    3. TRAFFIC MANAGEMENT
        Item 8.a.i. in Council’s information request states:
        8. “A preliminary Construction Management Plan … must include but not be limited to;
                a. traffic management during all aspects of the development including;
                          i. a Traffic Management Control Plan (for demolition, deliveries and
                          construction) in accordance with the Manual of Uniform Traffic Control
                          Devices (MUTCD) detailing all temporary signage and traffic control measures
                          ii. maintenance of safe pedestrian access for the areas affected by the works
                          during and after daily construction has ceased.”
                          iii. maintenance of safe pedestrian access for the areas affected by the works
                          during and after daily construction has ceased.”
                          iv. provision for worker car parking at off-site locations.”

        Preliminary Traffic Guidance Schemes for the proposed commercial development has been
        prepared by the Traffic Design Company and are attached at Appendix B.

        These documents illustrate Construction vehicles utilising several parking bays on Kingfisher
        Drive adjacent to the development. Access for construction vehicles is to be coordinated with
        early warning traffic signage and Traffic Controllers. The documents show the proposed
        redirection of pedestrians to the opposite side on Kingfisher Drive via a pedestrian crossing,
        traffic signage and Traffic Controllers. Proposed fencing and traffic bollard location have also
        been illustrated on these documents.

        Proposed site compound and worker vehicle parking will be confirmed upon appointment of
        the Principal Contractor for the works.

    4. EROSION & SEDIMENT CONTROL PLAN
        Item 8.b. in Council’s information request states:
        8. “A preliminary Construction Management Plan … must include but not be limited to;
                b. maintenance and protection of water quality and existing drainage lines through
                the construction site, through the implementation of appropriate erosion and
                sediment control measures.”

        Noosa Shire Council’s ‘The Noosa Plan Schedule 2 – Erosion and Sediment Control (ESC)
        Assessment’ provides a scoring system to assess erosion hazard during demolition and
        construction phase. The Developer and Contractor are committed to the management of
        erosion and sediment from the site throughout the duration of the project. An Erosion &
        Sediment Control Plan for the proposed works has been attached in Appendix C.




www.jce.engineering                                7                                 J.C. Engineers Pty. Ltd.
                                                                                 Level 13, 50 Cavill Avenue,
                                                                                        SURFERS PARADISE
                                                                                                   QLD 4217
Log in to download the original file

Att 3_CMP - Final.pdf · 9.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.