Skip to the record
The gold standard in government transparency.

Council archive · source document

Decision Notice - 010.2008.00001070.001 [As Published] · 132008.1070

of 9

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                       2008/1070



Contributions Towards Council Infrastructure
20.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
       upgrading various infrastructure at the rates applicable at the time of payment. An estimate
       only of the contribution amounts under the current Council policies and requirements is
       outlined in the table below:

        Contribution Required For:                                                    Amount:
        PSP20 – Pathway Trunk Network Contributions                                   $703.00
        TOTAL Contribution Amount =                                                   $ 703.00
        Please note, that these amounts are all subject to variations in the Consumer Price Index, All
        Groups Brisbane from June 2008 until the date of payment.

       All contributions must be paid prior to the issue of a Development Permit for Building Works.

       Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
       contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
       full.

       Processing of bonds for security where specific Council approval has been given for the
       bonding of contributions will incur an administration fee in accordance with Council’s Land
       Development Commercial & Regulatory Fees at the time of lodgement.

       In the event that the Development Permit for Material Change of Use of Premises lapses or is
       cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
21.    Any damage caused to any public utility during the course of construction shall be repaired to
       Council’s standards and at no cost to Council.
22.    Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site shall be at no cost to Council.
23.    The transportation of all materials to and from the site shall be undertaken in a manner such
       that no particle matter escapes onto a public road. All vehicles carrying materials either to or
       from the site shall be covered to prevent materials including dust being windblown from the
       vehicle.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                      Date
 0803 1001 CD              B        1 - Ground, 2 - Roof – Peter Hull         25 May 08
                                    Architect Pty Ltd


                                                                                      Page 4 of 9

Used in these records

About this file

File size
63 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001070.001 [As Published].pdf · 63 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.