EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH

Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach (EMAIL 3/3) - Fauna Management, Landscaping, Bushfire Management, Environmental Management, Waste & Preliminary Construction Management Plan.

of 25

Page text shows just the words. Original shows the document exactly as it was published.

                   ENVIRONMENTAL MANAGEMENT V2
                 PLAN (CONSTRUCTION AND OPERATION)

                              ESSENCE OF PEREGIAN BEACH
                          215 DAVID LOW WAY, PEREGIAN BEACH
                                      QUEENSLAND




                                                  FOR

                                   THOMCO NO. 2087 PTY LTD

                                          NOVEMBER 2019




Project Services
Department of Housing and Public Works




      Tel (07) 5450 5984 / PO Box 9566 Pacific Paradise QLD 4564 / Email: [email protected]
                                               ABN 60 625 108 625
Log in to download the original file

EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH.PDF · 1.7 MB (small file)

Full text of the other 24 pages

Page 2

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



DOCUMENT CONTROL

Document: Environmental Management Plan
Project Ref: J000488

Site:              Essence of Peregian Beach, 215 David
                   Low Way, Peregian Beach

 Version           Date         Distribution                 Author/s                Approver

     1         15/11/2019       Thomco No 2087 Pty           P. Fox (B. App Sc.      Joshua Lee (B. Sc.) –
                                Ltd                          (Env Sci) - Hons) –     Director
                                                             Principal
                                                             Environmental
                                                             Scientist / Ecologist
     2         21/11/2019                                    + Joshua Lee (B. Sc.)
                                                             – Director



Note:     The Environmental Management Plan (Construction and Operation) does not constitute a formal
environmental assessment report for the site and is not to be used for any purposes other than the purpose
intended. The recommendations provided are based on the site/development plans detailed in Attachment
B and address statutory requirements and policies that were in force at the time of writing. If there are
changes to the proposed development (particularly if vegetated areas are being impacted on), twelve months
or more have passed since the time of writing or new statutory requirements have come into force, the
statutory requirements and advice detailed in the report may no longer be valid. In these circumstances it is
recommended that a review of this report is undertaken to identify current requirements.




© 2019 - J000488                                                                                             1

Page 3

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




                                                  CONTENTS
1. Introduction                                                1
2. Purpose of This Report                                      1
3. Statutory and Policy Requirements                           1
4. Environmental Management                                    7
         4.1 General                                           7
         4.3 Vegetation Management and Fauna Protection        7
         4.4 Water Quality and Erosion and Sediment Control    7
         4.5 Weed Control and Pest Management                  7
         4.6 Waste Management                                  8
         4.7 Fuels and Hazardous Materials                     8
       4.8 Air Quality and Dust Control                        8
       4.9 Aboriginal Cultural Heritage                        8
5. Communication and Reporting                                10
       5.1 Site Induction                                     10
       5.2 Complaints and Incident Management Procedure       10
         5.3 Non-conformances and Incidents                   10
         5.4 Corrective and Preventive Action                 10
6. Training                                                   11

ATTACHMENT A – Development Plan
ATTACHMENT B – Environmental Checklist




© 2019 - J000488                                                   1

Page 4

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



1. Introduction

North Coast Environmental Services have been commissioned by Thomco No 2087 Pty Ltd to
prepare an Environmental Management Plan to manage impacts to the environmental values
associated with Lot 1 on SP286680; located at 215 David Low Way in Peregian Beach (referenced
hereafter as ‘the site’). The impacts are anticipated to arise as a result of the approved construction
of 19 x 3+ bedroom units, one (1) manager’s unit and a motel building containing 32 units. The site
is proposed to be reconfigured from one (1) Lot into three (3) Lots (MCU16/0153 REC16/0041).
The site layout has been prepared by Reddoor Architecture (refer Attachment A).

2. Purpose of This Report

This Environmental Management Plan (EMP) (Construction and Operation) has been prepared to
assist Thomco No. 2087 Pty Ltd (Thomco) and/or their nominated Construction Contractor, and
other parties associated with the Essence of Peregian Beach development works, in discharging
their statutory responsibilities relating to environmental matters during the construction and
operation phase of the Project. This EMP includes specific environmental management actions,
which have been detailed in Table 1 of this document.

The following potential environmental issues have been identified in this EMP as key areas for
consideration during the construction and operation phase of the Project:

    •    Legislative compliance
    •    Fauna and fauna habitat;
    •    Vegetation management;
    •    Water quality (including groundwater);
    •    Erosion and sediment control; and
    •    Weed control and pest management.

Other issues that have been considered in this EMP include:

    •    Waste management;
    •    Fuels and hazardous materials;
    •    Air quality and dust control;
    •    Aboriginal cultural heritage;
    •    Noise and vibration; and
    •    Visual amenity

3. Statutory and Policy Requirements

Thomco and all members of the project team have a “General Environmental Duty” under Section
319 of the Environmental Protection Act 1994 (EP Act). The General Environmental Duty makes
it an offence under the Act to carry out any activity that causes, or is likely to cause, environmental
harm unless all reasonable and practical measures have been taken to prevent or minimise the
potential harm.

To minimise environmental harm, it is necessary to assess what environmental conditions exist
on-site and to identify potential environmental impacts of the proposed development. In addition
to the EP Act, all development must comply with the relevant provisions of Commonwealth and
State Legislation including but not limited to:

    •    Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act)
         (Commonwealth);
    •    Planning Act 2016 (Planning Act);
    •    Nature Conservation Act 1992 (NC Act);

© 2019 - J000488                                                                                     1

Page 5

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



    •    Vegetation Management Act 1999 (VM Act);
    •    Nature Conservation (Wildlife Management) Regulations 2006
    •    Water Act 2000;
    •    Fisheries Act 1994;
    •    Queensland Heritage Act 1992;
    •    Waste Reduction and Recycling Act 2011;
    •    Waste Reduction and Recycling (Waste Levy) Amendment Act 2019;
    •    Aboriginal Cultural Heritage Act 2003;
    •    Biosecurity Act 2014;
    •    Environmental Protection (Air) Policy 2019
    •    Environmental Protection (Noise) Policy 2019

Development requirements are also set through a number of statutory instruments including State
Planning Policies, State government policies and Local Government planning schemes.

The Environmental Checklist in Attachment B summarises the results of the site surveys and
desktop investigations undertaken for the proposed works. For the project to comply with relevant
environmental laws and policies, the management measures summarised in the Project
Environmental Management Plan (Project EMP) detailed in Table 1 need to be implemented.

Thomco No. 2087 Pty Ltd Environmental Policy
Thomco are committed to a policy of ‘environmental improvement’ in the course of its business
operations. Thomco realise that the nature of our work is likely to cause disturbance of the natural
environment with the potential of environmental harm unless considered environmental
management practices are implemented. Thomco will continue to reduce potential environmental
impacts by:
   • Complying with Local, State and Commonwealth legislation;
   • Consulting with community, employees, traditional owners and subcontractors;
   • Managing potential impacts to flora / fauna, air, water and soil.




© 2019 - J000488                                                                                  2

Page 6

Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2



     Table 1 - Project Environmental Management Plan (Construction and Operation)

Based on the information contained in the Environmental Checklist Report (Attachment B), the following environmental aspects and issues have been identified for the project. The management measures
detailed below are to be implemented in order to:

     •       Manage environmental constraints identified for the site;
     •       Address statutory and environmental requirements for the proposed development; and
     •       Assist Council and/or their nominated contractor to meet their “General Environmental Duty” under Section 319 of the Environmental Protection Act 1994, to not carry out any activity that causes or is
             likely to cause harm unless all reasonable and practical measures have been taken to prevent or minimise the harm.

