EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
ENVIRONMENTAL MANAGEMENT V2
PLAN (CONSTRUCTION AND OPERATION)
ESSENCE OF PEREGIAN BEACH
215 DAVID LOW WAY, PEREGIAN BEACH
QUEENSLAND
FOR
THOMCO NO. 2087 PTY LTD
NOVEMBER 2019
Project Services
Department of Housing and Public Works
Tel (07) 5450 5984 / PO Box 9566 Pacific Paradise QLD 4564 / Email: [email protected]
ABN 60 625 108 625
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 24 pages
Page 2
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
DOCUMENT CONTROL
Document: Environmental Management Plan
Project Ref: J000488
Site: Essence of Peregian Beach, 215 David
Low Way, Peregian Beach
Version Date Distribution Author/s Approver
1 15/11/2019 Thomco No 2087 Pty P. Fox (B. App Sc. Joshua Lee (B. Sc.) –
Ltd (Env Sci) - Hons) – Director
Principal
Environmental
Scientist / Ecologist
2 21/11/2019 + Joshua Lee (B. Sc.)
– Director
Note: The Environmental Management Plan (Construction and Operation) does not constitute a formal
environmental assessment report for the site and is not to be used for any purposes other than the purpose
intended. The recommendations provided are based on the site/development plans detailed in Attachment
B and address statutory requirements and policies that were in force at the time of writing. If there are
changes to the proposed development (particularly if vegetated areas are being impacted on), twelve months
or more have passed since the time of writing or new statutory requirements have come into force, the
statutory requirements and advice detailed in the report may no longer be valid. In these circumstances it is
recommended that a review of this report is undertaken to identify current requirements.
© 2019 - J000488 1
Page 3
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
CONTENTS
1. Introduction 1
2. Purpose of This Report 1
3. Statutory and Policy Requirements 1
4. Environmental Management 7
4.1 General 7
4.3 Vegetation Management and Fauna Protection 7
4.4 Water Quality and Erosion and Sediment Control 7
4.5 Weed Control and Pest Management 7
4.6 Waste Management 8
4.7 Fuels and Hazardous Materials 8
4.8 Air Quality and Dust Control 8
4.9 Aboriginal Cultural Heritage 8
5. Communication and Reporting 10
5.1 Site Induction 10
5.2 Complaints and Incident Management Procedure 10
5.3 Non-conformances and Incidents 10
5.4 Corrective and Preventive Action 10
6. Training 11
ATTACHMENT A – Development Plan
ATTACHMENT B – Environmental Checklist
© 2019 - J000488 1
Page 4
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
1. Introduction
North Coast Environmental Services have been commissioned by Thomco No 2087 Pty Ltd to
prepare an Environmental Management Plan to manage impacts to the environmental values
associated with Lot 1 on SP286680; located at 215 David Low Way in Peregian Beach (referenced
hereafter as ‘the site’). The impacts are anticipated to arise as a result of the approved construction
of 19 x 3+ bedroom units, one (1) manager’s unit and a motel building containing 32 units. The site
is proposed to be reconfigured from one (1) Lot into three (3) Lots (MCU16/0153 REC16/0041).
The site layout has been prepared by Reddoor Architecture (refer Attachment A).
2. Purpose of This Report
This Environmental Management Plan (EMP) (Construction and Operation) has been prepared to
assist Thomco No. 2087 Pty Ltd (Thomco) and/or their nominated Construction Contractor, and
other parties associated with the Essence of Peregian Beach development works, in discharging
their statutory responsibilities relating to environmental matters during the construction and
operation phase of the Project. This EMP includes specific environmental management actions,
which have been detailed in Table 1 of this document.
The following potential environmental issues have been identified in this EMP as key areas for
consideration during the construction and operation phase of the Project:
• Legislative compliance
• Fauna and fauna habitat;
• Vegetation management;
• Water quality (including groundwater);
• Erosion and sediment control; and
• Weed control and pest management.
Other issues that have been considered in this EMP include:
• Waste management;
• Fuels and hazardous materials;
• Air quality and dust control;
• Aboriginal cultural heritage;
• Noise and vibration; and
• Visual amenity
3. Statutory and Policy Requirements
Thomco and all members of the project team have a “General Environmental Duty” under Section
319 of the Environmental Protection Act 1994 (EP Act). The General Environmental Duty makes
it an offence under the Act to carry out any activity that causes, or is likely to cause, environmental
harm unless all reasonable and practical measures have been taken to prevent or minimise the
potential harm.
To minimise environmental harm, it is necessary to assess what environmental conditions exist
on-site and to identify potential environmental impacts of the proposed development. In addition
to the EP Act, all development must comply with the relevant provisions of Commonwealth and
State Legislation including but not limited to:
• Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act)
(Commonwealth);
• Planning Act 2016 (Planning Act);
• Nature Conservation Act 1992 (NC Act);
© 2019 - J000488 1
Page 5
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
• Vegetation Management Act 1999 (VM Act);
• Nature Conservation (Wildlife Management) Regulations 2006
• Water Act 2000;
• Fisheries Act 1994;
• Queensland Heritage Act 1992;
• Waste Reduction and Recycling Act 2011;
• Waste Reduction and Recycling (Waste Levy) Amendment Act 2019;
• Aboriginal Cultural Heritage Act 2003;
• Biosecurity Act 2014;
• Environmental Protection (Air) Policy 2019
• Environmental Protection (Noise) Policy 2019
Development requirements are also set through a number of statutory instruments including State
Planning Policies, State government policies and Local Government planning schemes.
The Environmental Checklist in Attachment B summarises the results of the site surveys and
desktop investigations undertaken for the proposed works. For the project to comply with relevant
environmental laws and policies, the management measures summarised in the Project
Environmental Management Plan (Project EMP) detailed in Table 1 need to be implemented.
