Att 3_CMP - Final
Attached to the e-mail MCU18/0204 - Response to Information Request - 6 Heron St Peregian Beach - Part 1 of 2.
8. PROPOSED HAULAGE DURING WORKS
Item 8.f. in Council’s information request states:
8. “A preliminary Construction Management Plan … must include but not be limited to;
f. details on the location of external dumps sites, the haulage route, type of vehicle
to be utilised during operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations will be fully repaired at the
applicant’s expense.”
The Developer and Contractor is committed to replace existing Council infrastructure that is
damaged as part of the construction works to a standard which is consistent with Council’s
standards.
All site construction rubbish/waste to be secured, removed and disposed of efficiently so that
minimal visual impact occurs.
Upon appointment of the construction contractor, a Waste Management Plan will be
produced in accordance with Noosa Shire Council’s ‘The Noosa Plan Schedule 8 – Demolition
and Construction Waste Management’.
www.jce.engineering 9 J.C. Engineers Pty. Ltd.
Level 13, 50 Cavill Avenue,
SURFERS PARADISE
QLD 4217
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.