                                                                                                                                                                                   Responsible               Comments on
 Aspect/Issue                                                             Management Measure                                                            Project Phase               Discipline              Implementation


 Statutory Approvals and Permits
 Approval from NSC granted MCU16/0153 REC16/0041                          ▪    N/A

 Environmental Offsets
 Schedule 11 Koala                                                        ▪    Direct delivery or financial payment (TBA)                                  Pre-Construction           Thomco              None


 Mandatory Reporting or Notification
 Spotter Catcher Report                                                   ▪    Follow FMP and directions of spotter catcher during clearing                  Construction     Construction Contractor
                                                                                                                                                                                 /Spotter catcher

 Design Requirements
 As per approval                                                          ▪    Enact measures prescribed in DA conditions and documents                          All          Construction Contractor /
                                                                                                                                                                                  Site managers

 Contract Documentation
 ▪       General Environmental Duty under the Environmental               ▪    A project specific environmental specification should be prepared and       Construction and         Engineering
         Protection Act 1994                                                   included in the contract documents. As a minimum it should include the         Operation
                                                                               requirements detailed in the preconstruction, construction and
                                                                               operation sections below.

 Preconstruction
 ▪       General Environmental Duty under the Environmental               ▪    The following plans must be submitted by the contractor prior to              Construction     Construction Contractor
         Protection Act 1994                                                   commencement of the contract for review and acceptance:
             o The release of sediments or other contaminants                     o Fauna Management Plan (FMP)
                 to waters or stormwater systems is an offence                       o   Environmental Management Plan (Construction); and
                 under Section 440ZG of the Environmental
                                                                                     o   Erosion and Sediment Control Plan (in accordance with the
                 Protection Act 1994 (EP Act).
                                                                                         IECA Best Practice Erosion and Sediment Control 2008).

 Construction
 •       The vegetation and habitat present immediately west of           •    Vegetation clearing is not to occur outside of the Project area. The          Construction     Construction Contractor
         the Project area (Council Reserve and Noosa National                  western boundary is to be clearly fenced and labelled as a no-go-zone.
         Park) is considered to contain flora and fauna protected
         under the Commonwealth Environment Protection and
         Biodiversity Conservation Act 1999 and Nature
         Conservation Act 1992.
 •       All Aboriginal Cultural heritage is protected. Any               •    Works to cease and the relevant Aboriginal Party to be contacted if           Construction     Construction Contractor
         Aboriginal cultural heritage, if found, is protected under            evidence of Aboriginal cultural heritage is encountered during site
                                                                               works.


© 2019 - J000488                                                                                                                                                                                                             3

Page 7

Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2



                                                                                                                                                                                      Responsible            Comments on
 Aspect/Issue                                                             Management Measure                                                                  Project Phase            Discipline           Implementation
      the terms of the Aboriginal Cultural Heritage Act 2003
      even if DATSIP has no records relating to it.
 ▪    Vegetation to be cleared may provide breeding places,               ▪    Immediately prior to clearing, vegetation is to be inspected to ensure              Construction   Construction Contractor
      habitat or shelter for fauna species. Fauna species may                  that fauna is not present to reduce risk of injury during clearing
      be present and may be injured or killed during vegetation                operations. If fauna is present vegetation clearing should cease and
      clearing. s88 of the Nature Conservation Act 1992 (re                    fauna should be allowed to move out of the vegetation clearing area of
      ‘take’ of native fauna) or s332 of the Nature Conservation               its own accord with further advice should be sought from a licensed
      (Wildlife Management) Regulation 2006, (‘tampering with                  fauna spotter catcher. The need for a spotter catcher may also arise
      an animal breeding place’) is therefore potentially                      where fauna refuse to move on of their own accord after a reasonable
      applicable to the proposed works. It is a legal                          period.
      responsibility under the NC Act to demonstrate that
      reasonable measures have been undertaken to identify
      the presence of any listed fauna on the site prior to
      vegetation clearing.
 ▪    Vegetation not required to be cleared may be within the             ▪    Not applicable, all vegetation to be cleared.
      proposed limits of construction.
 •    The release of sediments or other contaminants to waters            •    Erosion and sediment control measures are to be implemented prior to                Construction   Construction Contractor
      (surface and groundwater) or stormwater systems is an                    commencement of works and maintained and monitored throughout the
      offence under Section 440ZG of the Environmental                         construction period.
      Protection Act 1994 (EP Act).                                       •    Waste oil and grease from machinery will be collected (if required) and
                                                                               sent to an approved disposal facility to mitigate impacts to soil, surface
                                                                               water and groundwater.
                                                                          •    Any herbicides shall be used in accordance with manufacturers and
                                                                               DES’s guidelines. Only herbicides designed for use near waterways
                                                                               shall be used on site.
                                                                          •    Ensure works are undertaken in accordance with approved plans and
                                                                               conditions of approval.
 ▪    Construction works will generate noise and dust which               ▪    Unless otherwise approved in any development approvals and/or                       Construction   Construction Contractor
      may affect the site users and neighbouring residents.                    statutory permits, works must comply with the default noise standard
                                                                               detailed in the EP Act including:
                                                                          ▪    Construction work should be restricted to Monday to Saturday
                                                                               (excluding public holidays) between 6.30 am and 6.30 pm;
                                                                          ▪    Operation of regulated devices such as chainsaws, mulchers and
                                                                               electrical, mechanical or pneumatic power tools should be restricted to
                                                                               Monday to Saturday (excluding public holidays) between 7 am and 7
                                                                               pm;
                                                                          ▪    Work should not be undertaken on public holidays; and
                                                                          ▪    Measures to be put in place to manage dust that may potentially be
                                                                               generated from tree removal and construction activities.
                                                                          ▪    Monitor wind speed and direction and avoid or minimise dust
                                                                               generating activities (i.e. stripping, excavation, etc) during dry and
                                                                               windy conditions, particularly during a southerly or south-easterly
                                                                               (most common wind direction at Peregian Beach) due to the
                                                                               Kindergarten north of the Project area.
                                                                          ▪    Use water trucks to water roads and unsealed areas to limit dust
                                                                               emissions
 ▪    Waste generation such as oily rags, oil filters, used oil,          ▪    Collected in suitable containers for disposal offsite at a licenced landfill        Construction   Construction Contractor
      food scraps, toilet waste (port-a-loos)                             ▪    Waste which can be recycled should be undertaken in accordance with
                                                                               the Qld Waste Reduction and Recycling Act 2011 and the Waste
                                                                               Reduction and Recycling (Waste Levy) Amendment Act 2019.



