2014-12-18 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Ordinary Meeting
Thursday, 18 December 2014
commencing at 6pm
Council Chambers, 9 Pelican Street, Tewantin
Crs Noel Playford (Chair), Bob Abbot, Sandy Bolton, Joe Jurisevic,
Frank Pardon, Tony Wellington, Frank Wilkie
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 66 sections
Section 2
ORDINARY MEETING AGENDA 18 DECEMBER 2014
TABLE OF CONTENTS
ITEM PAGE
1 ATTENDANCE & APOLOGIES 3
2 CONFIRMATION OF MINUTES 3
3 MAYORAL MINUTES 3
4 NOTIFIED MOTIONS 3
5 CONSIDERATION OF COMMITTEE RECOMMENDATIONS 4
INFRASTRUCTURE & SERVICES COMMITTEE RECOMMENDATIONS 4
PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS 6
GENERAL COMMITTEE RECOMMENDATIONS 50
6 ORDINARY MEETING REPORTS 56
1 RUFOUS STREET PRECINCT DEVELOPMENT PROJECT 56
2 NOOSA BIOSPHERE RESERVE - APPOINTMENT OF DIRECTORS AND
AMENDMENT TO CONSTITUTION 62
7 PETITIONS 67
8 CLOSED SESSION 67
1 PLANNING &
ENVIRONMENT COURT APPEAL 1648 OF 2014 – NOOSA ON WEYBA
DEVELOPMENT APPLICATION FOR PRELIMINARY APPROVAL FOR A
MIXED USE COMMUNITY TITLE DEVELOPMENT to be tabled
9 NEXT MEETING 67
10 MEETING CLOSURE 67
Page 2 of 67
Section 3
ORDINARY MEETING AGENDA 18 DECEMBER 2014
1 ATTENDANCE & APOLOGIES
2 CONFIRMATION OF MINUTES
The Minutes of the Ordinary Meeting held on 20 November 2014 be received and
confirmed.
3 MAYORAL MINUTES
Nil.
4 NOTIFIED MOTIONS
Nil.
Page 3 of 67
Section 4
ORDINARY MEETING AGENDA 18 DECEMBER 2014
5 CONSIDERATION OF COMMITTEE RECOMMENDATIONS
INFRASTRUCTURE & SERVICES COMMITTEE RECOMMENDATIONS
9 DECEMBER 2014 - Crs Sandy Bolton (Chair), Bob Abbot, Frank Pardon, Noel Playford
Other Councillors in Attendance: Crs Joe Jurisevic and Frank Wilkie
1 COUNCIL CABS & FLEXILINK SERVICES REVIEW
Item not dealt with by Infrastructure & Services Committee. Referred to General
Committee for consideration.
Reason for referral: Infrastructure & Services Committee requested a further report
providing more detailed information on costings, eligibility and criteria
2 NOOSA COUNCIL TRAFFIC ADVISORY AND SPEED MANAGEMENT COMMITTEE -
AUGUST 2014
That Council note the report by the Design Services Manager to the Infrastructure &
Services Committee Meeting dated 9 December 2014 detailing the key outcomes of the
Noosa Traffic Advisory and Speed Management Committee meeting held on 14 August
2014.
3 NOOSA SOCIAL PLAN 2016-2023 - WAY FORWARD
That Council note the report by the Community Development Coordinator to the
Infrastructure & Services Committee Meeting dated 9 December 2014 and
A. Agree that work commence on developing a new Noosa Social Plan 2016 -2023
B. Approve the proposed membership of the Noosa Social Plan Reference Group as per
Attachment 1
4 ANNUAL DISASTER MANAGEMENT REPORT 2014
That Council note the report by the Director Community Services to the Infrastructure &
Services Committee dated 9 December 2014 and:
A. Appoint members to the Noosa Local Disaster Management Group (LDMG) for 2015
as set out in Attachment 1; and
B. Request the Local Disaster Coordinator in liaison with the Noosa LDMG to develop a
Noosa Local Disaster Management Plan for adoption by Council prior to 30 June
2015.
5 WASTE COLLECTION SERVICES POLICY
Item not dealt with by Infrastructure & Services Committee. Referred to General
Committee for consideration.
Reason for referral: Infrastructure & Services Committee requested a further report
outlining suggested amendments to the Policy
Page 4 of 67
Section 5
ORDINARY MEETING AGENDA 18 DECEMBER 2014
6 WASTE MANAGEMENT CONTRACT 1415T006 AND IMPROVED CHEMICAL DOSING
AND MONITORING
That Council note the report by the Manager Waste and Environmental Health and the
Project Manager to the Infrastructure & Services Committee Meeting dated 9 December
2014 and
A. Award Contract 1415T006 to Sunstate Group Pty Ltd for the lump sum amount of
$840,510;
B. Allocate $175,000 from the Waste Management Reserve to cover the additional
funding for delivery of contract 1415T006;
C. Agree to proceed with the design and construction of improved chemical dosing and
monitoring equipment for the project, which are outside the scope of Contract
1415T006, at an estimated cost of $120,000, with costs allocated from the Waste
Management Reserve; and
D. Agree to budget adjustments being made in the next budget review.
Recommendation
The Infrastructure & Services Committee recommendations dated 9 December 2014 be adopted
except where dealt with or held over by separate resolution.
Page 5 of 67
Section 6
ORDINARY MEETING AGENDA 18 DECEMBER 2014
PLANNING & ORGANISATION COMMITTEE RECOMMENDATIONS
9 DECEMBER 2014 – Crs. Frank Wilkie (Chair), Joe Jurisevic, Noel Playford,
Tony Wellington
Other Councillors in Attendance: Nil.
1 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 3 LOTS INTO 17 LOTS
SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY - REC13/0146
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC13/0146 for a
Development Permit for Reconfiguration of a lot (3 lots into 17 lots) situated at 55 Lake
Macdonald Drive, Cooroy and:
A. Grant a Preliminary Approval in accordance with the following conditions:
PLANNING
Preliminary Approval
1. Prior to the issue of a Development Permit a revised flood strategy must be
provided. The flood strategy must demonstrate a non-worsening at the site’s
boundaries for rain events up to and including the 1%AEP based on the
following:
a. conventional bioretention/detention for the developed portion of the site.
The flood strategy must not rely upon increasing floodplain roughness to
achieve flood storage requirements
b. modified flood plain storage to offset any impacts created by vegetation
rehabilitation and restoration of the western tributary
c. works in the tributary must not include extensive re-profiling and/or
armouring of the existing watercourse.
When Conditions Must Be Complied With
2. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to Council endorsement of the Plan of Survey.
Approved Plans
3. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan, prepared by Date
10-3032AP5B Plan of Lot Reconfiguration of Lot 5 on 02-07-14
SP266731 & Parts of Lot 137 on MCH978 &
Lot 2 on RP173883 (Stage 3)
1225-89 A Revegetation & Rehabilitation Management 1 October
Plan – Eastern Tributary Stage 5 & 6 and as 2014
annotated by Council
4. All lot numbering on the subdivision plan to be submitted to Council for
compliance assessment must remain as shown on the Approved Plans.
5. The development must be undertaken and operated in a manner that causes
no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
Page 6 of 67
Section 7
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Road & Park Names
6. The proposed names of roads and parks must be lodged with the application
for a Development Permit for Operational Works. Names are to be:
a. Relevant to Australian, preferably local, history ,flora, fauna, culture,
landscape or physical characteristics;
b. If used, personal names should commemorate persons who have
contributed significantly to the development of the region; demonstrated
outstanding levels of civic service; or achieved role-model status in the
wider community or donated property or funds for community benefit; and
be recognised in memoriam;
c. Park names should be unique within the locality;
d. Approval will not be given to a name that may construed as advertising, is
more than one word, understanding that a geographic relationship such
as Cooroy Mountain is permissible; is insensitive to diverse cultures and
does not accord with community standards; and is not concise, easy to
pronounce and spell and be without accent marks, apostrophes or
hyphens.
7. All street signs on new roads (public and private) and parks must be erected
prior to works being accepted on maintenance.
Boundary Encroachments
8. Certification must be submitted to Council from a Licensed Surveyor which
certifies that:
a. all constructed access and roadworks (including associated fill batters
and retaining walls) are fully contained within a dedicated reserve or
registered easement
b. all utility services and connections (eg. electricity, telecommunications,
water, sewerage) are wholly located within the lot they serve or
alternatively included within an easement
c. all retaining walls and structures are fully contained within the lot they
retain
d. any fill, including fill batters, are wholly contained within the subject site
and not on adjacent properties
Water & Sewer Connections
9. An underground connection to reticulated water and sewerage must be
provided to each lot in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
10. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to each lot.
Performance Bond
11. Security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Page 7 of 67
Section 8
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Landscaping & Ecology
12. Landscaping and rehabilitation works must be undertaken in accordance with
an Operational Works approval and Planning Scheme Policy - PSP 3
Landscaping Plants and Guidelines. An ecological rehabilitation and
landscaping plan must be submitted, prepared by a suitably qualified person*
and must include in particular:
a. Western Tributary - the area to be rehabilitated must be generally 10m
from the top of bank of the western tributary and the whole of The Noosa
Plan’s mapped Riparian Buffer area to the western side of the western
tributary.
b. Eastern Tributary - the area to be rehabilitated must be generally in
accordance with the approved Revegetation & Rehabilitation
Management Plan – Eastern Tributary Stage 5 & 6
c. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
d. a maintenance period of no less than 3 years
e. a species palette and densities table incorporating the species selection
of only native indigenous species
f. measurable and achievable criteria on which the performance of the
floristic and structural component of the re-vegetation strategy can be
assessed annually over three years, including no weeds at the end of the
re-vegetation period
g. provision of 1 street tree with a minimum pot size of 100 litres planted
within the road reserve for every 8 metres of road frontage including
around the cul de sac’s
h. control of all weeds species listed in the following standards and
legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other
plants identified in writing by Council (*refer to Advisory Note)
13. All rehabilitation and re-vegetation of the eastern tributary (waterway) must be
completed prior to Council endorsement of the Plan of Survey.
Dedication of Land as Reserve
14. The area identified as lot 100 Park must be dedicated to the Crown as a
reserve for Park purposes. The land to be dedicated is “non-trunk
infrastructure” for the purposes of the Sustainable Planning Act 2009.
