ITEM DESCRIPTION UNIT QTY RATE ($) AMOUNT ($)
(SO) STORMWATER DRAINAGE
-
Notes:
(a)Where trenches and structures are outside of earthworks areas, rates are to allow for clearing,
removal and replacement of topsoil. This is to include reinstatement of areas disturbed as a result of the works.
(b)Disposal of spoil as a result of the installation of services and structures is deemed to be included in the rates.
SD 1 Excavation of open invert compl. incl. disposal
of spoil. Item 1 1000.00 1,000.00
SD 2 Stone pitching open invert (PO)(If Ordered) m2 10 100.00 1,000.00
TOTAL VALUE OF STORMWATER DRAINAGE FOR PROJECT $2,000.00
C~’.J...,
,..,
V’
/PRECISION
[OCR of page images]
SS
Page 4
aca | 48) +
na SONALI
URBANCONSULTANTS
ITEM DESCRIPTION UNIT arty RATE ($) AMOUNT ($)
(SD) - STORMWATER DRAINAGE
Notes:
(a) Where trenches and structures are outside of earthworks areas, rates are to allow for clearing,
removal and replacement of topsoil. This is to include reinstatement of areas disturbed as a result of the works.
(b) Disposal of spoil as a result of the installation of services and structures is deemed to be included in the rates.
sD 1 Excavation of open invert compl. incl. disposal
of spoil. Item 1 1000.00 1,000.00
SD 2 Stone pitching open invert (PQ) (If Ordered) m? 10 100.00 1,000.00
.
TOTAL VALUE OF STORMWATER DRAINAGE FOR PROJECT $2,000.00
reatiyity
/PRECISION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.