© 2019 - J000488                                                                                                                                                                                                             4

Page 8

Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2



                                                                                                                                                                                   Responsible            Comments on
 Aspect/Issue                                                             Management Measure                                                               Project Phase            Discipline           Implementation
                                                                          ▪    Food scrap waste to be in fauna-proof containers as necessary.
                                                                          ▪    Mobile ablution facilities will be emptied by licenced contractor and
                                                                               disposed at an approved facility.
 ▪   Weed and Pest control under Qld’s Biosecurity Act 2014               ▪    All restricted weed species will be removed from the construction site at        Construction   Construction Contractor
                                                                               initial clearing stages and also at the end of construction works in
                                                                               accordance with the Biosecurity Act 2014. These weeds should not be
                                                                               mulched with other onsite cleared vegetation.
                                                                          ▪    Weed removal shall occur prior to clearing to ensure that retained
                                                                               topsoil and native vegetative mulch is not contaminated with weed
                                                                               material
                                                                          ▪    Any herbicides shall be used in accordance with manufacturers and
                                                                               DES guidelines. Only herbicides designed for use near waterways shall
                                                                               be used on site.
                                                                          ▪    Restricted weed species must not be released into the environment,
                                                                               given away or sold as a plant or something infested with its seeds.
                                                                          ▪    Remove any weeds or exotic vegetation matter that can propagate from
                                                                               the site. This material shall be disposed of at Council landfill sites
                                                                          ▪    Everyone has a general biosecurity obligation (GBO) to take reasonable
                                                                               and practical steps to minimise the risks associated with invasive plants
                                                                               and animals under their control.
 ▪    Storage and Handling of Hazardous Substances                        ▪    All hazardous substances and dangerous goods shall be stored, used               Construction   Construction Contractor
         ▪ No justifiable complaints regarding inappropriate                   and handled in accordance with relevant legislation, Australian
      waste management resulting from construction activities                  Standards, MSDS and Codes of Practice.
      received from surrounding sensitive receptors or general            ▪    Under no circumstances are hazardous materials to be placed into a
      public.                                                                  place where it can reasonably be expected to move into Council
         ▪ To comply with the hazardous substances and                         Reserve and National Park which is downgradient of the site.
      dangerous goods storage and use requirements specified              ▪    Storage and handling of potential environmental contaminants on site
      in relevant legislation, Australian Standards, MSDS and                  should occur in flat areas well away from the Council Reserve and
      Codes of Practice                                                        National Park. Drop sheets or drip trays (or other bunded area) should
                                                                               be used under mixing and pouring areas as a precaution.
                                                                          ▪    Wherever possible products with low environmental toxicity should be
                                                                               identified and used in environmentally sensitive areas.
                                                                          ▪    All staff are to be trained in the handling of hazardous substances,
                                                                               including fuel and spill prevention and the use of spill kits.
                                                                          ▪    Store all hazardous goods a minimum of 30m away from the Council
                                                                               Reserve and National Park and in accordance with MSDS storage
                                                                               requirements. MSDS for each hazardous material used on site should
                                                                               be available on site at all times.
                                                                          ▪    Provide suitable number and size spill kits throughout the Project site
                                                                               and in a location available for immediate use, adjacent to sensitive
                                                                               environments.
                                                                          ▪    All hazardous substances must be stored on a suitably sized bunded
                                                                               pallet or similar capable of retaining at least 120% of the volume being
                                                                               stored and provided with a cover for deployment prior to adverse
                                                                               weather conditions.
                                                                          ▪    All equipment is to be well maintained, inspected frequently and free
                                                                               from fuel, oil, grease leaks.
                                                                          ▪    Where possible select biodegradable or low risk to the environment oils,
                                                                               greases and hydraulic fluids.
                                                                          ▪    Do not undertake any machine maintenance or refuelling within 30m of
                                                                               the Council Reserve and National Park or flow paths leading into the
                                                                               Council Reserve and National Park.




© 2019 - J000488                                                                                                                                                                                                          5

Page 9

Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2



                                                                                                                                                                                Responsible            Comments on
 Aspect/Issue                                                             Management Measure                                                            Project Phase            Discipline           Implementation
 ▪    Protection of visual amenity                                        ▪    Install site fences along the northern boundary. The other boundaries         Construction   Construction Contractor
                                                                               are not within view sheds sue to the Peregian Beach Hotel and the IGA.
 ▪    General Environmental Duty                                          ▪    Contractor is required to submit relevant environmental reports that          Construction   Construction Contractor
                                                                               should be reviewed and actioned as necessary.



 Operation
 ▪    Water conservation                                                  ▪    Water conservation in accordance with Stormwater Management Plan               Operation         Site Managers
                                                                               and Council requirements for water reuse (e.g. rainwater tanks).
 ▪    Water Quality Protection – changes to hydrology of                  ▪    Development in accordance with Stormwater Management Plan                      Operation         Site Managers
      adjacent Council Reserve and National Park                          ▪    Comply with Council discharge limits in relation to water quality
 ▪    The release of sediments or other contaminants to waters                 discharge criteria for total nitrogen, phosphorous and total suspended
      (surface and groundwater) or stormwater systems is an                    solids.
      offence under Section 440ZG of the Environmental
      Protection Act 1994 (EP Act).
 ▪    Maintenance of Stormwater Quality Improvement
      Devices
 ▪    Vegetation Protection.                                              ▪    Install clear signage on the Council Environmental Reserve including           Operation         Site Managers
 ▪    Fauna Protection                                                         interpretive signage regarding the environmental values of the Reserve
                                                                               and adjacent National Park
 ▪    Vegetation and habitat present immediately west of the
      Project area (Council Reserve and Noosa National Park)              ▪    National Park rules apply such as no domestic animals permitted in the
      is considered to contain flora and fauna protected under                 Reserve and National Park.
      the Commonwealth Environment Protection and                         ▪    Rehabilitation along the western boundary / bioretention area with
      Biodiversity Conservation Act 1999 and Nature                            endemic species.
      Conservation Act 1992.                                              ▪    No changes to hydrology of adjacent Council Reserve and National
                                                                               Park.
 ▪    Bushfire                                                            ▪    Compliance with the Project specific Bushfire Management Plan                  Operation         Site Managers
 ▪    Biting Insects Management                                           ▪    Remove potential mosquito breeding sites by:                                   Operation         Site Managers
                                                                          ▪    Tipping out any water in plastic containers, buckets, pot plant trays
                                                                          ▪    Roofing gutter kept clear of rotting leaves
                                                                          ▪    Dispose of fallen palm fronds and coconut shells which may hold water
                                                                          ▪    Dispose of empty containers, tyres or anything that catches and holds
                                                                               rainfall
 ▪    Waste Management                                                    ▪    Compliance with project Waste Management Plan and Planning                     Operation         Site Managers
                                                                               Scheme Policy 11, Waste Management Plans
                                                                          ▪    Waste which can be reused or recycled should be undertaken in
                                                                               accordance with the Qld Waste Reduction and Recycling Act 2011 and
                                                                               the Waste Reduction and Recycling (Waste Levy) Amendment Act
                                                                               2019.




© 2019 - J000488                                                                                                                                                                                                       6

Page 10

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




4. Environmental Management

4.1 General
The following sections identify specific environmental aspects that may be impacted by
construction works and outline:

    •    Objectives that apply to each identified aspect;
    •    Potential issues that may arise as a result of construction works within the Project area;
    •    Potential issues that may arise from operation; and
    •    Relevant legislation that may be triggered.

4.3 Vegetation Management and Fauna Protection
The following general objectives have been identified for the construction and operation phase of
the works with respect to vegetation and fauna management:

     •    Relevant investigations and approvals will be obtained prior to commencement of clearing
          works;
     •    No disturbance of vegetated areas shall occur outside the designated work area; and
     •    Appropriate measures are to be implemented to minimise any impact on fauna and their
          potential habitat.
A Fauna Management Plan has been prepared for this project (NCES, 2019) and the directives
prescribed therein are to be adhered to regarding the management of vegetation and fauna during
clearing works.

4.4 Water Quality and Erosion and Sediment Control
Objectives relating to erosion and sediment control for the construction and operation phase of the
works include:

    •    To comply with the relevant State Planning Policy Water Quality Objectives; and
    •    To minimise impacts to water quality by managing erosion risk and effectively containing
         sediment entrained run-off generated within the construction area.