Thomco No. 2087 Pty Ltd Environmental Policy
Thomco are committed to a policy of ‘environmental improvement’ in the course of its business
operations. Thomco realise that the nature of our work is likely to cause disturbance of the natural
environment with the potential of environmental harm unless considered environmental
management practices are implemented. Thomco will continue to reduce potential environmental
impacts by:
• Complying with Local, State and Commonwealth legislation;
• Consulting with community, employees, traditional owners and subcontractors;
• Managing potential impacts to flora / fauna, air, water and soil.
© 2019 - J000488 2
Page 6
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Table 1 - Project Environmental Management Plan (Construction and Operation)
Based on the information contained in the Environmental Checklist Report (Attachment B), the following environmental aspects and issues have been identified for the project. The management measures
detailed below are to be implemented in order to:
• Manage environmental constraints identified for the site;
• Address statutory and environmental requirements for the proposed development; and
• Assist Council and/or their nominated contractor to meet their “General Environmental Duty” under Section 319 of the Environmental Protection Act 1994, to not carry out any activity that causes or is
likely to cause harm unless all reasonable and practical measures have been taken to prevent or minimise the harm.
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
Statutory Approvals and Permits
Approval from NSC granted MCU16/0153 REC16/0041 ▪ N/A
Environmental Offsets
Schedule 11 Koala ▪ Direct delivery or financial payment (TBA) Pre-Construction Thomco None
Mandatory Reporting or Notification
Spotter Catcher Report ▪ Follow FMP and directions of spotter catcher during clearing Construction Construction Contractor
/Spotter catcher
Design Requirements
As per approval ▪ Enact measures prescribed in DA conditions and documents All Construction Contractor /
Site managers
Contract Documentation
▪ General Environmental Duty under the Environmental ▪ A project specific environmental specification should be prepared and Construction and Engineering
Protection Act 1994 included in the contract documents. As a minimum it should include the Operation
requirements detailed in the preconstruction, construction and
operation sections below.
Preconstruction
▪ General Environmental Duty under the Environmental ▪ The following plans must be submitted by the contractor prior to Construction Construction Contractor
Protection Act 1994 commencement of the contract for review and acceptance:
o The release of sediments or other contaminants o Fauna Management Plan (FMP)
to waters or stormwater systems is an offence o Environmental Management Plan (Construction); and
under Section 440ZG of the Environmental
o Erosion and Sediment Control Plan (in accordance with the
Protection Act 1994 (EP Act).
IECA Best Practice Erosion and Sediment Control 2008).
Construction
• The vegetation and habitat present immediately west of • Vegetation clearing is not to occur outside of the Project area. The Construction Construction Contractor
the Project area (Council Reserve and Noosa National western boundary is to be clearly fenced and labelled as a no-go-zone.
Park) is considered to contain flora and fauna protected
under the Commonwealth Environment Protection and
Biodiversity Conservation Act 1999 and Nature
Conservation Act 1992.
• All Aboriginal Cultural heritage is protected. Any • Works to cease and the relevant Aboriginal Party to be contacted if Construction Construction Contractor
Aboriginal cultural heritage, if found, is protected under evidence of Aboriginal cultural heritage is encountered during site
works.
© 2019 - J000488 3
Page 7
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
the terms of the Aboriginal Cultural Heritage Act 2003
even if DATSIP has no records relating to it.
▪ Vegetation to be cleared may provide breeding places, ▪ Immediately prior to clearing, vegetation is to be inspected to ensure Construction Construction Contractor
habitat or shelter for fauna species. Fauna species may that fauna is not present to reduce risk of injury during clearing
be present and may be injured or killed during vegetation operations. If fauna is present vegetation clearing should cease and
clearing. s88 of the Nature Conservation Act 1992 (re fauna should be allowed to move out of the vegetation clearing area of
‘take’ of native fauna) or s332 of the Nature Conservation its own accord with further advice should be sought from a licensed
(Wildlife Management) Regulation 2006, (‘tampering with fauna spotter catcher. The need for a spotter catcher may also arise
an animal breeding place’) is therefore potentially where fauna refuse to move on of their own accord after a reasonable
applicable to the proposed works. It is a legal period.
responsibility under the NC Act to demonstrate that
reasonable measures have been undertaken to identify
the presence of any listed fauna on the site prior to
vegetation clearing.
▪ Vegetation not required to be cleared may be within the ▪ Not applicable, all vegetation to be cleared.
proposed limits of construction.
• The release of sediments or other contaminants to waters • Erosion and sediment control measures are to be implemented prior to Construction Construction Contractor
(surface and groundwater) or stormwater systems is an commencement of works and maintained and monitored throughout the
offence under Section 440ZG of the Environmental construction period.
Protection Act 1994 (EP Act). • Waste oil and grease from machinery will be collected (if required) and
sent to an approved disposal facility to mitigate impacts to soil, surface
water and groundwater.
• Any herbicides shall be used in accordance with manufacturers and
DES’s guidelines. Only herbicides designed for use near waterways
shall be used on site.
• Ensure works are undertaken in accordance with approved plans and
conditions of approval.
▪ Construction works will generate noise and dust which ▪ Unless otherwise approved in any development approvals and/or Construction Construction Contractor
may affect the site users and neighbouring residents. statutory permits, works must comply with the default noise standard
detailed in the EP Act including:
▪ Construction work should be restricted to Monday to Saturday
(excluding public holidays) between 6.30 am and 6.30 pm;
▪ Operation of regulated devices such as chainsaws, mulchers and
electrical, mechanical or pneumatic power tools should be restricted to
Monday to Saturday (excluding public holidays) between 7 am and 7
pm;
▪ Work should not be undertaken on public holidays; and
▪ Measures to be put in place to manage dust that may potentially be
generated from tree removal and construction activities.
