52	3	225	2034	117	31	13	FREER
5	1	1	1	52	4	592	2054	29	25	19	Ss
5	1	1	1	52	5	769	2059	30	43	38	Gy)
5	1	1	1	52	6	882	2063	31	26	3	f
5	1	1	1	52	7	1420	2102	7	2	6	;
5	1	1	1	52	8	1685	2077	239	53	0	=a
5	1	1	1	52	9	1945	2073	33	66	24	|
5	1	1	1	52	10	2293	2092	32	62	24	ND
4	1	1	1	53	0	158	2064	2168	118	-1	
5	1	1	1	53	1	158	2064	35	23	56	©
5	1	1	1	53	2	227	2068	99	53	13	He
5	1	1	1	53	3	591	2081	106	44	37	av
5	1	1	1	53	4	882	2088	31	48	84	i
5	1	1	1	53	5	1298	2081	40	63	0	E/
5	1	1	1	53	6	1401	2104	41	47	19	=
5	1	1	1	53	7	1719	2121	200	46	38	eS
5	1	1	1	53	8	2291	2133	35	49	32	S
4	1	1	1	54	0	288	2153	1626	84	-1	
5	1	1	1	54	1	288	2153	8	23	49	:
5	1	1	1	54	2	591	2177	30	12	76	=
5	1	1	1	54	3	697	2170	15	17	70	2
5	1	1	1	54	4	771	2174	7	11	3	&
5	1	1	1	54	5	1182	2181	102	25	0	ee
5	1	1	1	54	6	1682	2184	14	53	0	io
5	1	1	1	54	7	1842	2204	72	25	54	i
4	1	1	1	55	0	159	2159	1884	169	-1	
5	1	1	1	55	1	159	2159	33	49	14	N
5	1	1	1	55	2	227	2165	69	51	20	Ta
5	1	1	1	55	3	318	2173	8	36	64	i
5	1	1	1	55	4	592	2190	45	29	86	=
5	1	1	1	55	5	695	2188	26	56	53	5
5	1	1	1	55	6	788	2163	11	69	0	;
5	1	1	1	55	7	959	2233	39	5	92	=
5	1	1	1	55	8	1183	2216	56	22	35	aes
5	1	1	1	55	9	1376	2202	30	126	91	\
5	1	1	1	55	10	1457	2230	30	27	38	55
5	1	1	1	55	11	1640	2190	138	113	46	Hp
5	1	1	1	55	12	1842	2237	83	30	51	Ear
5	1	1	1	55	13	2003	2252	40	22	0	e
4	1	1	1	56	0	273	2217	1764	102	-1	
5	1	1	1	56	1	273	2217	7	4	0	]
5	1	1	1	56	2	442	2234	15	16	0	g
5	1	1	1	56	3	697	2245	15	18	66	5
5	1	1	1	56	4	958	2244	5	19	0	L
5	1	1	1	56	5	1168	2242	39	51	20	co
5	1	1	1	56	6	1457	2258	30	32	37	ae
5	1	1	1	56	7	1640	2265	31	49	38	a:
5	1	1	1	56	8	1686	2265	15	30	0	e
5	1	1	1	56	9	1844	2275	64	2	31	——
5	1	1	1	56	10	2012	2270	25	49	58	He
4	1	1	1	57	0	442	2251	1597	117	-1	
5	1	1	1	57	1	442	2251	15	30	78	5
5	1	1	1	57	2	697	2264	95	26	0	B/S
5	1	1	1	57	3	1186	2266	32	53	0	aaa
5	1	1	1	57	4	1458	2273	15	60	20	He
5	1	1	1	57	5	1660	2296	42	19	24	oa
5	1	1	1	57	6	1842	2284	76	61	90	=
5	1	1	1	57	7	1948	2279	16	89	89	)
5	1	1	1	57	8	2012	2308	27	24	34	He
4	1	1	1	58	0	442	2282	1601	79	-1	
5	1	1	1	58	1	442	2282	15	19	49	3
5	1	1	1	58	2	696	2285	101	30	0	Alas
5	1	1	1	58	3	1177	2312	119	23	17	mA
5	1	1	1	58	4	1397	2311	70	29	32	a:
5	1	1	1	58	5	1795	2317	1	21	12	|
5	1	1	1	58	6	1812	2313	18	51	1	|
5	1	1	1	58	7	1842	2329	73	24	1	——
5	1	1	1	58	8	2012	2328	31	33	8	58
4	1	1	1	59	0	225	2252	1818	163	-1	
5	1	1	1	59	1	225	2309	117	29	0	CITL|
5	1	1	1	59	2	386	2293	16	62	30	«=
5	1	1	1	59	3	588	2309	211	63	11	Yat
5	1	1	1	59	4	940	2325	6	27	24	|
5	1	1	1	59	5	1179	2318	40	66	41	mA
5	1	1	1	59	6	1457	2330	30	45	40	i
5	1	1	1	59	7	1719	2305	99	88	28	cl
5	1	1	1	59	8	1842	2366	63	32	90	=
5	1	1	1	59	9	1938	2252	9	143	94	|
5	1	1	1	59	10	2012	2362	31	53	46	A
4	1	1	1	60	0	264	2386	1644	73	-1	
5	1	1	1	60	1	264	2386	31	23	65	Fo
5	1	1	1	60	2	327	2386	12	19	20	3
5	1	1	1	60	3	442	2395	15	16	0	&
5	1	1	1	60	4	684	2401	3	7	0	y
5	1	1	1	60	5	770	2402	29	18	66	BE
5	1	1	1	60	6	902	2409	11	19	15	g
5	1	1	1	60	7	1214	2414	49	26	24	WAH
5	1	1	1	60	8	1682	2428	37	31	0	ss]
5	1	1	1	60	9	1845	2444	63	12	32	aT
4	1	1	1	61	0	283	2406	1625	86	-1	
5	1	1	1	61	1	283	2411	12	10	81	g
5	1	1	1	61	2	326	2406	13	18	81	8
5	1	1	1	61	3	442	2412	15	20	53	3
5	1	1	1	61	4	665	2411	19	39	56	fi
5	1	1	1	61	5	882	2429	31	23	38	3S
5	1	1	1	61	6	1195	2433	43	24	32	HII
5	1	1	1	61	7	1719	2469	3	9	22	!
5	1	1	1	61	8	1828	2453	80	39	0	(reeree
4	1	1	1	62	0	282	2422	1729	100	-1	
5	1	1	1	62	1	282	2422	13	46	48	i
5	1	1	1	62	2	326	2432	13	33	50	z
5	1	1	1	62	3	442	2433	15	33	32	z
5	1	1	1	62	4	647	2438	30	41	19	a
5	1	1	1	62	5	878	2429	15	76	35	if
5	1	1	1	62	6	1177	2444	78	23	33	MEE
5	1	1	1	62	7	1322	2447	89	46	52	an
5	1	1	1	62	8	1442	2493	45	13	79	alll
5	1	1	1	62	9	1686	2445	15	77	7	:
5	1	1	1	62	10	1843	2487	71	26	29	a
5	1	1	1	62	11	1979	2448	32	50	46	5
4	1	1	1	63	0	283	2466	1636	71	-1	
5	1	1	1	63	1	283	2468	12	19	48	zB
5	1	1	1	63	2	442	2468	15	20	61	=
5	1	1	1	63	3	640	2481	40	23	18	A
5	1	1	1	63	4	883	2484	9	7	0	-
5	1	1	1	63	5	1477	2507	11	15	57	3
5	1	1	1	63	6	1684	2526	38	8	69	Sh
5	1	1	1	63	7	1846	2521	73	16	18	eae
4	1	1	1	64	0	280	2488	1442	76	-1	
5	1	1	1	64	1	280	2488	15	31	0	s
5	1	1	1	64	2	326	2493	13	43	13	a
5	1	1	1	64	3	632	2512	14	16	22	if
5	1	1	1	64	4	902	2507	11	40	0	d
5	1	1	1	64	5	1237	2521	18	14	21	i
5	1	1	1	64	6	1382	2541	2	5	0	'
5	1	1	1	64	7	1457	2493	30	71	0	i
5	1	1	1	64	8	1684	2534	38	22	52	S|
4	1	1	1	65	0	282	2527	1712	89	-1	
5	1	1	1	65	1	282	2527	57	29	62	a:
5	1	1	1	65	2	472	2535	153	27	2	eS,
5	1	1	1	65	3	642	2548	11	18	19	1
5	1	1	1	65	4	663	2537	58	33	19	TE
5	1	1	1	65	5	730	2545	83	12	31	rom
5	1	1	1	65	6	1393	2562	95	39	74	|
5	1	1	1	65	7	1719	2581	102	29	33	COTTA
5	1	1	1	65	8	1846	2580	99	28	48	See
5	1	1	1	65	9	1972	2585	22	31	22	els
4	1	1	1	66	0	280	2555	1778	85	-1	
5	1	1	1	66	1	280	2555	15	34	8	a
5	1	1	1	66	2	326	2557	13	46	88	3
5	1	1	1	66	3	482	2565	48	4	42	—
5	1	1	1	66	4	550	2574	25	35	64	$000
5	1	1	1	66	5	654	2571	41	29	40	00)
5	1	1	1	66	6	1227	2602	68	27	71	==
5	1	1	1	66	7	1369	2592	50	46	0	Cal
5	1	1	1	66	8	1463	2596	24	25	37	A
5	1	1	1	66	9	1725	2612	218	21	18	Sf
5	1	1	1	66	10	1975	2614	21	21	18	ST
5	1	1	1	66	11	1997	2614	61	26	14	BOUNDARY
4	1	1	1	67	0	282	2598	1511	107	-1	
5	1	1	1	67	1	282	2598	57	27	36	28
5	1	1	1	67	2	882	2616	32	48	0	L
5	1	1	1	67	3	952	2649	6	56	77	|
5	1	1	1	67	4	1177	2625	190	65	12	““G/
5	1	1	1	67	5	1408	2626	80	62	0	:¢
5	1	1	1	67	6	1769	2651	24	12	45	mt
4	1	1	1	68	0	231	2662	1883	77	-1	
5	1	1	1	68	1	231	2672	23	9	83	=
5	1	1	1	68	2	324	2665	18	12	66	a
5	1	1	1	68	3	882	2662	30	20	84	ge
5	1	1	1	68	4	1253	2678	12	28	59	\
5	1	1	1	68	5	1409	2693	16	26	4	z
5	1	1	1	68	6	1824	2690	28	29	89	MAX
5	1	1	1	68	7	1851	2690	42	29	83	HEIGHT
5	1	1	1	68	8	2103	2698	11	41	28	Oo
4	1	1	1	69	0	231	2665	1894	102	-1	
5	1	1	1	69	1	231	2665	125	63	33	B35!)
5	1	1	1	69	2	401	2708	65	18	40	ome
5	1	1	1	69	3	1037	2712	41	29	22	gs
5	1	1	1	69	4	1266	2712	18	42	0	\
5	1	1	1	69	5	2094	2740	31	27	96	>
4	1	1	1	70	0	231	2853	1894	84	-1	
5	1	1	1	70	1	231	2860	23	28	40	B|
5	1	1	1	70	2	324	2853	18	39	0	#|
5	1	1	1	70	3	400	2855	66	48	0	gaz
5	1	1	1	70	4	1037	2877	41	30	95	22
5	1	1	1	70	5	1245	2896	1	12	83	|
5	1	1	1	70	6	1330	2874	28	44	39	i
5	1	1	1	70	7	2094	2917	31	20	65	c
4	1	1	1	71	0	231	2905	235	45	-1	
5	1	1	1	71	1	231	2914	37	36	79	of]
5	1	1	1	71	2	324	2905	18	12	49	|

         |E g
eee

Section 29

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                  8 DECEMBER 2020


2                        MCU20/0090 DEVELOPMENT APPLICATION FOR A MATERIAL CHANGE OF USE FOR
                         AN EXTENSION TO SHOP/HIRE AND STORAGE BUILDING AT JETTY 256 GYMPIE
                         TERRACE, NOOSAVILLE
DOCUMENT INFORM AT ION




Author                              Development Planner, Glen Conforti
                                    Environment and Sustainable Development Department

Index                               ECM Reference/ Application/ MCU20/0090

Attachments                         1.    Proposal Plans



                   APPLICATION DETAILS

                   Applicant                      Bayeno Pty Ltd

                   Proposal                       Material Change of Use – extension to shop/hire and storage building

                   Properly Made Date             1 September 2020

                   Information Request Date       Not Applicable

                   Information Response Date      Not Applicable

                   Decision Due Date              23 December 2020

                   Number of Submissions          1 properly made
                                                  and
                                                  1 not properly made

                   PROPERTY DETAILS

                   Property Address               Jetty 256 Gympie Terrace, Noosaville

                   RP Description                 Lot 158 SP 146043

                   Land Area                      546m²

                   Existing Use of Land           Jetty and ancillary building

                   STATUTORY DETAILS

                   SEQRP Designation              Regional Landscape and Rural Production

                   Local Plan                     Noosaville

                   Zone                           Recreation and Open Space

                   Overlays                       Land Subject to Acid Sulfate Soils
                                                  Biodiversity, Waterways and Wetlands – Riparian Buffer
                                                  Flood Hazard Overlay

                   Assessment Type                Impact




                                                                                                        Page 29 of 77

Section 30

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee meeting dated 8 December 2020 regarding Application No. MCU20/0090 for a
Development Permit for Material Change of Use – extension to shop/hire and storage building,
situated at Jetty 256 Gympie Terrace, Noosaville, and:
A.    Refuse the application for the following reasons:
      1.    The proposal is contrary to Overall Outcome (ad) and Performance Outcomes PO22
            and PO23 of the Noosaville Local Plan Code as the proposal will result in increased
            commercial development on and adjacent the Noosa River and lead to the business
            operating outside their lease area.
      2.    The proposal is contrary to Overall Outcome (b) and Performance Outcome PO2 of the
            Waterways Works Code as the proposal will result in an increase in gross floor area
            and an increase to the scale and intensity of commercial operations on the Noosa
            River.
      3.    The business already exceeds the operational capacity of the lease area, as evidenced
            by the site’s compliance history, and increasing the enclosed storage space supports
            the continued operation of the business at a scale and intensity that is not consistent
            and/or compatible with the designated lease area.
B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.    PROPOSAL
The proposal seeks to enclose 7.6m² (2.9m x 2.63m) of front deck and a 3.82m² (2.1m x 1.82m)
portion to the northern side of the existing jetty 18.3m² building. The 2 areas proposed to be
enclosed are currently roofed and the external cladding proposed is consistent with the existing
finish. One large window is proposed facing the foreshore park and other openings on each side.
No new roofed area is proposed.
The applicant indicates that the extra space is required for storage purposes for items such as life
vests, eskies, buckets, wetsuits, fishing rods and other items as part of the hire business. The
applicant also indicates that the existing building is too small for the operation as up to 3 employees
are onsite, and the proposal will provide a new front desk/counter for hire clients as well as selling
bait, tackle and cold drinks ancillary to the use. The expanded area will also define a space for
storage from an area for minor repair areas.
The business hires self-drive boats, BBQ pontoon boats, hobbycats, kayaks, pedal boats, SUP’s
and fishing charter boat tours.
Figures 1, 2, 3, 4 and 5 below show a site plan and the proposed areas to be enclosed.




                                                                                       Page 30 of 77

Section 31

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020




                                    Figure 1 – Site Plan




             Figure 2 – Floor plan identifying the areas proposed to be enclosed




                                                                                   Page 31 of 77

Section 32

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA          8 DECEMBER 2020




                        Figure 3 – Foreshore elevation




                           Figure 4 – east elevation




                                                             Page 32 of 77

Section 33

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                          8 DECEMBER 2020




     Figure 5 – Left photo - shows the area to the foreshore (front) of the building proposed to be enclosed.
             Right photo – the area to the rear (River side) of the building proposed to be enclosed.