The Project area is located adjacent to a Noosa Council Environmental Reserve and Noosa
National Park. Run-off from the construction site is likely to contain sediment that could negatively
impact water quality.

An Erosion and Sediment Control Plan must be prepared and approved by Council prior to site
clearing and earthworks commencing. Adequate erosion and sediment controls must be in place
prior to the commencement of works to minimise the possibility of sediment entering the Reserve
and National Park. Erosion and sediment control devices must be maintained for the duration of
site works. Clean stormwater from upslope of the construction area should be diverted around the
extent of disturbance to maintain clean flows into the drainage line along the western side of the
site.

The Contractor is responsible for establishing adequate controls to prevent erosion and
sedimentation adversely affecting receiving environments.

4.5 Weed Control and Pest Management
The following objectives have been identified for the construction and operation phase of the works
with respect to weed control and pest management:


© 2019 - J000488                                                                                      7

Page 11

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



    •    Control existing weeds within the Project area;
    •    Prevent the establishment of new weeds within the Project area; and
    •    Minimise the spread of weeds outside the Project area as a result of construction activities.

The Contractor will be responsible for the control of restricted weeds within the works area as per
obligations under the Biosecurity Act 2014.

4.6 Waste Management
The following objectives have been identified for the construction phase of the works with respect
to waste management:

    •    Comply with relevant environmental legislation (e.g. Waste Reduction and Recycling Act
         2011);
    •    Implement waste management in accordance with the hierarchy of avoid, re-use, recycle,
         recover, dispose; and
    •    Provision of adequate and appropriate sanitary amenities and waste disposal facilities for
         the full duration of construction works.

Limited waste streams are expected to be generated during the construction phase.

4.7 Fuels and Hazardous Materials
The management of fuel and hazardous substances shall accord with the following objectives:

    •    All chemicals and fuels shall be managed responsibly to avoid environmental nuisance or
         harm from occurring; and
    •    No spills, leaks or other environmental incidents associated with the handling or use of
         chemicals or hazardous substances shall occur as a result of construction activities.

No hazardous or dangerous chemicals/materials will be used or stored at the construction site for
the duration of construction activities.

4.8 Air Quality and Dust Control
Objectives relating to air quality and dust control during the construction phase of the Project are
to comply with the Environmental Protection (Air) Policy 2019 and mitigate air quality nuisance
impacts to surrounding land uses and sensitive receivers. Earthmoving equipment will be
operating at different stages throughout the construction phase. Dust emissions may occur during
construction, particularly in dry and windy conditions. Mitigation measures for minimising the
generation of dust or other air emissions are to be implemented on-site.

4.9 Aboriginal Cultural Heritage
The following cultural heritage objectives are to be considered:

    •    Recognise, protect and conserve cultural heritage artefacts identified during the
         construction phase of the Project within the Project area; and
    •    Meet the requirements of the Aboriginal Cultural Heritage Act 2003

All persons have a Duty of Care to protect items or places of cultural heritage significance. In this
regard, works are to be undertaken in accordance with the cultural heritage Duty of Care. Council
may wish to discuss the extent of works with the local Aboriginal party to comply with their Duty of
Care under the Aboriginal Cultural Heritage Act 2003. The Aboriginal party for the area is:

Kabi Kabi Aboriginal Corporation

© 2019 - J000488                                                                                    8

Page 12

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



PO Box 1041
Maroochydore, QLD
P (07) 5346 9806
F (07) 5443 8899
E [email protected]




© 2019 - J000488                                             9

Page 13

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



5. Communication and Reporting

5.1 Site Induction
Site inductions are to be carried out by the Contractor. All personnel entering the construction area
are required to complete a site induction. The content of the site induction is to include reference
to environmental controls established on-site and outlined in this document. Site induction record
forms shall be retained and provided to Council for record keeping purposes.

5.2 Complaints and Incident Management Procedure
The Contractor shall establish a complaints management procedure, including provision for
signage advertising a phone number for members of the public to contact the Contractor should
they wish to enquire about the Project’s impacts or lodge a complaint. The Contractor shall
establish an incident management procedure for dealing with environmental incidents that may
occur during the site works. A copy of all complaints and incidents is to be provided to Council as
they occur.

5.3 Non-conformances and Incidents
All non-conformance events and incidents that arise from non-compliance with the provisions of
this EMP will be duly and appropriately recorded by the Contractor and made available to Council
within a 24-hour period. Where a non-conformance event or incident occurs, the non-conformance
report is to include the following information:

    •    The location of the non-conformance event;
    •    The time of the non-conformant event;
    •    The time the Contractor became aware of the non-conformant event;
    •    The suspected cause of the non-conformant event;
    •    The type of contaminant released (if any);
    •    A description of the resulting impacts (to the environment) of the non-conformance event;
    •    What actions were taken to mitigate any environment harm or environmental nuisance as
         a result of the non-conformant event; and
    •    Proposed actions to prevent a recurrence of the non-conformance event.

5.4 Corrective and Preventive Action
Any major environmental non-conformances and incidents that occur during the construction
phase of the Project will be investigated by the Contractor to determine the contributing factors and
underlying causes of the incident. The investigations will be completed to determine corrective
actions and necessary controls to prevent recurrence. Any corrective and preventive actions
identified will be recorded on the incident form and this EMP will be updated to reflect any changes
in management procedures.




© 2019 - J000488                                                                                  10

Page 14

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



6. Training

All persons shall be required to undertake a site induction and have the necessary qualifications
and current training to perform their responsibilities prior to commencing work at the site. The
environmental component of the site induction will include, as a minimum, the following:

    •    An overview of this EMP;
    •    A summary of the roles and responsibilities and site management contact details;
    •    All person’s duty to notify;
    •    Environmental performance criteria;
    •    Conditions of applicable environmental licences, permits, approvals or self-assessable
         codes;
    •    Environmentally sensitive areas (including no-go zones) with emphasis on the adjacent
         Reserve and National Park, erosion and sediment control, site access and the importance
         of working within the Project footprint;
    •    Key environmental control measures identified in the EMP, including specific environmental
         controls required for works adjacent to the Reserve and National Park;
    •    Emergency responses procedures;
    •    Incident and complaints reporting; and
    •    Induction records are to be maintained with information detailing the attendees, content,
         trainer and dates of the induction/training.




© 2019 - J000488                                                                                11

Page 15

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




ATTACHMENT A – SITE LAYOUT

Page 16

COPYRIGHT RED DOOR ARCHITECTURE ALL RIGHTS                                                                                                                                                                                       not visible from the north                                                                                                                                                visible from the north
RESERVED. THIS DRAWING AND RELEVANT AUSTRALIAN
STANDARDS. OR IN WHOLE WITHOUT WRITTEN                                                                                                                                                                A                                                                                                                                                                                                                                    3




                                                                                                              3000




                                                                                                                                                                                                                                  3000




                                                                                                                                                                                                                                                                                                                                  3000




                                                                                                                                                                                                                                                                                                                                                                                                         3000




                                                                                                                                                                                                                                                                                                                                                                                                                                                           3000
                                                                                                                                                                       3440
PERMISSION OF RED DOOR ARCHITECTURE.


