Skip to the record
Beware of cheap imitations.

Council archive · source document

Recommendation - Noosa Iconic Panel - 010.2008.00001787.001 [As Published] · 132008.1787

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

       MATERIALS ON-SITE                   DESTINATION
                                           Re-use and Recycling                    Disposal
       Expected     waste    Estimated     On-site            Off-site             *specify
       materials             volume        *specify proposed *specify              contractor    and
                             (m³)          re-use or on-site contractor      and   landfill site or
                                           recycling          recycling outlet     other     disposal
                                           methods                                 site
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
       Plasterboard
       Metals - please
       specify
       Asbestos
       Other - please
       specify
      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.
      The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.
Acoustic Amenity
104. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
     pumps etc) shall comply with the following requirements:
      The equipment shall be installed and located in a manner that prevents excessive noise in
      accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
      the-spot fines) may apply for offences.
      Noise emission from mechanical equipment shall comply with the following requirements:
      Air-conditioning and Refrigeration
             7am to 10pm: Maximum background + 5dB(A)
             10pm to 7am: Maximum background + 3dB(A)
      Pumps
             7am to 7pm: Maximum background + 5dB(A)
             7pm to 10pm: Maximum background + 3dB(A)
             10pm to 7am: No audible noise.
105. Written certification from a suitably qualified person shall be submitted confirming that the
     noise levels from all mechanical equipment comply with the levels detailed above when
     measured at either the residential boundary or outside the most exposed part of an affected
     building, whichever is the closest to the equipment.
      The certification is required immediately after installation of the equipment and prior to any
      occupation of the building, and in a format approved by Council. This assessment must take

                                                                                   Page 14 of 25

Used in these records

About this file

File size
399 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Recommendation - Noosa Iconic Panel - 010.2008.00001787.001 [As Published].pdf · 399 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.