Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Bushfire Management Report

of 40

Page text shows just the words. Original shows the document exactly as it was published.

                         Ecological Natural Area Management


2 Introduction
2.1       The reasons for the Bushfire Risk Assessment and Management Plan
A house to be constructed at 26 Little Springs Lane, Lake MacDonald in the Noosa Council
jurisdiction is mapped in a High Potential Bushfire Intensity area on the Noosa Plan Bushfire
Overlay map and Queensland Potential Bushfire Intensity mapping. Therefore, the house is
deemed to potentially be in a Bushfire Prone Area and an assessment of the bushfire risk to the
house and a bushfire risk management plan is required.
2.2       Commissioning of the Bushfire Risk Assessment and Management Plan
Ecological Natural Area Management has been commissioned to prepare a Bushfire Risk
Assessment and Bushfire Risk Management Plan to fulfil the above requirements. See Appendix 3:
Qualifications and experience of the author of this report for demonstration that the author is a “a
competent person [and] is an appropriately qualified and experienced consultant with appropriate
and proven technical expertise in the preparation of bushfire hazard assessment reports”.
2.3       The aim of the Bushfire Risk Assessment and Management Plan
The aim of this bushfire impact assessment report is to achieve appropriate levels of bushfire
protection for the developed properties while maintaining ecological sustainability. Bushfire
protection for buildings in bushfire prone areas is best achieved using a mix of:
      •Fire resistant building technologies in the structures.
      •Fire resistant methodologies in the structures such as minimising ember lodgement points
      •Providing and appropriate fire break between the developed properties and flammable
       vegetation.
    • Appropriate building siting for bushfire protection
    • Fuel management in the flammable vegetation near the developed properties while
       maintaining ecological values of the vegetation habitat.
    • Fuel management between the flammable vegetation and the developed properties.
    • Maintenance of ecological and habitat values of any vegetation subject to vegetation
       management for bushfire risk management.
To achieve the aim, the Plan will conduct bushfire assessments against legislative requirements
and make recommendations that address the requirements of these legislative instruments.
2.4       Legislative considerations
      •    Queensland Planning Act,
      •    Queensland Building Act,
      •    Queensland Vegetation Management Act,
      •    Queensland State Planning Policy 2017 and,
      •    The Noosa Plan 2020
2.5       Other regulatory considerations
      •    The National Construction Code of Australia and
      •    Australian Standard AS 3959 Construction of buildings in bushfire-prone areas.




Bushfire Risk Assessment and Management Plan for a house at 26 Little Springs Lane, Lake MacDonald   February 2021

                                                              7
Log in to download the original file

Bushfire Management Report.pdf · 6.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.