INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
, State-controlled road matters 2. The application involves: (tick applicable box/es)
‘ For more information refer to Guide"... .. | [} j) development on land contiguous‘ to a State controlled road and for - |
: Unless you answered "none 6f the above’ to Q2, . . .
_ the application triggers referral to the Department C1 (a) material change of use assessable against the planning scheme; -
j tain as (OMA) as a referral agency: (1 (b) reconfiguring a lot unless - |
$n certain circumstances DMR will ba an advice . : .
agency, while in other circumstances DMR will « the total number of lots is not increased; and
: be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
See ee Re seek you to (J (c) operational work (not associated with a material change of use assessable against the
concurrence agericy for the application. . planning scheme or reconfiguring a lot mentioned in (b) above)-
i * associated with access to a State-controlled road; or
i TE ni aye IE 7 e for filling or excavation; or
or See aie a wes an « involving the redirection or intensification of site stormwater from the land, through a
he rs ee pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
a wate od State-controlled road.
Bae ey ar: () (ii) development on land not contiguous to a State-controlled road and -
per Bre ae Te CJ (a) material change of use -
wo a a e assessable against the local government's planning scheme; and
\, ee * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
ryt edi choak ge wey 8 that schedule;
Se Be Lange on Ro [7 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
ay ee ET eA , and exceeding the thresholds set by that schedule;
es . . . ot ‘ . (J (c) operational work (not associated with a material change of use assessable against the
Dt om ee _o planning scheme or reconfiguring a lot mentioned in (b) above)—
whe BF . « assessable against the local government's planning scheme; and .
@ oe * mo « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
2. - as > og that schedule.
bos « ee | tii none of the above
{Clearing vegetation . “13. The application involves: (tick applicable bow/es)
tin tore information refer to Guide 12° «| [] (i) material change of use -
Uriless youafiswered “noite of the above” to Q3;: : . : .
| the-application requires assessment by the. (a) assessable against the planning scheme;
+ Department of Natural Resourges and Water Fr
jw (b) on alot containing 7
-ifan agency other than NRW is.the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation, or
i manager for the applicatian, NRWiS a. 2. 3. + if there is no property map of assessable vegetation for the lot - remnant vegetation,
| orcarenne BOeney ie the application in relation " (c)_ where the existing use of the land is a rural or environmental use; and
a : a st , oe * th : . .
Ht you ticked Q3¢) or (i), your application requifes (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
i referral to NRW for assessment regardless-of *:;. CL {ii) reconfiguring alot-
. whether vegetation, clearing is proposed or not... . _,
‘ Sorte Ene (a) ona lot containing a category 1, 2 or 3 area shown on a property map of
j a eo assessable vegetation or, if there is no property map of assessable vegetation for
poe Bap te won 4 the lot, remnant vegetation;
i Bae de ae (b) where the size of the lot before the reconfiguration is 2 hectares or larger;
ee ae ee Seif (c) where 2 or more lots are created; and
@ Dew ig a a OB (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
- to ms [J (iti) operational work -
pee oe , - (a) for the clearing of native vegetation where the vegetation clearing is made
ee assessable under Schedule 8 of the IPA; and
eB Pssst (b) not associated with a material change of use assessable against the planning
| oe 2 scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
i De ty Se tage fs vi
jor go Sue 4 (iv) none of the above.
j Strategic portland,” | 4. The application involves:
; For mere information refer to ea vata [1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
1 If you Ucked (i) «the rélevant Port Authority is the ;
i assessment manager for the application: = Act) - complete Pat of Form 1 , . . .
"Ifyou ticked (i) Queeristand Transport isa: : C (ii) a material change of use that is inconsistent with the land use plan approved under the
, Concurrence agency for the application, TI Act for the strategic port land - complete Part ! of Form 1
fom cw oo se] Diflijnone ofthe above
4 Land confiquous fo a State-controlled mad is defined in scheduta 14 of the IP Regutation to mean land - if part of the fand is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015062B.001.pdfRelated documentPublic source context ↗
07/0911 - MCU - Dwelling [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.