Soil materials, sediment, and turbidity are categorised as ‘pollution’, as is any material that
will change the physical, biological or chemical conditions of the water.
The impacts of contaminated water on a receiving stream include the lowering of liveability
conditions for the aquatic flora and fauna, and the silting of streams and drainage beds.
The primary goal during construction is to minimise the length of time an area is disturbed.
This will be achieved by sequencing of site-clearing and rehabilitation works to minimise
exposure time. This will be done in conjunction with development of site-specific control
structures.
4. STORMWATER MANAGEMENT
Stormwater will be managed to:
• Protect downstream water quality
• Minimise the potential for erosion and subsequent sedimentation
• Provide adequate and appropriate drainage and pollution control measures will be
installed to treat run-off from disturbed areas of the site
• Prevent soil materials and sediment from entering drainage systems
Where practicable, these objectives will be implemented using the following principals:
• Stormwater will be diverted around the work areas.
• Run-off velocities will be minimised to reduce erosion.
• Isolate uncontaminated water from off-site.
• Treat contaminated water before it reaches waterways.
• Direct all run-off from disturbed site areas through control structures.
It is recognised that there are many factors such as unexpected ground conditions, surface
level deviations from design plans, ongoing changes to construction planning, etc, which
may result in requirements for run-off controls to vary from original plans.
4.1 DRAINAGE
Stormwater is either channelled around the site (i.e. via undisturbed surfaces) or within
the site to sediment control devices. The structure should be designed for their
designed flow velocity to resist erosion.
Particular attention should be given to diverting clean waters from outside the works
into the natural drainage system by the installation of diversion channels and perimeter
banks. The structures will be designed and placed on the site to minimise the
accumulation and velocity of run-off waters.
Drainage structure may include:
• Grass drains, channels, and swales, which prevent scouring and promote
sediment retention.
www.jce.engineering 6 J.C. Engineers Pty. Ltd.
Level 13, 50 Cavill Avenue,
SURFERS PARADISE
QLD 4217
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.