EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
the terms of the Aboriginal Cultural Heritage Act 2003
even if DATSIP has no records relating to it.
▪ Vegetation to be cleared may provide breeding places, ▪ Immediately prior to clearing, vegetation is to be inspected to ensure Construction Construction Contractor
habitat or shelter for fauna species. Fauna species may that fauna is not present to reduce risk of injury during clearing
be present and may be injured or killed during vegetation operations. If fauna is present vegetation clearing should cease and
clearing. s88 of the Nature Conservation Act 1992 (re fauna should be allowed to move out of the vegetation clearing area of
‘take’ of native fauna) or s332 of the Nature Conservation its own accord with further advice should be sought from a licensed
(Wildlife Management) Regulation 2006, (‘tampering with fauna spotter catcher. The need for a spotter catcher may also arise
an animal breeding place’) is therefore potentially where fauna refuse to move on of their own accord after a reasonable
applicable to the proposed works. It is a legal period.
responsibility under the NC Act to demonstrate that
reasonable measures have been undertaken to identify
the presence of any listed fauna on the site prior to
vegetation clearing.
▪ Vegetation not required to be cleared may be within the ▪ Not applicable, all vegetation to be cleared.
proposed limits of construction.
• The release of sediments or other contaminants to waters • Erosion and sediment control measures are to be implemented prior to Construction Construction Contractor
(surface and groundwater) or stormwater systems is an commencement of works and maintained and monitored throughout the
offence under Section 440ZG of the Environmental construction period.
Protection Act 1994 (EP Act). • Waste oil and grease from machinery will be collected (if required) and
sent to an approved disposal facility to mitigate impacts to soil, surface
water and groundwater.
• Any herbicides shall be used in accordance with manufacturers and
DES’s guidelines. Only herbicides designed for use near waterways
shall be used on site.
• Ensure works are undertaken in accordance with approved plans and
conditions of approval.
▪ Construction works will generate noise and dust which ▪ Unless otherwise approved in any development approvals and/or Construction Construction Contractor
may affect the site users and neighbouring residents. statutory permits, works must comply with the default noise standard
detailed in the EP Act including:
▪ Construction work should be restricted to Monday to Saturday
(excluding public holidays) between 6.30 am and 6.30 pm;
▪ Operation of regulated devices such as chainsaws, mulchers and
electrical, mechanical or pneumatic power tools should be restricted to
Monday to Saturday (excluding public holidays) between 7 am and 7
pm;
▪ Work should not be undertaken on public holidays; and
▪ Measures to be put in place to manage dust that may potentially be
generated from tree removal and construction activities.
▪ Monitor wind speed and direction and avoid or minimise dust
generating activities (i.e. stripping, excavation, etc) during dry and
windy conditions, particularly during a southerly or south-easterly
(most common wind direction at Peregian Beach) due to the
Kindergarten north of the Project area.
▪ Use water trucks to water roads and unsealed areas to limit dust
emissions
▪ Waste generation such as oily rags, oil filters, used oil, ▪ Collected in suitable containers for disposal offsite at a licenced landfill Construction Construction Contractor
food scraps, toilet waste (port-a-loos) ▪ Waste which can be recycled should be undertaken in accordance with
the Qld Waste Reduction and Recycling Act 2011 and the Waste
Reduction and Recycling (Waste Levy) Amendment Act 2019.
© 2019 - J000488 4