Active Park
15. Active park embellishments must be provided generally in accordance with
drawing number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land
Development Concept Plan, prepared by Play Environment Consulting dated
13.05.14 and 14/005-S01 and 14/005-S02, titled Erindale Park, Cooroy
Proposed Park Land Development Concept Plan, prepared by Play
Environment Consulting dated 17.11.14. All works to be dedicated are “non-
trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
Page 8 of 67
Section 9
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Works within Protected Land
16. The following works must be undertaken within the land to be dedicated to the
Crown as Park reserve:
a. footbridge and pathway
b. All rehabilitation and re-vegetation of the eastern and western tributaries
(watercourses)
c. Active Park embellishments in accordance with this Decision Notice.
All works must be undertaken in accordance with an Operational Works
approval.
ENGINEERING
External Works
17. A new intersection must be constructed joining Blue Wren Place with the new
road. The works must be undertaken in accordance with an Operational Works
approval, and must include in particular:
a. vehicle priority maintained to Blue Wren Place
b. provision of sight distances adequate for the design speed of the road
c. installation of street lighting
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
New Roads
18. The new roads shown on the Approved Plans must be constructed in
accordance with the conditions of this Decision Notice and dedicated as road
reserve at no cost to Council. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a reserve width of 15 metres minimum widened where applicable to
encompass the cul-de-sacs and the necessary verge areas
b. sealing, kerbing and channelling
c. an “Access Road” in accordance with Council’s Planning Scheme Policy
5 – Engineering Design Standards - Road, Drainage and Earthworks
d. construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice
e. installation of street lighting
f. modifications to existing services
g. cul-de-sacs in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
h. bollards or similar approved barriers on the western side of the new road
that prevent vehicles from entering into the proposed bio-swale and park
i. flood immunity in accordance with QUDM
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Page 9 of 67
Section 10
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Pedestrian and Bicycle Facilities
19. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a 2 metre wide footpath within the road verge on the eastern side of the
new road extending to join with the existing pathway in Blue Wren Place
b. pram ramps on both sides of Blue Wren Place at the intersection with the
new road
c. a 2 metre wide footpath within proposed Lot 100 extending to the
pathway and footbridge as shown on plan number 1225-62A dated 9/14
prepared by Callaghan and Toth
d. a 2 metre wide footpath within the new road (between lots 25 & 26) and
proposed Lot 100 connecting the cul-de-sac of the new road to the
existing pathway network in Lake Macdonald Drive.
All pedestrian and bicycle facilities to be dedicated are “non-trunk infrastructure”
for the purposes of the Sustainable Planning Act 2009.
Stormwater Drainage.
20. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, and must include in particular:
a. the drainage structures generally as shown on the Approved Plans
b. the provision of Level 2 inter-allotment drainage for proposed Lots 26-28
including registration of drainage easements
c. provision of kerb adapters for all new lots that discharge into the new road
d. extension of the site stormwater system to accommodate stormwater
from applicable areas external to the site, including registration of
drainage easements
e. a maintenance path to any proposed bioretention basin that is suitable for
Council’s maintenance vehicles
21. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and the Bioretention Technical Design Guidelines (Water by Design)
and must include in particular:
a. stormwater quality treatment devices generally in accordance with the
Approved Plans
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard
Drawing No. WSUD-001
ii. are designed to ensure that flows which exceed the treatment
capacity of the device avoid damaging of the filter media or
subjecting the filter media to excessive sediment loads
iii. are provided with a free-draining outlet from the sub-soil drainage
system
Page 10 of 67
Section 11
ORDINARY MEETING AGENDA 18 DECEMBER 2014
22. Where bio-retention devices (or similar) are required within a residential
allotment the devices:
a. must be installed prior to the sealing of the Survey Plan
b. must be protected by a covenant.
c. a maintenance handbook, able to be provided to future owners, must be
prepared for the system to outline how the system works and the level of
maintenance that will be regularly required. The maintenance handbook
must be submitted to Council for approval and for records purposes prior
to the sealing of the Survey Plan.
23. Detailed life cycle costing must be prepared for the stormwater quality
treatment system by a Registered Professional Engineer Queensland and
submitted to Council prior to the issue of any Development Permit for
Operational Works.
Electricity and Telecommunication Services
24. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and
the standards and requirements of the relevant service provider.
25. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
26. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
27. Easements for inter-allotment drainage within Lots 26-28 which encompass the
constructed drainage structures.
28. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Page 11 of 67
Section 12
ORDINARY MEETING AGENDA 18 DECEMBER 2014
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
32. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they
will serve.
b. An approved water meter for each lot in accordance with Unitywater and
SEQ Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water
main to service located in Blue Wren Place to service each lot within the
proposed subdivision in accordance with Unitywater and SEQ Standard
Drawings.
d. Water meters must be located on alternative boundaries to electrical
pillars
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second
33. Reticulated sewerage must be provided to each lot in the development. This
must include:
a. Ensuring sewer house drains are wholly contained within the Lot they will
serve.
b. Provision of sewerage infrastructure to within the property boundaries of
each Lot within the proposed subdivision.
34. A minimum clearance of 1.5 metres must be maintained between Unitywater
sewers and proposed building envelopes, buildings and other structures
35. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
36. Stormwater retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure
37. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature
and suitable Unitywater approved varieties.
38. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
Page 12 of 67
Section 13
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Advisory Notes
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
obligations under the ACH Act 2003.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
(if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified Persons
3. For the purpose of preparing a Rehabilitation Plan, a qualified person is
considered to be a landscape architect or ecologist with a minimum of 3 years
current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
Page 13 of 67
Section 14
ORDINARY MEETING AGENDA 18 DECEMBER 2014
iv. approval of the Traffic Management Control Plan by the Department
of Transport and Main Roads (DTMR) for any works on State
controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic, services and other relevant
issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency of
usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan
will be a draft document requiring finalisation upon appointment of the
Principal Contractor employed to construct the works and a final
document will be required to be submitted at the Pre-Start Meeting for the
project.
UNITYWATER
7. Connection to the Unitywater live water supply and live sewerage system must
be undertaken by Unitywater at the applicant’s cost.
B. Include the following property notes:
REC13/0146 – Stormwater Treatment Device
The following notation applies to approved lots 26, 27 and 28:
“A private stormwater treatment device is located within this allotment and the owner
is responsible for any maintenance”
“This property contains a stormwater treatment device protected by a covenant, and
a maintenance handbook is available under separate application which outlines the
maintenance requirements.”
Page 14 of 67
Section 15
ORDINARY MEETING AGENDA 18 DECEMBER 2014
2 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
SITUATED AT 1-11 WILGEE COURT COOROY - REC14/0008
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC14/0008 for a
Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee
Court Cooroy and approve the application in accordance with the following conditions:
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision Notice
must be completed prior to Council endorsement of the Plan of Survey.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan, prepared by Date
10-3032AP6B3 Plan of Proposed Reconfiguration of Lot 8 on 14-10-14
SP266743 (being part of Lot 137 on MCH978
& Lot 2 on RP173883) and as annotated by
Council
1225-89 A Revegetation & Rehabilitation Management 1 October 2014
Plan – Eastern Tributary Stage 5 & 6 and as
annotated by Council
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Road & Park Names
5. The proposed names of roads and parks must be lodged with the application for a
Development Permit for Operational Works. Names are to be:
a. Relevant to Australian, preferably local, history ,flora, fauna, culture, landscape
or physical characteristics;
b. If used, personal names should commemorate persons who have contributed
significantly to the development of the region; demonstrated outstanding levels
of civic service; or achieved role-model status in the wider community or
donated property or funds for community benefit; and be recognised in
memoriam;
c. Park names should be unique within the locality;
d. Approval will not be given to a name that may construed as advertising, is more
than one word, understanding that a geographic relationship such as Cooroy
Mountain is permissible; is insensitive to diverse cultures and does not accord
with community standards; and is not concise, easy to pronounce and spell and
be without accent marks, apostrophes or hyphens.
6. All street signs on new roads (public and private) and parks must be erected prior to
works being accepted on maintenance.
Page 15 of 67
Section 16
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Boundary Encroachments
7. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement
c. all retaining walls and structures are fully contained within the lot they retain
d. any fill, including fill batters, are wholly contained within the subject site and not
on adjacent properties
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Landscaping & Ecology
11. Lot 15 must be removed from within the Riparian Buffer Overlay of The Noosa Plan
and the boundary setback a minimum of 10 metres from the top of bank, whichever is
the greater. The area removed from the lot must be rehabilitated in accordance with
the conditions of this Decision Notice.
12. Landscaping and rehabilitation works must be undertaken in accordance with an
Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
Plants and Guidelines and must include an ecological rehabilitation and landscaping
plan, prepared by a suitably qualified person* and must include in particular:
a. the area to be rehabilitated and re-vegetated must be generally in accordance
with the approved Revegetation & Rehabilitation Management Plan – Eastern
Tributary Stage 5 & 6
b. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
c. a maintenance period of no less than 3 years
d. a species palette and densities table incorporating the species selection of only
native indigenous species
Page 16 of 67
Section 17
ORDINARY MEETING AGENDA 18 DECEMBER 2014
e. measurable and achievable criteria on which the performance of the floristic
and structural component of the re-vegetation strategy can be assessed
annually over three years, including no weeds at the end of the re-vegetation
period
f. provision of 1 street tree with a minimum pot size of 100 litres planted within the
road reserve for every 8 metres of road frontage including around the cul de
sac
g. control of all weeds species listed in the following standards and legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other plants
identified in writing by Council (*refer to Advisory Note)
13. All rehabilitation of the eastern tributary (waterway) including the construction of the
footbridge must be completed prior to Council endorsement of the Plan of Survey.
ENGINEERING
External Works
14. A new intersection must be constructed joining Cordwood Drive with the new road
(Masonry Street). The works must be undertaken in accordance with an Operational
Works approval, and must include in particular:
a. vehicle priority maintained to Cordwood Drive
b. provision of sight distances adequate for the design speed of the road
c. installation of street lighting
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
New Roads
15. The new road (Masonry Street) shown on the Approved Plans must be constructed in
accordance with the conditions of this Decision Notice and dedicated as road reserve
at no cost to Council.
The road to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
16. The new road (Masonry Street) as shown on the Approved Plans must be
constructed. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. a reserve width of 15 metres minimum widened where applicable to encompass
the cul-de-sac and the necessary verge areas
b. sealing, kerbing and channelling
c. an “Access Road” in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
d. construction of pedestrian footpaths in accordance with the conditions of this
Decision Notice
e. installation of street lighting
f. modifications to existing services.
g. A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks
Page 17 of 67
Section 18
ORDINARY MEETING AGENDA 18 DECEMBER 2014
All works to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Pedestrian and Bicycle Facilities
17. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2 metre wide footpath within the road verge on the western side of “Masonry
Street” extending to join with the existing pathway in Cordwood Drive
b. pram ramps on both sides of “Masonry Street” at the intersection with
Cordwood Drive
c. the pathway and footbridge located generally as shown on plan number 1225-
62A dated 9/14 prepared by Callaghan and Toth excepting that the pathway
sections are to be a minimum 2 metres wide.
