Original source · versioned page text
2022-06-13 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 13 JUNE 2022 5. ITEMS REFERRED FROM COMMITTEES PLANNING & ENVIRONMENT COMMITTEE 1 RAL21/0033 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF A LOT (1 LOT INTO 8 LOTS) AT 60 GLENRIDGE DRIVE COOROIBAH In accordance with Chapter 5B of the Local Government Act 2009, Cr Lorentson provided the following declaration to the meeting of a declarable conflict of interest in this matter: I, Cr Lorentson, inform the meeting that I have a declarable conflict of interest in this matter due to my personal relationship with the applicant Mark Bain and the Bain Family who are family friends. We have attended social events together, and our children have attended school together. As a result of my conflict of interest, I will leave the meeting room while the matter is considered and voted on. Cr Lorentson left the meeting. Committee Recommendation Moved: Cr Stockwell Seconded: Cr Finzel That Council note the report by the Development Planner to the Planning and Environment Committee meeting of 7 June 2022 and: A. Approve the application and Issue a Development Approval in accordance with the following Conditions: PLANNING 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development detailed below. These plans must be amended in accordance with the conditions. Plan No. Rev. Plan/Document Name Date 21598-P001 D Locality and Site Plan 23.05.2021 21598-P002 C Roadworks and Drainage details 05.05.2021 21598-P003 E Earthworks Plan 23.05.2021 Doc 21598_RP1 B Tod Engineering Report in support of 24.03.2021 Development Application J001001 RP01 to B Vegetation Management and Covenant Area 05.05.2022 RP04 Rehabilitation Plan Concept V2 prepared by North Coast Environmental Services 21-0288 FS001 V5 Flood Investigation by Peak Urban 05.05.2022 J002001 RP05 B Fencing Plan (issue B V2) 05.05.2022 J1001001 V2 Bushfire Hazard Assessment and Management 05.05.2022 Plan prepared by North Coast Environmental Services 2. All works are to be carried out generally in accordance with the Flood Investigation – 60 Glenridge Dve, Cooroibah Version 5 prepared by Peak Urban dated 05/05/2022. 3. All buildings and structures must be located within the building envelopes shown on Plan 21598-P001 Rev D, prepared by TOD, 23.05.2022, as amended by this approval. 4. Buildings within the proposed Lots are to be provided with finished floor levels in accordance with Table 4-5 of the approved flood investigation report, unless a higher Page 3 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.