geotech report · 132003.220660.5
5.2.4 Geotechnical Constraints to Development Based on the contents of Sections 5.1 and 5.2, we consider that there are geotechnical constraints to the proposed development with regards to existing slope instability. However, we note that the excavations required to achieve design surface levels may extend below the existing building footings and temporary batter slopes will not, in most cases, be achievable. Consequently, appropriate care will need to be exercised when completing the excavations and providing support for both the cut faces in sands and the existing footings. Further advice is provided in the following sections of this report. Provided the proposed development is designed and constructed using the advice presented in Section 6, we consider that following construction, the levels of risk to life and property will remain at “Acceptable” levels. 6 COMMENTS AND RECOMMENDATIONS 6.1 Site Layout and Development Details As noted in Section 2 above, the proposed additions to the north and north-east of the house and the proposed lift area will require excavations to a maximum depth of approximately 1.5m adjacent to the northern side of the house. In addition, a new grass covered area will be constructed immediately to the east of the existing house with the eastern (downslope) side of the grass covered area supported by concrete block retaining wall (maximum height about 1m). 6.2 Site Classification Due to the presence of ‘uncontrolled’ fill and noting the low bearing capacity of the near surface soils, the site classification is Class P in accordance with AS2870-2011. The standard designs in AS2870-2011 are not applicable to the proposed alterations and additions and so the design of the footing system must therefore be carried out using engineering principles. 6.3 Demolition and Excavation 6.3.1 Dilapidation Survey We forewarn that Unitywater may require a dilapidation survey report be completed on the sewer main that extends north-south through the site and below a portion of the proposed walkway connecting the addition and the lift access. Unitywater should be asked to confirm that the report, if required, presents a fair record of existing conditions as the report may assist the client in defending themselves from unfair damage claims. 6.3.2 Demolition and Excavation Methods The excavation recommendations provided below should be complemented by reference to the current Safe Work Australia Code of Practice ‘Excavation Work’. 32032URrpt 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
geotech report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.