Page 24 of 25 [OCR of page images] 8. EPA Permit number: _IPCC01277908 Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works must be immediately rectified. . Acid Sulfate Soils 9. The latest edition of the Queensland Environmental Protection Agency's INSTRUCTIONS FOR THE TREATMENT AND MANAGEMENT OF ACID SULFATE SOILS, 2001, must be complied with when treating and managing acid sulfate sails. 10. Acid sulfate soils must be managed such that contaminants are not directly or indirectly released to any waters. a Water Quality 41. Contaminants must not be released from the site to any waters or the bed and banks of any waters. 12. All appropriate measures must be taken to prevent the release of contaminants (including but not limited to sediment runoff, fuel, oil and hydraulic fluid) to any waters or the bed and banks of any waters during construction of the works. 13. Any excavation or filling on site must be constructed, installed and maintained: (a) so as to maintain the local and regional drainage or hydrological systems; (b) so that changes in water chemistry will not impact on ecological values on or off site; (c) so that any changes in surface water hydrology do not result in any adverse impacts to surrounding environmental values. Storm Water 14. Design and construction of works stormwater drainage must ensure that alt contaminants are captured and retained within the works area. 15. Any stormwater outlet from the site must be constructed and maintained to prevent the release of contaminants and localised erosion or scouring. Any erosion or scouring that occurs must be repaired immediately. Coastal Management 16. The works must not result in any adverse impacts on the surrounding environment, nor cause any long- term maintenance and management implications. 17. Should the works be damaged as a result of sea erosion or storm tide inundation, the approval holder shall be responsible for the removal of all debris. 18. The chief executive administering the Coastal Protection and Management Act 1995 may order the works. to be removed or modified, within a reasonable time, if the works have or are likely to have a significant effect on coastal management because the works: (a) create a danger to the public; or (b) cause erosion or land degradation; or (c) are unstable. Page 5 of 6 Environmental Protection Agency Page 24 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Recommendation - Noosa Iconic Panel - 010.2008.00001787.001 [As Published]Related documentApplication case desk ↗
001A9300.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 399 KB (small file)
- File type
No other editions are linked here.