                                                                                                                                                                                                                                                                  4000
                                                                    B                                                                                                                                                            Kamala                                                    Wallum                                                              Wallum
                                                                                                                                                                                                                                                                                                                                                                                        6700
                                                                                                                                                                                                                                                                                                                                                                                                         Wallum                                             Wallum                               B
                                                                                                          Pool              BBQ 2000                                                                                                                                                                                                     Marram                                                                                     Marram
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             4000




                                                                                                                                                                                                                                                                   Sewer easement
                                                                                                                                                Lily
                                                       Bio-retention
                                                       Basin 115m²                                                                                                                                    700
                                                                                                         2 000 0                                                                           9                                  10                                                                            11                               12                   13
                                                                                                                                                                                                                                                                                                                                                                                        2000
                                                                                                                                                                                                                                                                                                                                                                                                                14              15
                                                       1:3 Batter                                                                                                                                                                                                                                                                                                                                                                                                  16




                                                                                                                                                                                                                          1962
                                                                                                                                               INTERNAL
                                                                                                                                                                       bins                                                                         bins                  bins                                                    bins                                    bins                                     bins
                                                                                                                                                                                                                                                                                                                                                                                               2m Wide Concrete Path                                                                             4
                                                                                                                                                                                                                                                                                                                                                                                                                                    Bin collection point




                                                                                                                                                                                                                                                                                                                                                                                                                                                                   9612
                                                                                                                                                                                                                          6000
                                                                                                                                                PRIVATE                                                                                                                                                                                                                                        to Pedestrian link to
                                                                                                                                                                                                  bins                                                             bins                                                           bins bins                                                                                         for units 14-16
                                                                                                                                                 ROAD                                                                                                                                                                                                                                          Rufous St precinct
                                                           Detention Basin                                                                                                                                                                                                                                                                                                                                                                                                                   2500mm HIGH




                                                                                                                        910
                                                           footprint                                                                                                                                                                                                                                                                                                                                                                                                                         ACOUSTIC FENCE




                                                                                                                           0
                                                                                                                                                                                                                                                                                                                                                                              INTERNAL




                                                                                                                                                                                                                                                                                                                                                                                                                                                    2300
                                                                                                                                                                                                                                                                                                                                                                               PRIVATE                                                                             FACADE
                                                                                                                                                                                                                   8                            7                                          3000                       6                                                         ROAD                                                                               OPTION
                                                                                                                                                                                                                                                900                                                                                          1000 5                                                              17                                 Saltbush
                                                                                                                                                                   Lily
                                                                                                                                                                                                                                                                                           4100                       Marram                                                        bins




                                                                                                                                                                                                                                                                                                                                                                                                                                             3300
                                                                                                                            V1  VIS.
                                                                                                                                Cars                                                                                                                    Kamala                                                                                        Kamala                        bins
                                                                                                                            V2




                                                                                                                                                                2440
                                                                                                                            20 0
                                                                                                                              0 0                                                                                                                                                                                                                                  3751          6000




                                                                                                                                                                                                            4440




                                                                                                                                                                                                                                                           4000




                                                                                                                                                                                                                                                                                                                       4000




                                                                                                                                                                                                                                                                                                                                                      2000
                                                                                                                                                                                                                                                                                                                                                                                                3000            18                              Saltbush
                                                                COUNCIL                                                        V3
                                                                                                                                                          Bar
                                                                                                                                                                                                                                                                                           5200                                          3000
                                                                RESERVE                                                          V4                                                    1000                  Kamala
                                                                                                                                                                                                                                         2500                                                                                                         Kamala
                                                                                                                                                                                                                                                                                                                                                                                               2000




                                                                                                                                                                                                                                                                                                                                                                                                                                             3300
                                                                                                                                                           Cabana                                                                                          Marram                                                     Marram                                                      bins
                                                                    C                                                  6000                                                                                                                                                                                                                                                                                                                                       FACADE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                  OPTION
                                                                                                                                                                                                                                                                                           3000                                                                                                             19                                Saltbush
                                                                                                                                                                                                                                 500                                                                                                            1000 4
                                                                                                                                                         Pool
                                                                        Bushfire resistant                                                                                                                                            1                            2                                                   3                                                                                                                                             9497
                                                                        species planted to                                                                                                                                                                                                                                                                                       bins




                                                                                                                                                                                                                                                                                                                                                                                                                                             3300
                                                                        batter




                                                                                                                                                                                                                                                                                                                                                                       840
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 D




                                                                                                                                                                                                                                                                                                                                                                          0
                                                                    D                                                                                                                             bins INTERNAL bins                                                                                                               bins bins
                                                                                                                                                                                                        PRIVATE                                                                                                                                                                                           20                               Saltbush
                                                                                                                                                                                                                                                                                                                              Amenities
                                                                                                                                                                                                         ROAD     VIS. Cars                                                                                                                       VIS. Cars
                                                                                                                                                                                                               V5                              V6                                                                             V7                 V8


                                                                                                                                                                                           Lanai


                                                                                                                                                                                                                                                                                                                                                               Easement
                                                                                                                                                                                                                              Conference
                                                                        COUNCIL                                      2673
                                                                                                                                                                         Admin
                                                                                                                                                                         /VPR
                                                                                                                                                                                                                              room
                                                                                                                                                                                                                                                                           Kit.                                               Screened 10x
                                                                        RESERVE                                                                                                                                                                                                                                               A/C condensers                              2m Wide Concrete
                                                                                                                                                                         Reception
                                                                                                                                                                                                            2500 2500             2500         2500 2500 2500                                                                                                             Path Pedestrian
                                                                                                                                                                                                                                                                                                                                                                          link to shops
                                                                        24 hr pedestrian access                                                                                                                                                                                                                               EMERGENCY EGRESS
                                                                    2                                                                 164 00                                                                                                                                                                                  ROAD
                                                                                                                                                                          2500




                                                                                                                                                                                                                       Car parking for
                                                                                                                                                                                                                                                                                                                                                                                                                                                                          SPECIALTY SHOPS
                                                                                                                                                                                                                                                    6000
                                                                                                                                      Min .                                                                            Units over
                                                                                                                                                                          2500 2500 2500




                                                                                                               2169                                                                                                                                                                         4000

                                                                        Detention Basin
                                                                                                                                                                                                                                  2800         2500 2500 2500                       1702
                                                                                                                                                                                                                                                                                                                                                                                    IGA
                                                                        footprint
                                                                        Access to secure carpark

                                                                                                                                                                                                                                                                                              Easement
                                                                                                                                                 11000




                                                                                                                                                                        Security                                                                                                    2283
                                                                                                                                                                                               5890




                                                                        via remote control key                                                                          gate                                           VAN         Lobby                          Bin
                                                                        activation. Exit via                                                                                                                                                     Ser.                                                                                    1
                                                                        pressure pad in slab.                                                                                                                                                                                                                                                                                                                                                                                 CARPARK
                                                                                                                                                                          2500 2500




                                                                        To be locked off in                                                                                                                                                                                         1678
                                                                                                                                                                                                                       2700




                                                                                                                                                                                                                                                             Store
                                                                        Emergency of Bushfire.                                                                                                                                                                                                                            19407
                                                                                                                                               SRV                                                                                 2500 2500 2500                   2500
                                                                        Screened hardstand
                                                                                                                                                                                                                       5400
                                                                                                                                                                          2500 2500 2500




                                                                                                                                                                                                                                                                                              Emergency egress road




                                                                        bin collection
                                                                                                                                 164 23
                                                                        3X 1100L loise noise
                                                                                                                                                                                                                                           Car parking for
                                                                                                                                                                                                                       6000




                                                                                                                                                                                                                                           Units over
                                                                                                                                                                                                                                                                                     887
                                                                                                                                                                                                                                                                                                                                         SHOPPING CENTRE
                                                                                                                                                                          2500 2500 2500