2.     SITE DETAILS
2.1. Background
Development Approvals
     OPW10/2192 for Operational Works for prescribed tidal works for a 15m² roofed deck to the
       front of the building was approved no 15/03/2011. This was a retrospective approval.
     OPW14/0307 for Operational Works to extend the existing jetty was approved on
       15/01/2015.
Compliance Actions
     25/11/2015 - Compliance Notice issued for breach of Local Law 1 - engaging in a restricted
       activity in a local government controlled area and roads. Instructed to remove items from
       council controlled land.
     2/06/2017 – Infringement issued for engaging in a restricted activity in a local government
       controlled area and roads (multiple a frame signs, sailing vessels, kayaks, paddle boats and
       jet skis being stored on Local Government controlled areas)
     8/06/2017 – Compliance Notice issued for breach of Local Law 1 - engaging in a restricted
       activity in a local government controlled area and roads. Instructed to remove items from
       council controlled land.
     10/10/2017 – Caution issued for engaging in a restricted activity in a local government
       controlled area and roads.
     13/07/2018 – Compliance Notice issued for breach of Local Law 1 - engaging in a restricted
       activity in a local government controlled area and roads. Instructed to remove items from
       council controlled land. (Verbally advised owner to move items back into leased area)
     17/07/2018 - Infringement issued for engaging in a restricted activity in a local government
       controlled area and roads.
     9/12/2018 – Photos obtained showing catamarans, jet skis on Local Government controlled
       land outside of lease area.
     11/12/2018 – Caution issued for engaging in a restricted activity in a local government
       controlled area and roads. (Verbally advised the owner to move items back into leased area)

                                                                                                Page 33 of 77

Section 34

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 DECEMBER 2020


   10/01/2019 – Infringement issued for engaging in a restricted activity in a local government
     controlled area and roads.
   11/01/2019 – Infringement issued for engaging in a restricted activity in a local government
     controlled area and roads.
   14/01/2019 – Infringement issued for engaging in a restricted activity in a local government
     controlled area and roads.
In addition to the above formal infringements Council Officers, on numerous occasions, have
verbally requested the business to move vessels/craft to within the lease area.
Figure 6 below includes historical aerials which identify vessels outside of the lease area
particularly using the beach outside the lease area. Notably the aerials are not fully accurate in
terms of the lease boundary but do give a reasonable indication that vessels are regularly stored
outside the lease area.




                  Figure 6 – Historical aerial view of operations outside the lease area.

                                                                                            Page 34 of 77

Section 35

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 DECEMBER 2020


2.2. Site Description
The site is a commercial lease area of 546m2. The lot includes approximately 15m of the Noosa
River foreshore park and extends approximately 35 metres into the waterway. The site contains
the ‘U Drive’ Boat Hire business, which consists of a single-storey boatshed/office/shop building of
approximately 18m² gross floor area (GFA), as well as associated jetty and pontoon structures.
Figure 7 below provides an aerial view of the subject Jetty.




             Figure 7 – Aerial view of the site showing the subject lease with a red perimeter.

2.3. Surrounding Land Uses
The site is adjacent to a number of recreational and commercial uses along the Noosa River
foreshore including, the Massoud slip, public and private jetties, recreational parkland and other
boat hire businesses. The foreshore area is zoned Recreation and Open Space, and the southern
side of Gympie Terrace is zoned Tourist Accommodation containing a diverse mix of residential,
commercial and dining uses reflective of the zoning.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
    State Planning Policy;
    South East Queensland Regional Plan;
    Planning Regulation 2017;
    The Noosa Plan 2020.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.


                                                                                             Page 35 of 77

Section 36

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                 8 DECEMBER 2020


South East Queensland (SEQ) Regional Plan
The site is located within the Regional Landscape and Rural Production area of the SEQ Regional
Plan. The proposal is consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for an urban activity within the Regional Landscape and Rural Production area is
within the assessment benchmarks contained in the Planning Regulation 2017 for the SEQ Region.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the provisions
are relevant to the development.
Local Plan and Works Provisions
The subject site is located in the Noosaville Local Plan area and is zoned Recreation and Open
Space. The proposed use is identified as a consistent use within the zone and is required to follow
an impact assessable application process.
The Noosaville Local Plan Code and the Waterways Works Code are most applicable to the
assessment of the proposal. The following Acceptable Outcomes and Performance Outcomes are
relevant to this assessment.

 Noosaville Local Plan Code
 Overall Outcome 7.2.4.2 (2) (ac) & (ad)
 (ac)Noosa River foreshore adjacent to Gympie Terrace is retained as an important recreational space for the local
 community and visitors. Development or operational works maintains it as an idyllic place for passive recreation,
 walking, dog exercise and access to the Noosa River including ferry stops.
 (ad) Existing businesses on Noosa River foreshore operate only from commercial jetty lease areas providing
 watercraft for hire, tour services and limited ancillary offerings to the community. Slipway services are maintained
 within the life of any current lease.

 Performance Outcome                                           Acceptable Outcome
 PO22                                                          No acceptable outcome provided
 Commercial development on and adjacent to the Noosa
 River is designed to –
      (a) provide for uses for marine facility purposes
           including water transport and boat hire;
   (b) be compatible with the scenic values of
       the waterway;
   (c) provide a high level of amenity, including ensuring
       low ambient noise levels;
   (d) not increase the overall scale and intensity of
       commercial operations;
   (e) use materials, natural finishes and colours that
       blend with the surrounding natural landscape; and
   (f) reflect the character and setting of the waterfront
       locality (such as timber and tin construction with a
       traditional pitched roof design).
 PO23                                                          AO23.1
 Commercial development on and adjacent to the Noosa           No additional commercial leases are created on or
 River is not increased or expanded beyond                     adjacent to the Noosa River and no additional areas are
 existing building footprints and structures within existing   added to the current commercial leases.
 lease areas.
                                                               AO23.2
                                                               Development does not increase the
                                                               overall building footprint, gross floor area or height
                                                               of buildings or structures associated with
                                                               commercial jetties.
 PO24                                                          No acceptable outcome provided.
 The loading and unloading of passengers and boat
 docking is confined to the commercial lease areas of the
 respective commercial operation.



                                                                                                      Page 36 of 77

Section 37

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                             8 DECEMBER 2020


 Waterways Works Code
 Overall Outcome 9.4.9.2 (2) (b)
 (2) (b) Development ensures there is no increase to the scale and intensity of commercial operations on the Noosa
 River and additional commercial leases are avoided.
 Performance Outcome                                       Acceptable Outcome
 Landings in conjunction with a commercial use             No acceptable outcome provided
 PO2
 Development—
  1. does not detract from the function and viability of
      centres or nearby businesses;
  2. does not increase the overall scale and
      intensity of any commercial operation;
  3. does not provide additional commercial leases on
      the Noosa River;
  4. ensures no net increase in site cover or gross
      floor area of buildings or structures;
  5. uses materials, natural finishes and colours that
      blend with the surrounding natural landscape; and
  6. reflects the character and setting of the locality
      (such as timber and tin construction with a
      traditional pitched roof design).

The codes clearly seeks that there be no further expansion of commercial operations on the Noosa
River by outlining:
    no increase to the overall scale and intensity of existing operations;
    no additional lease areas or expansion of lease areas;
    no net increase in gross floor area or site cover;
Furthermore, Overall Outcome 7.2.4.2 (2) (ad) seeks that development operates from within the
lease area. While the proposal is a small increase in gross floor area, it is considered the additional
gross floor area allows more space for a business which is considered to already exceed the
operational capacity of the lease area given the number of infringements issued by Council for
operating outside the designated lease area as outlined in section 2.1 above. Given the business
consistently operates outside the lease demonstrates that the existing scale of the business cannot
operate within the lease area at all times and does not meet the Overall Outcome.
The size of the lease area and the size of the building both regulate and limit the scale of the
business and expansion of either potentially results in an increase to the scale and intensity of the
business. In this instance the proposed increase in storage area supports the continued operation
of the business at a scale/intensity that is not consistent and or compatible with their designated
lease area and would only encourage the continued operation of the business outside the lease
area.
In terms of architectural built form the proposal is consistent with the existing building and design
requirements for buildings in the area and raises no concerns.
3.4. Public Notification
The application was publicly notified for 15 business days in accordance with the Planning Act
2016. One properly made submission and one not properly made submission was received against
the proposal. The following table provides a summary and assessment of the issues raised by
submitters.

  Matters Raised                                       Comments
  Properly made
  Unfair to expand the business into a shop            The Jetty use under the Noosa Plan 2020 is a Landing
  and big business when once they were only            with associated and ancillary ‘shops’. A ‘shop’ under
  Jetties.                                             the Noosa Plan is for the hire of goods.
                                                       The change in terminology is a result of a new
                                                       planning scheme which more accurately reflects the
                                                       use occurring.

                                                                                                   Page 37 of 77

Section 38

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                         8 DECEMBER 2020


                                                       The planning scheme seeks that businesses do not
                                                       expand on the Noosa River to help maintain the health
                                                       of the river system and minimise clutter.
     Where U-drive wants to expand, children like      The application is not to expand the lease area but
     to swim as a lot of space is taken up by hire     expand the floor area.
     boats.
     Not properly made
     Should have less building on the river not        The planning scheme seeks to maintain the buildings
     more, plus where does all the waste water go      that exist on river foreshore without any expansion.
     when washing down the equipment which             No prescribed contaminants should be washed into
     must contain detergents etc does this all get     the river. Each business should have a plan in place
     washed into the river along with any spillage     to manage waste. This aspect is governed by the
     from refuelling and servicing such equipment.     Environmental Protection Act 1994.

4.      CONCLUSION & REASONS FOR DECISION
The planning scheme clearly seeks that commercial operations are not expanded and operate
from within the existing lease areas. The planning scheme also seeks to avoid an increase in gross
floor area and site cover of commercial businesses on the Noosa River to limit the commercial
operations on the Noosa River given it is a highly popular recreation area. There is a direct
relationship between the size of the building and the scale and intensity of the business that can
operate from it.
While the proposal to enclose a portion of the front deck and a small portion at the rear of the
building is minor in some respects, it has the potential to increase the scale and intensity of the
existing hire business which is considered to be already operating beyond the capacity of the lease
area. This is supported by the number of infringements Council has previously issued to the
business for operating outside their lease area.
Given the proposal is increasing the gross floor area and has the potential to increase the scale
and intensity of the use, the proposal conflicts with the relevant outcomes of the planning scheme
and is recommended for refusal.
Departments/Sections Consulted:
       Chief Executive Officer    X   Community Services                         X   Corporate Services
       Executive Officer              Community Development                          Financial Services
       Executive Support              Community Facilities                           ICT
                                      Libraries & Galleries                          Procurement & Fleet
                                      Local Laws                                     Property
                                      Waste & Environmental Health                   Revenue Services

       Executive Services         X   Environment & Sustainable Development          Infrastructure Services
       Community Engagement           Building & Plumbing Services                   Asset Management
       Customer Service               Development Assessment                         Buildings and Facilities
       Governance                     Economic Development                           Civil Operations
       People and Culture             Environmental Services                         Disaster Management
                                      Strategic Land Use Planning                    Infrastructure Planning,
                                                                                     Design and Delivery




