Property Projects Australia Applicant’s Response The civil engineering response at Attachment D, demonstrates there are suitable ways of managing any major storm surface flows without impacting on the adjoining building or incurring local flooding. We request the conditions of any development approval require certification by a hydraulic designer or Register Professional Engineer Queensland (RPEQ) prior to the commencement of site works. Issue An existing Unitywater sewer main runs across the site adjacent to the rear boundary and the proposed works have the potential to impact on the sewer main and it’s ongoing maintenance. The submitted material does not demonstrate how the proposed development achieves the Existing Services - Specific Outcomes Ol and O2 Information Required 14. Provide written approval of the proposed works from Unitywater Applicant’s Response The civil engineering response at Attachment D demonstrates that compliance with the Queensland Development Code MP1.4 is achieved and will be addressed as part of the subsequent building approval. Issue The submitted plans do not indicate the necessary frontage works, footpath, as described in The Transport, Roads and Drainage Code Specific Outcome O13. Information Required Toowoomba Brisbane PO Box 3686, Toowoomba Old 4350 PO Box 1264, New Farm QIid 4005 Phone: 07 4632 0516 Phone: 07 3254 1566 Email: [email protected] propertyprojectsaustralia.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.