Original source · versioned page text
2021-10-21 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 21 OCTOBER 2021
Plan No. Rev. Plan/Document Name Date
A105B B Site Elevations by Middap Architecture 18.03.2019
A106B B Typical Villa Sections by Middap Architecture 18.03.2019
A201B B Villas and Service Core Floor and Roof Plan by Middap 18.03.2019
Architecture
A202B B Proposed Villas and Service Core 3D Views by Middap 18.03.2019
Architecture
A203A Proposed Entry Building Floor and Roof Plan by Middap 18.03.2019
Architecture
A204A Proposed Entry Building Elevations and 3D Views by 18.03.2019
Middap Architecture
A205B B Proposed Villa 1 and 2 Floor and Roof Plan by Middap 18.03.2019
Architecture
A206B B Proposed Villa 1 and 2 Elevation and 3D Views by 18.03.2019
Middap Architecture
A207A Proposed Villa 3 and 4 Floor and Roof Plan by Middap 18.03.2019
Architecture
A208A Proposed Villa 3 and 4 Elevation and 3D Views by 18.03.2019
Middap Architecture
1 PART SITE PLAN Received by
Council on
03.04.2020
2 BOUNDARY ELEVATION Received by
Council on
03.04.2020
1714-20 I Design Features Plan 1 of 7 by Callaghan & Toth Civil, November
Environmental & Hydraulic Engineers 2020
1714-27 I Design Setout Plan 1 of 6 by Callaghan & Toth Civil, November
Environmental & Hydraulic Engineers 2020
16519- D Proposed Permanent and Event Day Parking prepared by 08.09.20
C101 TOD Engineers & Project Managers as amended in red
by Council
CD01 P4 Site Plan, prepared by Middap Architecture March 2019
CD 02 - Floor Plan, prepared by Middap Architecture July 2021
P4
C. Include additional Conditions 55, 56 and 57 to read as follows:
Sunset period for temporary staff accommodation.
55. This development approval for 2 temporary accommodation units lapses on 21
October 2026, unless an application to extend the approval is approved by Council.
56. The 2 temporary accommodation units must be for the primary use of staff of the
residential care facility.
57. The 2 temporary staff accommodation units must be connected to the approved
stormwater water management system on site. An updated stormwater
management plan incorporating the units must be submitted to Council prior to the
issue of a Building approval.
D. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 9 of 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.