Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Appendix C - Code Assessment

of 31

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Reconfiguring a Lot Code



Development accommodates and provides for the efficient and                                                                                    infrastructure having consideration to their rural residential setting.
timely delivery of infrastructure appropriate to the site’s setting and
intended use.

PO11                                                                      No acceptable outcome provided                                       PO11 – Not Applicable
Roadway and pathway layout are predominantly rectilinear with a                                                                                The development does not involve any roadways or pathways.
high degree of permeability.                                              Editor’s Note— Further detail on traffic and the road network is
                                                                          addressed in Part 9.4.8 Transport Code




Infrastructure services Table 9.5.1.3 Criteria for assessment (part)

Performance outcomes                                                      Acceptable outcomes                                                  Assessment
Scenic amenity
Infrastructure and services

PO12                                                                      AO12.1                                                               AO12.1 – Complies
New lots are located, sized and configured so as to ensure each           All lots are connected to power supply and telecommunications        The lots will be connected to power and telecommunications
lot is capable of being serviced by appropriate levels of                 services and where located within the Urban boundaries, power
infrastructure including:                                                 supply and communications infrastructure are provided                supply.
                                                                          underground.
     a)    power supply;
     b)    telecommunications; and                                        AO12.2                                                               AO12.2 – Not Applicable
     c)    where within Local Plan Areas                                  If located in a water service area each new lot can be connected     The site is not located in a water service area.
     d)    reticulated water supply;                                      to Unitywater’s water supply network.
     e)    reticulated sewerage; and
     f)    stormwater drainage.                                           AO12.3
                                                                          If located in a sewerage service area each new lot can be
                                                                          connected to Unitywater’s sewerage network.                          AO12.3 – Not Applicable
                                                                                                                                               The site is not located in a sewerage service area.
                                                                          AO12.4
                                                                          If located in a Local plan area lots can be connected to Council’s
                                                                          stormwater drainage network.                                         AO12.4 – Not Applicable
                                                                                                                                               The site is not located in a Local plan area.
                                                                          AO12.5
                                                                          If not in a sewerage service area each lot has sufficient area and   AO12.5 – Complies
Log in to download the original file

Appendix C - Code Assessment.pdf · 466 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.