EMP v2 - ESSENCE OF PEREGIAN 215 DAVID LOW WAY, PEREGIAN BEACH
Essence of Peregian Beach - Environmental Management Plan (Construction and Operation) v2
Responsible Comments on
Aspect/Issue Management Measure Project Phase Discipline Implementation
▪ Protection of visual amenity ▪ Install site fences along the northern boundary. The other boundaries Construction Construction Contractor
are not within view sheds sue to the Peregian Beach Hotel and the IGA.
▪ General Environmental Duty ▪ Contractor is required to submit relevant environmental reports that Construction Construction Contractor
should be reviewed and actioned as necessary.
Operation
▪ Water conservation ▪ Water conservation in accordance with Stormwater Management Plan Operation Site Managers
and Council requirements for water reuse (e.g. rainwater tanks).
▪ Water Quality Protection – changes to hydrology of ▪ Development in accordance with Stormwater Management Plan Operation Site Managers
adjacent Council Reserve and National Park ▪ Comply with Council discharge limits in relation to water quality
▪ The release of sediments or other contaminants to waters discharge criteria for total nitrogen, phosphorous and total suspended
(surface and groundwater) or stormwater systems is an solids.
offence under Section 440ZG of the Environmental
Protection Act 1994 (EP Act).
▪ Maintenance of Stormwater Quality Improvement
Devices
▪ Vegetation Protection. ▪ Install clear signage on the Council Environmental Reserve including Operation Site Managers
▪ Fauna Protection interpretive signage regarding the environmental values of the Reserve
and adjacent National Park
▪ Vegetation and habitat present immediately west of the
Project area (Council Reserve and Noosa National Park) ▪ National Park rules apply such as no domestic animals permitted in the
is considered to contain flora and fauna protected under Reserve and National Park.
the Commonwealth Environment Protection and ▪ Rehabilitation along the western boundary / bioretention area with
Biodiversity Conservation Act 1999 and Nature endemic species.
Conservation Act 1992. ▪ No changes to hydrology of adjacent Council Reserve and National
Park.
▪ Bushfire ▪ Compliance with the Project specific Bushfire Management Plan Operation Site Managers
▪ Biting Insects Management ▪ Remove potential mosquito breeding sites by: Operation Site Managers
▪ Tipping out any water in plastic containers, buckets, pot plant trays
▪ Roofing gutter kept clear of rotting leaves
▪ Dispose of fallen palm fronds and coconut shells which may hold water
▪ Dispose of empty containers, tyres or anything that catches and holds
rainfall
▪ Waste Management ▪ Compliance with project Waste Management Plan and Planning Operation Site Managers
Scheme Policy 11, Waste Management Plans
▪ Waste which can be reused or recycled should be undertaken in
accordance with the Qld Waste Reduction and Recycling Act 2011 and
the Waste Reduction and Recycling (Waste Levy) Amendment Act
2019.
© 2019 - J000488 6