The pathway and footbridge to be dedicated is “non-trunk infrastructure” for the
purposes of the Sustainable Planning Act 2009.
Stormwater Drainage
18. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval, and must include in particular:
a. The drainage structures generally as shown on the Approved Plans
b. The provision of Level 2 inter-allotment drainage for proposed Lots 14-16
including registration of drainage easements
c. Provision of kerb adapters for all new lots that discharge into the new road
d. Extension of the site stormwater system to accommodate stormwater from Lot
1 RP173883 and other applicable areas external to the site, including
registration of drainage easements.
e. A maintenance path to the bioretention basin that is suitable for Council’s
maintenance vehicles
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
19. The existing stormwater drainage system for Lots 5-7 on SP266743 must be modified
to discharge into the bioretention basin.
20. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
the Bioretention Technical Design Guidelines (Water by Design) and must include in
particular:
a. stormwater quality treatment devices generally in accordance with the
Approved Plans
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard Drawing
No. WSUD-001
ii. are designed to ensure that flows which exceed the treatment capacity of
the device avoid damaging of the filter media or subjecting the filter media
to excessive sediment loads
iii. are provided with a free-draining outlet from the sub-soil drainage system
Page 18 of 67
Section 19
ORDINARY MEETING AGENDA 18 DECEMBER 2014
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
21. Detailed life cycle costing must be prepared for the stormwater quality treatment
system by a Registered Professional Engineer Queensland and submitted to Council
prior to the issue of any Development Permit for Operational Works.
Stormwater and Flood Management
22. Stormwater and flood management for the development must be provided generally
in accordance with the provisions identified for the eastern tributary in the Stormwater
and Flooding Report prepared by BSM and dated 15 September 2014. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a non-worsening at the site boundaries
b. certification must be submitted to Council at the completion of works from an
RPEQ which certifies that the development has met the stormwater and
flooding requirements of this Decision Notice
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
26. Easements for inter-allotment drainage must be provided within Lots 11, and 14-16
which encompass the constructed drainage structures.
27. An easement for drainage purposes must be registered against the title of proposed
Lot 10 in favour of Council over the land area identified as the eastern portion of
proposed Lot 10 with extents defined as the full frontage to Wilgee Court to the east,
Lot 5 SP266743 to the north, extending along the southern boundary of proposed Lot
13 in REC14/0009 and the road reserve boundary to the eastern boundary of
proposed Lot 100 in REC14/0009, along the southern boundary of Lot 100 in
REC14/0009, then perpendicular to the southern boundary of proposed Lot 10 and
returning to Wilgee Court. Draft easement documentation must be submitted to
Council for endorsement
28. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Page 19 of 67
Section 20
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site.
Advisory Notes
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable measures
to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
fail to comply with the duty of care. Substantial monetary penalties may apply to
individuals or corporations breaching this duty of care. Injunctions may also be issued
by the Land and Resources Tribunal, and the Minister administering the ACH Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal
cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
obligations under the ACH Act.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice” (if
applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified Persons
3. For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to
be a landscape architect or ecologist with a minimum of 3 years current experience in
the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details
that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees
will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of
Uniform Traffic Control Devices (MUTCD) detailing all temporary signage
and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
Page 20 of 67
Section 21
ORDINARY MEETING AGENDA 18 DECEMBER 2014
iii. proposed fencing to the site during the construction phase of the
development
iv. approval of the Traffic Management Control Plan by the Department of
Transport and Main Roads (DTMR) for any works on State controlled
roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through
the construction site, through the implementation of appropriate erosion and
sediment control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining
owners, emergency services and local businesses to advise of agreed
construction times, impacts on traffic, services and other relevant issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of
vehicle to be utilised during filling operations and frequency of usage. NB any
damage to the existing road system as a result of haulage operations shall be
fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be
required to be submitted at the Pre-Start Meeting for the project.
3 DEVELOPMENT APPLICATION FOR RECONFIGURATION OF 2 LOTS INTO 6 LOTS
PLUS 1 PARK LOT SITUATED AT 1 - 11 WILGEE COURT, COOROY - REC14/0009
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. REC14/0009 for a
Development Permit for Reconfiguration of a lot (2 lots into 6 lots) situated at 1 – 11 Wilgee
Court Cooroy and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to Council endorsement of the Plan of Survey.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Page 21 of 67
Section 22
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Plan No. Rev. Plan, prepared by Date
10-3032AP7B4 Plan of Proposed Reconfiguration of 14-10-14
Lot 8 on SP266743 (being part of
Lot 137 on MCH978 & Lot 2 on
RP173883)
1225-89 A Revegetation & Rehabilitation 1 October 2012
Management Plan – Eastern Tributary
Stage 5 & 6 and as annotated by
Council
3. All lot numbering on the subdivision plan to be submitted to Council for
compliance assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes
no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
Road & Park Names
5. The proposed names of roads and parks must be lodged with the application
for a Development Permit for Operational Works. Names are to be:
a. Relevant to Australian, preferably local, history, flora, fauna, culture,
landscape or physical characteristics;
b. If used, personal names should commemorate persons who have
contributed significantly to the development of the region; demonstrated
outstanding levels of civic service; or achieved role-model status in the
wider community or donated property or funds for community benefit; and
be recognised in memoriam;
c. Park names should be unique within the locality;
d. Approval will not be given to a name that may construed as advertising, is
more than one word, understanding that a geographic relationship such
as Cooroy Mountain is permissible; is insensitive to diverse cultures and
does not accord with community standards; and is not concise, easy to
pronounce and spell and be without accent marks, apostrophes or
hyphens.
6. All street signs on new roads (public and private) and parks must be erected
prior to works being accepted on maintenance.
Boundary Encroachments
7. Certification must be submitted to Council from a Licensed Surveyor which
certifies that:
a. all constructed access and roadworks (including associated fill batters
and retaining walls) are fully contained within a dedicated reserve or
registered easement
b. all utility services and connections (eg. electricity, telecommunications,
water, sewerage) are wholly located within the lot they serve or
alternatively included within an easement
c. all retaining walls and structures are fully contained within the lot they
retain
Page 22 of 67
Section 23
ORDINARY MEETING AGENDA 18 DECEMBER 2014
d. any fill, including fill batters, are wholly contained within the subject site
and not on adjacent properties
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be
provided to each lot in accordance with the standards and requirements of
Northern SEQ Distributor–Retailer Authority (Unitywater).
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to each lot.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Landscaping & Ecology
11. Landscaping and rehabilitation works must be undertaken in accordance with
an Operational Works approval and Planning Scheme Policy - PSP 3
Landscaping Plants and Guidelines. An ecological rehabilitation and
landscaping plan must be submitted, prepared by a suitably qualified person*
and must include in particular:
a. the area to be rehabilitated and re-vegetated must be generally in
accordance with the approved Revegetation & Rehabilitation
Management Plan – Eastern Tributary Stage 5 & 6 and
b. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
c. a maintenance period of no less than 3 years
d. a species palette and densities table incorporating the species selection
of only native indigenous species
e. measurable and achievable criteria on which the performance of the
floristic and structural component of the re-vegetation strategy can be
assessed annually over three years, including no weeds at the end of the
re-vegetation period.
f. provision of 1 street tree with a minimum pot size of 100 litres planted
within the road reserve for every 8 metres of road frontage including
around the cul de sac
g. control of all weeds species listed in the following standards and
legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other
plants identified in writing by Council (*refer to Advisory Note)
Page 23 of 67
Section 24
ORDINARY MEETING AGENDA 18 DECEMBER 2014
12. All rehabilitation and re-vegetation of the eastern tributary (waterway) including
works within the Park and the construction of the footbridge must be completed
prior to Council endorsement of the Plan of Survey.
Dedication of Land as Reserve
13. The area identified as lot 100 Park on the Approved Plans must be dedicated to
the Crown as a reserve for Park purposes. The land to be dedicated is “non-
trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
Works within Protected Land
14. The following works must be undertaken within the land to be dedicated to the
Crown as Park reserve:
a. footbridge and pathway
ENGINEERING
External Works
15. A new intersection must be constructed joining Cordwood Drive with the new
road (Masonry Street). The works must be undertaken in accordance with an
Operational Works approval, and must include in particular:
a. vehicle priority maintained to Cordwood Drive
b. provision of sight distances adequate for the design speed of the road
c. installation of street lighting
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
New Roads
16. The new road (Masonry Street) shown on the Approved Plans must be
constructed in accordance with the conditions of this Decision Notice and
dedicated as road reserve at no cost to Council. The works must be undertaken
in accordance with an Operational Works approval and must include in
particular:
a. a reserve width of 15 metres minimum widened where applicable to
encompass the cul-de-sac and the necessary verge areas
b. sealing, kerbing and channelling
c. An “Access Road” in accordance with Council’s Planning Scheme Policy
5 – Engineering Design Standards - Road, Drainage and Earthworks
d. construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice
e. installation of street lighting
f. modifications to existing services
g. A cul-de-sac in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Road, Drainage and Earthworks.
All works to be dedicated are “non-trunk infrastructure” for the purposes of the
Sustainable Planning Act 2009.
Pedestrian and Bicycle Facilities
17. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
Page 24 of 67
Section 25
ORDINARY MEETING AGENDA 18 DECEMBER 2014
a. a 2 metre wide footpath within the road verge on the western side of
“Masonry Street” extending to join with the existing pathway in Cordwood
Drive
b. pram ramps on both sides of “Masonry Street” at the intersection with
Cordwood Drive
c. the pathway and footbridge located generally as shown on plan number
1225-62A dated 9/14 prepared by Callaghan and Toth excepting that the
pathway sections are to be a minimum 2 metres wide.
The footpath and footbridge to be dedicated are “non-trunk infrastructure” for
the purposes of the Sustainable Planning Act 2009.
Stormwater Drainage.
18. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, and must include in particular:
a. The drainage structures generally as shown on the Approved Plans
b. provision of kerb adapters for all new lots that discharge into the new road
c. extension of the site stormwater system to accommodate stormwater
from Lot 1 RP173883 and other applicable areas external to the site,
including registration of drainage easements
d. a maintenance path to the bioretention basin that is suitable for Council’s
maintenance vehicles
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of
the Sustainable Planning Act 2009.