▪ Monitor wind speed and direction and avoid or minimise dust
generating activities (i.e. stripping, excavation, etc) during dry and
windy conditions, particularly during a southerly or south-easterly
(most common wind direction at Peregian Beach) due to the
Kindergarten north of the Project area.
▪ Use water trucks to water roads and unsealed areas to limit dust
emissions
▪ Waste generation such as oily rags, oil filters, used oil, ▪ Collected in suitable containers for disposal offsite at a licenced landfill Construction Construction Contractor
food scraps, toilet waste (port-a-loos) ▪ Waste which can be recycled should be undertaken in accordance with
the Qld Waste Reduction and Recycling Act 2011 and the Waste
Reduction and Recycling (Waste Levy) Amendment Act 2019.
© 2019 - J000488 4
Page 8
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
▪ Food scrap waste to be in fauna-proof containers as necessary.
▪ Mobile ablution facilities will be emptied by licenced contractor and
disposed at an approved facility.
▪ Weed and Pest control under Qld’s Biosecurity Act 2014 ▪ All restricted weed species will be removed from the construction site at Construction Construction Contractor
initial clearing stages and also at the end of construction works in
accordance with the Biosecurity Act 2014. These weeds should not be
mulched with other onsite cleared vegetation.
▪ Weed removal shall occur prior to clearing to ensure that retained
topsoil and native vegetative mulch is not contaminated with weed
material
▪ Any herbicides shall be used in accordance with manufacturers and
DES guidelines. Only herbicides designed for use near waterways shall
be used on site.
▪ Restricted weed species must not be released into the environment,
given away or sold as a plant or something infested with its seeds.
▪ Remove any weeds or exotic vegetation matter that can propagate from
the site. This material shall be disposed of at Council landfill sites
▪ Everyone has a general biosecurity obligation (GBO) to take reasonable
and practical steps to minimise the risks associated with invasive plants
and animals under their control.
▪ Storage and Handling of Hazardous Substances ▪ All hazardous substances and dangerous goods shall be stored, used Construction Construction Contractor
▪ No justifiable complaints regarding inappropriate and handled in accordance with relevant legislation, Australian
waste management resulting from construction activities Standards, MSDS and Codes of Practice.
received from surrounding sensitive receptors or general ▪ Under no circumstances are hazardous materials to be placed into a
public. place where it can reasonably be expected to move into Council
▪ To comply with the hazardous substances and Reserve and National Park which is downgradient of the site.
dangerous goods storage and use requirements specified ▪ Storage and handling of potential environmental contaminants on site
in relevant legislation, Australian Standards, MSDS and should occur in flat areas well away from the Council Reserve and
Codes of Practice National Park. Drop sheets or drip trays (or other bunded area) should
be used under mixing and pouring areas as a precaution.
▪ Wherever possible products with low environmental toxicity should be
identified and used in environmentally sensitive areas.
▪ All staff are to be trained in the handling of hazardous substances,
including fuel and spill prevention and the use of spill kits.
▪ Store all hazardous goods a minimum of 30m away from the Council
Reserve and National Park and in accordance with MSDS storage
requirements. MSDS for each hazardous material used on site should
be available on site at all times.
▪ Provide suitable number and size spill kits throughout the Project site
and in a location available for immediate use, adjacent to sensitive
environments.
▪ All hazardous substances must be stored on a suitably sized bunded
pallet or similar capable of retaining at least 120% of the volume being
stored and provided with a cover for deployment prior to adverse
weather conditions.
▪ All equipment is to be well maintained, inspected frequently and free
from fuel, oil, grease leaks.
▪ Where possible select biodegradable or low risk to the environment oils,
greases and hydraulic fluids.
▪ Do not undertake any machine maintenance or refuelling within 30m of
the Council Reserve and National Park or flow paths leading into the
Council Reserve and National Park.
© 2019 - J000488 5
Page 9
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
▪ Protection of visual amenity ▪ Install site fences along the northern boundary. The other boundaries Construction Construction Contractor
are not within view sheds sue to the Peregian Beach Hotel and the IGA.
▪ General Environmental Duty ▪ Contractor is required to submit relevant environmental reports that Construction Construction Contractor
should be reviewed and actioned as necessary.
Operation
▪ Water conservation ▪ Water conservation in accordance with Stormwater Management Plan Operation Site Managers
and Council requirements for water reuse (e.g. rainwater tanks).
▪ Water Quality Protection – changes to hydrology of ▪ Development in accordance with Stormwater Management Plan Operation Site Managers
adjacent Council Reserve and National Park ▪ Comply with Council discharge limits in relation to water quality
▪ The release of sediments or other contaminants to waters discharge criteria for total nitrogen, phosphorous and total suspended
(surface and groundwater) or stormwater systems is an solids.
offence under Section 440ZG of the Environmental
Protection Act 1994 (EP Act).
▪ Maintenance of Stormwater Quality Improvement
Devices
▪ Vegetation Protection. ▪ Install clear signage on the Council Environmental Reserve including Operation Site Managers
▪ Fauna Protection interpretive signage regarding the environmental values of the Reserve
and adjacent National Park
▪ Vegetation and habitat present immediately west of the
Project area (Council Reserve and Noosa National Park) ▪ National Park rules apply such as no domestic animals permitted in the
is considered to contain flora and fauna protected under Reserve and National Park.
the Commonwealth Environment Protection and ▪ Rehabilitation along the western boundary / bioretention area with
Biodiversity Conservation Act 1999 and Nature endemic species.
Conservation Act 1992. ▪ No changes to hydrology of adjacent Council Reserve and National
Park.