                                                                                                Page 38 of 77

Section 39

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 39 of 77

vu
                                                                                                                                                 r
                                                                                                                                                 >
                                                                                 za ZB meee 5 68 Gabe 83 3 #38 BB # abs a3                       m
                          Bebeaah    A388 go gb   a8 gonged fp  sane 4 B      aed    ¢ g358     og 3e8e  58   ges    es aE SR   q                <
                                                          REER ETE!                               ah ae                   re                     <
                                                                                                            a                                    a
                                              gazge peErze    BRS  3   5   BBR   @   Po 3856 8 55 Boe &    g   #2 g2 2   de  5 8                 5
                                                    BERSBERG 5208 g bo i e528 g i 5 gece § ga zo33       g 5  as gs 48    q     :                <
                                                                      PEO                               ae    isan"                              z
                                                                                        PEE ER ga            38    BGP   bee 88 a
                                                                                                a 9383 GF 4 ace a a5 Bs ge § §                  Qo
                                                                                                           | UE    EE ag OG a3 6                 @
                                                                                                                        aes ma 8                 z
                          eotagees baa Bao    os Be B5o33s 5 an5ezE         Pro oe   G BA52 B&B       £    g  a8 29 52    R35   9                z
                          Bug) abze area 3 33     a) 25853q 5 Aas #2   3      bare 3    bea eg     ie   Te    ss     pee ge 3   8
                          Bae bree & nae & 3 23 nants’ 5 Bile                        ae   gee   §   gece      2° ah      oe ae                   =
                          “aa oa 2 abo! 5% 5a ohh j oct                     an     a ian a      5 big ae      na     es  23 5 g                  m
                            go 38 9  BEB    a 8  52 p8hasg    B25o3—q  §    Papeete             a PERE 8      329  88    ee                     ay
                            re paged’ oe 3 hapsas op abeee                       sEefaba           Bead            pay
                             a          49       Bade: ©             |           =   8    ao 8  9   28   ag           2  bz GE 5                 =
                            aug     eet       38 ad gauge     fgigss   i    A    24a         cb    ae         |    ,  2      GB:
                                Ea    se       Hugs                            ee      gee      Ee      Hieaa            |      ;
                            He                                              GU                   HE                       iy                     =
          C     S           aad any            ia i i          a       co        ;              :           a   Hl Ee                            m
                                   ee                           See    9    eg   3              5  gS                    .
                                4      gies      Sa Boe     Pi      ee      a ae          ar 8  8  ge
                            on gh 6 ise     3       F  {    a  RA      8    z    ¢               _  ug   4  52  a  GSB 5 z
                            a a8 5 vee 4       : sf   Rog   7   8   A                  osegas a5 hse     Hu ba ag                                =
                            nue ae                  Os                  vn eu                  cate ond               ee                         =
                            ap      Pay                  ee                                                                                      m
                            78                   cE            Pal er:      Uisag   fe serdaets;   pees   928585 3   aba                         a
             gS           bei             ea       Hag   ne     Beep 2k scree oe pezceeel" es age Fue ebay                                       >
                          ace Te Ees     an om aaa       ag 8   one   375s    pene Bm = 2h Be Paes g Bas        ae   a nog
                          aERRSEeOTE      obits ga B05 a Hl       dpae 2a8)   ad   pe LEROpASEE   Estes ee5 Be         gee                       5
                                    zs   oaglas a8 f ae ai 5    B3ge arzen    ga38 §  a 128 peaes “a eepace be ae Ba                             z
                                            tah Ge   ala fac   “Ba ose        hn ce     eadeenss re        plea,     Gee!
                          E5tage     4 eeapes Bg 3288 BR        mene  sas B   ga8e Ba Erg eRe a5 aerede: RaaUe go    o2 GBS
            C             ae         a     ae   i Bal    Be     a           ee        ee ill             aa          | a                         o
                          AE         i 95g708      igaa 7         Hee peek  Bak    3  “igh ld age          esl  aE
5	1	1	1	41	15	1905	1412	42	36	15	ae
5	1	1	1	41	16	2292	1496	34	28	82	z
4	1	1	1	42	0	544	1182	1403	296	-1	
5	1	1	1	42	1	544	1182	107	52	4	sue
5	1	1	1	42	2	672	1205	55	39	9	DP
5	1	1	1	42	3	752	1218	92	55	0	alee
5	1	1	1	42	4	864	1248	28	27	17	a3
5	1	1	1	42	5	913	1248	106	59	26	ae
5	1	1	1	42	6	1057	1283	10	21	35	a
5	1	1	1	42	7	1105	1285	59	49	40	aaa
5	1	1	1	42	8	1201	1302	43	43	20	bse
5	1	1	1	42	9	1282	1325	108	51	37	a
5	1	1	1	42	10	1439	1347	43	42	39	al
5	1	1	1	42	11	1568	1378	107	49	0	ted
5	1	1	1	42	12	1696	1405	91	39	21	abe
5	1	1	1	42	13	1873	1434	74	44	17	ote
4	1	1	1	43	0	323	1159	2002	433	-1	
5	1	1	1	43	1	323	1159	32	133	9	¢
5	1	1	1	43	2	544	1213	105	110	23	a
5	1	1	1	43	3	672	1233	172	92	36	a
5	1	1	1	43	4	864	1267	155	95	34	ne
5	1	1	1	43	5	1057	1308	107	76	46	Pie
5	1	1	1	43	6	1201	1326	59	70	32	in
5	1	1	1	43	7	1298	1348	92	86	41	a
5	1	1	1	43	8	1437	1378	109	93	0	He
5	1	1	1	43	9	1568	1398	107	84	24	bn
5	1	1	1	43	10	1693	1434	190	86	8	ea
5	1	1	1	43	11	1905	1453	42	105	16	a
5	1	1	1	43	12	2292	1529	33	63	21	5
4	1	1	1	44	0	544	1259	1387	308	-1	
5	1	1	1	44	1	544	1259	86	72	0	arais
5	1	1	1	44	2	672	1285	43	50	0	a,
5	1	1	1	44	3	752	1303	92	77	33	a
5	1	1	1	44	4	864	1321	108	56	8	bea
5	1	1	1	44	5	1057	1374	203	61	30	aes
5	1	1	1	44	6	1295	1407	95	40	23	eg
5	1	1	1	44	7	1503	1445	43	40	27	ape
5	1	1	1	44	8	1568	1453	107	50	0	bsagids
5	1	1	1	44	9	1696	1479	139	65	38	ae
5	1	1	1	44	10	1873	1520	58	47	48	a
4	1	1	1	45	0	544	1293	1403	295	-1	
5	1	1	1	45	1	544	1297	57	26	15	een
5	1	1	1	45	2	605	1293	29	46	0	ey
5	1	1	1	45	3	704	1330	11	3	26	Z
5	1	1	1	45	4	750	1342	29	21	37	“3
5	1	1	1	45	5	801	1340	10	32	55	8
5	1	1	1	45	6	864	1351	28	39	66	ge
5	1	1	1	45	7	929	1355	11	30	57	8
5	1	1	1	45	8	962	1378	10	21	33	a
5	1	1	1	45	9	1009	1389	10	18	11	®
5	1	1	1	45	10	1105	1402	10	9	59	z
5	1	1	1	45	11	1117	1384	47	65	0	ie
5	1	1	1	45	12	1201	1418	59	32	27	332°
5	1	1	1	45	13	1298	1443	27	16	32	es
5	1	1	1	45	14	1380	1446	10	30	11	g
5	1	1	1	45	15	1439	1461	43	29	54	nga
5	1	1	1	45	16	1503	1476	43	33	46	gag
5	1	1	1	45	17	1584	1493	90	35	0	p2ogoo
5	1	1	1	45	18	1696	1515	58	28	29	2350
5	1	1	1	45	19	1776	1545	11	2	50	z
5	1	1	1	45	20	1873	1552	10	19	54	8
5	1	1	1	45	21	1905	1561	42	27	22	Be
4	1	1	1	46	0	544	1315	1384	274	-1	
5	1	1	1	46	1	544	1315	90	30	0	geseae
5	1	1	1	46	2	672	1336	7	11	24	x
5	1	1	1	46	3	704	1334	11	28	0	:
5	1	1	1	46	4	785	1347	10	41	17	j
5	1	1	1	46	5	833	1359	11	28	70	i
5	1	1	1	46	6	929	1377	43	51	40	abe
5	1	1	1	46	7	1009	1409	10	12	36	3
5	1	1	1	46	8	1057	1396	10	30	0	;
5	1	1	1	46	9	1105	1412	34	53	11	uF
5	1	1	1	46	10	1201	1429	43	29	24	eae
5	1	1	1	46	11	1298	1443	21	50	45	ge
5	1	1	1	46	12	1437	1483	45	23	43	223
5	1	1	1	46	13	1503	1496	43	23	27	Ros
5	1	1	1	46	14	1568	1500	26	27	68	ge
5	1	1	1	46	15	1632	1517	23	25	76	25
5	1	1	1	46	16	1696	1533	91	32	0	Bagrds
5	1	1	1	46	17	1921	1578	7	11	89	3
4	1	1	1	47	0	544	1331	1403	286	-1	
5	1	1	1	47	1	544	1331	171	56	18	eet
5	1	1	1	47	2	769	1364	11	31	47	|
5	1	1	1	47	3	801	1373	91	44	47	ata
5	1	1	1	47	4	929	1406	43	28	35	iu
5	1	1	1	47	5	1105	1434	59	31	19	shat
5	1	1	1	47	6	1234	1451	26	41	20	24g)
5	1	1	1	47	7	1315	1478	75	30	36	eo
5	1	1	1	47	8	1439	1499	43	28	41	be
5	1	1	1	47	9	1568	1520	74	40	0	Bares
5	1	1	1	47	10	1693	1548	46	31	38	ois
5	1	1	1	47	11	1761	1566	74	25	52	peg
5	1	1	1	47	12	1873	1575	10	28	80	a
5	1	1	1	47	13	1905	1580	42	37	40	oh
4	1	1	1	48	0	544	1328	1403	318	-1	
5	1	1	1	48	1	544	1328	106	81	32	a
5	1	1	1	48	2	672	1382	43	40	21	cio
5	1	1	1	48	3	769	1391	75	46	10	gab
5	1	1	1	48	4	929	1419	90	58	33	ee
5	1	1	1	48	5	1057	1427	10	50	0	§
5	1	1	1	48	6	1105	1445	59	71	20	se
5	1	1	1	48	7	1201	1453	59	63	22	uae,
5	1	1	1	48	8	1298	1451	43	92	0	u
5	1	1	1	48	9	1380	1512	102	54	0	Pai
5	1	1	1	48	10	1503	1541	43	43	0	ib
5	1	1	1	48	11	1568	1529	88	73	0	irae
5	1	1	1	48	12	1713	1560	74	56	7	pee
5	1	1	1	48	13	1905	1605	42	41	58	a
4	1	1	1	49	0	544	1382	1387	283	-1	
5	1	1	1	49	1	544	1382	171	86	25	mee
5	1	1	1	49	2	929	1461	138	62	13	mb
5	1	1	1	49	3	1298	1534	248	82	40	ane
5	1	1	1	49	4	1568	1574	219	86	28	PPE
4	1	1	1	50	0	574	1421	1213	249	-1	
5	1	1	1	50	1	574	1421	44	36	29	Let
5	1	1	1	50	2	705	1456	10	5	59	2
5	1	1	1	50	3	801	1468	43	31	0	z&9
5	1	1	1	50	4	879	1480	13	31	17	a
5	1	1	1	50	5	945	1487	26	36	58	BB
5	1	1	1	50	6	1057	1513	10	33	54	3
5	1	1	1	50	7	1105	1524	27	24	58	RG
5	1	1	1	50	8	1153	1532	11	29	51	=
5	1	1	1	50	9	1201	1545	43	32	0	o2ho
5	1	1	1	50	10	1298	1563	10	9	26	8
5	1	1	1	50	11	1330	1569	11	19	38	e
5	1	1	1	50	12	1380	1579	10	25	82	3
5	1	1	1	50	13	1455	1596	10	2	3	a°
5	1	1	1	50	14	1503	1608	43	26	15	383
5	1	1	1	50	15	1568	1628	11	8	16	g
5	1	1	1	50	16	1647	1625	11	27	0	e
5	1	1	1	50	17	1713	1636	10	19	45	4
5	1	1	1	50	18	1776	1645	11	25	54	5
4	1	1	1	51	0	1294	1431	252	237	-1	
5	1	1	1	51	1	1294	1431	252	237	6	a
4	1	1	1	52	0	591	1496	750	154	-1	
5	1	1	1	52	1	591	1496	27	18	53	Qs
5	1	1	1	52	2	704	1525	2	2	12	t
5	1	1	1	52	3	785	1528	10	21	0	g
5	1	1	1	52	4	937	1556	35	26	0	ke
5	1	1	1	52	5	1057	1579	10	17	51	2
5	1	1	1	52	6	1103	1601	12	4	85	8
5	1	1	1	52	7	1138	1596	26	18	73	oo
5	1	1	1	52	8	1201	1610	28	13	72	Bc
5	1	1	1	52	9	1250	1619	10	19	49	B
5	1	1	1	52	10	1331	1641	10	9	23	5
4	1	1	1	53	0	410	1480	915	172	-1	
5	1	1	1	53	1	410	1480	22	17	0	o
5	1	1	1	53	2	575	1506	76	36	0	bgane
5	1	1	1	53	3	672	1528	43	21	27	ES
5	1	1	1	53	4	785	1534	42	60	24	ofa
5	1	1	1	53	5	929	1566	90	44	9	fea
5	1	1	1	53	6	1095	1597	64	46	10	ae
5	1	1	1	53	7	1218	1624	11	22	11	BAF
5	1	1	1	53	8	1289	1611	30	60	39	ge
4	1	1	1	54	0	288	1479	2037	415	-1	
5	1	1	1	54	1	288	1479	143	55	7	epee
5	1	1	1	54	2	560	1530	91	51	0	Shanes
5	1	1	1	54	3	672	1550	10	30	14	2
5	1	1	1	54	4	702	1553	13	43	58	2
5	1	1	1	54	5	769	1544	73	84	33	a
5	1	1	1	54	6	927	1586	92	56	42	wee
5	1	1	1	54	7	1057	1623	10	21	34	8
5	1	1	1	54	8	1105	1616	124	60	30	sues?
5	1	1	1	54	9	1298	1673	10	9	0	*
5	1	1	1	54	10	2035	1788	36	61	0	q
5	1	1	1	54	11	2292	1835	33	59	6	0
4	1	1	1	55	0	282	1502	2044	425	-1	
5	1	1	1	55	1	282	1502	48	43	28	OB
5	1	1	1	55	2	346	1529	80	36	0	£Rs
5	1	1	1	55	3	560	1553	91	51	21	Burky
5	1	1	1	55	4	672	1585	10	36	0	3
5	1	1	1	55	5	769	1597	56	35	0	$8a5
5	1	1	1	55	6	929	1632	43	21	20	a
5	1	1	1	55	7	1057	1647	10	28	24	ea
5	1	1	1	55	8	2291	1897	35	30	83	m
4	1	1	1	56	0	282	1541	2044	416	-1	
5	1	1	1	56	1	282	1541	80	36	84	O28
5	1	1	1	56	2	377	1553	55	40	47	NG
5	1	1	1	56	3	560	1581	91	57	0	ieakes
5	1	1	1	56	4	672	1621	10	22	69	4
5	1	1	1	56	5	704	1612	11	16	66	8
5	1	1	1	56	6	769	1628	38	50	37	age
5	1	1	1	56	7	833	1640	11	20	82	5
5	1	1	1	56	8	1187	1729	59	26	42	aH
5	1	1	1	56	9	2046	1841	13	47	48	oO
5	1	1	1	56	10	2292	1931	34	26	58	©
4	1	1	1	57	0	282	1570	964	206	-1	
5	1	1	1	57	1	282	1570	144	38	10	gasse
5	1	1	1	57	2	560	1625	155	38	27	PEE
5	1	1	1	57	3	785	1664	59	18	29	ab
5	1	1	1	57	4	1075	1721	93	55	9	502892
5	1	1	1	57	5	1167	1721	79	55	0	99Er%
4	1	1	1	58	0	282	1591	2044	404	-1	
5	1	1	1	58	1	282	1591	144	65	12	qeeee
5	1	1	1	58	2	454	1587	54	106	40	|
5	1	1	1	58	3	566	1641	68	33	12	UP
5	1	1	1	58	4	914	1729	75	39	2	EU
5	1	1	1	58	5	1012	1730	218	84	18	an
5	1	1	1	58	6	2038	1896	22	87	6	O°
5	1	1	1	58	7	2292	1962	34	33	96	=
4	1	1	1	59	0	299	1623	2027	405	-1	
5	1	1	1	59	1	299	1623	100	37	16	agen
5	1	1	1	59	2	737	1730	10	9	83	a
5	1	1	1	59	3	770	1725	49	54	11	gee
5	1	1	1	59	4	833	1729	28	26	9	36
5	1	1	1	59	5	872	1725	28	54	15	6
5	1	1	1	59	6	931	1744	10	18	0	egag
5	1	1	1	59	7	1012	1770	10	2	18	2
5	1	1	1	59	8	1060	1764	89	58	0	An8cere
5	1	1	1	59	9	1203	1776	43	66	26	i
5	1	1	1	59	10	2292	2001	34	27	64	w
4	1	1	1	60	0	282	1638	2044	454	-1	
5	1	1	1	60	1	282	1638	150	76	16	‘Pee
5	1	1	1	60	2	542	1729	270	62	9	PLL
5	1	1	1	60	3	914	1760	75	98	47	a
5	1	1	1	60	4	1047	1773	199	120	17	eral
5	1	1	1	60	5	2035	1985	36	27	45	2
5	1	1	1	60	6	2292	2033	34	59	0	.
4	1	1	1	61	0	282	1686	1782	383	-1	
5	1	1	1	61	1	282	1686	86	50	28	Boe
5	1	1	1	61	2	404	1716	28	20	56	2
5	1	1	1	61	3	561	1740	26	41	38	td
5	1	1	1	61	4	609	1751	42	41	52	dE:
5	1	1	1	61	5	673	1754	25	77	21	:
5	1	1	1	61	6	721	1776	91	51	28	a
5	1	1	1	61	7	914	1817	75	41	15	alas’
5	1	1	1	61	8	1012	1824	10	42	38	8
5	1	1	1	61	9	1043	1832	122	65	5	Baal:
5	1	1	1	61	10	1187	1858	59	60	19	shee
5	1	1	1	61	11	2035	2013	29	56	39	nm
4	1	1	1	62	0	282	1715	2042	424	-1	
5	1	1	1	62	1	282	1715	80	53	49	B28
5	1	1	1	62	2	410	1738	16	29	33	3
5	1	1	1	62	3	544	1759	43	56	0	i
5	1	1	1	62	4	609	1782	138	65	21	ae
5	1	1	1	62	5	769	1805	92	66	35	es
5	1	1	1	62	6	914	1846	73	48	37	petal
5	1	1	1	62	7	1011	1856	217	90	11	En
5	1	1	1	62	8	2042	2024	19	71	0	wu
5	1	1	1	62	9	2288	2068	36	71	0	NS
4	1	1	1	63	0	282	1765	2031	395	-1	
5	1	1	1	63	1	282	1765	86	34	0	ooa
5	1	1	1	63	2	544	1814	11	29	0	e
5	1	1	1	63	3	577	1813	10	23	60	3
5	1	1	1	63	4	610	1826	89	35	50	335208
5	1	1	1	63	5	737	1848	43	32	66	az
5	1	1	1	63	6	802	1847	10	40	70	3
5	1	1	1	63	7	850	1872	11	31	65	5
5	1	1	1	63	8	914	1874	74	37	0	Baoee
5	1	1	1	63	9	1009	1901	44	30	22	“Eb
5	1	1	1	63	10	1056	1897	78	52	0	esne§
5	1	1	1	63	11	1155	1932	58	29	56	325
5	1	1	1	63	12	2044	2076	14	53	46	oO
5	1	1	1	63	13	2303	2121	10	39	40	Oo
4	1	1	1	64	0	303	1781	2022	401	-1	
5	1	1	1	64	1	303	1781	57	57	31	a8
5	1	1	1	64	2	542	1844	13	20	0	°
5	1	1	1	64	3	577	1837	10	20	42	8
5	1	1	1	64	4	610	1847	89	41	0	iaacse
5	1	1	1	64	5	737	1885	10	18	77	R
5	1	1	1	64	6	770	1864	42	41	39	gos
5	1	1	1	64	7	850	1907	11	9	56	8
5	1	1	1	64	8	921	1904	68	48	0	eae
5	1	1	1	64	9	1037	1918	64	46	0	eu
5	1	1	1	64	10	2035	2129	36	28	85	9
5	1	1	1	64	11	2292	2159	33	23	49	8
4	1	1	1	65	0	346	1841	1979	366	-1	
5	1	1	1	65	1	346	1841	16	21	0	g
5	1	1	1	65	2	577	1862	122	66	0	ja
5	1	1	1	65	3	769	1890	92	70	11	wi
5	1	1	1	65	4	915	1916	46	68	11	Bes
5	1	1	1	65	5	1027	1949	203	82	26	fae
5	1	1	1	65	6	2035	2162	36	28	65	Z
5	1	1	1	65	7	2291	2184	34	23	18	S
4	1	1	1	66	0	609	1911	621	136	-1	
5	1	1	1	66	1	609	1911	42	21	44	ass
5	1	1	1	66	2	737	1929	75	37	0	gue
5	1	1	1	66	3	850	1954	11	14	23	3
5	1	1	1	66	4	933	1965	56	34	23	25a
5	1	1	1	66	5	1043	1983	91	44	5	geRga®
5	1	1	1	66	6	1172	2006	58	41	4	yeas
4	1	1	1	67	0	577	1919	653	151	-1	
5	1	1	1	67	1	577	1925	10	13	65	3
5	1	1	1	67	2	609	1919	90	51	32	gaa
5	1	1	1	67	3	721	1933	26	83	0	le
5	1	1	1	67	4	770	1955	42	34	5	cee
5	1	1	1	67	5	850	1968	11	38	5	i
5	1	1	1	67	6	914	1974	75	55	18	38982
5	1	1	1	67	7	1028	1989	106	68	0	nanneay
5	1	1	1	67	8	1172	2029	58	41	0	H8yF
4	1	1	1	68	0	577	1941	1494	297	-1	
5	1	1	1	68	1	577	1941	10	20	79	3
5	1	1	1	68	2	609	1958	42	11	4	o2e
5	1	1	1	68	3	673	1955	26	26	46	5g
5	1	1	1	68	4	769	1983	43	17	52	maa
5	1	1	1	68	5	914	2008	75	24	0	328aA
5	1	1	1	68	6	1027	2031	74	20	0	agmga
5	1	1	1	68	7	1172	2055	58	21	48	and
5	1	1	1	68	8	2020	2196	51	42	94	Qo
4	1	1	1	69	0	284	1928	946	195	-1	
5	1	1	1	69	1	284	1928	179	42	0	alejs/s|
5	1	1	1	69	2	577	1965	10	25	64	3
5	1	1	1	69	3	609	1968	90	49	0	Raed
5	1	1	1	69	4	769	1997	92	47	5	aoa
5	1	1	1	69	5	914	2028	75	43	41	ee
5	1	1	1	69	6	1027	2036	203	87	2	Sn
4	1	1	1	70	0	159	1918	1912	395	-1	
5	1	1	1	70	1	159	1918	34	26	0	&
5	1	1	1	70	2	233	1928	14	41	16	(2
5	1	1	1	70	3	284	1936	21	37	41	|Z
5	1	1	1	70	4	340	1953	123	44	0	2\5\2
5	1	1	1	70	5	577	1990	10	39	17	2
5	1	1	1	70	6	609	2002	90	51	0	Sele
5	1	1	1	70	7	721	2020	26	25	39	i
5	1	1	1	70	8	770	2030	91	58	10	sage
5	1	1	1	70	9	914	2055	75	56	17	uate
5	1	1	1	70	10	1027	2072	203	68	16	ia
5	1	1	1	70	11	2035	2287	36	26	72	a
4	1	1	1	71	0	158	1947	1072	221	-1	
5	1	1	1	71	1	158	1947	26	23	55	9
5	1	1	1	71	2	233	1968	14	19	41	[2
5	1	1	1	71	3	287	1962	11	43	59	Cc
5	1	1	1	71	4	390	1987	73	35	0	s\|=
5	1	1	1	71	5	583	2026	52	31	34	ec
5	1	1	1	71	6	658	2041	26	31	31	Ee
5	1	1	1	71	7	721	2040	26	41	54	ES
5	1	1	1	71	8	769	2064	26	23	45	oe
5	1	1	1	71	9	850	2081	11	24	25	3
5	1	1	1	71	10	931	2090	58	38	0	gae9
5	1	1	1	71	11	1027	2108	26	33	5	gE
5	1	1	1	71	12	1055	2104	28	48	5	28
5	1	1	1	71	13	1107	2129	58	24	42	Ba

