Original source · versioned page text
RFI - D - Vehicle swept paths
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ALTUM SWEPT PATH LAYOUT PLAN
DATUM:
SHEET 2 OF 5
PROJECT NO:
188-002
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
PROJECT:
245 DAVID LOW WAY,
No. DATE REVISIONS BY CKD DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
[email protected] PEREGIAN BEACH QLD 4573 PLAN No 188-002-801 REVISION B A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.