Council archive · source document
RESPONSE TO FURTHER ADVICE -Updated Design and Landscape Plans · MCU25/0054
Plans and drawings: the text below has words only, no drawings.
Very large file (14.9 MB): may take a few minutes to open.
♻ play your part - print on recycled paper
5m 4 3 2 1
Min. building height and setback line as detailed in Noosa
Plan 2020 6.3.3 AO9.1 shown from typical NGL 1.365m COLORBOND® ultra steel rebated gutter/flashing to be
AHD fixed in accordance with manufacturers specifications and
hydraulic engineers detail.
STRATCO 200mm Edge gutters in COLORBOND® steel COLORBOND® steel Custom Orb oof sheeting to be fixed
Boundary
Boundary
to be fixed in accordance with manufacturers in accordance with manufacturers specifications.
specifications. 180 x 30mm h3 treated primed timber
fascia. Gutters to have 10mm spacers to fascia to provide 12,836
overflow point. 600 top of roof AHD
10.0° 600
1,500
3,670 Balcony facing boundary to have additional intermediate
bdy to wall battens added to provide privacy screen max. opening not
11,850 to exceed 50%.
11,490
Ceiling
Suspended concrete green roof to be in accordance with
structural engineers design and detail. Planter to have
40mm upvc drainage outlets and Soprema Landscape
2,500 2,500
3,000
Concrete block wall to be in accordance with structural waterproofing system with premium soil fill and plants to
bdy to wall bdy to wall
2,740
engineers design and detail. Provide acrylic render landscapers specifications.
system with fine sand finish and painted with selected
colour in accordance with final colour selections to Knotwood Hinoki 100 x 50mm @150mm cts. to provide
exposed wall surfaces. balustrade in accordance with ABCB Housing Provisions
8,750 Standard 2022 : 11.3. Balustrade to be a min. 1000mm
Second floor high above finished floor level.
HDG steel spiral stairs to be in accordance with HDG steel spiral stairs to be in accordance with
manufacturers design and detail. Stairs to be in manufacturers design and detail. Stairs to be in accordance
3,000
3,150
accordance with ABCB Housing Provisions Standard with ABCB Housing Provisions Standard 2022 : 11.2 Stairs
2022 : 11.2 Stairs and handrail to have selected powder and handrail to have selected powder coated finish with 75
coated finish with 75 x 25mm Knotwood Hinoki hit & miss 2,930 2,030 x 25mm Knotwood Hinoki hit & miss batten balustrade
batten balustrade screen to spiral staircase. bdy to batten bdy to batten screen to spiral staircase.
5,600
First floor
Knotwood Hinoki 150 x 25mm battens @150mm cts. to
4,515 5,160 2,500
bdy to column provide privacy screening.
4,280
2,900
4,500
2,900
2,700 2,700
Ground floor
HDG steel spiral stairs to be in accordance with
manufacturers design and detail. Stairs to be in
accordance with ABCB Housing Provisions Standard
2022 : 11.2 Stairs and handrail to have selected powder
coated finish with 75 x 25mm Knotwood Hinoki hit & miss
batten balustrade screen to spiral staircase.
Eastern Elevation
E 1:100
/Users/benthornton/Documents/Cadfiles/2502 - Palazzesi - 20 William/
Archicad/01082025/2502.pln
sbt designs pty ltd t/a
Skale Building Design project Residence lot no. 3 DA05 Development application issue 1/8/2025
project number
Mobile: 0412 025 657
for Ross Palazzesi plan no. RP 63813 DA04 Development application issue 31/7/2025
2502
skale skale.com.au
DA03 Development application issue 10/6/2025
20 William Street drawn BT
DA02 Development application issue 25/3/2025
drawing number
[email protected]
building design A.C.N. 123 976 296 QBCC: 1143 609 at Noosaville scale (A3) 1:100 Rev Details Date 12 DA05 © Skale Building Design
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RESPONSE TO FURTHER ADVICE -Updated Design and Landscape Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.