 8   EP      Eals            tae               i     ee ae                                                                      >
vo   |E|     [Fl   4|        lie          ue   |     pal   HG ae                                                                a
w | =              5         2 Ggleee     aH         ate   Aegeaea cee                                                          o
©    |"            -         z H235g  8h 228   A     oohe  Bea       BoRs
9°                           = gne8   a 8s     §     Beas  qj tte                                                               O
                  in         S a2e    ee 8a    3     3oet   aagiage  bby                                                        m
                                                                     8e3a
Y        lgely 2             i        ap          CH       bp                                                                   Ss
                             Pea                           LP                                                                   O
         gl 3)o/m)                      -                                                                                       2 3
             Zz     vU       a
         \alesle                                                                                                                09     |
     2/5 2) m)      2                                                                                                       mine
     :|2/= a                                                                                                                mo
     #/9}5 3                                                                                                                2s
     2   Ol:    >                                                                                                           <i      =
     g | 2 c|o                                                                                                                          h
     a|c o|m                                ,                                                                               Dm         |
             </0               %         ra                                                                                 —_—     OS
     F|      lag                 4                                                                                          GAR
             m 9               eRe.      4                                                                                  |   ”    t-_
     m       2\=               re                                                                                           SS
             SS               be |                                                                                          —         A
                C           Sey “<4                                                                                             @ oo
             =|             bey                                                                                             5
      |      a              eS                  ie
     Z                         Riel nt
      oO                        Pr
     9    3   0                LUE RN
     m|   2   Ss                tae
     0    &   S                Herre:
          ;   =

Section 40

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 40 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                                         8 DECEMBER 2020

                                                                                                                                                                                     L\        (RIV            \l
        Real Property Description                                                                                                                                                PROPOSED WORKS:
        ae                            ee                                                                              ENCLOSE FRONT & REAR SECTION OF THE EXISTING
         ot:
        Plan: SP146043                                                                                                                                                                  JETTY BUILDING
        Local Authority: Noosa Shire Council.
        BUILDERS NOTE
        THE BUILDER IS RESPONSIBLE TO CHECK ALL EXISTING SERVICES
        PRIOR TO BEGINNING CONSTRUCTION AND DESIGNER TO BE                                                                                                                                :
        NOTIFIED                                                                                               A                                                                    fief iecoraren
        PRIOR AND DURING CONSTRUCTION ALL LEVELS, HEIGHTS AND                                              cl                                                        |                   gis
        MEASUREMENTS TO BE CONFIRMED ON SITE IN ACCORDANCE WITH                                       BA as                                                          .   @@
        ALL CONSTRUCTION WORKS TO BE IN ACCORDANCE WITH DA                                               pi      ra dl                                ha             |                   a [TG
        STATUTORY AUTHORITIES                                                                         : rt f                                                                              oe
        APPROVAL CONDITIONS AND COUNCIL APPROVED PLANS. ANY                                                 Ve     eo                         ae é
        DISCREPANCIES NOTED PLEASE CONTACT DESIGNER.                                                     ga     a)       -                              :            a
        WALKING SURFACES SHALL BE FINISHED IN ACCORDNCE WITH                                               et a           it                          TEE:                                — 4 eS            eI
        AS48586.                                                                                           i         MV                             I                                    FSS SNES
        STORMWATER NOTE                                              ‘ce rt                                re ee                           *        ra               |                    Py
        ALL STORMWATER DRAINAGE SHALL BE IN ACCORDANCE WITH        ee nC         |                          er                            Sie  ia                                        be IB      Ib     Iba
        AS3500.3. ALL STORMWATER DRAINAGE SHALL BE IN ACCORDANCE   =      \ al                               ’         &             .                                                    B-)   Hod eo)      aH
                                                                      Pal;                                  i                          as  Py                        e                    HAN awe            weg
        WITH COUNCIL GUIDELINES TO MINIMISE EROSION AND SCOURING Pa A ) a                                     AG                                                                          ‘ 4 ‘ i        i m H .
        STORMWATER FLOW OTHER THAN NATURAL OVERLAND FLOW        Mh       2:5 E                         ve       ak      wy.                                                                Vp    i      ip   Wi
        SHALL NOT BE DISCHARGED ONTO NEIGHBORING PROPERTY.           ies 22      a                               i     er                                               L     A            Ww    VY     Vy    Bre  |
        ALL STORMWATER DRAINAGE DESIGN IS PRELIMINARY AND SHALL     ,     4                                     r    eS                                                                                     _,
        BE CONFIRMED BY A LICENCE HYDRAULIC ENGINEER.                      a My  ge                    ;         =             5!                                    .                   fi    ] Sj    Ee     oI
                                                                                i                             F                                                                          [SS 4) 1°
       ENERGY EFFICIENCY ASSESSOR TO CONFIRM ADEQUACY OR               <i         a                   ee   wie 2     es                                             |                     Ha
        PROPOSED CONSTRUCTION. PROVIDE INSULATION IN ACCORDANCE                       ,               4                              a.                              <r |                Ip     bd | bd } bg
        WITH THE NCC ANF BERS CERTIFICATION REPORT.                  \s                                                                is         on                  SS                  So Sey Soy         oe
        BUSHFIRE NOTE                                           \ \      pe            Sl                                             bo   Oe                          aan             > W WW         WW     W ,
                                                                       by                      ~                                      oS             -                   Sat       }-      Tu,   Ti    ttf   hf i
        THE PROPOSED BUILDING IS LOCATED IN A BUSHFIRE PRONE AREA. mts        \         ¥                      ¥e                  es                 a              en      ||        S|        ae     Le    va
        BUILDING CONSTRUCTION TO BE IN ACCORDANCE WITH N.C.C   A 2                   [ s    “lf                1 ae             _{o>    Ge     eee                    Sec     |        Ol.       .
        PART 3.7.4 & AS. 3959 REFER TO ASSESSMENT CONDUCTED FOR NV yA                                  Pi                     Oa      a. »N       aks                3      Ss         3
        BAL RATING.                                             ee le                                a%           ° —            —          4      :    q              eT
        DESIGN PARAMETERS                                        ot       acon       A      .                8: at              ae        /                          eer       il      =
                                                                AS   |               ’                ae       MS      a      aA,   ,      Le           \             a                oO                          a
        vBASIC WIND SPEED Vu = 57 ms                                    ee            nao’            i     sh            Ry      =      5                                         TTT 5
        - GUST DURATION = 30sec                                                                                                                                       SS          ] I                              ,
        - TERRAIN CATEGORY TC2                                      ao            z       —              at     tit et                           ;    —                 orl
        WAVE                                                                                                                                                            —    2                                     |
        - WIND GENERATED WAVE Hmax 0.6m                                                                                                                                      eens
        - BOAT WAKE Hmax 0.5M                                                                                                                                               | ROOF |                               ;
        “arena                                                                                                                                                              | | ll
        - APPROACH VELOCITY v = 0.3m/s                                                                                                                                                                             |
         00 FLOOD Vinax = 1.5m/s                                                                                                                                            Eien                  - He -
        ALL VESSELS SHALL BE REMOVED UNDER FLOOD CONDITIONS                                                                                                                       |       {
        LIVE LOAD ON PONTOONS                                                                                                                                                             ,
        - MAX UNIFORMLY DISTRIBUTED LOAN 3kpa                                                                                                                                —_           i
        - FREEBOARD UNDER DEAD LOAD 400 25mm                                                                                                                                 ere E
       NOTES:                                                                                                                        a%       S i te                         | ROOF |
       1.     TIMBER JETTY AND RP BOUNDARY ARE BASED ON PREVIOUS                                                                        1  Nibieinaeill                       ATT
              SURVEY CONDUCTED. DRAWING FILE: detail_060514.DWG                                                                      \'/       12200                         eer]
       LEGEND:                                                                                                                                                                       ba
       ED © Ga © au o cmmmmm |£ASED BOUNDARY AREA
                                                                                                                                  DRAWING TITLE:        SITE PLAN
                                                                                                Hayley Deans Designs
                                                                                                M: 0417 194 192                   SITE ADDRESS          256 GYMPIE TERRACE, NOOSAVILLE                  DW. 02
                       [   e                                               ;                    E: [email protected]    | cuenT NAME:           BAYENO PTY LTD - U DRIVE BOAT HIRE
              “t-             i              mea       J              BOO                       Superior Built QLD Pty Ltd                                                                              onawnve wumecr
                                                                                                QBCC Licence: 1249579             ISSUE:                CONSTRUCTION ISSUE
                                                                                                                                  DRAWING DATE:              DRAWN BY: Hayley Deans SCALE:    AS/INDICATED
                                                                                                                                 Page 40 of 77

Section 41

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 41 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                            8 DECEMBER 2020

                                                                                                                                          L\     (Sy          \]
     PROPOSED WORKS:                                                                                                                                     C]
     ENCLOSE FRONT & REAR SECTION OF THE EXISTING                                                                                                     S|    A
     JETTY BUILDING                             a
                PROPOSED WALLS (HIGHLIGHTED IN RED) , ~/APPROX-LOCATION. OF 2a                                                            DELETE SECTION OF EXISTING WALL
               TO ENCLOSE UNDER EXISTING ROOF TOTAL oe a oe a. Se eee                                                                     PROPOSED WALLS (HIGHLIGHTED IN RED)
             3 WALLS TO ENCLOSE UNDERROOF, WILL HAVE ete      Stott    wot  “                                                             TO ENCLOSE UNDER EXISTING ROOF TOTAL
               WINDOWS AND A DOOR, CLADDING WILLBE fh. ov               ga                                                                2 WALLSTO ENCLOSE UNDERROOF, WILL HAVE|
              TO MATCH EXISTING TO MAINTAIN CHARACTER | 2-0 fon Ue ton ee ae    ee                                                        DOOR, CLADDING TO MATCH EXISTING TO
                                AND AMENITY  —                   LS                                                                       MAINTAIN CHARACTER AND AMENITY
                  EXISTING POSTS TO EITHER CORNER Pe      | no   2680" i      ee Bo BS           5500                          2100       EXISTING POSTS TO EITHER CORNER
                                     ——                  es                                                              ae
                                     gs   \——_ FEXTSTING JELLY |                  EXISTING JETTY BUILDING.              |S NX
                              {iy    8    ————— EC                                                                                                        (2
                              oWE          ——                  DEC Ke eN                                                                            3
                                                                                                                      ee                 NS         g

          CONCRETE PATH       [eS

                              SSS SS5853585585858 8 85858                   __              LhL_LL___———

                                          be          ee      ae       et  es          nc    ya                ee                  eta           APPROX LOCATION OF
    CURRENT ENCLOSED FLOOR:  15.95m2      eo Te et       PL lv ee te ae Sr                                      ee      ew              ete      LOW TIDE MARK
     PROPOSED NEW ENCLOSED FLOOR AREA: 11.40m2 Le gh 8a                              ne SE         a De a          2 es was
    TOTAL:                  23.57m2       L    We : APPROX LOCATION OF SAND... -         rk:     ae oe — ” “S Cee         A fell Vis
     NOTE:                                wa a                             ey be ee
     NOT CHANGE WHERE PROPOSED WALLS ARE    o (: a -FLOOR PLAN st Dp et                     pe        is he fae a      a   De  oA
     TOTAL JETTY ROOF AREA AND JETTY FLOOR DOES: ee “  “4       . ye        fe Ce  a        a a        - “ae TM et em Te          te     oN
     LOCATED. EXISTING ROOF AND FLOOR STRUCTURE pos 4:        ee ee So                                 a st                 ba     ta at

                                                                                                    DRAWING TITLE:  FLOOR PLAN
                                                                         Hayley Deans Designs
                                                                         Hovey Pears                                                                     Dwo3
                  [  e                                   ,               E: [email protected] | cient NAME: BAYENO PTY LTD - U DRIVE BOAT HIRE
                                  aay               Qe        WG         Superior Built QLD Pty Ltd
                                                                         QBCC Licence: 1249579      ISSUE:          CONSTRUCTION ISSUE                  DRAWING NUMBER
                                                                                                   DRAWING DATE:        DRAWN BY: Hayley Deans SCALE: AS/INDICATED
                                                                                                   Page 41 of 77

Section 42

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 42 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                  8 DECEMBER 2020

