     3. Stockpiles for soils and materials are to be protect using bunded banks to divert upstream flows, and with
        downstream sediment fencing to prevent sediments being lost from the stockpile area

     4. Diversion of upstream catchments around any exposed areas using diversion drains around the site.

     5. Disturbed areas are to be stabilised through turfing or hydromulching as soon as practicable once
        earthworks are complete.


     4.2. Operational Phase
In accordance with the Noosa Plan 2020 Water Quality and Drainage Code, the proposed development site will be
required to achieve the design objectives for operational stormwater quality as outlined in Table 9.4.8.3 PO6, as
shown in Table 4.1 - Operational Water Quality Objectives below.


                                            Table 4.1 - Operational Water Quality Objectives

                                                  Pollutant                      Percentage Reduction
                                                                                      Target (%)

                                    Total Suspended Solids (kg/yr)                         80

                                        Total Phosphorus (kg/yr)                           60

                                          Total Nitrogen (kg/yr)                           45

                                         Gross Pollutants (kg/yr)                          90


MUSIC modelling has been carried out to assess the proposed development treatment train against these
objectives as described in the following section.


          4.2.1 MUSIC Modelling
The proposed development and the above treatment train have been modelled in MUSIC (Model for Urban
Stormwater Improvement Conceptualisation) software in accordance with the Water by Design MUSIC Modelling
Guidelines (2018).

The climatic data has been modelled using the rainfall and PET data at station 40059 (Cooroy Composite) in 6-
minute timesteps. The rainfall run-off parameters have been set as defined for the Southeast Queensland region,
shown below in Figure 4.2 - Rainfall run-off parameters for SEQ




Project number 20220156                                                                                          Page 13 of 28
File RECOR Stormwater Management Report - 20220156.docx, 2023-01-13 Revision 2

P +61 7 5211 1003                         A 37 Mary St, Noosaville Qld 4566         E [email protected]    recorconsulting.com

Used in these records

About this file

File size
9.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Document MCU22-0144 & OPW22-0207.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.