Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Recommendation - Noosa Iconic Panel - 010.2008.00001787.001 [As Published] · 132008.1787

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Page 24 of 25


[OCR of page images]
8.

EPA Permit number: _IPCC01277908

Any erosion or loss of sand surrounding the works that occurs because of changes caused by the works
must be immediately rectified. .

Acid Sulfate Soils

9. The latest edition of the Queensland Environmental Protection Agency's INSTRUCTIONS FOR THE
TREATMENT AND MANAGEMENT OF ACID SULFATE SOILS, 2001, must be complied with when
treating and managing acid sulfate sails.

10. Acid sulfate soils must be managed such that contaminants are not directly or indirectly released to any
waters. a

Water Quality

41. Contaminants must not be released from the site to any waters or the bed and banks of any waters.

12. All appropriate measures must be taken to prevent the release of contaminants (including but not limited
to sediment runoff, fuel, oil and hydraulic fluid) to any waters or the bed and banks of any waters during
construction of the works.

13. Any excavation or filling on site must be constructed, installed and maintained:

(a) so as to maintain the local and regional drainage or hydrological systems;

(b) so that changes in water chemistry will not impact on ecological values on or off site;

(c) so that any changes in surface water hydrology do not result in any adverse impacts to surrounding
environmental values.

Storm Water

14. Design and construction of works stormwater drainage must ensure that alt contaminants are captured
and retained within the works area.

15. Any stormwater outlet from the site must be constructed and maintained to prevent the release of

contaminants and localised erosion or scouring. Any erosion or scouring that occurs must be repaired
immediately.

Coastal Management

 

16. The works must not result in any adverse impacts on the surrounding environment, nor cause any long-
term maintenance and management implications.

17. Should the works be damaged as a result of sea erosion or storm tide inundation, the approval holder
shall be responsible for the removal of all debris.

18. The chief executive administering the Coastal Protection and Management Act 1995 may order the works.
to be removed or modified, within a reasonable time, if the works have or are likely to have a significant
effect on coastal management because the works:

(a) create a danger to the public; or
(b) cause erosion or land degradation; or
(c) are unstable.
Page 5 of 6 Environmental Protection Agency

Page 24 of 25

Used in these records

About this file

File size
399 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Recommendation - Noosa Iconic Panel - 010.2008.00001787.001 [As Published].pdf · 399 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.