                                                                                                                                                   A     ACHIVIEN
                                                                                                                                               PROPOSED WORKS:
                                                                                                ENCLOSE FRONT & REAR SECTION OF THE EXISTING
                                                                                      a                                                              JETTY BUILDING
                                                               PROPOSED WALL WITH DOOR HIGHLIGHTED IN RED
         EXISTING SCREENED STORAGE                                                EXISTING BUILDING
                 PROPOSED WALL                                              EXISTING ROOF STRUCTURE
              EXISTING STRUCTURES                       PROPOSED WALL WITH WINDOW & DOOR HIGHLIGHTED IN RED
                                                  I                            EXISTING 90x90 POSTS                   _]
                                                JZ!                        EXISTING STRUCTURAL JETTY                  a=
                                               ZAP.                                                                   _———S
                                             a                                                             Too o
       es                                                                             — — — — — —|_[ephive 087 HR [ee
                                             ——$      I                      8                             aor        WAI] T-F 1
                                   HI               i                        :                                        TMM       |               NI
         ee                                 _——                     ee                   ee                         NE                  FN                  _ ___ nica +1.5m ep APPRO:
                                      ail                            APPROX OW WATFR N                                                        -  oo         ~
            aw North                                                                          3) East
            \!/     1:100                                                                     \“/     12100
                                                                                                                                              EXISTING JETTY BUILDING
                                                                                                                                              EXISTING JETTY BUILDING ROOF STRUCTURE
                                                              EXISTING 90x90 POSTS TO EACH CORNER                                             EXISTING AWNING
                                                              EXISTING BUILDING                                                               PROPOSED WALL WITH WINDOW HIGHLIGHTED IN RED]
                                                              EXISTING ROOF STRUCTURE WITH SIGNAGE                    |                       oxletiNe eraucTnAL Jerhy OUTSIDE CORNER
                                    La i                      PROPOSED WALL WITH WINDOW HIGHLIGHTED IN RED _——
                                     —                        EXISTING STRUCTURE                                    a
      _ _S feeveconrie                             |                        ee
                                            7]                                            Mo                    ies
                                     d\       4                     g                      IM}           =)            een
                                        =                           ‘                     INI       @    tL
      _____ APPROX FRONTAGE GROUND LeveL _ ___ H]=—=====—— || _                     || il |               eee                              A              Leis +1.5m oo arerox

          /a South                                                                            7, West
          { 2 to                                                                              \ 4 |         a
          \&/     1:100                                                                       \*/     1.100

                                                                              Hayley Deans Designs                -
                                                                              sodos eames                                                                        pwo4
             a    Ley            clomid: i              BOTS                 Superior Built QLD Pty Ltd  “_—                                                     oravane wumeeR
                                                                             QBCC Licence: 1249879

                                                                                                         Page 42 of 77

Section 43

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 43 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA         8 DECEMBER 2020

                                                                                    L\  (= VU   \

                                                     |i t—isdzC
                                               rt                                   INTERNAL TOP OF EXPOSED TRUSSES
                            es                 a - - - - - — A ict
                             |]   era
                          5       |            aT iH                     ronnie
      7 Section 1       —          peel                      eee   —     US                | hoor tevet.
      (4                  Ta
      A) 1-50
                         INTERNAL TOP OF EXPOSED TRUSSES
                        MANCELINGLEVEL            PEELE                    FT          SCS@Y  |
                                _——              EL         TE                 nu      |  g
                                 |               = ELLINVE
                                               |__|         | |                 |
      va Section 2      ‘swoon eve — |_|                            Ne         ee
      \2) 1-50

     Uy           Nn        )               Tom                                              DWOs
                                            Hayley Deans Designs -
           /                                   siperoult@bgpon
       a      or   Rai         Oe of        Superior Built QLD Pity Ltd }ISSUE: = CONSTRUCTIONISSUE | _(ORAING NUMBER
                                                            Page 43 of 77

Section 44

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 44 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                              8 DECEMBER 2020

                                                                                                                                              L      A CHIV      \

                                                        2630                            5500                           2100

                                               SESE    eee ceoeamcce                                               STORAGE
                                                 FS                                                              et
                                        8        E 3 ING JETTY            EXISTING JETTY BUILDING              |
                                        s             DECK                                                     lI
                                               Sesser                 =                                        II
                                               ee                      \         a           | om |        —|
                                                                           \     =       Q                |
                                                 a       a                  ene                   one         |) owe |
                                                           oe                i         —_—_—_—_——_—_—                    >
                                                      THREE PEOPLE ARE REQUIRED TO RUN THE BOOKINGS AT ALL TIMES.
                                                       INCLUDES SOMEONE TAKING BOOKINGS, EMPLOYEE HANDLING CUSTOMERS, EMPLOYEE DOING SAFETY BRIEFS

                                                                                                      DRAWING TITLE:  FLOOR PLAN STORAGE LAYOUT
        WY.                 L)                  !)                         M0417 194 192              STE ADDRESS:    256 GYMPIE TERRACE, NOOSAVILLE         DWo06
                                                                           Hayley Deans Designs
                  {  e                                    7                E: [email protected] CLIENT NAME:  BAYENO PTY LTD - U DRIVE BOAT HIRE
            a                      aa                ae        ay          Superior Built QLD Pty Ltd
                                                                           QBCC Licence: 1249579      ISSUE:          CONSTRUCTION ISSUE                    DRAWING NUMBER
                                                                                                      DRAWING DATE:       DRAWN BY: Hayley Deans SCALE: AS/INDICATED
                                                                                                     Page 44 of 77

Section 45

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                   8 DECEMBER 2020


3                        PLANNING & ENVIRONMENT COURT APPEAL NO 2974 OF 2020 APPLICATION FOR
                         EXTENSION TO CURRENCY PERIOD
DOCUMENT INFORM AT ION




Author                               Manager Development Assessment, Kerri Coyle
                                     Environment & Sustainable Development Department

Index                                ECM/ Application/ MCU11/0266.03/ Case/ Andema

Attachments                          Nil


EXECUTIVE SUMMARY
Not Applicable

RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 8 December 2020 regarding Planning & Environment
Court Appeal 2974 of 2020 and agree to defend the appeal.


REPORT
On 17 September Council at its Ordinary Meeting resolved to refuse an application to extend the
currency period of a development approval for 6 Heron St, Peregian Beach for the following
reasons:
1.                       The proposed development is contrary to the Overall Outcomes 7.7.2 g), jj) and oo) and
                         Specific Outcomes O6 and O12 of the Eastern Beaches Locality Code of the Noosa Plan
                         2006 as:
                         i.    The proposed development does not incorporate a pitched or curved roof form,
                               exceeds the maximum plot ratio for the Neighbourhood Centre Zone and results in a
                               building scale which is not compatible with surrounding development and which
                               presents an appearance of excessive bulk to adjacent properties, roads and the village
                               green.
2.                       The proposed development is contrary to the Purpose, Overall Outcomes and Performance
                         Outcomes PO11 and PO12 of the Local Centre Zone of the Noosa Plan 2020 as:
                         i.    The proposed development is not small in scale in the context of Peregian Beach
                               village, exceeding the maximum plot ratio of the site and will result in a building which
                               is not compatible with the scale of surrounding development and presents a bulky
                               appearance adjacent properties, roads and the village green.
                         ii.   The proposed development does not provide a 2 metre setback to the village green
                               and maintain the visual continuity and pattern of buildings fronting the village green
                               and consequently will impact on the area’s amenity.
3.                       The proposed development is contrary to the Purpose and Overall Outcomes and the
                         Performance Outcome PO3, PO7 and PO10 of the Coastal Communities Local Plan Code
                         of the Noosa Plan 2020 as:
                         i.    The proposal does not retain and enhance the built form of streetscape character of
                               the centre as the scheme has excessive plot ratio and site cover, and proposes
                               inadequate setbacks to the village green.
                         ii.   The proposed development does not provide varied roof forms and variations in
                               projected and recessed elements and facades.


                                                                                                         Page 45 of 77

Section 46

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                8 DECEMBER 2020


     iii.   The proposed development does not respect the scale and character of development
            on adjoining sites and is not sympathetic to the coastal village character of the local
            centre.
4.   It is unlikely the proposed development can proceed as approved as it makes no allowance
     for equitable access to level 1 and the roof terrace contrary to the Building Code of Australia
     and the Disability Discrimination Act 1992.
The report to Council at the time concluded that “…the proposed development exceeds the
allowable plot ratio of the superseded and current scheme and the subsequent building bulk is not
consistent with surrounding development, the informal character of the Peregian beach village or
the Peregian Beach Framework and Character Plan. It is also noted that the proposed flat roof
form does not comply with the requirements of the superseded planning scheme. Furthermore, the
development does not provide sufficient setback to the upper level which fronts the village green
as required by the new Noosa Plan.
It is also unlikely that the development can proceed as approved as there is no allowance for
equitable access as required by the Building Code.”
As a result of Council’s decision to refuse the application, the applicant has now lodged an appeal
to the Planning & Environment Court, seeking that the currency period be extended by 2 years.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting Minutes, 17 September 2020, Item 2, Page 17
That Council note the report by the Coordinator Planning to the Planning & Environment Committee
Meeting dated 8 September 2020 regarding Application No. MCU11/0266.03 for an extension to
the currency period for a Development Permit for Material Change of Use for Business Type 1
Office, Entertainment and Dining Business Type 1 Food & Beverage & Retail Business Type 2
Shop & Salon, situated at 6 Heron Street, Peregian Beach and:
A.   Refuse to extend the currency period for the following reasons:
     1.     The proposed development is contrary to the Overall Outcomes 7.7.2 g), jj) and oo)
            and Specific Outcomes O6 and O12 of the Eastern Beaches Locality Code of the
            Noosa Plan 2006 as:
            i.    The proposed development does not incorporate a pitched or curved roof form,
                  exceeds the maximum plot ratio for the Neighbourhood Centre Zone and results
                  in a building scale which is not compatible with surrounding development and
                  which presents an appearance of excessive bulk to adjacent properties, roads
                  and the village green.
     2.     The proposed development is contrary to the Purpose, Overall Outcomes and
            Performance Outcomes PO11 and PO12 of the Local Centre Zone of the Noosa Plan
            2020 as:
            i.    The proposed development is not small in scale in the context of Peregian Beach
                  village, exceeding the maximum plot ratio of the site and will result in a building
                  which is not compatible with the scale of surrounding development and presents
                  a bulky appearance adjacent properties, roads and the village green.
            ii.   The proposed development does not provide a 2 metre setback to the village
                  green and maintain the visual continuity and pattern of buildings fronting the
                  village green and consequently will impact on the area’s amenity.
     3.     The proposed development is contrary to the Purpose and Overall Outcomes and the
            Performance Outcome PO3, PO7 and PO10 of the Coastal Communities Local Plan
            Code of the Noosa Plan 2020 as:



                                                                                     Page 46 of 77

Section 47

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 8 DECEMBER 2020


             i.     The proposal does not retain and enhance the built form of streetscape character
                    of the centre as the scheme has excessive plot ratio and site cover, and proposes
                    inadequate setbacks to the village green.
             ii.    The proposed development does not provide varied roof forms and variations in
                    projected and recessed elements and facades.
             iii.   The proposed development does not respect the scale and character of
                    development on adjoining sites and is not sympathetic to the coastal village
                    character of the local centre.
      4.     It is unlikely the proposed development can proceed as approved as it makes no
             allowance for equitable access to level 1 and the roof terrace contrary to the Building
             Code of Australia and the Disability Discrimination Act 1992.
B.    Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal, particularly if the matter proceeds to trial.
No mediation has been arranged currently for this appeal.
Consultation
External Consultation - Community & Stakeholder
Thynne Macartney – Tim Webb
Internal Consultation
Departments/Sections Consulted:

     Chief Executive Officer       Community Services                        Corporate Services
     Executive Officer             Director                                  Director
     Executive Support             Community Development                     Financial Services
                                   Community Facilities                      ICT
                                   Libraries & Galleries                     Procurement & Fleet
                                   Local Laws                                Property
                                   Waste & Environmental Health              Revenue Services

     Executive Services        x   Environment & Sustainable Development     Infrastructure Services
     Director                      Director                                  Director
     Community Engagement          Building & Plumbing Services              Asset Management
     Customer Service          x   Development Assessment                    Buildings and Facilities
     Governance                    Economic Development                      Civil Operations
     People and Culture            Environmental Services                    Disaster Management
                                   Strategic Land Use Planning               Infrastructure Planning,
                                                                             Design and Delivery




                                                                                        Page 47 of 77

Section 48

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                  8 DECEMBER 2020


6                        REPORTS FOR NOTING BY THE COMMITTEE

4                        PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY
DOCUMENT INFORM AT ION




Author                              Development Assessment Manager, Kerri Coyle
                                    Environment and Sustainable Development Department

Index                               ECM / Subject / 17.26 – All Applications

Attachments                         Nil

EXECUTIVE SUMMARY
Nil.
RECOMMENDATION
That Council note the report by the Development Assessment Manager to the Planning &
Environment Committee Meeting dated 8 December 2020 regarding planning applications that
have been decided by delegated authority.

REPORT
The Local Government Act 2009 allows, by resolution, a local government to delegate its powers
to the Mayor, CEO, a standing committee or a joint standing committee and the CEO to delegate
those powers to another employee of Council.
Under the current delegations for the Planning Act 2016 the ability to manage, assess and decide
a range of development applications are delegated to officers with the exception of the following
which are reported to Council for a decision:
a)                       an application for a variation request mentioned in section 61 of the Planning Act 2016 to
                         vary the effect of the planning scheme;
b)                       the approval of an application where there is substantial non-compliance with a stated policy
                         of the Council or a high order provision of the Planning Scheme being a desired
                         environmental outcome, or an overall outcome of a code;
c)                       the refusal of any application where Council is the assessment manager;
d)                       requests for change representations, and change applications to change or delete conditions
                         that were imposed by Council at an Ordinary Meeting or a Special Meeting;
e)                       and an application for a proposed development of significant community interest.
It should be noted though that due to the strict time frames of the Planning Act 2016, officers under
the current delegations have the ability to decide an application where the application has the
potential for 'deemed approval'.
In accordance with the current delegations, a wide range of development applications are decided
by Council officers each month, with a limited number of applications reported to Council for a
decision. Between 1 January and 31 October 2020 a total of 391 development applications were
decided, with 363 approved, with the majority of those refused being related to applications
involving the removal of trees.
The following applications were decided by delegated authority during the month of October 2020
(excluding applications seeking to remove a tree(s) adjacent to a building or structure):




                                                                                                       Page 48 of 77

Section 49

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              8 DECEMBER 2020


1.   Application No.:    51901.4210.01
     Application Type:   Material Change of Use - Minor Change to Approval
     Applicant:          JDBA Certifiers
     Registered Plan:    BUP 6343
     Location:           “Bloodwoods” 9 Berrima Row, Noosa Heads
     Proposal:           Change to Development Approval – Generally in Accordance – Raising
                         the existing deck around the pool area within setbacks.
     Decision:           Refused
     Decision Date:      16/10/2020


2.   Application No.:    DBW19/0028
     Application Type:   Building Work - Code
     Applicant:          Anania Albert Khamu, Roza Khamu
     Registered Plan:    Lot 4 N 21840
     Location:           51 Orient Drive, Sunrise Beach
     Proposal:           Additions to Detached House (Coastal Protection)
     Decision:           Refused
     Decision Date:      28/10/2020


3.   Application No.:    DBW20/0001
     Application Type:   Building Work - Code
     Applicant:          Ronald William O'Grady
     Registered Plan:    Lot 8 RP 88535
     Location:           19 Viewland Drive, Noosa Heads
     Proposal:           Additions to Detached House (Height - new skillion roof form)
     Decision:           Approved
     Decision Date:      28/10/2020


4.   Application No.:    DBW20/0025
     Application Type:   Building Work – Code-
     Applicant:          Tim Ditchfield Architects
     Registered Plan:    Lot 110 N 21845
     Location:           43 Witta Circle, Noosa Heads
     Proposal:           Dwelling House
     Decision:           Approved
     Decision Date:      20/10/2020




                                                                                    Page 49 of 77

Section 50

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020


5.   Application No.:     MCU20/0021
     Application Type:    Material Change of Use - Code
     Applicant:           Roger Parkin Project Architect
     Registered Plan:     Lot 121 RP 70296 & Lot 1 RP 117315
     Location:            53 & 55 Hilton Terrace, Tewantin
     Proposal:            Multiple Housing - Type 2 Duplex
     Decision:            Approved
     Decision Date:       29/10/2020


6.   Application No.:     MCU20/0022
     Application Type:    Material Change of Use - Impact
     Applicant:           Pace Planning Pty Ltd
     Registered Plan:     Lot 7 RP 858525
     Location:            292 Illoura Place, Cooroibah
     Proposal:            Visitor Accommodation - Type 3 Rural (3 x 2 bedroom cabins)
     Decision:            Approved
     Decision Date:       19/10/2020


7.   Application No.:    MCU20/0064
     Application Type:   Material Change of Use - Code
     Applicant:          Project BA
     Registered Plan:    Lot 3 SP 266744
     Location:           5 Figbird Court, Lake Macdonald
     Proposal:           Detached House
     Decision:           Approved
     Decision Date:      09/10/2020