                                                                                                                                                                                                                                                                                                                                         LANDSCAPING
                                                                           COUNCIL                                                                                                                                                                                                                                                                                                                     PEREGIAN VILLAGE MARKETS
                                                                                                                                                                                                                       5400




                                                                                                                                                                                                                                   2500 2500 2500                   2500
                                                                           RESERVE
                                                                                                                                                                                                                                                                                           4000
                                                                                                                                                                                                                                   2500 2500
                                                                                                                                                                          2500 2500




                                                                                                                                                                                                             Bins




                                                                                                                                                                                                                                                                                                                                             Access and service easement                                                                                          REVISION           4     16.04.19     REVIEW ISSUE

                                       WWW.RDARCH.COM.AU        180082                 SCALE
                                                                                               1 : 500                 JAN 19                                                                                          215 DAVID LOW WAY, PEREGIAN BEACH                                                                                                                      ESSENCE OF PEREGIAN BEACH                                                            SD04             SITE / FLOOR PLAN

Page 17

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




ATTACHMENT B – Environmental Checklist

Page 18

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




Environmental Checklist Report – Essence of Peregian Beach

          Items that may trigger the requirement for a development approval/assessment under the Planning Act 2016 (Planning Act) are highlighted in yellow
          Items that may trigger other statutory approvals
          Items that may trigger statutory reporting requirements

Site Description and Proposed Development
Description       Description                                 Address                         Essence of Peregian Beach
                  ❑ Size, type, extent of site
                                                              Lot on Plan                     Area                     Tenure              Owned by/Trustee (purpose)

                                                              Lot 1 on SP286680               17,820m2 (incl.          Freehold            Thomco
                                                                                              IGA)

                  Description                                 The Project Area is approximately 140m x 120 m. The IGA takes up approximately 3,600m 2 in the south east corner of the Lot. The
                                                              site is border by Noosa Council Reserve and then Noosa National Park to the west and also along the small portion of the southern
                  ❑ Adjacent land uses
                                                              boundary. The Rufous Street Precinct which includes a new carpark under construction, Peregian Beach Kindergarten and D-Hurst
                  ❑ Sensitive receptors
                                                              Oval is located to the north. The Peregian Beach Hotel and IGA borders the site to the east.
Development       facilities/use                              Current facilities/use
                  ❑ Nature of facilities
                                                              The site is a former caravan park with dilapidated caravan park infrastructure remaining onsite.
                  ❑ population/usage
                  ❑ Operating hours                           Proposed development/works
                  ❑ Other relevant features/aspects
                                                              Construction of 19 x 3+ bedroom units, one (1) manager’s unit and a motel building containing 32 units. The site is proposed to be
                                                              reconfigured from one (1) Lot into three (3) Lots.
                  ❑   Building Class                          1                                      ❑    Development classification under the relevant       Development Permit for Material Change
                                                                                                          planning scheme.                                    of Use of Premises & Development Permit
                                                                                                                                                              to Reconfigure a Lot

Page 19

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




    Planning, Development Approvals & Consultation
    LANDUSE PLANNING STATUS
    Planning Act       Local Planning Scheme                      Local Authority                      How is the site listed?                   Is the proposed development compatible with the local planning scheme?
    2016
                                                                  Noosa Council                        Open Space Recreation                     Yes
    Applicable
    Planning
    Instruments        Is the proposed development                Yes – The works are proposed within an urban area.                             Is the proposed development considered to              No
                       considered to be an urban                                                                                                 community infrastructure2 under the Planning Act?
                       purpose1?
    Land Act 1994      Other Statutory Authorities                Are there any known or likely special arrangements or jurisdictions applying   No
                                                                  to the property other than normal State or Local Authority statutes? (i.e.
                                                                  federal or state control authorities, airport corporations etc.)
    DEVELOPMENT APPROVAL
    Planning Act       Is the site Ministerially Designated?
    2016                                                          No                                                      NA

                       If currently designated is the             NA                                                      NA
                       proposed development compatible
                       with the existing designation?
                       Is the development a material              Yes                                                     Approval issued - MCU16/0153
                       change of use2?
                       Will the development include               Yes                                                     Approval pending
                       operational works3?
                       Does the development involve the           Yes                                                     Approval issued - REC16/0041
                       reconfiguring of a lot2?
                       Is the development assessable              No                                                      NA
                       development under Sec 3 of SP
                       Reg. (items highlighted in yellow below)
                       Is Development Approval or                 Yes
                       redesignation required?
    Environment        Does the project trigger a referral        No.                                                     N/A
    Protection and     under the EPBC Act?
    Biodiversity Act
    1999
    CONSULTATION
                       Is consultation with other authorities     Yes                                                     QLD NPWS Noosa Shire Council
                       or stakeholders recommended


1
  An urban purpose (as defined under the Planning Act 2016) is purposes for which land is used for in cities and towns including residential, industrial, sporting, recreation and commercial purposes, but not
including environmental, conservation, rural, natural or wilderness area purposes
2
  Refer to Schedule 2 of the Planning Act
3
  as defined under S 10 (1) of the Planning Act

Page 20

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



                   (outside of development approval or
                   designation processes)?

 Environmental Aspects
 Element          Triggers                Assessment Issues                                            Status                                                       Requirements and Advice
 HERITAGE & NATIVE TITLE
 Indigenous       Aboriginal Cultural     Is the site listed on DES’s Cultural Heritage Database or    No.                                                          It should be noted that any Aboriginal cultural heritage, if
 Cultural         Heritage Act 2003       Register?                                                                                                                 found, is protected under the terms of the Aboriginal Cultural
 Heritage                                                                                                                                                           Heritage Act 2003 even if EHP has no records relating to it.
                                                                                                                                                                    Contract documents should include provisions for works to
                                                                                                                                                                    cease and the relevant Aboriginal Party to be contacted if
                                                                                                                                                                    evidence of Aboriginal cultural heritage is encountered during
                                                                                                                                                                    site works.
                                          Are there any known or possible indigenous cultural          None identified.                                             NA
                                          heritage associations with the property which may
                                          require assessment?

                                          How is the nature of the proposed activity classified        The nature of the activity is likely to be classified as     Where an activity is proposed under category 4 it is generally
                                          under the Aboriginal Cultural Heritage Act 2003 Duty of      Category 4 “Areas previously subject to Significant Ground   unlikely that it could harm Aboriginal cultural heritage.
                                          Care Guidelines?                                             Disturbance” under the Aboriginal Cultural Heritage Act
                                                                                                       2003, Section 28 Duty of Care Guidelines.
                                          Is there potential for the proposed development to           Unlikely.
                                          impact on any indigenous cultural heritage, historical
                                          heritage or sensitive items or issues?


 Native Title     Native Title Act 1993   Will site be affected by Native Title                        Native Title has not been investigated as part of this       All projects require a Native Title Clearance to meet the
                  (Com)                                                                                commission.                                                  requirements of the Commonwealth Native Title Act 1993.

 Historical       Queensland Heritage     Has the property been listed on the national, state or       No                                                           No
 Heritage         Act                     local heritage registers?

                  Environment
                  Protection and          Does it have features which are of historical significance   None identified                                              NA
                  Biodiversity            or require preservation?
                  Conservation Act


 FLORA & FAUNA
 Native           Vegetation              Does the property possess native vegetation                  Selected vegetation/trees are present. The area has          No approvals for vegetation clearing are required under the
 Vegetation       Management Act          communities that may be affected?                            previously been cleared of remnant vegetation                VMA as the site measures <5ha.
                  1999                    ❑ Any regional ecosystems under the Vegetation
                                              Management Act 1999
                                          ❑ Full native/remnant vegetation cover.
                                          ❑ Partial native/remnant vegetation cover.
                                          ❑ Selected vegetation/trees.

