EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)
Does the proposed development have any traffication Yes
requirements (e.g. access approvals, internal or external
parking, external traffic provisions
Is a formal traffic study likely to be required for the Development approved
proposed development?
ENVIRONMENTAL NUSIANCE
Noise, Dust, Environmental Are there any sensitive receptors specific to the property Yes. Peregian Beach Kindergarten located on Rufous It should be ensured that construction impacts, including air
Light Protection Act 1994 or adjacent areas which may need to be considered? Street is located adjacent to the north of the Site. The local and noise pollution are managed to reduce the potential
(i.e. residential, hospitals etc.) White’s IGA and Peregian Beach Hotel are also located impacts on local residents and community facilities.
EPP Noise adjacent to the east of the site. Construction EMP for the project addresses noise and air
EPP Air pollution.
Unless otherwise approved in any development approvals
and/or statutory permits, works must comply as a minimum
with default noise standard detailed in the EP Act including:
Construction work should be restricted to Monday to
Saturday (excluding public holidays) between
6.30 and 6.30 pm
Operation of regulated devices such as chainsaws,
mulchers and electrical, mechanical or pneumatic
power tools should be restricted to Monday to
Saturday (excluding public holidays) between 7 am
and 7 pm
Work should not be undertaken on public holidays.
Measures should be put in place to manage dust which may
potentially be generated from tree removal and construction
activities.
Are there any particular activities associated with the Yes. Initial increase in construction traffic. Construction traffic managed in accordance with EMP.
development that may generate environmental Increase in local traffic. Operational traffic managed in accordance with approved
nuisances that may need to be addressed? Traffic Management Plan.
Are there any potential generators of environment Yes. Increased traffic. Construction traffic managed in accordance with EMP.
nuisances that may impact on the proposed Operational traffic managed in accordance with approved
development? (e.g. traffic, industry) Traffic Management Plan.