Planning Report 3032
13
Specific Outcomes Proposed Solutions
O12 An adequate and accessible water supply is All proposed lots will be connected to a
provided for fire fighting purposes. reticulated water supply that is reliable and
conforms to Council’s Standards.
Energy efficiency
O13 The street and lot orientation facilitates the In designing the subdivision layout
construction of energy efficient buildings that consideration has been given to street and lot
respond to the local climate conditions. orientation and how buildings can respond to
local climate conditions. All lots contain
AND sufficient area to allow orientation of dwellings
to optimise solar access.
O14 For residential development, the subdivision
design provides for the maximum practicable number
of lots with house site areas that—
a) maximise solar access to the north in winter;
b) minimise solar access to the east and west in
the summer;
c) maximise access to any prevailing summer
breezes; and
d) minimise exposure to prevailing winter winds.
Infrastructure
O15 Each lot is capable of being serviced by All lots will be connected to power supply,
appropriate levels of— telecommunications services, water supply and
a) water supply; sewerage reticulation.
b) reticulated sewerage;
c) stormwater drainage; The proposed location of the Lots in relation to
d) power supply; and existing infrastructure allows for services to be
e) telecommunications; provided in an efficient manner with minimal
AND impact on the environment.
O16 The design and provision of public services and
utilities, including sewerage, water, electricity, street
lighting and telecommunication services—
a) meets the needs of users;
b) ensures health, safety and convenience of the
community;
c) protects the natural environmental values of
the site and surrounds, including visual amenity
and native vegetation;
d) are cost effective over their life cycle;
e) minimises adverse impacts to the environment
(including the amenity of the local area) in the
short and long term; and
f) ensures that the existing systems are upgraded
or relocated to be capable of supporting the
proposed development;
AND
O17 Essential public utilities are available and
maintain their function during flood events up to a 1%
AEP (1:100 year ARI) flood event.
Electricity supply infrastructure No proposed lots are located in close proximity
O18 Uses and works maintain a safe distance from to any electrical supply infrastructure.
electrical infrastructure including substations,
overhead power lines, power poles and transformers.
Earthworks and stormwater management
O19 Stormwater run-off is managed so as not to Each lot has appropriate means of disposing
cause any adverse impacts on the built or natural stormwater with the topography allowing for all
environment including changes in quality, quantity or stormwater from the proposed Lots to flow into
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.