19. The existing stormwater drainage system for Lots 5-7 on SP266743 must be
modified to discharge into the bioretention basin.
20. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and the Bioretention Technical Design Guidelines (Water by Design)
and must include in particular:
a. stormwater quality treatment devices generally in accordance with the
Approved Plans
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard
Drawing No. WSUD-001
ii. are designed to ensure that flows which exceed the treatment
capacity of the device avoid damaging of the filter media or
subjecting the filter media to excessive sediment loads
iii. are provided with a free-draining outlet from the sub-soil drainage
system
All infrastructure to be dedicated is “non-trunk infrastructure” for the purposes of
the Sustainable Planning Act 2009.
21. Detailed life cycle costing must be prepared for the stormwater quality
treatment system by a Registered Professional Engineer Queensland and
submitted to Council prior to the issue of any Development Permit for
Operational Works.
Page 25 of 67
Section 26
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Stormwater and Flood Management
22. Stormwater and flood management for the development must be provided
generally in accordance with the provisions identified for the eastern tributary in
the Stormwater and Flooding prepared by BSM and dated 15 September 2014.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. a non-worsening at the site boundaries
b. certification must be submitted to Council at the completion of works from
an RPEQ which certifies that the development has met the stormwater
and flooding requirements of this Decision Notice
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and
the standards and requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
26. An easement for inter-allotment drainage must be provided within Lot 11 which
encompasses the constructed drainage structures.
27. An easement for drainage purposes must be registered against the title of
proposed Lot 17 in favour of Council over the land area identified as the eastern
portion of proposed Lot 17 with extents defined as the full frontage to Wilgee
Court to the east, Lot 5 SP266743 to the north, extending along the southern
boundary of proposed Lot 13 and the road reserve boundary to the eastern
boundary of proposed Lot 100, along the southern boundary of Lot 100, then
perpendicular to the southern boundary of proposed Lot 17 and returning to
Wilgee Court. Draft easement documentation must be submitted to Council for
endorsement.
28. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site.
Page 26 of 67
Section 27
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Advisory Notes
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 32476212 to discuss any
obligations under the ACH Act.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
(if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified Persons
3. For the purpose of preparing a Rehabilitation Plan, a qualified person is
considered to be a landscape architect or ecologist with a minimum of 3 years
current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the
development
Page 27 of 67
Section 28
ORDINARY MEETING AGENDA 18 DECEMBER 2014
iv. approval of the Traffic Management Control Plan by the Department
of Transport and Main Roads (DTMR) for any works on State
controlled roads
v. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic, services and other relevant
issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency of
usage. NB any damage to the existing road system as a result of
haulage operations shall be fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan
will be a draft document requiring finalisation upon appointment of the
Principal Contractor employed to construct the works and a final
document will be required to be submitted at the Pre-Start Meeting for the
project.
B. Include the following property note:
REC14/0009 – Gas Pipeline Buffer
The following notation applies to approved lots 10, 11, 12, and 13:
The allotment is within 200 metres of a gas pipeline easement. Enquiries regarding
the future construction and operation of the pipeline should be directed to the gas
pipeline licence holder - APA Group on 33236148 or PO Box 6569, Upper Mt Gravatt,
QLD 4122.
4 COMBINED DEVELOPMENT APPLICATION REC13/0148 & MCU13/0226 FOR
RECONFIGURING A LOT (2 INTO 25 LOTS & PARK) AND A S242 PRELIMINARY
APPROVAL FOR DETACHED HOUSING IN THE COMMUNITY SERVICES ZONE AT
PEARSONS RD AND 55 LAKE MACDONALD DRIVE, COOROY
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Combined Application No.
REC13/0148 & MCU13/0226 for a Development Permit for Reconfiguring a Lot (3 into 272
into 25); and Preliminary Approval for Material Change of Use under Section 242 of the
Sustainable Planning Act 2009 for development to be carried out in accordance with the
Detached House zone, situated at Pearsons Rd & 55 Lake Macdonald Dr Cooroy, and
Page 28 of 67
Section 29
ORDINARY MEETING AGENDA 18 DECEMBER 2014
A. Approve the application in accordance with the following conditions:
Preliminary Approval for Material Change of Use under Section 242 of the
Sustainable Planning Act 2009 for development to be carried out in accordance
with the Detached Housing Zone on Lot 135 on MCH978
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table and may be amended by these conditions.
Plan No. Rev. Plan/Document Name Date
10-3032AZ1A - Plan of Proposed Reconfiguration of Lot 135 on 06/05/2014
MCH978 drawn by Max Watterson & Associates
Nature and Extent of Approved Use
3. This approval overrides the planning scheme pursuant to s242 of the Sustainable
Planning Act 2009 for the life of the approval to the extent that development on
the site must comply with the development provisions for the Detached Housing
zone within the Cooroy & Lake Macdonald Locality under The Noosa Plan.
Development Permit for Reconfiguring a Lot (2 into 25 and Park)
When Conditions Must Be Complied With
1. Unless otherwise stated, all works required by the conditions of this Decision
Notice must be completed prior to submission of the subdivision plan to Council
for compliance assessment.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
10-3032AZ1A - Plan of Proposed Reconfiguration of Lot 135 on 06/05/2014
MCH978 drawn by Max Watterson & Associates
3. All lot numbering on the subdivision plan to be submitted to Council for
compliance assessment must remain as shown on the Approved Plans.
4. The development must be undertaken and operated in a manner that causes
no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
Road & Park Names
5. The proposed names of roads and parks must be lodged with the application
for a Development Permit for Operational Works. Names are to be:
a. Relevant to Australian, preferably local, history ,flora, fauna, culture,
landscape or physical characteristics;
Page 29 of 67
Section 30
ORDINARY MEETING AGENDA 18 DECEMBER 2014
b. If used, personal names should commemorate persons who have
contributed significantly to the development of the region; demonstrated
outstanding levels of civic service; or achieved role-model status in the
wider community or donated property or funds for community benefit; and
be recognised in memoriam;
c. Park names should be unique within the locality;
d. Approval will not be given to a name that may construed as advertising, is
more than one word, understanding that a geographic relationship such
as Cooroy Mountain is permissible; is insensitive to diverse cultures and
does not accord with community standards; and is not concise, easy to
pronounce and spell and be without accent marks, apostrophes or
hyphens.
6. All street signs on new roads (public and private) and parks shall be erected
prior to works being accepted on maintenance.
Security Bond
7. Security in the form of a cash bonds or trading bank guarantees to the sum of
$20,000 must be submitted, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works.
The cash bond or trading bank guarantee will be returned on performance of
the conditions of approval less any costs incurred by Council in respect of
enforcing performance of this permit.
Boundary Encroachments
8. Certification must be submitted to Council from a Licensed Surveyor which
certifies that:
a. All constructed access and roadworks (including associated fill batters
and retaining walls) are fully contained within a dedicated reserve or
registered easement.
b. All utility services and connections (eg. electricity, telecommunications,
water, sewerage) are wholly located within the lot they serve or
alternatively included within an easement.
c. All retaining walls and structures are fully contained within the lot they
retain.
d. Any fill, including fill batters, are wholly contained within the subject site
and not on adjacent properties.
Landscaping
9. Landscaping in the road reserve is to be in accordance with PSP03 –
Landscaping Plants & Guidelines and a properly prepared landscape plan,
prepared by a suitably qualified Landscape Architect or Horticulturalist. The
landscape plans are to be submitted and approved as part of the Operational
Works incorporating landscaping. Where other permits for Operational Works
for roads, drainage or access are required, the landscaping layout shall be
based on approved drawings for those Operational Works.
10. The landscaping plans shall include:
a. A minimum 2m wide landscaping buffer along the Elm Street frontage,
including a 2m truncation of the western property boundaries of lots 44-47
with Elm Street to establish screening vegetation on the site.
Page 30 of 67
Section 31
ORDINARY MEETING AGENDA 18 DECEMBER 2014
b. The densely planted buffer shall be located so as to allow for adequate
sight lines, be clear of existing and proposed services within the road
reserve, including the footpath, power lines (using appropriate species
where applicable), bus stop design and to provide shade to pedestrians.
c. Retention of existing local origin trees located within the proposed parks,
which are not required to be removed for the bioretention basin. An
arborist must inspect the trees before and after works, to confirm they are
not affected by any earthworks;
d. New roads are to be landscaped with a minimum of 1 street tree with a
minimum pot size of 100 litres planted within the road reserve for every 8
metres of road frontage including around the cul de sac, which provide a
good-sized canopy to allow good shade once fully mature. Further to the
native street trees recommended for planting within PSP03, Council also
recommends the planting of 100 litre appropriate edible fruit tree species
as part of the road reserve plantings and located at the end of each
property boundary, to minimise impacts from construction and future
driveways.
e. Tree plantings must maintain a minimum horizontal clearance a minimum
distance of:
i. 2m from stormwater catchpits;
ii. 4m from overhead lighting; and
iii. Landscaping plants within these clearances must be low growing
when mature and suitable Council approved varieties.
11. Landscaping of the road reserve is to be completed in accordance with the
approved landscaping plan prior to acceptance of the development ‘On
Maintenance’ and maintained thereafter for a three (3) year period to the
reasonable satisfaction of Council.
Vegetation Protection & Weed Removal
12. Prior to issue of a Development Permit for Operational Works, an Ecological
Restoration Plan and Specifications for the proposed park shall be approved by
Council. The restoration plan shall include the following:
a. A plan indicating revegetation, including a species palette incorporating
the species selection of only native indigenous species;
b. Measurable and achievable criteria on which the performance of the
floristic and structural component of the re-vegetation strategy can be
assessed annually over 3 years, including no weeds in the park area for
all of the annual assessments and at the end of the re-vegetation period.
c. Control of all weed species listed in the following standards and
legislation:
i. Declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003.
ii. Council listed Environmental Weeds, exotic grasses and other
plants identified in writing by Council.
d. All rehabilitation and revegetation must be completed prior to Council
endorsement of the Plan of Survey.
e. The area identified as Park on the Approved Plans must be dedicated to
the Crown as a reserve for Park purposes.
The land to be dedicated is “non-trunk infrastructure” for the purposes of
the Sustainable Planning Act 2009.
