Essence of Peregian Beach Project v2
Environmental Management Plan (Construction and Operation)



                                         Does the proposed development have any traffication          Yes
                                         requirements (e.g. access approvals, internal or external
                                         parking, external traffic provisions

                                         Is a formal traffic study likely to be required for the      Development approved
                                         proposed development?

 ENVIRONMENTAL NUSIANCE
 Noise, Dust,      Environmental         Are there any sensitive receptors specific to the property   Yes. Peregian Beach Kindergarten located on Rufous               It should be ensured that construction impacts, including air
 Light             Protection Act 1994   or adjacent areas which may need to be considered?           Street is located adjacent to the north of the Site. The local   and noise pollution are managed to reduce the potential
                                         (i.e. residential, hospitals etc.)                           White’s IGA and Peregian Beach Hotel are also located            impacts on local residents and community facilities.
                   EPP Noise                                                                          adjacent to the east of the site.                                Construction EMP for the project addresses noise and air
                   EPP Air                                                                                                                                             pollution.

                                                                                                                                                                       Unless otherwise approved in any development approvals
                                                                                                                                                                       and/or statutory permits, works must comply as a minimum
                                                                                                                                                                       with default noise standard detailed in the EP Act including:

                                                                                                                                                                               Construction work should be restricted to Monday to
                                                                                                                                                                             Saturday (excluding public holidays) between
                                                                                                                                                                             6.30 and 6.30 pm
                                                                                                                                                                               Operation of regulated devices such as chainsaws,
                                                                                                                                                                             mulchers and electrical, mechanical or pneumatic
                                                                                                                                                                             power tools should be restricted to Monday to
                                                                                                                                                                             Saturday (excluding public holidays) between 7 am
                                                                                                                                                                             and 7 pm
                                                                                                                                                                               Work should not be undertaken on public holidays.

                                                                                                                                                                       Measures should be put in place to manage dust which may
                                                                                                                                                                       potentially be generated from tree removal and construction
                                                                                                                                                                       activities.
                                         Are there any particular activities associated with the      Yes. Initial increase in construction traffic.                   Construction traffic managed in accordance with EMP.
                                         development that may generate environmental                  Increase in local traffic.                                       Operational traffic managed in accordance with approved
                                         nuisances that may need to be addressed?                                                                                      Traffic Management Plan.

                                         Are there any potential generators of environment            Yes. Increased traffic.                                          Construction traffic managed in accordance with EMP.
                                         nuisances that may impact on the proposed                                                                                     Operational traffic managed in accordance with approved
                                         development? (e.g. traffic, industry)                                                                                         Traffic Management Plan.
Log in to download the original file

EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH.PDF · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.