8.   Application No.:    MCU20/0067
     Application Type:   Material Change of Use - Code
     Applicant:          AQH Storage P/L
     Registered Plan:    Lot 6 SP 190837
     Location:           6/11 Bartlett Road, Noosaville
     Proposal:           Ancillary Dwelling Unit
     Decision:           Approved
     Decision Date:      26/10/2020




                                                                                  Page 50 of 77

Section 51

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                            8 DECEMBER 2020


9.    Application No.:    OPW18/0155.01
      Application Type:   Operational Works - Minor Change to Approval
      Applicant:          CBD Settlers Cove Pty Ltd
      Registered Plan:    Lot 7 SP 195871
      Location:           12 Serenity Close, Noosa Heads
      Proposal:           Revised Landscaping Plans for Bushfire
      Decision:           Approved
      Decision Date:      26/10/2020


10.   Application No.:    OPW19/0266
      Application Type:   Operational Works - Code
      Applicant:          Pensar
      Registered Plan:    Lot 1 SP 286680
      Location:           215 David Low Way, Peregian Beach
      Proposal:           Earthworks, Landscaping & Stormwater
      Decision:           Approved
      Decision Date:      13/10/2020


11.   Application No.:    OPW20/0108
      Application Type:   Operational Works - Code
      Applicant:          Wessel Petroleum
      Registered Plan:    Lot 21 RP 72829
      Location:           52 Mary Street, Noosaville
      Proposal:           Drainage Works, Earthworks, Landscaping, Roadworks & Stormwater
      Decision:           Approved
      Decision Date:      13/10/2020


12.   Application No.:    RAL20/0002
      Application Type:   Reconfiguring A Lot - Code
      Applicant:          Roger Parkin Project Architect
      Registered Plan:    Lot 121 RP 70296 & Lot 1 RP 117315
      Location:           53 & 55 Hilton Terrace, Noosaville
      Proposal:           Access Easement
      Decision:           Approved
      Decision Date:      29/10/2020




                                                                                 Page 51 of 77

Section 52

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


13.   Application No.:    RAP20/0035
      Application Type:   Concurrence Agency Referral - Referral Agency Response - Planning
      Applicant:          Peter Maxwell Taylor, Rosemary Jane Taylor
      Registered Plan:    Lot 15 SP 315575
      Location:           13-15 Hilton Esplanade, Tewantin
      Proposal:           Detached House
      Decision:           Approved
      Decision Date:      08/10/2020


14.   Application No.:    REC14/0005.03
      Application Type:   Reconfiguring A Lot - Minor Change to Approval
      Applicant:          Bunnings Properties Pty Ltd
      Registered Plan:    Lot 101 SP 241371
      Location:           178 Eumundi Noosa Road, Noosaville
      Proposal:           Change to current Lot No’s & Extension to Currency Period
      Decision:           Approved
      Decision Date:      29/10/2020


15.   Application No.:    SPS20/0001
      Application Type:   Request for Superseded Planning Scheme
      Applicant:          CJ & W Dowd
      Registered Plan:    Lot 259 N 21858
      Location:           56 Noosa Parade, Noosa Heads
      Proposal:           Short Term Accommodation
      Decision:           Approved
      Decision Date:      16/10/2020


16.   Application No.:    DBW19/0005.03

      Application Type:   Minor Change - Building Work – Code
      Applicant:          SC Scheuer & CL Miller
      Registered Plan:    Lot 595 RP 48112
      Location:           32 Park Crescent, Sunshine Beach
      Proposal:           Minor Change to approval for Additions to Detached House (Coastal
                          Protection)
      Decision:           Approved
      Decision Date:      23/10/2020




                                                                                      Page 52 of 77

Section 53

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 8 DECEMBER 2020


17.   Application No.:    DBW20/0029
      Application Type:   Building Work - Code
      Applicant:          CW Sykes
      Registered Plan:    Lot 566 SP 291328
      Location:           25 Ross Crescent, Sunshine Beach
      Proposal:           Additions to Detached House (Coastal Protection)
      Decision:           Approved
      Decision Date:      14/10/2020


18.   Application No.:    PBA16/0023.02
      Application Type:   Minor Change – Building Work - Code
      Applicant:          NM Lord
      Registered Plan:    Lot 49 RP 81810
      Location:           30 Seaview Terrace, Sunshine Beach
      Proposal:           Minor Change to approval - Extension to Currency Period
      Decision:           Approved
      Decision Date:      29/10/2020


19.   Application No.:    132010.105.01
      Application Type:   Minor Change to Approval
      Applicant:          J McNally
      Registered Plan:    Lot 5 SP 190381
      Location:           30 Moorhen Place, Noosaville
      Proposal:           Minor Change to Approval – Detached House
      Decision:           Approved
      Decision Date:      26/10/2020


20.   Application No.:    51997.2283.02
      Application Type:   Minor Change to Approval
      Applicant:          EarthCert Pty Ltd
      Registered Plan:    Lot 6 SP 120741 & SP 120741
      Location:           “Hilton Park” 80-86 Hilton Terrace, Noosaville
      Proposal:           Minor Change to Approval – Unit 6, enclosing part of existing balcony
      Decision:           Refused
      Decision Date:      06/10/2020




                                                                                      Page 53 of 77

Section 54

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 8 DECEMBER 2020


21.   Application No.:    MCU13/0153.02
      Application Type:   Minor Change to Approval
      Applicant:          GL & MS Properties Pty Ltd
      Registered Plan:    Lot 1 RP 222164
      Location:           148 Eumundi Noosa Road, Noosaville
      Proposal:           Minor Change to Approval – Addition of Hail Netting
      Decision:           Approved
      Decision Date:      29/10/2020


22.   Application No.:    MCU14/0053.02
      Application Type:   Minor Change to Approval
      Applicant:          Cammeray Investments Pty Ltd
      Registered Plan:    Lot 6 N 21827
      Location:           15 Noosa Drive, Noosa Heads
      Proposal:           Minor Change to Approval – removal of additional landscaping condition
      Decision:           Approved
      Decision Date:      23/10/2020


23.   Application No.:    MCU20/0007.01
      Application Type:   Minor Change to Approval
      Applicant:          Project BA
      Registered Plan:    Lot 9 RP 99140
      Location:           71 Noosa River Drive, Noosa North Shore
      Proposal:           Minor Change to Approval – Detached House (Biodiversity)
      Decision:           Approved
      Decision Date:      14/10/2020


24.   Application No.:    MCU20/0084
      Application Type:   Material Change of Use
      Applicant:          VZ Dioszegi
      Registered Plan:    Lot 3 RP 851976
      Location:           328 Upper Pinbarren Creek Road, Pinbarren
      Proposal:           Nature Based Tourism – 3 Cabins
      Decision:           Approved
      Decision Date:      15/10/2020




                                                                                     Page 54 of 77

Section 55

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                              8 DECEMBER 2020


25.   Application No.:    MCU20/0087
      Application Type:   Material Change of Use
      Applicant:          Noosa Building Certifiers
      Registered Plan:    Lot 9 MCH 1714
      Location:           199 Maximillian Road, Noosa North Shore
      Proposal:           Dwelling House (Riparian Buffer)
      Decision:           Approved
      Decision Date:      16/10/2020


26.   Application No.:    OPW18/0343.01
      Application Type:   Minor Change of Approval
      Applicant:          Bluecare
      Registered Plan:    Lot 9 SP 252905
      Location:           Ben Lexcen Drive, Sunrise Beach
      Proposal:           Minor Change to Operational Works approval – relocation of proposed
                          stormwater
      Decision:           Approved
      Decision Date:      30/10/2020


27.   Application No.:    OPW20/0148
      Application Type:   Operational Works
      Applicant:          J Heerings
      Registered Plan:    Lot 298 RP 856170
      Location:           20 Mermaid Quay, Noosaville
      Proposal:           Boat Lifting Device
      Decision:           Approved
      Decision Date:      02/10/2020


28.   Application No.:    OPW20/0152
      Application Type:   Operational Works
      Applicant:          Hpt 4 Services Pty Ltd
      Registered Plan:    Lot 1 RP 87781
      Location:           167 Gympie Terrace, Noosaville
      Proposal:           Vehicular Crossover
      Decision:           Approved
      Decision Date:      21/10/2020




                                                                                    Page 55 of 77

Section 56

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


29.   Application No.:    OPW20/0154
      Application Type:   Operational Works
      Applicant:          JDBA Certifiers
      Registered Plan:    Lot 652 P 93128
      Location:           35 Oriole Avenue, Peregian Beach
      Proposal:           Vehicular Crossover
      Decision:           Approved
      Decision Date:      19/10/2020


30.   Application No.:    OPW20/0167
      Application Type:   Operational Works
      Applicant:          Callaghan & Toth
      Registered Plan:    Lot 78 RP 136461
      Location:           26 Jirrima Crescent, Cooroibah
      Proposal:           Roadwork, Stormwater & Vehicular Crossover
      Decision:           Approved
      Decision Date:      20/10/2020


31.   Application No.:    RAL20/0016
      Application Type:   Reconfiguring a Lot
      Applicant:          LA Studdock TTE
      Registered Plan:    Lot 1 RP 902966 & Lot 7 SP 142413
      Location:           1089 Cootharaba Road, Cootharaba
      Proposal:           Reconfiguring a Lot – Boundary Realignment
      Decision:           Approved
      Decision Date:      09/10/2020


32.   Application No.:    REC14/0005.02
      Application Type:   Reconfiguring A Lot - Minor Change to Approval
      Applicant:          Bunnings Properties Pty Ltd
      Registered Plan:    Lot 101 SP 279285
      Location:           178 Eumundi Noosa Road, Noosaville
      Proposal:           Change to current Lot No’s & Extension to Currency Period
      Decision:           Approved
      Decision Date:      29/10/2020




                                                                                      Page 56 of 77

Section 57

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 DECEMBER 2020


 33.     Application No.:        RAP16/0044.01
         Application Type:       Minor Change to Referral Agency Approval
         Applicant:              Duncan Squires Building Pty Ltd
         Registered Plan:        Lot 279 RP 48111
         Location:               37 Ferguson Street, Sunshine Beach
         Proposal:               Minor Change to Approval – Detached House
         Decision:               Approved
         Decision Date:          16/10/2020


 34.     Application No.:        RAP20/0038
         Application Type:       Referral Agency – Planning
         Applicant:              ST Irwin
         Registered Plan:        Lot 86 P 9311
         Location:               22 David Low Way, Peregian Beach
         Proposal:               Referral Agency Response – Planning for additions to dwelling house (3
                                 storeys)
         Decision:               Approved
         Decision Date:          29/10/2020


 35.     Application No.:        RAP20/0043
         Application Type:       Referral Agency – Planning
         Applicant:              AJ Law
         Registered Plan:        Lot 41 RP 52918
         Location:               91 Upper Hastings Street, Noosa Heads
         Proposal:               Referral Agency Response – Planning for additions to dwelling house (3
                                 storeys)
         Decision:               Approved
         Decision Date:          29/10/2020


Departments/Sections Consulted:
       Chief Executive Officer        Community Services                           Corporate Services
       Executive Officer              Community Development                        Financial Services
       Executive Support              Community Facilities                         ICT
                                      Libraries & Galleries                        Procurement & Fleet
                                      Local Laws                                   Property
                                      Waste & Environmental Health                 Revenue Services

       Executive Services         x   Environment & Sustainable Development        Infrastructure Services
       Community Engagement           Building & Plumbing Services                 Asset Management
       Customer Service           x   Development Assessment                       Buildings and Facilities
       Governance                     Economic Development                         Civil Operations
       People and Culture             Environmental Services                       Disaster Management
                                      Strategic Land Use Planning                  Infrastructure Planning,
                                                                                   Design and Delivery




                                                                                              Page 57 of 77

Section 58

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      8 DECEMBER 2020


5                        NOOSA COUNCIL CARBON FOOTPRINT REPORT 2019/2020
DOCUMENT INFORM AT ION




Author                           Project Officer Carbon Reduction, Anne Nolan
                                 Environment & Sustainable Development Department

Index                            ECM/ Subject / Carbon Emission Reduction (ZEN)

Attachments                      1.   Electricity Consumption Data for Council Owned Large Sites


EXECUTIVE SUMMARY
Noosa Council’s Zero Emissions Organisational Strategy 2016-2026 (“ZEN Strategy”) aims to
achieve an ambitious net zero emissions target by 2026. The following report provides details of
the 2019/20 carbon footprint and outlines the actions that have been undertaken in line with the
ZEN Strategy and the Cities Power Partnership pledges.
Council’s carbon footprint has been calculated in accordance with the Climate Active Carbon
Neutral Standard, previously known as the National Carbon Offset Standard (NCOS). In 2019/20
Council’s carbon footprint was 49,999 tonnes CO2e. This is a 2% reduction from the previous
year’s carbon footprint.
Emissions from the decomposition of organic matter in the Noosa Landfill comprise 63% of
Council’s carbon emissions. There has been a slight increase in emissions from the landfill in
2019/20 compared to the previous year, due to reduced landfill gas capture. Council is continuing
to work with the landfill gas contractor to improve gas capture. The forthcoming waste strategy will
consider further opportunities to reduce organic waste to landfill in addition to existing green waste
bins.
Emissions from electricity consumption in Council operations decreased by 25%, compared to the
previous year. Council has implemented energy efficiency savings such as LED lighting upgrades,
air conditioning changes and has also installed over 490 kW of Solar PV on Council properties
which has resulted in net electricity consumption savings from the electricity grid of around 50–
60% depending upon the site and the size of the PV system. This was also reflected in a 28%
reduction in emissions associated with the transport and distribution of electricity (Scope 3)
compared to the previous year.
A revised methodology for the calculation of embedded emissions in purchased goods and
services (Scope 3) resulted in an 8% reduction compared to the previous year.
As a result of a 3rd party review of Council’s footprint methodology, and a new set of guidelines for
the Climate Active Carbon Neutral Standard, emissions from Council related business travel have
been included this year’s carbon footprint. Council officers will continue to improve data collection
methodology for emissions calculation from leased assets and employee commuting to be included
in future carbon footprints as recommended by the review.
To date, Council has focussed on reducing emissions at the source, however it is likely that an
“emissions floor” will be reached whereby further emission reductions are not technically or
economically feasible. Council will need to consider options for dealing with residual emissions
such as sequestration and offsetting in the future.

RECOMMENDATION
That Council note the report by the Project Officer Carbon Reduction to the Planning &
Environment Committee Meeting dated 8 December 2020 that includes a calculation of the 2019/20
Carbon Footprint for Noosa Council and its progress towards the target of net zero emissions by
2026 .



                                                                                           Page 58 of 77

Section 59

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


REPORT
1.    INTRODUCTION
The purpose of this report is present Council’s carbon footprint for the financial year 2019/20 and
to advise of the initiatives undertaken to continue to reduce its emissions.
Noosa Council’s Zero Emissions Organisational Strategy 2016-2026 (“ZEN Strategy”) aims to
achieve an ambitious net zero emissions target by 2026.
This report outlines Council’s achievements in accordance with the principles and key actions
outlined in the Zero Emissions Noosa Organisational Strategy 2016-2026, the ZEN Organisational
Action Plan 2017-2020 and Council’s pledges under the Cities Power Partnership (CPP).
As a member of the Cities Power Partnership (CPP), Council pledged to take action and report on
the following key actions:
1.    Install renewable energy (solar PV and battery storage) on Council buildings;
2.    Support community facilities accessing renewable energy through incentives, support or
      grants;
3.    Implement landfill gas methane flaring or capture for electricity generation;
4.    Adopt best practice energy efficiency measures across all Council buildings, and support
      community facilities to adopt these measures; and
5.    Encourage sustainable transport use (public transport, walking and cycling) through Council
      transport planning and design.
2.    ZERO EMISSIONS NOOSA ORGANISATIONAL STRATEGY 2016-2026
Key Action 1: Council will continue to improve its knowledge and data collection. It will
measure emissions using credible measurement tools.
Council’s 2019/20 carbon footprint has been prepared in accordance with the requirements of the
Climate Active Carbon Neutral Standard for Organisations1 and national legislation and relevant
international standards. These included:
     National Greenhouse and Energy Reporting (Measurement) Determination 2008,
       Compilation No. 10, Registered 1 July 2018
     Greenhouse Gas (GHG) Protocol Corporate Accounting and Reporting Standard, 2004
     GHG Protocol Corporate Value Chain (Scope 3) Accounting and Reporting Standard, 2011
The organisational emissions inventory, also known as a “carbon footprint”, is defined in
accordance with section 2.3.1 of the Climate Active Standard using an “operational control”
approach. For an organisation, the emissions boundary must include all relevant emissions
sources. This includes all emissions under the direct control or ownership of an organisation as
well as emissions that are a consequence of the organisation’s activities but outside of its direct
ownership or control.
The entities included in the Noosa Council’s carbon footprint cover its administration and
operations across the Shire and includes the following Council operated facilities:
   The J
   Noosa Aquatic Centre
   Noosa Leisure Centre
   Noosa Day Respite Centre
   Noosa River Holiday Park
   Boreen Point Holiday Park
   Noosa North Shore Campground
   Peregian Beach Digital Hub
   Noosa Landfill.

