Rational Method
For a 1 year ARI storm in Noosa:
51, = 128mm / hr
60ho = 72m/hr
From Table 4.05.3(a) of QUDM:
C,o = 0.76
FY = 0.80
5Qr = 0.76 x 0.80 x 128mm If hr x 1686m2
= 0.036m3 / sec
Swale Capacity - Mannings
For Swale 2 flowing full:
A =0.3x1.0=0.3m2
P = 2 x 0.3 + 1.0 = 1.6m
R = A/P = 0.188m
n = 0.04 (medium grass)
s = 0.005
V = R213 S12/n=0.188213x0.0051 /2/0.04
= 0.58m / sec
Q = V.A = 0.58m / sec x 0.3m2
= 0.174m3 / sec >>5Q,
This proposed Swale 2 is adequate to convey 1 year ARI flows and hence 3 month ARI flows.
3. Demonstrate that there will not be an increase in runoff in events that exceed the
design capacity of the swales. Appropriate detention must be demonstrated where
required.
All rainwater incident on the proposed development, up to 100 year ARI events is to be infiltrated
on site via Rapid Infiltration Pits as demonstrated in the application. As such there will be no
runoff from the site for events up to 100 year ARI and no increase in runoff from the site for
events up to 100 year ARI, satisfying the requirements of QUDM and Condition 49.
4. Revise surface treatment proposed for swales so that it is low maintenance and likely
to maintain its modeled configuration during the long term and consistent with the
-- -requirements of -the approvedmanagement plans---
Drawings have been revised to remove reference to turf in swales (despite its successful use on
previous adjacent stages). We defer to the landscape architect for details of Swale planting.
S3000/11/L5/Response to Information Request - Sunshine Coast Regional Council
SH/cw
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.