▪ Bushfire ▪ Compliance with the Project specific Bushfire Management Plan Operation Site Managers
▪ Biting Insects Management ▪ Remove potential mosquito breeding sites by: Operation Site Managers
▪ Tipping out any water in plastic containers, buckets, pot plant trays
▪ Roofing gutter kept clear of rotting leaves
▪ Dispose of fallen palm fronds and coconut shells which may hold water
▪ Dispose of empty containers, tyres or anything that catches and holds
rainfall
▪ Waste Management ▪ Compliance with project Waste Management Plan and Planning Operation Site Managers
Scheme Policy 11, Waste Management Plans
▪ Waste which can be reused or recycled should be undertaken in
accordance with the Qld Waste Reduction and Recycling Act 2011 and
the Waste Reduction and Recycling (Waste Levy) Amendment Act
2019.
© 2019 - J000488 6
Page 10
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
4. Environmental Management
4.1 General
The following sections identify specific environmental aspects that may be impacted by
construction works and outline:
• Objectives that apply to each identified aspect;
• Potential issues that may arise as a result of construction works within the Project area;
• Potential issues that may arise from operation; and
• Relevant legislation that may be triggered.
4.3 Vegetation Management and Fauna Protection
The following general objectives have been identified for the construction and operation phase of
the works with respect to vegetation and fauna management:
• Relevant investigations and approvals will be obtained prior to commencement of clearing
works;
• No disturbance of vegetated areas shall occur outside the designated work area; and
• Appropriate measures are to be implemented to minimise any impact on fauna and their
potential habitat.
A Fauna Management Plan has been prepared for this project (NCES, 2019) and the directives
prescribed therein are to be adhered to regarding the management of vegetation and fauna during
clearing works.
4.4 Water Quality and Erosion and Sediment Control
Objectives relating to erosion and sediment control for the construction and operation phase of the
works include:
• To comply with the relevant State Planning Policy Water Quality Objectives; and
• To minimise impacts to water quality by managing erosion risk and effectively containing
sediment entrained run-off generated within the construction area.
The Project area is located adjacent to a Noosa Council Environmental Reserve and Noosa
National Park. Run-off from the construction site is likely to contain sediment that could negatively
impact water quality.
An Erosion and Sediment Control Plan must be prepared and approved by Council prior to site
clearing and earthworks commencing. Adequate erosion and sediment controls must be in place
prior to the commencement of works to minimise the possibility of sediment entering the Reserve
and National Park. Erosion and sediment control devices must be maintained for the duration of
site works. Clean stormwater from upslope of the construction area should be diverted around the
extent of disturbance to maintain clean flows into the drainage line along the western side of the
site.
The Contractor is responsible for establishing adequate controls to prevent erosion and
sedimentation adversely affecting receiving environments.
4.5 Weed Control and Pest Management
The following objectives have been identified for the construction and operation phase of the works
with respect to weed control and pest management:
© 2019 - J000488 7
Page 11
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
• Control existing weeds within the Project area;
• Prevent the establishment of new weeds within the Project area; and
• Minimise the spread of weeds outside the Project area as a result of construction activities.
The Contractor will be responsible for the control of restricted weeds within the works area as per
obligations under the Biosecurity Act 2014.
4.6 Waste Management
The following objectives have been identified for the construction phase of the works with respect
to waste management:
• Comply with relevant environmental legislation (e.g. Waste Reduction and Recycling Act
2011);
• Implement waste management in accordance with the hierarchy of avoid, re-use, recycle,
recover, dispose; and
• Provision of adequate and appropriate sanitary amenities and waste disposal facilities for
the full duration of construction works.
Limited waste streams are expected to be generated during the construction phase.
4.7 Fuels and Hazardous Materials
The management of fuel and hazardous substances shall accord with the following objectives:
• All chemicals and fuels shall be managed responsibly to avoid environmental nuisance or
harm from occurring; and
• No spills, leaks or other environmental incidents associated with the handling or use of
chemicals or hazardous substances shall occur as a result of construction activities.
No hazardous or dangerous chemicals/materials will be used or stored at the construction site for
the duration of construction activities.
4.8 Air Quality and Dust Control
Objectives relating to air quality and dust control during the construction phase of the Project are
to comply with the Environmental Protection (Air) Policy 2019 and mitigate air quality nuisance
impacts to surrounding land uses and sensitive receivers. Earthmoving equipment will be
operating at different stages throughout the construction phase. Dust emissions may occur during
construction, particularly in dry and windy conditions. Mitigation measures for minimising the
generation of dust or other air emissions are to be implemented on-site.
4.9 Aboriginal Cultural Heritage
The following cultural heritage objectives are to be considered:
• Recognise, protect and conserve cultural heritage artefacts identified during the
construction phase of the Project within the Project area; and
• Meet the requirements of the Aboriginal Cultural Heritage Act 2003
All persons have a Duty of Care to protect items or places of cultural heritage significance. In this
regard, works are to be undertaken in accordance with the cultural heritage Duty of Care. Council
may wish to discuss the extent of works with the local Aboriginal party to comply with their Duty of
Care under the Aboriginal Cultural Heritage Act 2003. The Aboriginal party for the area is:
Kabi Kabi Aboriginal Corporation
© 2019 - J000488 8
Page 12
Essence of Peregian Beach Project v2 Environmental Management Plan (Construction and Operation) PO Box 1041 Maroochydore, QLD P (07) 5346 9806 F (07) 5443 8899 E [email protected] © 2019 - J000488 9
Page 13
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
5. Communication and Reporting
5.1 Site Induction
Site inductions are to be carried out by the Contractor. All personnel entering the construction area
are required to complete a site induction. The content of the site induction is to include reference
to environmental controls established on-site and outlined in this document. Site induction record
forms shall be retained and provided to Council for record keeping purposes.
5.2 Complaints and Incident Management Procedure
The Contractor shall establish a complaints management procedure, including provision for
signage advertising a phone number for members of the public to contact the Contractor should
they wish to enquire about the Project’s impacts or lodge a complaint. The Contractor shall
establish an incident management procedure for dealing with environmental incidents that may
occur during the site works. A copy of all complaints and incidents is to be provided to Council as
they occur.
