Skip to the record
Accept no imitations.

Council archive · source document

0015062B.001

of 20

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                        IDAS Assessment Checklist, Version 20, 2 April 2007
          , State-controlled road matters         2.   The application involves: (tick applicable box/es)
          ‘ For more information refer to Guide"... .. | [} j) development on land contiguous‘ to a State controlled road and for -                                   |
          : Unless you answered "none 6f the above’ to Q2,                   .                                  .             .
          _ the application triggers referral to the Department C1 (a) material change of use assessable against the planning scheme;                                -
          j  tain  as (OMA) as a referral agency:              (1 (b) reconfiguring a lot unless -                                                                    |
           $n certain circumstances DMR will ba an advice                                        .     :         .
           agency, while in other circumstances DMR will              « the total number of lots is not increased; and
          : be a concurrence agency.                                  « the total number of lots abutting the State-controlled road is not increased;
        See ee Re                     seek you to              (J (c) operational work (not associated with a material change of use assessable against the
           concurrence agericy for the application. .                  planning scheme or reconfiguring a lot mentioned in (b) above)-
          i                                                           * associated with access to a State-controlled road; or
          i    TE       ni aye          IE 7                          e for filling or excavation; or
          or See aie            a wes          an                     « involving the redirection or intensification of site stormwater from the land, through a
         he   rs                   ee                                    pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
          a       wate                    od                             State-controlled road.
          Bae         ey     ar:                       () (ii) development on land not contiguous to a State-controlled road and -
          per     Bre ae                Te                     CJ (a) material change of use -
            wo       a      a                                         e assessable against the local government's planning scheme; and
          \,    ee                                                    * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
           ryt     edi    choak ge wey        8                         that schedule;
           Se Be        Lange    on     Ro                      [7 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
                   ay      ee    ET eA                         ,       and exceeding the thresholds set by that schedule;
           es              .     .  .     ot    ‘     .         (J (c) operational work (not associated with a material change of use assessable against the
           Dt                    om  ee     _o                         planning scheme or reconfiguring a lot mentioned in (b) above)—
           whe        BF                    .                         « assessable against the local government's planning scheme; and                         .
@         oe          *                    mo                         « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
         2.               -      as       >    og                       that schedule.
          bos «                         ee       |      tii     none of the above
          {Clearing vegetation    . “13.               The application involves: (tick applicable bow/es)
          tin tore information refer to Guide 12° «|   [] (i)   material change of use -
           Uriless youafiswered “noite of the above” to Q3;: :                       .             :           .
          | the-application requires assessment by the.          (a) assessable against the planning scheme;
          + Department of Natural Resourges and Water                              Fr
          jw                                                     (b) on alot containing                                                         7
          -ifan agency other than NRW is.the assessment              * acategory 1, 2 or 3 area shown on a property map of assessable vegetation, or
          i manager for the applicatian, NRWiS a. 2. 3.              + if there is no property map of assessable vegetation for the lot - remnant vegetation,
          | orcarenne BOeney ie the application in relation    " (c)_ where the existing use of the land is a rural or environmental use; and
          a     :    a     st      , oe  * th   :                                .               .
           Ht you ticked Q3¢) or (i), your application requifes  (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
          i referral to NRW for assessment regardless-of *:;. CL {ii) reconfiguring alot-
          . whether vegetation, clearing is proposed or not... .                   _,
          ‘ Sorte            Ene                                (a)  ona lot containing a category 1, 2 or 3 area shown on a property map of
          j           a eo                                            assessable vegetation or, if there is no property map of assessable vegetation for
          poe               Bap te       won    4                     the lot, remnant vegetation;
          i  Bae de                 ae                           (b)  where the size of the lot before the reconfiguration is 2 hectares or larger;
          ee ae               ee            Seif                 (c)  where 2 or more lots are created; and
@         Dew          ig               a a     OB               (d)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
          -   to                      ms                [J (iti) operational work -
          pee       oe            ,            -                 (a)  for the clearing of native vegetation where the vegetation clearing is made
            ee                                                        assessable under Schedule 8 of the IPA; and
             eB            Pssst                                 (b)  not associated with a material change of use assessable against the planning
          |         oe 2                                              scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
          i De             ty Se tage                   fs            vi
          jor              go           Sue 4               (iv) none of the above.
          j Strategic portland,”                 | 4.   The application involves:
           ; For mere information refer to ea vata      [1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
           1 If you Ucked (i) «the rélevant Port Authority is the   ;
           i assessment manager for the application: =         Act) - complete Pat of Form 1      ,       .       .       .
           "Ifyou ticked (i) Queeristand Transport isa: : C (ii) a material change of use that is inconsistent with the land use plan approved under the
           , Concurrence agency for the application,           TI Act for the strategic port land - complete Part ! of Form 1
           fom cw                oo          se] Diflijnone         ofthe above

           4  Land confiquous fo a State-controlled mad is defined in scheduta 14 of the IP Regutation to mean land - if part of the fand is within 100m of the State-controlled road; or that is part of a future State-
              controlled road.
                                                                                      Page 2

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015062B.001.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.