Council archive · source document
0015062B.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
a %
INTEGRATED PLANNING ACT 1997 _ IDAS Assessment Checklist, Version 20, 2 April 2007
{ Operational work that.is tidal work or. }9. The application involves operational work that is: ( tick the applicable box/es)
“workin COasta) manager eae | LI (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
* snore information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, of .
focal government tidal areas refer to Guide 24. C1 (ii) tidat work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 4;
¢ Unlass you answered ‘none of the above" to 9, or '
“the application requires assessment by thay |. 5 a .
* Envirorimental Protection Agency (EPA): = (J {iti) carried out within a coastal management district under the Coastal Act and for - complete
{If an agency other than EPA is the assessment” Part M of Form 1 if any box/es (a) to (i) below are ticked.
Haetslbhdeaatetr cation ns (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
or for thé ai i iSah 7 GMs - . . . . .
‘relationtothismatier. other than those works in fidal water) where the development has been determined not
bocal government is the assessment managér to be assessable against the Water Act 2000 ;
, all prescribed tidal work, [1 (b) constructing a canal intended to be connected to tidal waters; .
1. ns ae [] (ce) constructing an artificial waterway;
i 7 [1] (d)_ reclaiming land under tidal water;
[ a Ci (e) disposing of dredge spoil or other solid waste material in tidal water;
i Pes oe oe C1 (f) _ interfering with quarry material on State coastal land above high-water mark;
Be tee iy (1) (g) draining or allowing drainage or flow of water or other matter across State
Poe eg coastal land above high-water mark;
ets oe Be gp ae ee Y . . . '
Pe bk ee eRe gE LI (h) removing or interfering with coastal dunes on land, other than State coastal land,
coat geal’ eadbeg de ae that is in an erosion prone area and above high-water mark;
A, 1 , - ere (J (i) constructing a bank or bund wall to establish a ponded pasture on land, other
a “a ee, / than State coastal land, above high-water mark; or : ‘
ee sbotig’ OB ta 3 a .
@ aatt - & ee et at oth Lapeer (iv) none of the above. _ esse er ee es Seen
| Operational work below high water; °) 10. The application involves operational work that is: ( tick the applicable box/es)
43 . . . . . . . ”
es t rick alisn reer Gis i a Fo (1 (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the
| more information about prescribed tidal work in| Coastal Act) that is not prescribed tidal work - complete Part Mof Form 1;0r
local goverment el ae’ ah ‘0 et [71 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF
Unless you answered. “none of the above’ to. - * ess : wpe eyes
ai, psa tigers referral to" Me (] (iii) carried out within a coastal management district under the Coastal Act and for -
/Queensiand Transport (QT).{Maritimg Safety ~: « ‘ : ; ; ore _
| Qld) as aconcurence agency. “=e (J (a) disposing of dredge spoil or other solid waste material in tidal water ~ complete Part
| Local government is thé assessment manager _ Mot Fam ¢,
‘ for all prescribed tidal work: an (J (b) reclaiming tand under tidal water - comptete Part M of Form 1; or
Po +4 oe (J (c) constructing a canal, if the canal is associated with reconfiguring a lot - complete
po Te Th Part M of Form 1;
8 i - Hin none of the above.
j Coastal management; ”..4... | 14. The application involves: (tick the applicable box/es)
‘For more information refer to Guide 18... [7] (i) a material change of use assessable under a planning scheme involving operational
[Uns ou sna a of he abv by ine work carried out completely or partly in a coastal management district
Environmental Protéction’ Agency (EPA)... 1 (ii) a material change of use assessable under a planning scheme involving building
{ if an agéricy other than EPA Is the:agsessment work, carried out completely or partly in a coastal management district that is -
@ Hee emai te apstcabon in erga » the construction of a new premises with a GFA" of at least 1000m?
f relation to.this maiter. *, rs « the enlargement of the GFA of existing premises by more than 1000m?
me RONG a i a aa : is SI
en re (J (ili) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
Sg a A ee completely or partly in a coastal management district
ey Ae ae aT UD ; . . . .
a gay ap Lt sy C) (iv) reconfiguring a fot’ assessable under schedule 8 of the IPA and in connection with
OR ™ the construction of a canal - complete Part M of Form 1
pe Haye So, a, :
Ro ahd | LM (W) mone ofthe above eg
10 Tidal work is dafined in sch 10 of the IPA.
11 Prescribed Uda! work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within 2 local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of ihe IPA. .
14 Preserbed tidal work is defined in the Coastal Protection and Management Regulation 2003 and inctudes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined In sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA Is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
47 Under $117 of the Coastaf Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must ba
accompanied by the application for the operational works to construct the artificial waterway.
Page 4See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0015062B.001.pdfRelated documentPublic source context ↗
07/0911 - MCU - Dwelling [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.