5.3 Non-conformances and Incidents
All non-conformance events and incidents that arise from non-compliance with the provisions of
this EMP will be duly and appropriately recorded by the Contractor and made available to Council
within a 24-hour period. Where a non-conformance event or incident occurs, the non-conformance
report is to include the following information:
• The location of the non-conformance event;
• The time of the non-conformant event;
• The time the Contractor became aware of the non-conformant event;
• The suspected cause of the non-conformant event;
• The type of contaminant released (if any);
• A description of the resulting impacts (to the environment) of the non-conformance event;
• What actions were taken to mitigate any environment harm or environmental nuisance as
a result of the non-conformant event; and
• Proposed actions to prevent a recurrence of the non-conformance event.
5.4 Corrective and Preventive Action
Any major environmental non-conformances and incidents that occur during the construction
phase of the Project will be investigated by the Contractor to determine the contributing factors and
underlying causes of the incident. The investigations will be completed to determine corrective
actions and necessary controls to prevent recurrence. Any corrective and preventive actions
identified will be recorded on the incident form and this EMP will be updated to reflect any changes
in management procedures.
© 2019 - J000488 10
Page 14
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
6. Training
All persons shall be required to undertake a site induction and have the necessary qualifications
and current training to perform their responsibilities prior to commencing work at the site. The
environmental component of the site induction will include, as a minimum, the following:
• An overview of this EMP;
• A summary of the roles and responsibilities and site management contact details;
• All person’s duty to notify;
• Environmental performance criteria;
• Conditions of applicable environmental licences, permits, approvals or self-assessable
codes;
• Environmentally sensitive areas (including no-go zones) with emphasis on the adjacent
Reserve and National Park, erosion and sediment control, site access and the importance
of working within the Project footprint;
• Key environmental control measures identified in the EMP, including specific environmental
controls required for works adjacent to the Reserve and National Park;
• Emergency responses procedures;
• Incident and complaints reporting; and
• Induction records are to be maintained with information detailing the attendees, content,
trainer and dates of the induction/training.
© 2019 - J000488 11
Page 15
Essence of Peregian Beach Project v2 Environmental Management Plan (Construction and Operation) ATTACHMENT A – SITE LAYOUT
Page 16
COPYRIGHT RED DOOR ARCHITECTURE ALL RIGHTS not visible from the north visible from the north
RESERVED. THIS DRAWING AND RELEVANT AUSTRALIAN
STANDARDS. OR IN WHOLE WITHOUT WRITTEN A 3
3000
3000
3000
3000
3000
3440
PERMISSION OF RED DOOR ARCHITECTURE.
4000
B Kamala Wallum Wallum
6700
Wallum Wallum B
Pool BBQ 2000 Marram Marram
4000
Sewer easement
Lily
Bio-retention
Basin 115m² 700
2 000 0 9 10 11 12 13
2000
14 15
1:3 Batter 16
1962
INTERNAL
bins bins bins bins bins bins
2m Wide Concrete Path 4
Bin collection point
9612
6000
PRIVATE to Pedestrian link to
bins bins bins bins for units 14-16
ROAD Rufous St precinct
Detention Basin 2500mm HIGH
910
footprint ACOUSTIC FENCE
0
INTERNAL
2300
PRIVATE FACADE
8 7 3000 6 ROAD OPTION
900 1000 5 17 Saltbush
Lily
4100 Marram bins
3300
V1 VIS.
Cars Kamala Kamala bins
V2
2440
20 0
0 0 3751 6000
4440
4000
4000
2000
3000 18 Saltbush
COUNCIL V3
Bar
5200 3000
RESERVE V4 1000 Kamala
2500 Kamala
2000
3300
Cabana Marram Marram bins
C 6000 FACADE
C
OPTION
3000 19 Saltbush
500 1000 4
Pool
Bushfire resistant 1 2 3 9497
species planted to bins
3300
batter
840
D
0
D bins INTERNAL bins bins bins
PRIVATE 20 Saltbush
Amenities
ROAD VIS. Cars VIS. Cars
V5 V6 V7 V8
Lanai
Easement
Conference
COUNCIL 2673
Admin
/VPR
room
Kit. Screened 10x
RESERVE A/C condensers 2m Wide Concrete
Reception
2500 2500 2500 2500 2500 2500 Path Pedestrian
link to shops
24 hr pedestrian access EMERGENCY EGRESS
2 164 00 ROAD
2500
Car parking for
SPECIALTY SHOPS
6000
Min . Units over
2500 2500 2500
2169 4000
Detention Basin
2800 2500 2500 2500 1702
IGA
footprint
Access to secure carpark
Easement
11000
Security 2283
5890
via remote control key gate VAN Lobby Bin
activation. Exit via Ser. 1
pressure pad in slab. CARPARK
2500 2500
To be locked off in 1678
2700
Store
Emergency of Bushfire. 19407
SRV 2500 2500 2500 2500
Screened hardstand
5400
2500 2500 2500
Emergency egress road
bin collection
164 23
3X 1100L loise noise
Car parking for
6000
Units over
887
SHOPPING CENTRE
2500 2500 2500
LANDSCAPING
COUNCIL PEREGIAN VILLAGE MARKETS
5400
2500 2500 2500 2500
RESERVE
4000
2500 2500
2500 2500
Bins
Access and service easement REVISION 4 16.04.19 REVIEW ISSUE
WWW.RDARCH.COM.AU 180082 SCALE
1 : 500 JAN 19 215 DAVID LOW WAY, PEREGIAN BEACH ESSENCE OF PEREGIAN BEACH SD04 SITE / FLOOR PLAN
Page 17
Essence of Peregian Beach Project v2 Environmental Management Plan (Construction and Operation) ATTACHMENT B – Environmental Checklist
Page 18
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Environmental Checklist Report – Essence of Peregian Beach
Items that may trigger the requirement for a development approval/assessment under the Planning Act 2016 (Planning Act) are highlighted in yellow
Items that may trigger other statutory approvals
Items that may trigger statutory reporting requirements
Site Description and Proposed Development
Description Description Address Essence of Peregian Beach
❑ Size, type, extent of site
Lot on Plan Area Tenure Owned by/Trustee (purpose)
Lot 1 on SP286680 17,820m2 (incl. Freehold Thomco
IGA)
Description The Project Area is approximately 140m x 120 m. The IGA takes up approximately 3,600m 2 in the south east corner of the Lot. The
site is border by Noosa Council Reserve and then Noosa National Park to the west and also along the small portion of the southern
❑ Adjacent land uses
boundary. The Rufous Street Precinct which includes a new carpark under construction, Peregian Beach Kindergarten and D-Hurst
❑ Sensitive receptors
Oval is located to the north. The Peregian Beach Hotel and IGA borders the site to the east.