Page 31 of 67
Section 32
ORDINARY MEETING AGENDA 18 DECEMBER 2014
ENGINEERING
External Works
13. Elm Street must be upgraded for the length of its frontage to the subject site.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. construction of kerb and channelling (OR table drain) and underground
stormwater drainage for the full frontage of the development site;
b. installation of street, pathway and bus stop lighting; and
c. widening and sealing of the existing road pavement to include the bus
stop and the entry and departure tapers.
The Elm St pathway infrastructure is imposed pursuant to s646 of the
Sustainable Planning Act 2009 being necessary trunk infrastructure
identified by Council’s LGIP to service the development. All other
infrastructure is imposed pursuant to s665 of the Sustainable Planning
Act 2009 being non-trunk infrastructure.
14. The new road must join smoothly with the existing formation of Blue Wren
Court. The works must be undertaken in accordance with an Operational Works
approval and be designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards - Roads, Drainage
and Earthworks. The works must include in particular:
a. provision of sight distances adequate for the design speed of the road;
b. relocation of the existing footpath, services and property accesses; and
c. retention of all existing parking facilities on Blue Wren Court.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Bus Stop
15. The developer must design and construct a bus stop on the Elm Street frontage
of the site. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. The proposed bus stop is to be “Indented” and be in accordance with the
current TransLink Public Transport Infrastructure Manual. The bus stop
must contain all Mandatory and Preferred components as stated in the
manual, and be constructed in accordance with the new Noosa Council
Custom Design Rural Bus Shelter; and
b. The design for the bus stop shall consider a Pedestrian Refuge Island
and a coupled bus stop (indented but unsheltered) on the opposite side of
Elm Street for future construction.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Blue Wren Close Road Works
16. The developer must construct 4 indented carparking bays on the northern side
of Blue Wren Close between the development site and Lake Macdonald Drive
with the final location determined in conjunction with Council. The works must
be undertaken in accordance with an Operational Works approval.
17. This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Page 32 of 67
Section 33
ORDINARY MEETING AGENDA 18 DECEMBER 2014
New Roads
178. The new roads shown on the Approved Plans must be constructed in
accordance with the conditions of this Decision Notice and dedicated as road
reserve at no cost to Council.
19. This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
1820. The new roads as shown on the Approved Plans must be designed and
constructed in accordance with Council’s Planning Scheme Policy 5 –
Engineering Design Standards - Roads, Drainage and Earthworks. The works
must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. Reserve and formation widths to an “Access Road” standard;
b. sealing, drainage, kerbing and channelling;
c. construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice;
d. installation of street and pathway lighting; and
e. For roads terminating in a cul-de-sac, a circular turning area of sufficient
size to accommodate the single forward motion turn of a Waste Collection
Vehicle (WCV) clear of private driveways on-street parking and speed
control devices.
1921. A temporary sealed turnaround facility must be constructed at the end of each
road left temporarily incomplete as a result of the development staging. The
temporary turnaround facility must be in accordance with an Operational Works
approval and must be of sufficient size to accommodate the 3-point turn
manoeuvre of a Waste Collection Vehicle (WCV).
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Property Access and Driveways
202. A residential driveway must be constructed to Lots 43-47. The residential
driveway for Lot 44 must extend for the full length of the access handle. The
works must be undertaken in accordance with an Operational Works approval.
213. Vehicle access to Lots 44-46 is limited to the new road only. A clause must be
included in the contract of sale for Lots 44-46 which prohibits vehicle access
being taken from Elm Street.
Pedestrian and Bicycle Facilities
224. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. a new 2 metre wide footpath within the road verge for the entire length of
the site’s frontage to Elm Street;
b. a 2 metre wide footpath along southern side of the new road and
extending to the existing pathway in Blue Wren Close;
c. a 2 metre wide path across the frontages of proposed lots 33 and 34;
d. a 2 metre wide footpath between lots 46 and 47 extending from the new
path in Elm Street to the path in the new road; and
e. Pram crossings where applicable.
Page 33 of 67
Section 34
ORDINARY MEETING AGENDA 18 DECEMBER 2014
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
Stormwater Drainage
235. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and the Queensland Urban Drainage Manual, and
must include in particular:
a. the works generally as shown on drawing number 1225-33 revision A and
dated 06/14 prepared by Callaghan and Toth;
b. provision of kerb adapters for all new lots; and
c. extension of the site stormwater system to accommodate stormwater
from external to the site, including registration of drainage easements.
This condition is imposed pursuant to s665 of the Sustainable Planning Act
2009 being non-trunk infrastructure.
246. All elements of the stormwater drainage system, including any necessary scour
protection, must be wholly contained within the subject site, existing and/or new
road reserves.
Easements
257. Unless otherwise agreed in writing by the relevant service provider, any public
or third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
268. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the
Grantee’s standard easement terms. Draft easement documentation must be
submitted to Council for endorsement.
279. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
2830. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
2931. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
3032. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
3133. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in
height must be fitted with a commercial grade safety fence.
Electricity and Telecommunication Services
3234. Underground reticulated electricity and telecommunication services must be
provided to each lot in accordance with an approval for Operational Works and
the standards and requirements of the relevant service provider.
Page 34 of 67
Section 35
ORDINARY MEETING AGENDA 18 DECEMBER 2014
3335. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
3436. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Street and Pathway Lighting
3537. Street lighting and pathway lighting throughout the subdivision shall have a high
energy efficient rating to the reasonable satisfaction of Council and shall
generally be provided in accordance with the principles of Council’s Planning
Scheme Policy 5.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted at
[email protected]
Water and Sewerage
3638. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they
will serve.
b. An approved water meter for each lot in accordance with Unitywater and
SEQ Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water
main located in Blue Wren Place to service each lot within the proposed
subdivision in accordance with Unitywater and SEQ Standard Drawings.
d. Water meters must be located on alternative boundaries to electrical
pillars.
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
3739. Reticulated sewerage must be provided to each lot in the development. This
must include:
a. Ensuring sewer house drains are wholly contained within the Lot they will
serve.
b. Provision of sewerage infrastructure to within the property boundaries of
each lot within the proposed subdivision.
3840. A minimum clearance of 1.5 metres must be maintained between Unitywater
sewers and proposed building envelopes, buildings and other structures
3941. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
Page 35 of 67
Section 36
ORDINARY MEETING AGENDA 18 DECEMBER 2014
4042. Stormwater retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure
4143. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature
and suitable Unitywater approved varieties.
4244. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do
not form part of the assessment manager conditions:
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
3. A preliminary Construction Management Plan must be submitted with the
Operational Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD) detailing all temporary
signage and traffic control measures prior to construction.
ii. maintenance of safe pedestrian access for the areas affected by the
works during and after daily construction has ceased.
iii. proposed fencing to the site during the construction phase of the
development.
iv. approval of the Traffic Management Control Plan by the Department
of Transport and Main Roads (DTMR) for any works on State
controlled roads.
v. provision for worker car parking.
Page 36 of 67
Section 37
ORDINARY MEETING AGENDA 18 DECEMBER 2014
b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic, services and other relevant
issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency of
usage. NB any damage to the existing road system as a result of haulage
operations shall be fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan
will be a draft document requiring finalisation upon appointment of the
Principal Contractor employed to construct the works and a final
document will be required to be submitted at the Pre-Start Meeting for the
project.
Property Notes
4. The following property notes shall be placed against the relevant lots advising
the following:
A Rail and Traffic Noise Study has been undertaken for new buildings on
this property. New buildings shall be constructed in accordance with the
conclusions of the study and the Queensland Development Codes (QDC)
MP 4.4 – Building in a Transport Corridor (or equivalent codes/guidelines
at the time of building).
No direct vehicular access to Elm Street is permitted.
Development Compliance Inspection
5. Prior to the commencement of the use, please contact Council to arrange a
Development Compliance Inspection.
Unitywater
6. Connection to the Unitywater live water supply and live sewerage system must
be undertaken by Unitywater at the applicant’s cost.
Infrastructure Charges
7. This Development Permit triggers an “Infrastructure Charge Notice” to be
issued in for Council “trunk” infrastructure in accordance with Council’s
“Adopted Infrastructure Charges Resolution” under the State Planning
Regulatory Provision (Adopted Charges) and the Sustainable Planning Act
2009.
Page 37 of 67
Section 38
ORDINARY MEETING AGENDA 18 DECEMBER 2014
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The development provides for a practical infill development to support a
growing urban settlement of permanent residents in Cooroy.
2. The proposal is compatible with the residential zoned land surrounding the site;
3. The proposed residential uses are compatible with the constrained site access
provided via Blue Wren Place, with more intensive development unlikely to be
suitable.
4. The use of the site for residential uses will not unduly impact Cooroy’s ability to
provide for a range of community uses.
5 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
UNDEFINED USE - TEMPORARY SHORT-TERM SELF-CONTAINED RV STOP AT 154
HOLTS ROAD, COOROY - MCU14/0060
Item not dealt with by Planning & Organisation Committee. Referred to General
Committee for consideration.
Reason for referral: Planning & Organisation Committee Councillors suggest a
significant reduction in the length of time for visitor stays.
6 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR AN
INDUSTRIAL BUSINESS - TYPE 2 PRODUCTION, ALTERATION, REPACKAGING &
REPAIRING (SOFT DRINK FACTORY) AT 271 LAKE MACDONALD DRIVE, LAKE
MACDONALD - MCU14/0073
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0073 for a
Development Permit for Material Change of Use for an Industrial Business - Type 2
Production, alteration, repackaging & repairing (Soft Drink Factory) situated at 271 Lake
Macdonald Drive, Lake Macdonald and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions Must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
1281-14 Sheet 02 - Site Plan – Drawn by Zenith Design -
1281-14 Sheet 03 - GF Overall - – Drawn by Zenith Design -
1281-14 Sheet 04 - GF Office Layout – Drawn by Zenith Design -
1281-14 Sheet 05 - FF Overall – Drawn by Zenith Design -
Page 38 of 67
Section 39
ORDINARY MEETING AGENDA 18 DECEMBER 2014
1281-14 Sheet 06 - FF Office Layout – Drawn by Zenith Design -
1281-14 Sheet 07 - Elevations – Drawn by Zenith Design -
1281-14 Sheet 12 - Driveway Layout – Drawn by Zenith Design -
Nature and Extent of Approved Use
3. The extent of the approved use is limited to that part of the existing building
identified on the approved plans.
4. The approved use must not operate outside of the hours of 7am to 5pm
Monday to Saturday.
5. No more than 30 employees shall be on site at any one time.
6. Any display and retail sale of goods resulting from the premises must remain an
ancillary component to the approved use and must not exceed 200m 2 of use
area.
Heavy Vehicle Movements
7. Heavy vehicle movements associated with the approved use shall not exceed
10 return trips per day.