Page 21

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



 Other            Local Planning          Does the property possess other vegetation species that    No.                                                              NA
 vegetation       Schemes                 may be affected or require consideration?
                                          ❑ Significant trees (amenity
                                          ❑ Other
                                          ❑ Local Tree or Vegetation Protection Orders.
                                          ❑ Memorial trees
 Rare and         Environment             Is there any known or possible protected flora or fauna    Note: adjacent remnant vegetation within the Council             Clearing is prohibited beyond the site boundaries and all
 Threatened/      Protection              on the property to be considered under Federal, State or   Reserve and Noosa National Park is likely to contain             works to be undertaken in accordance with this EMP and
 Protected        Biodiversity            Local legislation?                                         threatened flora and fauna species and habitat likely to         other approvals to ensure no impacts to adjacent areas.
 species          Conservation Act        ▪ Environment Protection and Biodiversity                  support threatened flora and fauna species listed under the
                  1999                         Conservation Act 1999                                 Commonwealth Environment Protection and Biodiversity
                                                                                                     Conservation Act 1999.
                  Nature Conservation
                  Act 1992                ▪   Nature Conservation Act 1992                           Note: adjacent remnant vegetation within the Council             Clearing is prohibited beyond the site boundaries and all
                                                                                                     Reserve and Noosa National Park is likely to contain             works to be undertaken in accordance with this EMP and
                  Fisheries Act 1994                                                                 threatened flora and fauna species and habitat likely to         other approvals to ensure no impacts to adjacent areas.
                                                                                                     support threatened flora and fauna species listed under the
                  Local Planning                                                                     Nature Conservation Act 1992.
                  Schemes

                  Local Laws              ▪   Marine plants under the Fisheries Act 1994             No                                                               NA



 Habitat          SEQ Koala Planning      Koala habitat                                              Yes, the subject site is within mapped Low Value koala           Compliance with Schedule 11 of SPR required. Offsetting
                  Instruments                                                                        bushland habitat and mapped Low Value Habitat Suitable           required. Refer Fauna Management Plan (NCES 2019).
                                                                                                     for Rehabilitation.                                              A spotter catcher required on site during all clearing works.
                  Vegetation              Essential habitat                                          Yes – The adjacent vegetation is mapped as containing            No approvals for vegetation clearing are required under the
                  Management Act                                                                     essential habitat for Crinia tinnula (wallum froglet), Litoria   VMA as the site measures <5ha.
                  1999                                                                               freycineti (wallum rocketfrog), Litoria olongburensis (wallum
                                                                                                     sedgefrog), Pezoporus wallicus wallicus (eastern ground
                                                                                                     parrot) and Phascolarctos cinereus (koala).
                                          Are there any parts of the property which are or are       Yes – few hollows, thick ground vegetation in ornamental         All clearing supervised and undertaken in accordance with
                                          likely indicated as habitats, breeding areas or wildlife   gardens, narrow bank of wetland habitat                          Fauna Management Plan (FMP).
                                          corridors for fauna?
                                          ❑ Natural water systems.
                                          ❑ Natural ground or shrub areas.
                                          ❑ Nests, hollow-bearing trees etc.
                  Fisheries Act 1994      ▪   Is a watercourse mapped under the Queensland           No.                                                              N/A
                                              Waterways for Waterway Barrier Works spatial data
                                              layer
 Weeds            Land Protection (Pest   Are listed noxious weeds present on the site?              Restricted weeds present on site                                 Weeds and declared pests encountered during project
                  and Stock Route                                                                                                                                     works should be removed and disposed of appropriately.
                  Management) Act
                  1994
                  Weeds of national
                  significance
 Invasive Pests   Plant Protection Act    Is the property within a declared fire ant/crazy ant       No                                                               NA
                                          restriction area?

Page 22

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



                                         Will movement restrictions and a Fire Ant Management        No                                                      NA
                                         Plan be required to the project?

 PROTECTED & VULNERABLE AREAS
 Watercourses     Water Act 2000         Does the site contain any watercourses?                     No                                                      N/A
                                         Are they protected by the Water Act 2000?                   No                                                      N/A
                  EPP Water

                                         Will they be impacted on by the development?                No                                                      N/A

 Wetlands         Planning Act           Does the site contain any referable wetland areas?          No                                                      NA

 Coastal Areas    Coastal Protection     Is the property within a coastal management district or     No                                                      NA
                  and Management Act     erosion prone area as defined under the Coastal
                  1995                   Protection and Management Act 1995 and/or Regional
                                         Coastal Management Plans if available?
                                         Will works be undertaken within a tidal area?               No                                                      NA
                                         Is the site within a Wetland Protection Area?               No.                                                     NA
                  (SDAP Module 11:
                  Wetland Protection
                  and Wild Rivers

 Surrounding      EPBC Act               Are there any adjacent areas which are protected or         Yes. Noosa National      Park   and   Noosa   Council   Works avoid these areas and works undertaken to mitigate
 Environments                            constitute environmentally sensitive areas (i.e.            Environmental Reserve.                                  potential for offsite impacts.
                  Environmental          watercourses, estuaries, wetlands, marine areas,
                  Protection Act         vegetation areas, national parks, dunes, desert systems
                                         etc.) which forms part of the property’s catchment or
                  Nature Conservation    association?
                  Act 1992
                                         Will they be impacted on by the development?

 HYDROLOGY & STORMWATER
 Stormwater       SPP: State interest—   Does the development trigger requirements under the         No                                                      NA
 Runoff &         water quality          State Planning Policy: State interest - water quality?
 Controls.        Environmental          Is it likely that the development will or may result in     Yes                                                     To minimise the risk of releasing sediment (and other
                  Protection (Water)     impacts to downstream stormwater systems and/or                                                                     contaminants) to waters during construction and to meet the
                  Policy 2009            discharges to surface drainage or natural watercourse                                                               General Environmental Duty under the EP Act, a Site Erosion
                                         systems? (i.e. sediment loss, pollution etc.)                                                                       and Sediment Control Plan (ESCP) must be
                                                                                                                                                             prepared/certified by a suitably qualified person prior to
                                                                                                                                                             commencing construction. The ESCP must be implemented
                                                                                                                                                             and monitored throughout the construction phase.
                                         Is it requested that specific treatment systems be          Yes
                                         integrated in the development of the facility? (Wetlands,
                                         retention basins, pollution control devices etc.)