1 Previously known as the National Carbon Offset Standard (NCOS) for Organisations.


                                                                                      Page 59 of 77

Section 60

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   8 DECEMBER 2020


The carbon footprint also includes Council-owned streetlights and those provided by Energex but
operated by Council.
In order to calculate the carbon footprint, three types of emissions are differentiated.
Scope 1 emissions include all direct greenhouse gas emissions from sources that are within the
organisation’s control boundary.
Scope 2 emissions include purchased electricity, heat, cooling and steam (i.e. energy produced
outside the organisation’s control boundary but used within the organisation).
Scope 3 emissions are all indirect emissions that occur as a result of the activities of the
organisation, but occur from sources outside the organisation’s control boundary.
Emissions associated with the activities within Council’s footprint include Scope 1 or “direct
emissions” including:
    the use of fuel in Council’s transport fleet and stationary equipment; and
    fugitive emissions from the Noosa Landfill.
Emissions from Council’s fuel use were calculated using activity data (litres) and applying the
relevant emission factors for the specific fuel from the current edition of the National Greenhouse
Gas Factors1. Emissions arising from the landfill were determined in accordance with National
Greenhouse and Energy Reporting Scheme (Measurement) Determination 2008 as updated
annually2.
Scope 2 or “indirect emissions” included the emissions associated with the consumption of
electricity from the national electricity grid in Council’s buildings and facilities and Rate 3
streetlights. Emissions from electricity were calculated using activity data (kilowatt-hours) and
applying the relevant emission factor for Queensland electricity from the current edition of the
National Greenhouse Gas Accounts Factors August 20193.
Scope 3 emissions occur from sources owned or controlled by other entities in the Council’s value
chain (e.g., materials suppliers, third-party logistics providers, travel suppliers, lessees and lessors,
franchisees, retailers, employees, and customers). The GHG Protocol Corporate Value Chain
(Scope 3) Accounting and Reporting Standard was applied in the consideration of Scope 3
emissions sources. Council considered the 15 categories listed in Section 5.4 of the Standard and
considered the following categories should be included in the in the calculation of Council’s Scope
3 emissions where data is available:
    Purchased goods and services
    Capital goods
    Upstream transport and distribution of fuel
    Business travel
    Upstream leased assets
    Investments.
Emissions sources are relevant to the organisation’s carbon footprint when any two of the following
conditions are met:
1.    The emissions from a particular source are likely to be large relative to the attributable
      emissions.
2.    The emissions from a particular source contribute to the responsible entity’s greenhouse gas
      risk exposure.
3.    The emissions from a particular source are deemed relevant by key stakeholders.

2 https://www.legislation.gov.au/Details/F2020C00600
3 https://www.industry.gov.au/data-and-publications/national-greenhouse-accounts-factors-2019


                                                                                         Page 60 of 77

Section 61

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


4.    The responsible entity could influence emissions reduction from a particular source.
5.    The emissions are from outsourced activities that were previously undertaken within the
      organisation’s boundary or from outsourced activities that are typically undertaken within the
      boundary for products or services
Accurate data was not available for the electricity consumption of Council’s leased assets and
estimation methods did not accurately reflect the usage patterns of Council’s tenants. Similarly,
accurate data for Council employee commuting was not available and has been excluded for the
2019/20 carbon footprint. Council officers are endeavouring to determine efficient data collection
methods to include these sources in future years.
Based on the relevance test, the following Scope 3 emissions were excluded from the 2019/20
carbon footprint calculations
    Purchased goods and services – where an initial screening resulted in supplier emissions
      estimated at <300 tonnes of CO2e
    Investments – at the time of reporting data was not available for inclusion
Key Action 2: GHG emissions will be measured annually. Progress towards the defined net
zero emissions target will be included in Council’s annual reporting.
The 2019/20 Carbon Footprint is presented in Table 1

                                    Noosa Council Carbon Footprint 2019/20
                                              Emissions (tonnes CO2e)         % of total footprint
Scope 1
Transport Fuels                                           823                         1.6%
Stationary Fuels                                          200                         0.4%
Refrigerants                                              229                         0.5%
Landfill emissions                                      31427                        62.9%

Scope 2
Electricity - large sites                                1295                         2.6%
Electricity small sites                                   588                         1.2%
Rate 3 Streetlights                                       108                         0.2%

Scope 3
Purchased goods & services –
operational & capital                                   12834                        25.7%
Business Travel                                             54
                                                                                      0.1%
3rd Party controlled Streetlights                        2093                         4.3%
Fuel losses – transport & distribution                    348                         0.7%

Total emissions                                         49999
                            Table 1: Noosa Council Carbon Footprint 2019/20

To demonstrate the changes in Council’s emissions over time, Table 2 provides the carbon footprint
by year and illustrates a material >10% increase or decrease in emissions from the previous year
through colour coding: – red showing an increase in emissions from the previous years, green
shows a decrease in emissions from the previous year and no colour show the emissions with a
small variation (<10%) from the previous year, or that the emissions were not included in the
previous year’s calculations.

                                                                                        Page 61 of 77

Section 62

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


                                                           Emissions (tonnes CO2e)

                                        2015/16        2016/17       2017/18    2018/19      2019/20

 Scope 1
 Transport Fuels                             788           752           896          861       823
 Stationary fuels                            333           303           156          114       200
 Refrigerants                                                                         229       229
 Landfill emissions                       36122         32697          26712     30649        31427
 Total Scope 1                            37243         33752          27764     31853        32679

 Scope 2
 Purchased electricity Council             2150           2147          2094         1847      1295
 Controlled large Sites
 Purchased electricity Council               701           632           656         712        588
 Controlled small sites
 Purchased electricity Council               106           104           105         107        108
 Controlled street lights and public
 lighting (Rate 3)
 Total Scope 2                             2957           2883          2855          2666     1991

 Scope 3 Emissions
 Purchased goods & services               13104         12143          15201     13933        12834
 operating & capital
 Business Travel                                                                                 54
 Staff commute
 Leased premises
 3rd Party controlled streetlights         1995           1970          2000         2046      2093
 Electricity & Fuel losses –                 544           645           560         483        348
 transport & distribution
 Total Scope 3                            15643         14758          17761     16462        15329
 Total Emissions                          55843         51393          48381     50981        49999
                          Table 2: Noosa Council Carbon Footprint over time

The carbon footprint is discussed in more detail below.
1.    Total Emissions
The total emissions for Noosa Council in 2019/20 was 49,999 tonnes CO2e. This is a 2% reduction
compared to the 2018/19 footprint. It should be noted that the 2019/20 carbon footprint calculations
included emissions from business travel including flights and accommodation which was not
included in previous years calculations:
In future carbon footprints, emissions from leased assets and employee commuting to work may
be added to the footprint depending upon accurate data calculations.
2.    Scope 1 – Direct emissions
Transport and stationary fuel
The data collection methodology changed slightly in the 2019/20 year. Data was sourced directly
from the suppliers for volume of fuel purchased during the financial year. This is considered a more
accurate approach than previously used. As such there is an apparent slight decrease in transport
fuels (4%) and a significant increase in stationary fuels (75%). Transport fuel is used in registered
road vehicles, whereas stationary fuel is used by plant and equipment that is not road registered.

                                                                                        Page 62 of 77

Section 63

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                        8 DECEMBER 2020


Transport and stationary fuel emissions comprise under 2% of Council’s total carbon footprint.
However, Council vehicles are a particularly visible symbol of the commitment to zero emissions.
Whilst there have been a number of hybrid vehicles added to the fleet, more fully electric vehicles
are becoming available and could be considered where appropriate for the business need.
Landfill Emissions
The greatest source of Council’s greenhouse gas emissions (63%) is the fugitive emissions from
the landfill. These emissions are a result of community waste disposal. Organic matter such as
green waste, food waste, paper and cardboard produce methane as they decompose under landfill
conditions. Methane is 28 times more potent as a greenhouse gas than CO2.


               Noosa Council Waste to landfill and estimated
                               emissions
 60000

 50000

 40000

 30000                                                                         Waste to landfill (T)

 20000                                                                         Estimated Emissions (T CO2e)

 10000

       0
           2012/132013/142014/152015/162016/172017/182018/192019/20

     Figure 1: Noosa Council Landfill - Waste to landfill, methane captured and emissions over time

Emissions from the landfill have increased slightly (2.5%) compared to 2019/20 as the amount of
methane captured was less than the previous year, whilst the amount of waste deposited in the
landfill increased by approximately 2%. The degradation of organic waste in landfills is a complex
series of chemical and biological reactions. Landfill conditions, weather conditions, age of the
waste and gas extraction equipment productivity will all affect the methanogenic bacterial action
and hence the resultant landfill gas capture.
Council officers continue to work with the contractors managing the landfill gas operation to improve
landfill gas capture. New lateral lines and vertical wells are being installed into waste cells as soon
as practicable. It is expected that the methane gas capture will increase following the installation
of new gas wells in the latter part of 2020.
This organic material which makes up 65% of waste, breaks down under landfill conditions to
produce the methane that is captured and flared. Council officers are exploring further technological
and behavioural change initiatives to improve waste management and reduce overall waste
generation and waste to landfill in the Noosa Shire as part of the upcoming waste strategy project.

3.     Scope 2 - Indirect emissions
Purchased electricity
Whilst the emissions from the purchase of electricity from the grid are a small percentage of
Council’s total carbon footprint, the business case for the implementation of energy efficiency and
on-site renewable energy generation is positive and reduces the impact of increased electricity
prices in the future. Overall, there was a 25% reduction in emissions from electricity consumption
in 2019/20 compared to the previous year.



                                                                                               Page 63 of 77

Section 64

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                                8 DECEMBER 2020


Council controlled large sites
Council has been working to reduce emissions from electricity purchased from the electricity grid.
Overall there has been a 30% decrease in emissions from Council large sites in 2019/20 compared
to the previous year. Removing the impact of the COVID 19 shut downs results in a 25% reduction
in emissions from the purchased electricity of these sites from the previous year.
Figure 2 shows Council’s total electricity consumption of the Council-owned large sites for each
financial year, to enable comparison for the same month (and season) across the years.

                    Noosa Council Large Sites - Electricity Consumption per
                                        financial year
     300,000.00


     250,000.00


     200,000.00


     150,000.00


     100,000.00


      50,000.00


             -
                     Jul     Aug    Sep    Oct    Nov       Dec   Jan     Feb      Mar   Apr   May    Jun

                                      FY 17/18   FY 18/19     FY 19/20   FY20/21

                           Figure 2: Noosa Council Large sites' electricity consumption

Note the following:
       July-August 2019, the Noosa Aquatic Centre was shut for renovation
       The reduced consumption during April and May 2020 demonstrates the Council site closures
         because of COVID–19
As part of the ZEN Strategy, Council has installed the following solar systems across its buildings
and facilities
                 Location                            Size kW             Installation Date
                 Noosa Aquatic Centre                     26             September 2018
                 The J                                    50             June 2018
                 Noosaville Depot                         50             June 2018
                 The Respite Centre                       36             October 2018
                 Cooroy Library                           58             November 2018
                 Noosa Leisure Centre                     32             June 2018
                 Cooroy Butter Factory                    20             May 2020
                 Noosa River HP                           46             July 2020
                 Tewantin Admin                           90             June 2019
                 Noosaville Library                       72             July 2020
                 Pomona Depot                             10             May 2019
                 Total                                   490
                                    Table 3: Noosa Council Solar installations


                                                                                                     Page 64 of 77

Section 65

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    8 DECEMBER 2020


Energy efficiency initiatives such as LED lighting upgrades and air conditioning replacements and
improvements have also resulted in decreased electricity consumption from the grid.
The consumption graphs for each individual site are provided in Attachment 1. The following
outlines the initiatives and the resultant savings at individual sites to October 2020. The analysis
removes the impact of the COVID-19 related shut down for comparison.
The J
A 50 kW solar system was installed in June 2018.
The electricity consumption from the grid for July 2019–February 2020 was 37% lower than for the
same period without solar. This is a significant result as much of The J’s electricity consumption
occurs at night. The solar system exports electricity that is generated in excess of the site’s needs
to the electricity grid, which offsets some of the night time consumption.
Noosa Leisure Centre
Energy efficient initiatives include the progressive retrofit of LED lighting, the installation of energy
efficient fans and the installation of a 32kW solar PV in August 2018.
    Electricity consumption from the grid in July 2019–Feb 2020 was 50% lower than for the
      same period prior to the installation of solar
Noosaville Depot
Energy efficiency initiatives include the installation of an inverter air conditioning system, retrofit of
office LED lighting and the installation of a 50kW solar PV in June 2018.
    Electricity consumption from the grid in July 2019–Feb 2020 was 77% lower than for the
      same period prior to the installation of solar.
Cooroy Library
Energy efficiency initiatives include improvements to the air conditioning system controls, retrofit of
LED lighting and the installation of a 60kW solar PV system in November 2018.
    Electricity consumption from the grid in July 2019–Feb 2020 was 64% lower than for the
      same period prior to the installation of solar.
Noosa Aquatic Centre
Energy efficiency improvements include LED lighting retrofit and the installation of a 26kW solar
system in November 2018.
    Electricity consumption from the grid in July 2019–Feb 2020 was 19% lower than for the
      same period prior to the installation of solar (adjusting for NAC renovation shutdown and
      COVID). .
Tewantin Administration Building
A 90 kW system was installed in June 2019 as part of the roof replacement capital project. Energy
efficiency projects including the installation of LED lights have significantly reduced electricity
consumption.
    Electricity consumption from the grid in July 2019–Feb 2020 was 60% lower than for the
      same period prior to the installation of solar.
Noosaville Library
An innovative lightweight solar panel system was installed on the Noosaville Library in July 2020.
    Electricity consumption from the grid for the first three months since installation was 61%
      lower than for the same period prior to the installation of solar




                                                                                          Page 65 of 77

Section 66

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                       8 DECEMBER 2020


Council small electricity consumption sites
Council has numerous small sites that use electricity from the grid. These “small sites” consume
less than 100,000kW per annum. There has been an 18% reduction in emissions from electricity
consumption at these sites in the 2019/20 carbon footprint compared to the previous years.
    A 36 kW solar system was installed at the Noosa Day Respite Centre in November 2018 and
      has reduced electricity consumption and emissions from the grid by 64%.
    The 10kW system from the Tewantin Admin building was repurposed to Pomona Depot when
      the new large system was installed on the Tewantin building.
    A 20kW system has been installed at the Cooroy Butter Factory in May 2020
Council Controlled Streetlight (Rate 3)
Emissions from Council-controlled streetlights (Rate 3) in 2019/20 were equivalent to emissions in
2019/20. As Rate 3 lights fail, they are replaced with more efficient LED lights.
4.    Scope 3 emissions
Scope 3 emissions showed a reduction of 7% compared to the previous year. Emissions from the
transport and distribution of electricity and fuel have reduced by 28% compared to the previous
year due to the reduction in electricity consumption from the grid as a result of energy efficiency
and solar installation.
The methodology used to calculate embedded emissions in purchased goods and services was
improved in the 2019/20 calculation and this is reflected in 8% reduction as compared to previous
years.
A 3rd party specialist carbon measurement and management consultancy, Pangolin & Associates
undertook a gap analysis of Council’s carbon footprint methodology as compared to the
requirements of the Climate Active standard. The consultant’s report recommended emissions
from business travel, employee commute and leased assets were also included in Council’s
footprint.
In the 2019/20 Carbon footprint report, business travel was included. Council officers will
endeavour to obtain accurate data for employee commute and leased assets for inclusion in future
carbon footprints.
5.    Emission Reduction Targets
The international scientific community has recognised that to avoid catastrophic impacts of climate
change, global emissions must be reduced to zero by 2050, however a recent report4 advises that
global emissions need to reach net zero by 2030 to avoid runaway climate change impacts. The
Noosa Council target of net zero emissions for its operations by 2026 is an ambitious target that
recognises our responsibility and opportunity to reduce Council’s emissions at a greater rate and
show leadership to the community and is in line with this recent report
To achieve this ambitious target, emissions modelling has shown that an annual reduction of 11%
year upon year is required. Council will continue to reduce emissions, however there will be a point
where emissions may reach an “emissions floor” whereby further emission reductions are not
economically or technologically feasible. To achieve net zero emissions, Council will be required
to consider alternate options including sequestration opportunities as well as generating or
purchasing carbon offsets.




