5. SEDIMENT CONTROL
Sediment control devices will be designed to retain, on the site, as much of the eroded
material as possible. The following devices will comprise the majority of site control
measures.
5.1 Stabilised Entry/Exit or Grid (Rumble Pad/Grid)
Where possible the entry/exit site point should have a stabilised entry/exist point so
that sediment is not tracked off the site. Where practical entry/exit points will be
restricted these designated locations (Figure 2). Figure 3 identifies an alternative option
for establishment of a rumble pad.
Figure 2: Stabilised Entry/Exit Pad - Building Sites
Figure 3: Stabilised Site Access
www.jce.engineering 8 J.C. Engineers Pty. Ltd.
Level 13, 50 Cavill Avenue,
SURFERS PARADISE
QLD 4217
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.