Development facilities/use Current facilities/use
❑ Nature of facilities
The site is a former caravan park with dilapidated caravan park infrastructure remaining onsite.
❑ population/usage
❑ Operating hours Proposed development/works
❑ Other relevant features/aspects
Construction of 19 x 3+ bedroom units, one (1) manager’s unit and a motel building containing 32 units. The site is proposed to be
reconfigured from one (1) Lot into three (3) Lots.
❑ Building Class 1 ❑ Development classification under the relevant Development Permit for Material Change
planning scheme. of Use of Premises & Development Permit
to Reconfigure a Lot
Page 19
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Planning, Development Approvals & Consultation
LANDUSE PLANNING STATUS
Planning Act Local Planning Scheme Local Authority How is the site listed? Is the proposed development compatible with the local planning scheme?
2016
Noosa Council Open Space Recreation Yes
Applicable
Planning
Instruments Is the proposed development Yes – The works are proposed within an urban area. Is the proposed development considered to No
considered to be an urban community infrastructure2 under the Planning Act?
purpose1?
Land Act 1994 Other Statutory Authorities Are there any known or likely special arrangements or jurisdictions applying No
to the property other than normal State or Local Authority statutes? (i.e.
federal or state control authorities, airport corporations etc.)
DEVELOPMENT APPROVAL
Planning Act Is the site Ministerially Designated?
2016 No NA
If currently designated is the NA NA
proposed development compatible
with the existing designation?
Is the development a material Yes Approval issued - MCU16/0153
change of use2?
Will the development include Yes Approval pending
operational works3?
Does the development involve the Yes Approval issued - REC16/0041
reconfiguring of a lot2?
Is the development assessable No NA
development under Sec 3 of SP
Reg. (items highlighted in yellow below)
Is Development Approval or Yes
redesignation required?
Environment Does the project trigger a referral No. N/A
Protection and under the EPBC Act?
Biodiversity Act
1999
CONSULTATION
Is consultation with other authorities Yes QLD NPWS Noosa Shire Council
or stakeholders recommended
1
An urban purpose (as defined under the Planning Act 2016) is purposes for which land is used for in cities and towns including residential, industrial, sporting, recreation and commercial purposes, but not
including environmental, conservation, rural, natural or wilderness area purposes
2
Refer to Schedule 2 of the Planning Act
3
as defined under S 10 (1) of the Planning Act
Page 20
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
(outside of development approval or
designation processes)?
Environmental Aspects
Element Triggers Assessment Issues Status Requirements and Advice
HERITAGE & NATIVE TITLE
Indigenous Aboriginal Cultural Is the site listed on DES’s Cultural Heritage Database or No. It should be noted that any Aboriginal cultural heritage, if
Cultural Heritage Act 2003 Register? found, is protected under the terms of the Aboriginal Cultural
Heritage Heritage Act 2003 even if EHP has no records relating to it.
Contract documents should include provisions for works to
cease and the relevant Aboriginal Party to be contacted if
evidence of Aboriginal cultural heritage is encountered during
site works.
Are there any known or possible indigenous cultural None identified. NA
heritage associations with the property which may
require assessment?
How is the nature of the proposed activity classified The nature of the activity is likely to be classified as Where an activity is proposed under category 4 it is generally
under the Aboriginal Cultural Heritage Act 2003 Duty of Category 4 “Areas previously subject to Significant Ground unlikely that it could harm Aboriginal cultural heritage.
Care Guidelines? Disturbance” under the Aboriginal Cultural Heritage Act
2003, Section 28 Duty of Care Guidelines.
Is there potential for the proposed development to Unlikely.
impact on any indigenous cultural heritage, historical
heritage or sensitive items or issues?
Native Title Native Title Act 1993 Will site be affected by Native Title Native Title has not been investigated as part of this All projects require a Native Title Clearance to meet the
(Com) commission. requirements of the Commonwealth Native Title Act 1993.
Historical Queensland Heritage Has the property been listed on the national, state or No No
Heritage Act local heritage registers?
Environment
Protection and Does it have features which are of historical significance None identified NA
Biodiversity or require preservation?
Conservation Act
FLORA & FAUNA
Native Vegetation Does the property possess native vegetation Selected vegetation/trees are present. The area has No approvals for vegetation clearing are required under the
Vegetation Management Act communities that may be affected? previously been cleared of remnant vegetation VMA as the site measures <5ha.
1999 ❑ Any regional ecosystems under the Vegetation
Management Act 1999
❑ Full native/remnant vegetation cover.
❑ Partial native/remnant vegetation cover.
❑ Selected vegetation/trees.
Page 21
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Other Local Planning Does the property possess other vegetation species that No. NA
vegetation Schemes may be affected or require consideration?
❑ Significant trees (amenity
❑ Other
❑ Local Tree or Vegetation Protection Orders.