Street Identification
8. The street address of the development must be clearly visible and discernible
from the frontage of the site by the provision of a street number and, where
appropriate, the building name.
Performance Bond
9. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to commencement of operational works associated with
the development. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with condition.
CIVIL ENGINEERING
External Works
10. That part of the Lake Macdonald Drive frontage of the site extending from the
existing culvert adjacent to “Gate 2” to a point approximately 85 metres to the
south west must be upgraded. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. linemarking to clearly indicate a left turn lane for vehicles accessing the
site
b. road widening to provide for the left turn lane (where necessary)
c. reconstruction of the existing table drain to ensure that the road formation
is free draining
d. the reshaping of the verge to ensure that sediment is not transported onto
the road formation.
Page 39 of 67
Section 40
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Site Access and Driveways
11. Sealed access driveways must be provided from Lake Macdonald Drive to all
parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. a driveway crossover generally in accordance with IPWEAQ standard
drawing SEQ R-051
b. a driveway width sufficient to cater for regular use by a HRV and the
occasional use by a semi-trailer (AV)
c. all damaged sections of the existing hardstand driveway must be
replaced with a suitable similar surface
Car Parking
12. A minimum of 64 car parking spaces must be provided and marked on the site.
The spaces must be available and accessible at all times while the use is open
for business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. 44 staff parking spaces within the total, which are clearly marked for that
purpose
b. 20 visitor/customer parking spaces within the total, which are clearly
marked for that purpose and accessible at all times for visitor/customer
use
c. 2 disabled parking space/s within the total
d. a sealed surface with crossfalls and gradients in accordance with
Australian Standard AS2890: Parking Facilities
13. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Bicycle Parking & End of Trip Facilities
14. Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must
be provided for the development. The facilities must be indicated on the plans
and submitted in accordance with an Operational Works approval and must
include in particular:
a. a total of 10 bicycle parking spaces
b. end of trip facilities involving a minimum of 5 lockers and 1 shower cubicle
with an ancillary change room.
Damage to Services and Assets
15. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
c. Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority
for approval.
Page 40 of 67
Section 41
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, the Queensland Urban Drainage Manual and
Engineering report dated 3 September 2013 by Barlow Shelly Consulting
Engineers (with the works expanded to reflect the extended development area).
Stormwater Quality Management
17. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5.0 and 6.0 of the of the
Engineering report dated 3 September 2013 by Barlow Shelly Consulting
Engineers (with the works expanded to reflect the extended development
area)
b. swales which are designed in accordance with the Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland
c. The works must be undertaken in accordance with the Bioretention
Technical Design Guidelines (Water by Design, 2012)
18. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
1). The approved Operational Works drawings for the stormwater quality
treatment system and detailed life cycle costing of the system must be attached
as an addendum to this document. Records of all maintenance activities
undertaken must be kept and made available to Council upon request.
Stormwater Harvesting
19. Operating stormwater harvesting tanks must be provided for the development.
The tanks must be provided in accordance with an Operational Works approval
and must include in particular:
a. the details identified in section 5.0 and 6.0 of the of the Engineering report
dated 3 September 2013 by Barlow Shelly Consulting Engineers (with the
works expanded to reflect the extended development area).
LANDSCAPE & ECOLOGY
Landscaping Works
20. The development must be landscaped, in accordance an approval for
Operational Works. The particular works must generally accord with the
planning scheme Landscape Code and Planning Scheme Policy 3 Landscaping
Plants and Guidelines and include:
a. Landscaping to car park areas, including shade trees
b. Vegetated buffer to the Lake Macdonald Drive
c. Vegetated screening of any electrical transformers, bin storage areas and
the like from the road frontage
d. Details of any proposed clearing of vegetation and details of retention of
any existing trees on the site and road verge to accommodate the
approved development footprint. An Arborist Report is required to validate
any proposed clearing.
Page 41 of 67
Section 42
ORDINARY MEETING AGENDA 18 DECEMBER 2014
e. Removal of all weeds species listed in the following standards and
legislation:
i. Declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. undesirable species, as defined within Planning Scheme Policy 3
Landscaping Plants and Guidelines of the Noosa Plan.
21. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques and irrigation that allow
for healthy, sustained and vigorous plant growth. All plant material must be
allowed to grow to full form and be refurbished when its life expectancy is
reached.
Rehabilitation
22. The land area defined by the vegetated portion contained within the Riparian
Buffer Area of the Biodiversity Overlay of the Noosa Plan on the subject must
be rehabilitated in accordance with a rehabilitation plan prepared by a suitably
qualified person and an approval for Operational Works. Rehabilitation works
must:
a. restore the habitat value of the land to meet the characteristics of the
appropriate regional ecosystem
b. return the land to its natural undisturbed state, where practicable. Where
impracticable, provide justification.
c. The treatment of undesirable species, as defined within Planning Scheme
Policy 3 Landscaping Plants and Guidelines of the Noosa Plan.
ENVIRONMENTAL HEALTH
Refuse Management
23. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties. A bin wash area is
required with a cold-water tap, hose and drain outlet connected to the effluent
disposal system, via a bucket trap. The drain outlet is to be designed to prevent
storm water entry to the effluent system and this can be achieved with a nib
wall 50mm high and up to 700mm x 700mm wide (max 0.5m²), or alternatively
the waste area can be roofed, or any other design approved by Council’s
delegate.
24. The development must allow refuse-loading areas to be located off street. All
vehicles associated with the collection of waste/recyclables, shall enter and
leave the site in a forward direction.
25. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, shall be developed and implemented on site. The Waste
Management Plan must include the following as a minimum: -
The types and estimated volumes of waste that will be generated from the
activities approved within the development.
Methods to be used for dealing with garden waste.
Page 42 of 67
Section 43
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Initiatives to minimise waste either by waste prevention, reduction, re-use
or recycling.
Description of procedures and clearly identified site responsibilities for all
site occupants for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing
and system to prevent storm water getting into the effluent system via the
bin wash.
A description of types and volume of waste storage containers to be
used, and the collection frequency of containers,
The waste and recycling storage area shall include the provision of
containers for all waste and recycling materials including putrescible
matter, non-recycling waste, paper/ cardboard, glass, aluminum/steel
cans, waste oil, Styrofoam boxes, etc.
Effluent Disposal
26. All factory wastewater and wash down waters shall be collected, treated and
disposed of lawfully on site in an approved effluent disposal system.
PLUMBING
Plumbing, Drainage and Waste Water Treatment and Disposal
27. The development must be provided with Plumbing, Drainage and an On-site
Waste Water Treatment and Effluent Disposal System having a capacity
sufficient for the use*.
*(Refer to Advisory Note)
Advisory Notes
PLANNING
Aboriginal Cultural Heritage Act 2003
1. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
Page 43 of 67
Section 44
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for
compliance with the requirements of the National Construction Code - Building
Code of Australia (Volume 1) as they relate to people with disabilities. Your
attention is also directed to the fact that in addition to the requirements of the
National Construction Code as they relate to people with disabilities, one or
more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
3. Prior to the commencement of the use, please contact Council's Development
Audit & Response Unit to arrange a Development Compliance Inspection.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
6. The works identified in this Decision Notice will be required to be carried out in
accordance with a Construction Management Plan endorsed by Council
through an approval for Operational Works. To ensure expedient assessment
of any Operational Works application, the applicant is advised to submit a
preliminary Construction Management Plan that addresses the requirements of
the planning scheme. In particular, the preliminary Construction Management
Plan should address the following:
a. provisions that ensure the proposed construction does not unduly impact
on the surrounding area and ensure the site is safe for members of the
public, implementing appropriate traffic signage in accordance with the
Manual of Uniform Traffic Control Devices (MUTCD) and making
provision for safe pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
Plumbing, Drainage, Waste Water Treatment and Disposal System
7. The establishment of Plumbing and Drainage and a waste water treatment and
disposal system for the site requires a Compliance Permit to be obtained from
Council under the Plumbing and Drainage Act 2002. The system must be
designed in accordance with the Queensland Plumbing and Wastewater Code,
Australian Standards AS/NZS3500, AS/NZS1547: 2000 “On-site Domestic
Wastewater Management”.
8. The existing Waste Water Treatment and Disposal System for the site is as
mentioned in the report from Barlow Shelley, Consulting Engineers, Section 8 ,
Reference number 1014 Dated 3rd September 2013, is capable of
accommodating the proposed changes to the development.
Page 44 of 67
Section 45
ORDINARY MEETING AGENDA 18 DECEMBER 2014
9. If design requirements for the site change, whereby the development exceeds
the accommodation or use of 21 or more equivalent persons, or generates a
requirement for an ERA63, then an Operator’s Licence from The Department of
Environment and Heritage Protection (DEHP) will also be required.
Health
10. Due regard should be given to the design and location of noise emitting fixed
plant and equipment and any acoustic treatment that may be required. It is
advised that an appropriately qualified acoustic consultant be involved with the
selection and installation of such equipment. A qualified acoustic consultant can
give advice on how to best locate and design the equipment such that it can
meet statutory noise or planning requirements.
11. The Environmental Protection Act 1994 states that a person must not carry out
any activity that causes, or is likely to cause, environmental harm unless the
person takes all reasonable and practicable measures to prevent or minimise
the harm. Environmental harm includes environmental nuisance. In this regard
persons and entities, involved in the civil, earthworks and construction phases
of development, are to adhere to their ‘general environmental duty’ to minimise
the risk of causing environmental harm. Environmental harm is defined by the
Act as any adverse effect, or potential adverse effect whether temporary or
permanent and of whatever magnitude, duration or frequency on an
environmental value and includes environmental nuisance. Therefore, no
person should cause any interference with the environment or amenity of the
area by reason of the emission of noise, vibration, smell, fumes, smoke,
vapour, steam, soot, ash, dust, waste water, waste products, grit, sediment, oil
or otherwise, or cause hazards likely in the opinion of the administering
authority to cause undue disturbance or annoyance to persons or affect
property not connected with the use.
