Attachment 1 - Information Request Response

Attached to the e-mail Response to Council’s Information Request - MCU21/0183 & OPW21/0292 - 9 Ruby Street Cooroy.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                ingeniir


               By providing positive surface drainage in the rear of the lot to Opal Lane the development will
               have a beneficial impact on the neighbouring properties to the West.

          b. The existing impervious area in the rear portion of the allotment (fronting Opal Lane) is
             comprised of 2 sheds and paved landscaping around the pool area totaling 170m2. The proposed
             roof area of the new building is 160m2 hence is less than the existing impervious area to be
             removed as part of the development, as such will be non-worsening for stormwater runoff.

          c.   The development only proposes to redirect surface flows on the rear portion of the allotment to
               avoid draining to Opal Lane through the neighbouring property to the West; and will drain to
               Opal Lane directly as a result which is considered a beneficial outcome.



     5. Provide amended plans, prepared by a RPEQ, detailing the proposed roadworks, including
        but not limited to :
           a. Pavement design, including connection to existing concrete pavement, thickness,
               reinforcement, concrete strength, etc.;
           b. Stormwater discharge details, including scour protection, cross sections, etc.

          a.   Refer accompanying engineering plans revised to include the proposed pavement details
               matching that of the IPWEAQ standard RS-051 crossover. Details have been added for pavement
               connection to existing.

          b. The stormwater from the site is to discharge to a kerb adapter in accordance with IPWEAQ
             standards. The scour protection is provided by the pavement widening added to opal lane. Cross
             sections can be found on the standard drawings for the outlet.

If you wish to discuss this matter further, please contact Daniel Kenna.

Yours sincerely,


Daniel Kenna
Beng CPEng MIEAust RPEQ 15522 NER 3133685 EC 66121


for and on behalf of Ingeniir Pty Ltd




                                                    Ingeniir Pty Ltd | 212602-RFI-01
                     ABN: 99 642 485 363 | PO Box 988 Maroochydore QLD 4558 | [email protected] | 0404157187
                                                               Page 3 | 4
Log in to download the original file

Attachment 1 - Information Request Response.pdf · 5.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.