MCU17/0025
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection
to reticulated water and sewerage has been provided to the development site.
Landscaping
10. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and The Noosa Plan’s Planning
Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and must
include:
a. The landscaped areas as generally shown on the approved Site Plan.
b. Trees planted to achieve tall, dense screening vegetation within the western
landscaped area to assist with screening the new building.
c. A minimum of 3 trees within the front setback area and along western
boundary to soften the visual building bulk.
11. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
ENGINEERING
12. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
External Works
13. Rene Street must be upgraded for the length of its frontage to the subject site. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. construction of a 2 metre wide footpath within the road verge extending from
the existing path in the frontage of the site to the existing path to the east in
the frontage of No 64 Rene Street
b. removal of the existing property access and reinstatement of the kerb, footpath
and verge area to match the balance of the site frontage, including the
provision of topsoil and turf where the existing verge is grassed
Site Access and Driveways
14. A sealed access driveway must be provided from Rene Street to all parking and
manoeuvring areas of the development. The works must be undertaken in
accordance with an Operational Works approval and must include in particular a
driveway crossover in accordance with Council’s standard drawing RS-051.
15. The driveway at the rear of the site that crosses Council’s lane between No 62 and
No 64 must be undertaken in accordance with an Operational Works approval. The
access driveway must be designed and constructed to ensure that safe access to
the reserve area at the rear is maintained for the public, Council, service authorities
and emergency services. The works:
a. must ensure that the pathway is clear at all times
Page 3 of 10
Document Set ID: 20424844
Version: 7, Version Date: 26/09/2017 Print Date: 26 September 2017, 3:05 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.