12. In accordance with the Public Health Act 2005, rainwater tanks must be
constructed with mosquito proof screens (made from either brass, copper,
aluminium or stainless steel), and constructed with a mesh size of no more than
1mm, and must be installed in a way that does not accelerate corrosion. Tanks
that contain flap valves must be installed so that when closed, mosquitoes
cannot pass through the valve. It is unlawful under the Public Health Act 2005
to construct, install or be in possession of a tank that does not comply with
these requirements.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The development allows the re-use of the existing industrial building on the site
and improved built form, landscaping and environmental outcomes on the site;
and
2. The site has existing use rights for a major industrial use (brickworks), which is
also categorised as an Industrial Use Type 2 under The Noosa Plan, and the
proposal is of substantially lesser intensity
Page 45 of 67
Section 46
ORDINARY MEETING AGENDA 18 DECEMBER 2014
7 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR OPEN SPACE
TYPE 1 - SPORT & RECREATION (EXPANSION OF NOOSA PAR 3 GOLF COURSE)
AT 2 & 16 GOLDBERG COURT, NOOSAVILLE - MCU14/0068
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0068 for a
Development Permit for a Material Change of Use for Open Space – Type 1 Sport &
Recreation (Extension to Existing Par 3 Golf Course) situated at 2 & 16 Goldburg Court,
Noosaville and:
A. Approve the application in accordance with the following conditions:
MCU Conditions
PLANNING & ENVIRONMENT
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
in the following table and may be amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SD-01 A Noosa Par 3 Golf Course Proposed Extension 15/08/14
prepared by the DFS Group
Landscaping & Ecology
3. Landscaping and rehabilitation works must be undertaken on Lot 23 RP223289
in accordance with an Operational Works approval and Planning Scheme
Policy - PSP 3 Landscaping Plants and Guidelines and must include an
ecological rehabilitation and landscaping plan, prepared by a suitably qualified
person* and must include in particular:
a. Screening vegetation to adjacent residences to the east to provide
privacy and protection from line-of-play.
b. rehabilitated and revegetation of the riparian area to the existing creekline
with native trees and understorey plantings for an area generally not less
than 35m wide either side of the centreline of the watercourse.
c. details of treatments to batters, armoury, plantings, weed treatment, and
rehabilitation.
d. a minimum maintenance period of 3 years.
e. a species palette and densities table incorporating the species selection
of only native indigenous species.
f. control of all weeds species listed in the following standards and
legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other
plants identified in writing by Council (*refer to Advisory Note).
Page 46 of 67
Section 47
ORDINARY MEETING AGENDA 18 DECEMBER 2014
ENGINEERING
Earthworks
4. All earthworks must be in compliance with the relevant codes and policies of
The Noosa Plan (particularly the Earthworks Code) and undertaken in
accordance with a Development Permit for Operational Works. The application
for operational works for earthworks shall also include the details of any
associated drainage works (eg swales, scour protection, stormwater pipes
work).
5. Suitable construction management measures must be put in place prior to the
commencement of development works on this site and for all stages of works,
the measures must address in particular:
a. Traffic management during all aspects of the construction phase
including:
i. Temporary signage and traffic control measures in accordance with
Manual of Uniform Traffic Control Devices (MUTCD) to provide
warning to drivers and road users of any safety hazard or changes
to traffic conditions due to the proposed works.
ii. Details on the location of imported fill sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency
of usage.
NOTE: any damage to the existing road system as a result of
haulage operations must be fully repaired at the applicant’s
expense
b. Effective procedures and measures to protect the Riparian Buffer and
existing natural flora and fauna.
c. Effective procedures and measures to minimise adverse environmental
impact on other properties and roads users including noise and dust
emission.
d. Establishment of a communication protocol with the adjoining owners and
any other affected parties to advise of construction times, impacts on
traffic and services and any other relevant issues.
Stormwater Drainage
6. Stormwater runoff from the development areas must be disposed off in a
controlled manner on site without causing erosion or adverse impacts on the
environment and/or the existing drainage conditions on other properties (eg by
concentrating or diverting additional flows and/or causing additional ponding on
other properties) .
7. The development works must include stormwater management and treatments
measures/devices that:
a. Are designed in accordance with the current version of the Deemed to
Comply Solutions by Water By Design; or
b. Are designed to treat stormwater to achieve 80% Reduction in Total
Suspended Solids, 60% Reduction in Total Phosphorous and 45%
Reduction in Total Nitrogen prior to discharge from the site compared to if
there was no water pollutant mitigation incorporated into the design.
A Development Permit for Operational Works for stormwater management shall be
required.
Page 47 of 67
Section 48
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Advisory Notes
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call)
or (07) 3212 6855.
Aboriginal Cultural Heritage Act 2003
2. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003
(ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A
person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage”. It is
an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the ACH Act can also issue stop orders for an activity
that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any
obligations under the ACH Act.
B. Find the following are sufficient grounds to justify the decision despite the conflict
with the Planning Scheme:
1. The development is an expansion of an existing approved golf course within
the Rural Settlement zone.
2. The golf course requires a large site that generally necessitates a rural
setting.
3. The development will not have significant adverse impacts on the amenity of
existing residents or the existing rural character of the area.
8 INDICATIVE COST REDUCTION FOR STREETLIGHT NETWORK CHARGES
That Council note the report by the Manager Procurement / Fleet to the Planning &
Organisation Committee Meeting dated 9 December 2014 regarding the anticipated cost
reduction achieved by LGAQ / Local Buy for Council’s street lighting charges applicable to
the 2015/16 budget.
9 FEES AND CHARGES UPDATE - NOOSA HOLIDAY PARKS
That Council note the report by the Property Officer to the Planning & Organisation
Committee Meeting dated 9 December 2014 and:
A. Set fees and charges for Noosa Holiday Parks to align with the cessation of June/July
2016 Queensland school holidays; and
B. Adopt the Proposed General Cost Recovery Fees and Commercial Charges for
Noosa Holiday Parks for the period ending 10 July 2016 as detailed in Attachment 1
to report.
Page 48 of 67
Section 49
ORDINARY MEETING AGENDA 18 DECEMBER 2014
10 COMMUNITY JURY PROJECT
That Council note the report by the Community Engagement Manager to the Planning &
Organisation Committee Meeting dated 9 December regarding the Community Jury Project
and endorse that the question for the first Community Jury be: “What is the best option for
minimising organic waste sent to landfill?”
11 CHANGE OF VENUE FOR COUNCIL MEETINGS - 2015
That Council note the report by the PA to the CEO to the Planning & Organisation
Committee Meeting dated 9 December 2014 and:
A. Pursuant to Section 257(3)(b) of the Local Government Regulation 2012, resolve to
hold its Ordinary Meeting on:
1. Thursday, 7 May 2015 at the Cooran Memorial School of Arts Hall, Cooran
commencing at 6pm; and
2. Thursday, 19 November 2015 at The J, Noosa Junction commencing at 6pm.
B. Request the Chief Executive Officer to ensure that suitable advertising is undertaken
to promote these community based Council Meetings.
Recommendation
The Planning & Organisation Committee recommendations dated 9 December 2014 be adopted
except where dealt with or held over by separate resolution.
Page 49 of 67
Section 50
ORDINARY MEETING AGENDA 18 DECEMBER 2014
GENERAL COMMITTEE RECOMMENDATIONS
15 DECEMBER 2014 - Crs Tony Wellington (Chair), Bob Abbot, Sandy Bolton, Joe
Jurisevic, Frank Pardon and Noel Playford
Apology: Cr Frank Wilkie
1 COUNCIL CABS & FLEXILINK SERVICES REVIEW - FURTHER REPORT
That Council note the report by the Project Officer and Development Officer to the
Infrastructure & Services Committee Meeting dated 9 December 2014 and the further
report to the General Committee Meeting dated 15 December 2014 and: request the CEO
to arrange a Councillor/Staff Workshop to consider alternative transport proposals as
outlined during discussions at the General Committee Meeting on the proposed Noosa
Council Transport Assist service.
A. Discontinue the Boreen Point – Tewantin Flexilink and Council Cabs Services as of
31 January 2015;
B. Agree to partner with ComLink to provide a new transport service commencing 2
February 2015;
C. Adopt the new transport service purpose, service area, fares, service frequency, and
eligibility criteria as detailed in the report;
D. Approve a budget of $80,000 for a one year trial of the new transport service; and
E. Adopt the name “Noosa Council Transport Assist” for the new transport service.
2 WASTE COLLECTION SERVICES POLICY - FURTHER REPORT
That Council note the report by the Waste Coordinator to the Infrastructure and Services
Committee Meeting dated 9 December 2014 and the further report to the General
Committee Meeting dated 15 December 2014 and:
A. Rescind the existing Waste Collection Services Policy that transferred to the Noosa
Council from the Sunshine Coast Council under the Local Government (De-
amalgamation Implementation) Regulation; and
B. Approve the amended Noosa Council Waste Collection Services Policy provided as
Attachment 1 to the further report incorporating the minor wording amendments noted
at the meeting.
3 DEVELOPMENT APPLICATION FOR MCU - RV STOP MCU14/0060
That Council note the report by the Coordinator Planning to the Planning & Organisation
Committee Meeting dated 9 December 2014 regarding Application No. MCU14/0060 for a
Temporary Development Permit for a Temporary Short Term Self-Contained RV Stop
situated at 154 Holts Road, Cooroy and:
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied
with prior to the use commencing, and then compliance maintained at all times
while the use continues.
Page 50 of 67
Section 51
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
below and as may be amended by the conditions herein.
Plan No. Rev. Plan/Document Name Date
13-3461AB - Plan of Proposed (Temporary) Short-Term, Self- 04/07/14
Contained RV Stop at Lot 2 on RP893989 prepared
by Max Watterson + Associates
Nature and Extent of Approved Use
3. No more than 20 Recreational Vehicles (RV’s)(caravans, motorhomes or the
like) may stay at the site at any one time.
4. Visitor stays shall not exceed 14 consecutive days 4 consecutive nights.
5. All RV’s shall be fully self-contained and must retain all grey water and black
water via holding tanks.
6. No on-site release of grey water is permitted.
Visitor Education
7. Visitors must be advised of the following requirements:
a. No on-site release of grey water or other waste
b. Location of nearest dump point and potable water supply
c. All dogs must be on a leash when walked in the area and must be
restrained at all times during the stopover period
d. Owners must pick up and collect their dogs’ faeces
e. Consideration be given for residents and road users when walking in the
area
f. Noise must be minimised after 8.30pm
Street Identification
8. The street address of the development must be clearly visible from the Holts
Road frontage of the site by the provision of a street number.
9. Access to the site must be clearly signed with a sign of up to 1m 2.
Temporary Development Approval
10. This temporary development approval expires in two (2) years on 18 December
2016. Upon request, Council may provide written consent to extend the
approval on an annual basis having regard to the status of the adjacent mining
lease, the degree of compliance with the approval conditions herein and the
complaint history relating to the development.
ENGINEERING
General
11. The developer must meet any costs to repair damage to any Council or public
asset during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the frontage of the site should be completed and kept for future reference and
made available to Council if required.
