Council archive · source document
0015062B.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 : . IDAS Assessment Checklist, Version 20, 2 April 2007
| integration of fand use and public “| 22. The application involves: (tick the applicable box/es)—
Pee raaion refet 10 Guide 23, schadulle (1 (i) a material change of use assessable against the planning scheme for a purpose
1 8A of the IPA, & schedul6.2 of the [P Regulation. mentioned in schedule 43C of the IP Regulation and exceeding the thresholds set by that
| Unless you afiswered “none of the above", the schedule.
application triggers referral toOQT asa = **
concurrence: agency. . an (-] (ii) reconfiguring a lot— .
- can ee Ce [1] (a) on land that is completely or partly within a public transport corridor, and the
Me a total number of lots increases;
re C)(b) on land that is completely or partly within a future public transport corridor or
re an airport's public safety area;
rn (J (c) on land that is within 400m of a public passenger transport facility or a future
i mem “ public passenger transport facility, and the total site area is 5000m? or greater;
pe (1) (d) for a residential purpose within the 25 ANEF contour for an airport;
ia cS : LJ (e) for a residential purpose resulting in 100 or more allotments.
Bes ee [7 (ii) operational work assessable against the planning scheme, but not associated with a
a ee ae material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
AME RE ofa nS above, on land that—
Pomeg Swat or oe [1 (a) _ is completely or partly within a public transport corridor or a future public
ee transport corridor;
hag cet ee gt (J (b) will result in work that encroaches into an airport's operational airspace.
[ ee EL Aw none ote above ce oe ee
Railway safety and efficiency oo ' 23. The application involves: (tick the applicable box/es)—
; For mote information refer to Guide 23, schedule (J (i) a material change of use assessable against the planning scheme for a purpose
@ Bhar te IPA & seheaus 2of he (E Raauiaton <s 7 mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
{Unless you afiswefed “none of the above’, the. ;
* application triggers refeiral to QT-asa schedule.
concurrence agency. ~ C1] (ii) reconfiguring a fot—
ie DE on, 7 (J (a) on land that is completely or partly within a future public transport corridor,
: yo Lo Ste future railway land or a railway tunne/ easement;
Coe Beeb we (C1) (b) — on land that is within 400m of a Citytrain passenger railway station or a future
: cee te Bae Citytrain passenger railway station, and the total site area is 000m? or
| cue wa greater;
eo Son TS ~ (1) _ onland that abuts rail corridor land, commercial corridor land or future railway
: * nn OO land, and the total number of jots increases, .
; CEE Nee [J (4) on land that abuts rail corridor land, commercial corridor land or future railway
Bo wee es land and an easement abutting the corridor or future railway tand is created;
a CJ (e) on land that is completely or partly within 100m of, and abutting an approach
Sw wo to, a railway level crossing, and the total number of lots increases;
poo ete aes CJ (f} for aresidential purpose resulting in 100 or more allotments.
L woe tte : “a (ili) operational work assessable against the planning scheme, but not associated with a
| oe ty 5 Be iy ett material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii).
i tg eg above, involving extracting, excavating or filling greater than 50m*, on land that—
pO [J (a) is completely or partly within rail corridor land or commercial corridor land, and
@ pP ONE the work is not for rail transport infrastructure or other rail infrastructure;
pF Re Mes (1) (b) _ is completely or partly within future railway land, or a railway tunnel easement,
oe * a [1 (c) abuts rail corridor land, commercial corridor land or future railway land, and .
Poe aR di the work is within 25m of the railway boundary.
po RE (iv) none of the above.
!Moonié:to Brisbane pipeline ° | 24. The application involves the easement for the construction or operation of the Moonie to
‘ For mofe information refer ta schedule 2of the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
jReaudion C1 (i) a material change of use assessable against the planning scheme and not associated
| Ure. a ere enaorat with reconfiguring a lot, and any structure or work will be located wholly or partly in the
{ pipeline licence No‘1 issuéd under'thie Petfoleum easement.
{ Act 1923, currently Santos QNT Ply Lid, for: } (ii) reconfiguring a lot
— ee er aos (1 (ii) operational work assessable against the planning scheme, that is filling, excavation,
Bo we gf compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
i « , work is located wholly or partly in the easement.
CS (iv) none of the above. oe
Page 8See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015062B.001.pdfRelated documentPublic source context ↗
07/0911 - MCU - Dwelling [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.