❑ Memorial trees
Rare and Environment Is there any known or possible protected flora or fauna Note: adjacent remnant vegetation within the Council Clearing is prohibited beyond the site boundaries and all
Threatened/ Protection on the property to be considered under Federal, State or Reserve and Noosa National Park is likely to contain works to be undertaken in accordance with this EMP and
Protected Biodiversity Local legislation? threatened flora and fauna species and habitat likely to other approvals to ensure no impacts to adjacent areas.
species Conservation Act ▪ Environment Protection and Biodiversity support threatened flora and fauna species listed under the
1999 Conservation Act 1999 Commonwealth Environment Protection and Biodiversity
Conservation Act 1999.
Nature Conservation
Act 1992 ▪ Nature Conservation Act 1992 Note: adjacent remnant vegetation within the Council Clearing is prohibited beyond the site boundaries and all
Reserve and Noosa National Park is likely to contain works to be undertaken in accordance with this EMP and
Fisheries Act 1994 threatened flora and fauna species and habitat likely to other approvals to ensure no impacts to adjacent areas.
support threatened flora and fauna species listed under the
Local Planning Nature Conservation Act 1992.
Schemes
Local Laws ▪ Marine plants under the Fisheries Act 1994 No NA
Habitat SEQ Koala Planning Koala habitat Yes, the subject site is within mapped Low Value koala Compliance with Schedule 11 of SPR required. Offsetting
Instruments bushland habitat and mapped Low Value Habitat Suitable required. Refer Fauna Management Plan (NCES 2019).
for Rehabilitation. A spotter catcher required on site during all clearing works.
Vegetation Essential habitat Yes – The adjacent vegetation is mapped as containing No approvals for vegetation clearing are required under the
Management Act essential habitat for Crinia tinnula (wallum froglet), Litoria VMA as the site measures <5ha.
1999 freycineti (wallum rocketfrog), Litoria olongburensis (wallum
sedgefrog), Pezoporus wallicus wallicus (eastern ground
parrot) and Phascolarctos cinereus (koala).
Are there any parts of the property which are or are Yes – few hollows, thick ground vegetation in ornamental All clearing supervised and undertaken in accordance with
likely indicated as habitats, breeding areas or wildlife gardens, narrow bank of wetland habitat Fauna Management Plan (FMP).
corridors for fauna?
❑ Natural water systems.
❑ Natural ground or shrub areas.
❑ Nests, hollow-bearing trees etc.
Fisheries Act 1994 ▪ Is a watercourse mapped under the Queensland No. N/A
Waterways for Waterway Barrier Works spatial data
layer
Weeds Land Protection (Pest Are listed noxious weeds present on the site? Restricted weeds present on site Weeds and declared pests encountered during project
and Stock Route works should be removed and disposed of appropriately.
Management) Act
1994
Weeds of national
significance
Invasive Pests Plant Protection Act Is the property within a declared fire ant/crazy ant No NA
restriction area?
Page 22
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Will movement restrictions and a Fire Ant Management No NA
Plan be required to the project?
PROTECTED & VULNERABLE AREAS
Watercourses Water Act 2000 Does the site contain any watercourses? No N/A
Are they protected by the Water Act 2000? No N/A
EPP Water
Will they be impacted on by the development? No N/A
Wetlands Planning Act Does the site contain any referable wetland areas? No NA
Coastal Areas Coastal Protection Is the property within a coastal management district or No NA
and Management Act erosion prone area as defined under the Coastal
1995 Protection and Management Act 1995 and/or Regional
Coastal Management Plans if available?
Will works be undertaken within a tidal area? No NA
Is the site within a Wetland Protection Area? No. NA
(SDAP Module 11:
Wetland Protection
and Wild Rivers
Surrounding EPBC Act Are there any adjacent areas which are protected or Yes. Noosa National Park and Noosa Council Works avoid these areas and works undertaken to mitigate
Environments constitute environmentally sensitive areas (i.e. Environmental Reserve. potential for offsite impacts.
Environmental watercourses, estuaries, wetlands, marine areas,
Protection Act vegetation areas, national parks, dunes, desert systems
etc.) which forms part of the property’s catchment or
Nature Conservation association?
Act 1992
Will they be impacted on by the development?
HYDROLOGY & STORMWATER
Stormwater SPP: State interest— Does the development trigger requirements under the No NA
Runoff & water quality State Planning Policy: State interest - water quality?
Controls. Environmental Is it likely that the development will or may result in Yes To minimise the risk of releasing sediment (and other
Protection (Water) impacts to downstream stormwater systems and/or contaminants) to waters during construction and to meet the
Policy 2009 discharges to surface drainage or natural watercourse General Environmental Duty under the EP Act, a Site Erosion
systems? (i.e. sediment loss, pollution etc.) and Sediment Control Plan (ESCP) must be
prepared/certified by a suitably qualified person prior to
commencing construction. The ESCP must be implemented
and monitored throughout the construction phase.
Is it requested that specific treatment systems be Yes
integrated in the development of the facility? (Wetlands,
retention basins, pollution control devices etc.)
Page 23
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Groundwater Are there any parts of the property which indicate the Yes. Some ground seepage observed in low-lying areas Works undertaken in accordance with Stormwater
presence of sub-surface water reservoirs or ground towards western boundary of site Management Plan.
seepage?
❑ Natural springs.
❑ Known seepage areas.
❑ Local bore water.
❑ Other (i.e. local knowledge).