Page 23

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



 Groundwater                              Are there any parts of the property which indicate the       Yes. Some ground seepage observed in low-lying areas           Works undertaken in accordance with Stormwater
                                          presence of sub-surface water reservoirs or ground           towards western boundary of site                               Management Plan.
                                          seepage?
                                          ❑ Natural springs.
                                          ❑ Known seepage areas.
                                          ❑ Local bore water.
                                          ❑ Other (i.e. local knowledge).
 SOILS AND GEOLOGY
 Soil Erosion     Environmental           Does the site have any soil erosion risk factors?            Possible. Site is positioned on a gentle slope running down    The release of sediments or other contaminants to waters is
 and sediment     Protection Act 1994         ▪     Erosive/dispersive soils                           to the Reserve/ National Park and therefore presents a         an offence under Section 440ZG of the Environmental
 control                                      ▪     hill slope stability problems (steep               possible soil erosion risk during clearing and construction    Protection Act 1994. To minimise the risk of releasing
                  Environmental                     topography)                                        activities. It is not expected that the site has major slope   sediment (and other contaminants) to waters during
                  Protection (Water)          ▪     High intensity rainfall events                     stability issues. Soil erosion risk assessment would be        construction and to meet the General Environmental Duty
                  Policy 1998                                                                          required to determine risk status.                             under the EP Act, a Site Erosion and Sediment Control Plan
                                                                                                                                                                      (ESCP) must be prepared/certified by a suitably qualified
                  SPP: State interest—                                                                                                                                person prior to commencing construction. The ESCP must be
                  water quality                                                                                                                                       implemented and monitored throughout the construction
                                                                                                                                                                      phase.
                                          Will construction require specific soil control and/or       Possible. Soil erosion risk assessment would be required       To minimise the risk of releasing sediment (and other
                                          rehabilitation treatments to minimise impacts on existing    to determine risk status.                                      contaminants) to waters during construction and to meet the
                                          environment (other than normal construction                                                                                 General Environmental Duty under the EP Act, a Site Erosion
                                          management controls)?                                                                                                       and Sediment Control Plan (ESCP) must be
                                          (i.e. sediment basins, surface protection, wetlands etc.)                                                                   prepared/certified by a suitably qualified person prior to
                                                                                                                                                                      commencing construction. The ESCP must be implemented
                                                                                                                                                                      and monitored throughout the construction phase.
 ASS              SPP: State interest—    Does the site have acid sulfate soils or potential acid      Presence of ASS / PASS possible.                               Manage site as per requirements of approved Acid Sulfate
                  water quality           sulphate soils?                                                                                                             Soil and Groundwater Management Plan.
                                          Are acid sulfate soils likely to be disturbed by proposed    Possibly                                                       NA
                                          development works?
                                          Is it likely that State Planning Policy: State interest -    Yes                                                            NA
                                          water quality will be triggered by the proposed
                                          development?
 Soil             Soil Conservation Act   Is the site subject to salinity or soil degradation?         No                                                             NA
 conservation     1986                    Is any part of the site subject to an approved project
                                          plan for soil conservation?
                  Local Planning          Does the site include land identified as good quality        No.                                                            NA
                  Scheme                  agricultural land, or is the site adjacent to agricultural
                                          areas?
                                          If so, will the proposal be compatible with agricultural
                                          activities?
 Other            Local Planning          Is there evidence, knowledge or likely indications that      No                                                             NA
 geotechnical     Schemes                 rock or other geological features may be present or
 features                                 encountered on site?
                                          ❑ Rocky terrain.
                                          ❑ Shallow topsoil with under bearing rock substrata.
                                          ❑ Mines.
                                          ❑ Faults, slips, subsidence or other movement.
                                          ❑ Local knowledge.

Page 24

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)




 NATURAL HAZARDS
 Fire               State Planning Policy   Is the development an institution where evacuating           No                                                            NA
                    State Interest -        people may be particularly difficult and/or community
                    Natural hazards, risk   Infrastructure that provides services vital to the well-
                    and resilience          being of the community?
                                            Are there any areas on the property or adjacent which        Yes                                                           Development in accordance with Bushfire Management
                                            are considered to be within a bushfire hazard area?                                                                        Plan.
                                            ❑ Local authority mapping
                                            ❑ State Planning Policy SARA Bushfire Mapping
                                            Is the development subject to requirements under SPP         Yes                                                           Requirements satisfied in approved design
                                            Part E Interim Development Assessment
                                            Requirements?
 Flooding                                   Is there any known or likely flooding or inundation on the   No                                                            N/A
                                            property from stormwater flows or stream/waterway
                                            flooding? This can be from natural and/or constructed
                                            stormwater systems.
                                            ▪ Presence of adjacent waterways/streams or
                                                 wetlands.
                                            ▪ Presence of defined drainage depressions or gully
                                                 systems.
                                            ▪ Presence of underground municipal stormwater
                                                 drainage pipe systems and/or easements.
                                            ▪ Poor development systems.
                                            ▪ Large external catchments.
 Overland flow                              Is proposed development likely to impact on or be            No.                                                           NA
                                            impacted by overland flow?
 Storm Surge                                Is the site or its access at risk from storm surge? (i.e.    No                                                            NA
                                            coastal land at a level of 2.5 m AHD or lower)
 SITE ACCESS, ROADS AND TRAFFIC
 State Controlled    Planning               Are there any state-controlled roads declared under the      No                                                            NA
 Road                Act/Transport          Transport Infrastructure Act 1995 in close vicinity of the
                     Infrastructure Act     development site?
                     1994


 Traffic                                    What are existing traffication facilities (parking, access   Carpark at Rufous Street immediately adjacent to the north    Refer approved Traffic Management Plans
                                            etc.)?                                                       of the site is currently under construction. Access via IGA
                                                                                                         carpark via David Low Way.
                                            Will the operational use of the proposed facility impact     Traffic condition impacts approved by Noosa Shire Council
                                            on existing traffic conditions?

Page 25

Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



                                         Does the proposed development have any traffication          Yes
                                         requirements (e.g. access approvals, internal or external
                                         parking, external traffic provisions

                                         Is a formal traffic study likely to be required for the      Development approved
                                         proposed development?

 ENVIRONMENTAL NUSIANCE
 Noise, Dust,      Environmental         Are there any sensitive receptors specific to the property   Yes. Peregian Beach Kindergarten located on Rufous               It should be ensured that construction impacts, including air
 Light             Protection Act 1994   or adjacent areas which may need to be considered?           Street is located adjacent to the north of the Site. The local   and noise pollution are managed to reduce the potential
                                         (i.e. residential, hospitals etc.)                           White’s IGA and Peregian Beach Hotel are also located            impacts on local residents and community facilities.
                   EPP Noise                                                                          adjacent to the east of the site.                                Construction EMP for the project addresses noise and air
                   EPP Air                                                                                                                                             pollution.

                                                                                                                                                                       Unless otherwise approved in any development approvals
                                                                                                                                                                       and/or statutory permits, works must comply as a minimum
                                                                                                                                                                       with default noise standard detailed in the EP Act including:

                                                                                                                                                                               Construction work should be restricted to Monday to
                                                                                                                                                                             Saturday (excluding public holidays) between
                                                                                                                                                                             6.30 and 6.30 pm
                                                                                                                                                                               Operation of regulated devices such as chainsaws,
                                                                                                                                                                             mulchers and electrical, mechanical or pneumatic
                                                                                                                                                                             power tools should be restricted to Monday to
                                                                                                                                                                             Saturday (excluding public holidays) between 7 am
                                                                                                                                                                             and 7 pm
                                                                                                                                                                               Work should not be undertaken on public holidays.

                                                                                                                                                                       Measures should be put in place to manage dust which may
                                                                                                                                                                       potentially be generated from tree removal and construction
                                                                                                                                                                       activities.
                                         Are there any particular activities associated with the      Yes. Initial increase in construction traffic.                   Construction traffic managed in accordance with EMP.
                                         development that may generate environmental                  Increase in local traffic.                                       Operational traffic managed in accordance with approved
                                         nuisances that may need to be addressed?                                                                                      Traffic Management Plan.

                                         Are there any potential generators of environment            Yes. Increased traffic.                                          Construction traffic managed in accordance with EMP.
                                         nuisances that may impact on the proposed                                                                                     Operational traffic managed in accordance with approved
                                         development? (e.g. traffic, industry)                                                                                         Traffic Management Plan.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.