Council archive · source document
geotech report · 132003.220660.5
a ZoI line advised by Unitywater, such that the sewer line is not surcharged by the footings. In any event, permission will need to be sought from Unitywater in relation to the proposed construction over their asset. 6.11 Site Maintenance We recommend that where dilapidated log retaining walls are to remain that they be inspected by a structural engineer and the walls strengthened or replaced as necessary. 6.12 Overall Effect of the Development on Stability We do not consider that the development will have any detrimental impact on the stability of the site. This is on condition that the design and construction of the proposed development refers to the geotechnical advice presented in this report. 7 CONCLUSION We consider the site is suitable for the proposed development on condition the advice contained in this report is used. The geotechnical advice presented in the preceding sections of this report are intended to achieve “Acceptable” levels of risk instability of the site and to control future risks. The above recommendations address geotechnical issues only and other conditions may be required to address other aspects. 8 GENERAL COMMENTS The recommendations presented in this report include specific issues to be addressed during the design and construction phase of the project. As an example, special treatment of soft spots may be required as a result of their discovery during proof-rolling, etc. In the event that any of the advice presented in this report is not implemented, the general recommendations may become inapplicable and JK Geotechnics accept no responsibility whatsoever for the performance of the structure where recommendations are not implemented in full and properly tested, inspected and documented. Occasionally, the subsurface conditions between and beyond the boreholes and DCP tests completed by ASI and the DCP tests completed by JK Geotechnics may be found to be different (or may be interpreted to be different) from those expected. Variation can also occur with groundwater conditions, especially after climatic changes. If such differences appear to exist, we recommend that you immediately contact this office. This report provides advice on geotechnical aspects for the proposed civil and structural design. As part of the documentation stage of this project, Contract Documents and Specifications may be prepared based on our report. However, there may be design features we are not aware of or have not commented on for a variety of reasons. The designers should satisfy themselves that all the necessary advice has been obtained. 32032URrpt 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
geotech report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.