MCU17/0025
5 REFERRAL AGENCIES
Not Applicable
6 ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not
form part of the assessment manager conditions:
PLANNING
Equitable Access and Facilities
1. The plans for the proposed building work have NOT been assessed for compliance
with the requirements of the National Construction Code - Building Code of Australia
(Volume 1) as they relate to people with disabilities. Your attention is also directed
to the fact that in addition to the requirements of the National Construction Code as
they relate to people with disabilities, one or more of the following may impact on
the proposed building work:
c. the Disability Discrimination Act 1992 (Commonwealth);
d. the Anti-Discrimination Act 1991 (Queensland); and
e. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
2. Prior to the commencement of the use, please contact Council's DA Planning
Section to arrange a Development Compliance Inspection.
Infrastructure Charges
3. This Development Permit will trigger an “Infrastructure Charge Notice” to be issued
in accordance with Council’s “Charges Resolution” made pursuant to the
Sustainable Planning Act 2009 and in conjunction with the State Planning
Regulatory Provision (Adopted Charges).
ENGINEERING
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
Page 6 of 10
Document Set ID: 20424844
Version: 7, Version Date: 26/09/2017 Print Date: 26 September 2017, 3:05 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.