SOILS AND GEOLOGY
Soil Erosion Environmental Does the site have any soil erosion risk factors? Possible. Site is positioned on a gentle slope running down The release of sediments or other contaminants to waters is
and sediment Protection Act 1994 ▪ Erosive/dispersive soils to the Reserve/ National Park and therefore presents a an offence under Section 440ZG of the Environmental
control ▪ hill slope stability problems (steep possible soil erosion risk during clearing and construction Protection Act 1994. To minimise the risk of releasing
Environmental topography) activities. It is not expected that the site has major slope sediment (and other contaminants) to waters during
Protection (Water) ▪ High intensity rainfall events stability issues. Soil erosion risk assessment would be construction and to meet the General Environmental Duty
Policy 1998 required to determine risk status. under the EP Act, a Site Erosion and Sediment Control Plan
(ESCP) must be prepared/certified by a suitably qualified
SPP: State interest— person prior to commencing construction. The ESCP must be
water quality implemented and monitored throughout the construction
phase.
Will construction require specific soil control and/or Possible. Soil erosion risk assessment would be required To minimise the risk of releasing sediment (and other
rehabilitation treatments to minimise impacts on existing to determine risk status. contaminants) to waters during construction and to meet the
environment (other than normal construction General Environmental Duty under the EP Act, a Site Erosion
management controls)? and Sediment Control Plan (ESCP) must be
(i.e. sediment basins, surface protection, wetlands etc.) prepared/certified by a suitably qualified person prior to
commencing construction. The ESCP must be implemented
and monitored throughout the construction phase.
ASS SPP: State interest— Does the site have acid sulfate soils or potential acid Presence of ASS / PASS possible. Manage site as per requirements of approved Acid Sulfate
water quality sulphate soils? Soil and Groundwater Management Plan.
Are acid sulfate soils likely to be disturbed by proposed Possibly NA
development works?
Is it likely that State Planning Policy: State interest - Yes NA
water quality will be triggered by the proposed
development?
Soil Soil Conservation Act Is the site subject to salinity or soil degradation? No NA
conservation 1986 Is any part of the site subject to an approved project
plan for soil conservation?
Local Planning Does the site include land identified as good quality No. NA
Scheme agricultural land, or is the site adjacent to agricultural
areas?
If so, will the proposal be compatible with agricultural
activities?
Other Local Planning Is there evidence, knowledge or likely indications that No NA
geotechnical Schemes rock or other geological features may be present or
features encountered on site?
❑ Rocky terrain.
❑ Shallow topsoil with under bearing rock substrata.
❑ Mines.
❑ Faults, slips, subsidence or other movement.
❑ Local knowledge.
Page 24
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
NATURAL HAZARDS
Fire State Planning Policy Is the development an institution where evacuating No NA
State Interest - people may be particularly difficult and/or community
Natural hazards, risk Infrastructure that provides services vital to the well-
and resilience being of the community?
Are there any areas on the property or adjacent which Yes Development in accordance with Bushfire Management
are considered to be within a bushfire hazard area? Plan.
❑ Local authority mapping
❑ State Planning Policy SARA Bushfire Mapping
Is the development subject to requirements under SPP Yes Requirements satisfied in approved design
Part E Interim Development Assessment
Requirements?
Flooding Is there any known or likely flooding or inundation on the No N/A
property from stormwater flows or stream/waterway
flooding? This can be from natural and/or constructed
stormwater systems.
▪ Presence of adjacent waterways/streams or
wetlands.
▪ Presence of defined drainage depressions or gully
systems.
▪ Presence of underground municipal stormwater
drainage pipe systems and/or easements.
▪ Poor development systems.
▪ Large external catchments.
Overland flow Is proposed development likely to impact on or be No. NA
impacted by overland flow?
Storm Surge Is the site or its access at risk from storm surge? (i.e. No NA
coastal land at a level of 2.5 m AHD or lower)
SITE ACCESS, ROADS AND TRAFFIC
State Controlled Planning Are there any state-controlled roads declared under the No NA
Road Act/Transport Transport Infrastructure Act 1995 in close vicinity of the
Infrastructure Act development site?
1994
Traffic What are existing traffication facilities (parking, access Carpark at Rufous Street immediately adjacent to the north Refer approved Traffic Management Plans
etc.)? of the site is currently under construction. Access via IGA
carpark via David Low Way.
Will the operational use of the proposed facility impact Traffic condition impacts approved by Noosa Shire Council
on existing traffic conditions?
Page 25
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Does the proposed development have any traffication Yes
requirements (e.g. access approvals, internal or external
parking, external traffic provisions
Is a formal traffic study likely to be required for the Development approved
proposed development?
ENVIRONMENTAL NUSIANCE
Noise, Dust, Environmental Are there any sensitive receptors specific to the property Yes. Peregian Beach Kindergarten located on Rufous It should be ensured that construction impacts, including air
Light Protection Act 1994 or adjacent areas which may need to be considered? Street is located adjacent to the north of the Site. The local and noise pollution are managed to reduce the potential
(i.e. residential, hospitals etc.) White’s IGA and Peregian Beach Hotel are also located impacts on local residents and community facilities.
EPP Noise adjacent to the east of the site. Construction EMP for the project addresses noise and air
EPP Air pollution.
Unless otherwise approved in any development approvals
and/or statutory permits, works must comply as a minimum
with default noise standard detailed in the EP Act including:
Construction work should be restricted to Monday to
Saturday (excluding public holidays) between
6.30 and 6.30 pm
Operation of regulated devices such as chainsaws,
mulchers and electrical, mechanical or pneumatic
power tools should be restricted to Monday to
Saturday (excluding public holidays) between 7 am
and 7 pm
Work should not be undertaken on public holidays.
Measures should be put in place to manage dust which may
potentially be generated from tree removal and construction
activities.
Are there any particular activities associated with the Yes. Initial increase in construction traffic. Construction traffic managed in accordance with EMP.
development that may generate environmental Increase in local traffic. Operational traffic managed in accordance with approved
nuisances that may need to be addressed? Traffic Management Plan.
Are there any potential generators of environment Yes. Increased traffic. Construction traffic managed in accordance with EMP.
nuisances that may impact on the proposed Operational traffic managed in accordance with approved
development? (e.g. traffic, industry) Traffic Management Plan.