Original source · versioned page text
Attachment 1 - Information Request Response
Attached to the e-mail Response to Council’s Information Request - MCU21/0183 & OPW21/0292 - 9 Ruby Street Cooroy.
EXAMPLE -CCTV Re Pakt Conduit Inspection Date: Asset owner's job ref.: Asset Owner: Operator : Section number: Pipe Asset Id: 9/07/2016 UNITY 1 2536517 Time of inspection: Cleaning: Standard: LRP. Conduit Unit Length Method of Inspection 13:30:22 not cleaned WSA 05-2008 2.2 Inside Face of the Wall 0.90 m Television Camera Town: Catchment: US MH: 2668647 Suburb: Client: Survey Dir: upstream Street: Precipitation.: No DS MH: 2668594 Asset Location Private Property Flow control No measures Inspect Lenght: 63.60 m Purpose of inspection: Buildover Shape : Circular Use of Conduit: Sewage Dia/Height: 1560 mm Type of Conduit: Gravity Width: Lining Method: Pipe Material: Vitrified clay Remarks 1:435 Position Code Observation MPEG Photo Grade 66859: 0.00 STMH _ Start node, maintenance hole, Nodename: 2668594 00:00:32 0 0.00 WLC Water level, clear flow (the invert is visible) 00:00:33 0 20.36 IR Infiltration, Running--a continuous flow , at 4 o'clock 00:05:37 1_3A, 1 1_3B MC Change of conduit material. New material, u-PVC 00:14:19 1_4A 0 RF Fine roots--a relatively small number of flexible minor roots 00:14:23. 1_5A 41 , feduction in cross sectional area, at joint, Obstruction: <5% , from 8 to 9 o'clock JIRN Jointing material intrusion, Seal visibly displaced/damaged 00:14:59 1_6A 3 but not intruding into conduit , from 10 to 12 o'clock JNGO — Junction open, good workmanship, diameter 100mm _, at 2 00:11:59 1_4A, 0 o'clock 1_4B MC Change of conduit material. New material, Vitrified Clay 00:16:26 0 MC Change of conduit material. New material, u-PVC 00:18:18 4_9A 0 JNGO — Junction open, good workmanship, diameter 100mm _, at 2 00:18:45 1_10A, 0 o'clock 1_10B A 47.99 MC Change of conduit material. New material, Vitrified Clay 00:20:17 0 53.19 RM A Mass of mostly fine Roots, which has developed into an 00:21:59 1_12A 3 interwoven clump, at joint, Obstruction: 5-20%, Lf @MANHOLE, from 4 to 8 o'clock e6B64 53.50 FHMH _ Finish node, maintenance hole, Nodename: 2668647 00:22:42 0 STR no def STR peak STR mean STR total STR grade SER no def SER peak SER mean SER total SER grade 0 0 0 0 1 4 30 0.99 53 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.