4 Spratt, D ., Dunlop,I., & Taylor (2020) Climate Reality Check 2020.   Breakthrough – National
Centre for Climate Restoration


                                                                                            Page 66 of 77

Section 67

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                  8 DECEMBER 2020


Key Action 3: The decision-making framework outlined in the Strategy will be used when
determining the appropriate approach to reduce emissions for a specific activity.
The decision-making framework is outlined below:




           Figure 3: Hierarchy of Decision Making Framework for Zero Emissions Noosa

The following actions have been undertaken in accordance with the decision making framework:
Avoid – Staff are encouraged to turn off all equipment when not in use.
Reduce – Council has been implementing energy efficiency measures such as changes to LED
lighting, upgrading air conditioning and changing pool cars to energy efficient small hybrid sedans.
Change - Council has installed over 270 Kilowatts of rooftop solar PV on Council buildings. The
reduction in electricity consumption from the grid has been significant, as discussed above.
Offset – To date, Council has focussed on reducing emissions at the source and will consider
options for dealing with residual emissions such as sequestration and offsetting in the future.
Key Action 4: A detailed Action Plan will be developed that will prioritise actions over an
initial 5-year period (and ultimately 10 years). Funding of actions will be considered as part
of the annual budget development process.
Given the changing nature of technologies and approaches to energy reduction, an initial 3 year
action plan was developed.
An audit undertaken of Council buildings and facilities identified over 40 potential projects which
Council could undertake to reduce its emissions. Council developed a Marginal Abatement Cost
Curve (MACC) to compare potential energy efficiency and carbon reductions projects and rank
them based on their economic feasibility and potential impact. The MACC is used to prioritise the
projects which will achieve the greatest emission reductions for the dollar spend. To date over 30
energy efficiency and solar projects have been implemented.
With the development of the Noosa Council Climate Change Response Plan, a further action plan
will be developed to identify the requirements for Council to achieve its net zero target by 2026

                                                                                       Page 67 of 77

Section 68

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                   8 DECEMBER 2020


Key Action 5: The process outlined in the Strategy will be utilized when determining the
appropriate approach to the purchase of carbon offsets.
The decision-making process for the purchase of offsets in outlined below in Figure 4.




                  Figure 4: Decision-making process for the purchase of offsets

To date Council has been pursuing emission reductions by avoiding emissions, reducing emissions
by improving energy efficiency, and changing energy to renewable sources as shown in Table 3.
The purchase of offsets is the last resort option when considering actions to achieve net zero
emissions.
Due to the legacy of landfill emissions, it is likely that Council will reach an “emissions floor”
whereby further emission reductions are not technically or economically feasible. Therefore to
achieve net zero emissions Council may need to purchase carbon offsets or identify quantifiable
greenhouse gas reductions. During 2019/20 Council commenced investigating the quantum of this
emissions floor and the likely cost of purchasing carbon offsets. This work is ongoing and will inform
the development of an emissions offset strategy.
3.    CITIES POWER PARTNERSHIP
Council has joined the Climate Council’s Cities Power Partnership (CPP). The CPP is a national
program to highlight the initiatives local councils are undertaking to reduce emissions and address
climate change. It is a requirement of CPP membership for participating Councils to select 5 key
actions from The Partnership Action Pledges related to the following categories:
    Renewable Energy
    Energy efficiency
    Sustainable Transport
    Work together and influence
The following 5 key actions were endorsed by Council at the Ordinary Meeting of 18 January 2018
as they align with Council’s Sustainability Principles, ZEN Strategy, Transport Strategy and the
Waste Reduction and Recycling Plan. The status of each of these actions is outline in Table 4.




                                                                                      Page 68 of 77

Section 69

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      8 DECEMBER 2020


Pledge                                                  Status

Install renewable energy (solar PV and battery          Ongoing as discussed above
storage) on council buildings

Support community facilities accessing renewable        Council has supported community facilities through
energy through incentives, support or grants.           the Council grant scheme. In 2019/20, Council
                                                        provided grants for community projects for LED
                                                        lighting, installation of solar PV, an electric vehicle
                                                        expo and bike workshops, School “race to zero”
                                                        program

Implement landfill gas methane flaring or capture for   Ongoing as discussed above
electricity generation

Encourage sustainable transport use (public             Progressing in accordance with Council’s Transport
transport, walking and cycling) through Council         Strategy and Go Noosa Campaign which outlines a
transport planning and design.                          range of initiatives including new technology, park
                                                        and ride services, support of sustainable transport
                                                        options and free holiday buses.

Adopt best practice energy efficiency measures          Ongoing as discussed above.
across all Council buildings, and support community
facilities to adopt these measures.
                        Table 4: Status of Cities Power Partnership Pledges

4.   FUTURE INITIATIVES
Council will continue to reduce its emissions in line with decision making framework of the ZEN
Strategy and shown in Figure 3. The following actions are planned or currently underway:
Landfill emissions
   Continue to educate and encourage residents to place green waste in the green bin and
     reduce organic matter going to landfill (status - ongoing).
   Investigate further opportunities and costs to divert organic matter from landfill (status –
     ongoing).
   Work with Landfill gas contractors to identify opportunities to improve methane capture at the
     landfill. (status – ongoing)
Transport Fuels
   Monitor the opportunities for energy efficiency in Council fleet (status-ongoing).
Electricity consumption
   Install roof top solar systems on Council-owned small sites
   Review the cost effective options to achieve net zero emissions for its electricity supply such
     as:
     o      Continued energy efficiencies and staff behavioural change
     o      Continuation of roof top solar installation
     o      Entering into a renewable energy Power Purchasing Agreement
     o      Investigating a Council-owned solar farm
     o      Purchasing “green power”
Offsets
   Develop an Carbon Offset Strategy for residual emissions


                                                                                             Page 69 of 77

Section 70

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020


Community Engagement
   Assist community groups to reduce their electricity consumption, costs and emissions
     through Council grants (status – ongoing)
   Investigate opportunities for Council to assist the Noosa community reduce emissions as part
     of the Noosa Council Climate Change Response Plan currently in development.

Previous Council Consideration

Ordinary Meeting Minutes, 18 January 2018, Item 8, Page 6
That Council note the report by the Project Officer - Carbon Reduction to the General Committee
Meeting dated 15 January 2018 regarding the Zero Emissions Noosa Organisational Action Plan
2017-2020 and:
A.   Approve the Net Zero Emissions Noosa Organisational Action Plan 2017-2020; and
B.   As a member of the Climate Council Cities Power Partnership pledge to take action and
     report on the following key actions;
     1.    Install renewable energy (solar PV and battery storage) on Council buildings;
     2.    Support community facilities accessing renewable energy through incentives, support
           or grants;
     3.    Implement landfill gas methane flaring or capture for electricity generation;
     4.    Adopt best practice energy efficiency measures across all Council buildings and
           support community facilities to adopt these measures; and
     5.    Encourage sustainable transport use (public transport, walking and cycling) through
           Council transport planning and design.
Ordinary Meeting Minutes, 19 May 2016, Item 2, Page 10
That Council note the report by the Executive Manager to the Planning and Environment Committee
Meeting dated 10 May 2016 and the further report to the General Committee Meeting dated 16
May 2016 and adopt the Emission Reduction Policy provided at Attachment 1 to the General
Committee Report.
Finance
In 2019/20 a capital budget of $500,000 was allocated to the ZEN implementation project.
The ZEN Project Control Group reviewed the ERM Energy recommendations from the MACC and
determined the projects to be undertaken in the 2019/20 financial year in accordance with the
following criteria:
   Emissions reduction per $ spend;
   Building works status of each facility;
   Capital cost; and
   Total emission reduction achieved.
The capital projects (outlined above) were completed within budget.
Risks & Opportunities Strategic Risks
The 2018 Intergovernmental Panel on Climate Change (IPCC) Report 5 has warned that there is
only 12 years in which to take significant global action to keep global warming to a maximum of
1.5oC, beyond which increases the risk of lasting and irreversible changes to global biodiversity,
ecosystem integrity, human health, food security and economic growth.
Without continued action to reduce Council’s own emissions, there is a risk that Council is not
taking its share of responsibility to deal with global climate change, the effects of which will be
exacerbated in the Noosa Shire.

                                                                                    Page 70 of 77

Section 71

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                    8 DECEMBER 2020


Financial Risk
Council will eventually reach an “emissions floor” whereby the emission reduction initiatives
undertaken on Council facilities reach a level where further reductions are not technologically or
economically viable. To achieve its net zero emissions goal, Council will be required to purchase
carbon offsets. This will result in an annual financial liability to Council. The price of carbon offsets
is likely to increase over time due to increased demand within the voluntary and regulatory
environment. Council officers are also investigating opportunities for generating its own carbon
offsets.
Any changes to the carbon footprint calculation methodology such as the inclusion of leased
premises and employee commuting will potentially increase Council’s emissions as result, the
number of carbon offsets that Council will need to generate or purchase. Council is also
investigating carbon draw down methodologies which may result in a decrease in the number of
offsets required to be purchased.
Project Risk
The risk of implementing energy efficiency and renewable energy projects is low. The price of
renewable energy is reducing over time and the technology is improving over time.
Time Risk
The Council’s target is net zero emissions by 2026. This is a very ambitious target and there is a
risk that Council will not achieve this without considering sequestration opportunities or
generating/purchasing carbon offsets.
Consultation
External Consultation - Community & Stakeholder
Nil
Internal Consultation
     ZEN Project Control Group
       o   Director Environment and Sustainable Development
       o   Director Corporate Services
       o   Director Executive Services
       o   Director Community Services
     ZEN Operational Team
       o   Representative managers and staff
This report provides the annual status update to Council of the implementation of the ZEN
organisation strategy and Council’s carbon footprint. In addition to this annual report, a number of
workshops have been held with Council over the past 12 months to provide updates and discuss
a range of initiatives towards zero emissions.
Departments/Sections Consulted:
      Chief Executive Officer   X   Community Services                      X   Corporate Services
      Executive Officer         x   Director                                x   Director
      Executive Support             Community Development                       Financial Services
                                x   Community Facilities                        ICT
                                    Libraries & Galleries                       Procurement & Fleet
                                    Local Laws                                  Property
                                x   Waste & Environmental Health                Revenue Services

      Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
      Director                  x   Director                                    Director
      Community Engagement          Building & Plumbing Services                Asset Management
      Customer Service              Development Assessment                  x   Buildings and Facilities
      Governance                    Economic Development                        Civil Operations
      People and Culture        x   Environmental Services                      Disaster Management
                                x   Strategic Land Use Planning             X   Infrastructure Planning,
                                                                                Design and Delivery


                                                                                           Page 71 of 77

Section 72

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 72 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 DECEMBER 2020

                                                                                        Attachment 1

               Electricity consumption data for Council owned large sites

                                          The J - kWh/FY
             30,000

             25,000                                                    Solar installed
                                                                               |
             20,000                                                            |
             15,000

             10,000                                                            y

              5,000

             kWors    Jul  Aug  Sep  Oct  Nov   Dec  Jan  Feb  Mar  Apr  May   Jun
                    mFY16/17    © FY17/18   ™mFY18/19  mFY19/20    mFY 20/21

                              Figure 1: The J electricity consumption

                                          Cooroy Library - kWh/FY
             30,000

             25,000
                                   Solar installed

             20,000

             15,000

             10,000

              5,000

              kWhrs   Jul  Aug  Sep  Oct  Nov   Dec  Jan  Feb  Mar  Apr  May   Jun
                    mFY16/17.   “FY17/18    mFY18/19   mFY19/20    mFY20/21

                          Figure 2: Cooroy Library electricity consumption

                                                                                    Page 72 of 77

Section 73

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 73 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                      8 DECEMBER 2020

                              Council Admin Building - kWh/month
           40,000

           35,000                                                            Solar
           30,000                                                               |
           25,000

           20,000
                                                                               v
            15,000

            10,000

            5,000

         kWhrs       Jul Aug   Sep  Oct  Nov   Dec  Jan  Feb  Mar  Apr  May   Jun
                   mFY16/17    = FY17/18  mFY18/19    mFY19/20    mFY20/21

                    Figure 3: Tewantin Admin Building electricity consumption

                              Noosaville Depot - kWh/FY
           25,000

            15,000

            10,000
            5,000                                                            .
                                J
        kWhrs
                     Jul Aug   Sep  Oct  Nov   Dec  Jan  Feb  Mar  Apr  May Jun
              m FY 16/17 © FY 17/18 @ FY 18/19 @ FY 19/20 @ FY+Graphs!$31:531 20/21

                       Figure 4: Noosaville Depot electricity consumption

                                                                          Page 73 of 77

Section 74

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 74 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                      8 DECEMBER 2020

                               Noosa River Holiday Park - kWh/FY
             60,000
                       Solar
             50,000      |
             40,000     |
             30,000

             20,000

             10,000

          Kwhr        Jul  Aug  Sep  Oct  Nov  Dec  Jan  Feb  Mar  Apr  May   Jun
                    mFY16/17    w= FY17/18 mFY18/19   mFY19/20    mFY20/21

                     Figure 5: Noosa River Holiday Park electricity consumption

                               Lock and Weir - kWh/FY
             12,000

             10,000

              8,000

              6,000

              4,000

              2,000

          kWhr        Jul  Aug  Sep  Oct  Nov  Dec  Jan  Feb  Mar Apr   May   Jun
                    mFY16/17    “FY17/18   M@FY18/19  mFY19/20    mFY20/21

                           Figure 6: Lock & Weir electricity consumption

                                                                          Page 74 of 77

Section 75

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 75 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 DECEMBER 2020

                                 Noosaville Library - kWh/FY
              20,000
              18,000
              16000
              14,000
              12,000
              10,000
               8,000
               6,000
               4,000
               2,000

                        Jul Aug   Sep  Oct   Nov  Dec   Jan  Feb  Mar   Apr  May  Jun
          kWhrs       mFY16/17    © FY17/18   M@FY18/19   mFY19/20    mFY20/21

                          Figure 7: Noosaville library electricity consumption

                                 Noosa Leisure Centre - kWh/FY
              18,000
              16,000
              14,000
              12,000
              10,000
               8,000
               6,000
               4,000
               2,000

          kWhrs    /                                                     |
                       Jul  Aug   Sep  Oct  Nov   Dec  Jan   Feb  Mar  Apr  May   Jun
              (2,000)

                     mFY16/17.    ~FY17/18    ™mFY18/19   mFY19/20    mFY20/21

                        Figure 8: Noosa Leisure Centre electricity consumption

                                                                                  Page 75 of 77

Section 76

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020




                                                      Page 76 of 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                       8 DECEMBER 2020

           O                                 O                                 O
                              Noosa Aquatic Centre - kWh/FY
            “

            140,000             |
            120,000             }
            100,000             }
             80,000
           O                                                                   O
             60,000

             40,000

             20,000

             kWhrs   Jul  Aug  Sep  Oct Nov  Dec  Jan  Feb  Mar  Apr May Jun
                   M@FY16/17  “FY17/18   MFY18/19   FY 19/20   MFY 20/21
           ©                                 Oo                                0

                        Figure 9: Noosa Aquatic Centre Electricity consumption

                                                                            Page 76 of 77

Section 77

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 DECEMBER 2020



7   CLOSED SESSION

    Nil.




                                                      Page 77 of 77

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