Attachment 1 - Information Request Response
Attached to the e-mail Response to Council’s Information Request - MCU21/0183 & OPW21/0292 - 9 Ruby Street Cooroy.
5. The building work is to be located and the footings/foundations to be constructed as detailed
within the approved drawings listed below, which are to be integral to the building development
approval issued by the building certifier for the work.
Approved Drawings
Drawing Number
Drawing Title Prepared by Date
(Revision/Issue)
C01-01
Site Plan Valentine Building Design 02.07.2021
Rev. A
Sheet PS01
Footing & Slab Layout Ingeniir 09.07.2021
Issue 1
NB – Approved Drawings are enclosed
6. Any variation to the approved drawings will require a further referral to Unitywater for
consideration prior to commencing the building work. Such amended proposals will be considered
on their individual merits and may or may not be considered favourably.
7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
sewerage property connection point, must be accurately located on the property prior to
commencing the building work. In the event the actual clearance is less than design clearance, a
further referral to Unitywater is required and the resultant response shall be acted upon
accordingly.
8. A CCTV Survey of the sewer main as shown on the enclosed GIS Map is to be performed by an
independent contractor and submitted within twenty (20) business days from the footing system
for the building work having been completed.
NOTE: To submit the relevant CCTV video file/s and report documentation to Unitywater, send
an email request to [email protected] to arrange an Objective Connect link
to be provided to you for upload of the CCTV footage and CCTV written report
• The results (Video and Technical Report) must include the asset I.D numbers as shown on
the GIS Map and is to be submitted to Unitywater for assessment within ten (10) business
days of the CCTV Survey having been completed.
• The survey must be conducted utilising a tracked vehicle with a rotating camera head and
the lens is to be free of water and obstructive material.
• The Technical Report may be in hard copy and/or electronic format and must identify the
location and characteristics of reportable features (i.e. sewer main defects) and other
essential details necessary to define the extent of the survey (i.e. the length of the main,
chainages of defects, sewer property connections, etc). An example of an acceptable
Technical Report is enclosed for your reference.
*IMPORTANT – A ‘Notice of Finalisation’ for this Concurrence Agency Referral Response will
be issued once the CCTV Survey has been received, reviewed and it is determined there has
been no impact to the sewer main resulting from the construction of the footing system.
Page 2 of 3
Revision No: 7 Revised Date: 04/09/2020 Next Review Date: 04/09/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.