Page 51 of 67
Section 52
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Driveway and Internal Roads
12. Sealed crossovers must be provided for the two accesses to the site in
compliance with the following:
a. IPWEAQ Standard Drawing SEQ R-056.
b. Designed and certified by a RPEQ
c. Have a minimum width of 4.0m at the property front boundary line.
13. Internal roads must:
a. Have a minimum width of 3.0m and widened where necessary to provide
passing opportunities for vehicles using the site.
b. Be all weather construction (sealed or compacted gravel) suitable for the
anticipated traffic and load of vehicles using the site.
c. Be provided with adequate stormwater drainage that prevents undue
erosion or surface deformation or settlement.
Excavation and Filling
14. All earthworks shall be undertaken in accordance with the provisions of AS
3798 “Guidelines on Earthworks for Commercial and Residential
Developments”.
Stormwater Drainage
15. Stormwater drainage works and water quality devices and measures must be
provided and maintained in accordance with the approved engineering plans
and in compliance with the Stormwater Quality Management Plan included in
the Stormwater Drainage for No 154 Holts Rd Cooroy Report dated 26
September 2014, Ref No: 1432 IWMP.doc, prepared by Callaghan & Toth.
Particular attention must be given to the construction and maintenance regime
of the two proposed Sediment Basins. The drainage works and basins must be
certified by an RPEQ on completion.
16. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site, the dam or any adjoining property.
Erosion and Sediment Control
17. The developer must ensure non-essential, short or long term, exposure of soil
is prevented by minimising the duration of soil exposure to adverse weather
conditions and effectively turf or stabilise any exposed area without delay and
prior to rainfall occurring.
18. The developer must ensure sediment does not leave the site or enter onto
adjoining properties or the dam on the site due to surface runoff on tyres of
vehicles and/or machinery. The developer must implement appropriate
approved erosion and sediment control measures throughout the site during all
phases of construction and the ongoing operation of the site.
19. Prior to the completion of the development, all site surfaces must be effectively
stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-
term. For the purpose of this condition, an effectively stabilised surface is
defined as one that does not, or is not likely to result in visible evidence of soil
loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead to
water contamination.
Page 52 of 67
Section 53
ORDINARY MEETING AGENDA 18 DECEMBER 2014
20. The supervising engineer and applicant are responsible to ensure that the
implemented, short and long term, erosion controls measures are effective and
regularly maintained to cater for all weather conditions.
After Completion of Works
21. Prior to the commencement of use and the engineering certification of the
works by the supervising engineer (RPEQ), a combined inspection of the
completed works by Council’s Inspector/s and the supervising engineer is
required. Please contact Council on 5329 6244 to arrange the inspection.
Waste
22. The developer must provide adequate waste storage and disposal facilities.
23. Refuse bins must not be placed on the existing road formation of Holts Road. A
suitably sized all-weather pad shall be constructed adjacent the driveway
entrances to provide for waste bin collection.
ADVISORY NOTES
Engineering Certification
1. Council has undertaken an audit check of the submitted plans in relation to the
proposed works. A detailed check of the calculations and drawings has not
been undertaken, as they have been certified by a RPEQ. The RPEQ bears full
responsibility for all aspects of the engineering design. Council reserves the
right to require further amendments and/or additions at a later date should
design errors become apparent.
General Environmental Advisory Note
2. The Environmental Protection Act 1994 states that a person must not carry out
any activity that causes, or is likely to cause, environmental harm unless the
person takes all reasonable and practicable measures to prevent or minimise
the harm. Environmental harm includes environmental nuisance. In this regard
persons and entities, involved in the civil, earthworks, construction and
landscaping phases of this development are to adhere to their ‘general
environmental duty’ to minimise the risk of causing environmental harm.
Aboriginal Cultural Heritage Act 2003
3. There may be a requirement to establish a Cultural Heritage Management Plan
and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:
“A person who carries out an activity must take all reasonable and practicable
measures to ensure the activity does not harm Aboriginal cultural heritage.” It
is an offence to fail to comply with the duty of care. Substantial monetary
penalties may apply to individuals or corporations breaching this duty of care.
Injunctions may also be issued by the Land and Resources Tribunal, and the
Minister administering the Act can also issue stop orders for an activity that is
harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
discuss any obligations under the ACH Act.
Page 53 of 67
Section 54
ORDINARY MEETING AGENDA 18 DECEMBER 2014
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the planning scheme:
1. The development will help to address a significant need for low-cost
accommodation for self-contained RV travellers in the Noosa area.
2. The development will provide economic and community benefit through
increased visitation to the Noosa hinterland.
3. The development provides for the adaptive re-use of the existing nursery on the
site.
4. The site’s location near the Bruce Highway is appropriate to cater for self-
contained RV traveller’s needs.
5. The development will not have significant adverse impacts on residential
amenity or water supply quality.
4 DEVELOPMENT APPLICATION 132005.220.04 - REQUEST FOR A PERMISSIBLE
CHANGE TO AN EXISTING APPROVAL FOR 22 VILLAGE INDUSTRY LOTS AT 70
CARPENTERS ROAD, COOROY
That Council note the report by the Infrastructure Assessment Officer to the General
Committee Meeting dated 15 December 2014 regarding Application No. 132005.220.04 for
a Permissible Change to the existing approval situated at 70 Carpenters Road, Cooroy and
approve the request with the following changes:
In relation to the request to make a change to the existing approval, Council decided to:
A. Change Condition 114 to read:
Contributions Towards Council Infrastructure
114. Monetary contributions shall be paid to Council towards the cost of providing
and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current
Council policies and requirements is outlined in the table below:
Stage 1 Stage 2 Stage 3
Contribution Required For: Amount Amount Amount
(Lots 6,7 & 8) (Lots 10 to 26) (Lots 9 & 27)
PSP17 – Water Supply Headworks
$ 25,135 $ 191,289 $ 22,264
Contributions
PSP16 – Sewerage Headworks
$ 11,253 $ 85,641 $ 9,968
Contributions
PSP12 – Public Open Space
$ 8,630 $ 65,665 $ 7,643
Contributions (Park)
PSP20 – Pathway Trunk Network
$ 13,179 $ 100,281 $ 11,672
Contributions
Roadworks Contributions (including
$ 28,000 $ 213,506 $ 24,798
public transport)
TOTAL Contribution Amount = $ 86,197 $ 656,382 $ 76,345
These amounts are subject to variations in the Consumer Price Index, All Groups
Brisbane from September 2014 until the date of payment.
All contributions must be paid prior to Council endorsement of the plan of
survey for the applicable stage.
Page 54 of 67
Section 55
ORDINARY MEETING AGENDA 18 DECEMBER 2014
B. Change Advisory Note 1 to read:
1. The applicant is advised that development contributions and infrastructure
charges applicable to this development approval have been based on the
following estimates for Uses Class/ Uses and applicable quantities in
accordance with the approved plan:-
Existing
Approved Development
Development
Use Use Quantity
Class / Quantity Class / Stage 1 Stage 2 Stage 3
Use Use (Lots 6,7 & 8) (Lots 10 to 26) (Lots 9 & 27)
One Industrial
3 x Industrial 17 x Industrial 2 x Industrial
Vacant Vacant Business
Lots Lots Lots
Allotment Type 2
Water & Sewerage Headworks
5,069 m2 lot 38,578 m2 lot 4,490 m2 lot
contributions based on the lot
area area area
areas per the approved plan =
Open Space, Pathway &
Roadworks contributions based
2,028 m2 gfa 15,431 m2 gfa 1,796 m2 gfa
on 40% site cover of the lots per
the approved plan =
Note: Lots 50, 100, 101 & 102 are not current developable lots and have not been
subjected to infrastructure contributions/charges. Nil infrastructure contributions/charges
discounts (credits) are available should future development occur on these lots.
5 FINANCIAL PERFORMANCE REPORT - NOVEMBER 2014
That Council note the report by the Manager Financial Services to the General Committee
Meeting dated 15 December 2014 providing the November monthly financial performance
report.
6 NOOSA WATERS LOCK & WEIR LEVY
That Council note the report by the Chief Executive Officer to the General Committee
Meeting dated 15 December 2014 providing background to the history of the Noosa Waters
lock and weir levy and:
A. Note that the current levy that has accumulated from 2000/2001 to 30 June 2014 will
be surplus to future requirements for the Noosa Waters lock and weir;
B. Note that section 96 of the Local Government Regulation has specific provisions in
relation to how refunds of levy surpluses must be undertaken; and
C. Authorise the CEO to implement a refund of the Noosa Waters lock and weir levy
surpluses for the period 2000/2001 to 30 June 2014 in accordance with the approach
outlined in the report and based on legal advice from King and Co.
Recommendation
The General Committee recommendations dated 15 December 2014 be adopted except where
dealt with or held over by separate resolution.
Page 55 of 67
Section 56
ORDINARY MEETING AGENDA 18 DECEMBER 2014
6 ORDINARY MEETING REPORTS
1 RUFOUS STREET PRECINCT DEVELOPMENT PROJECT
DOCUMENT IN FOR MATI ON
Author Alan (Fox) Rogers, Director Community Services
Community Services Department
Index ECM/ Project and Contract/ Rufous Street Precinct Project
Attachments 1. Map of the proposed Rufous Street development precinct
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Director Community Services to the Ordinary Meeting dated
18 December 2014 and agree to:
A. Establish a Rufous Street Precinct Project Control Group to oversee the development of
the Precinct as identified in the map shown at Attachment 1 to the report; and
B. Allocate a budget of $100,000 for:
1. The safe removal of the buildings and asbestos contamination from the Peregian
Bowls Club site; and
2. Concept design and consultation.
REPORT
1. Purpose
On Wednesday 10 December 2014, Council finalised the purchase of the Peregian Bowls Club
taking possession of the land and buildings. The purpose of this report is to seek Council
approval for the establishment of a Rufous Street Precinct Project Control Group (PCG) and the
allocation of funds to allow for:
the safe removal of the buildings and asbestos contamination from the Bowls Club site; and
concept design and consultation.
2. Establishment of the Rufous Street Precinct PCG
The Old Peregian Bowls Club site is located between David Low Way and Rufous Street to the
north west of Peregian Village. The development of the Bowls Club site and Rufous Street
presents a unique strategic opportunity to connect the commercial hub of Peregian Village with
surrounding sports fields and community activities as well as help solve some of the entrenched
parking problems within the area.
At the same time it also presents an opportunity to enhance the economic development of the
area through the establishment of a digital hub/incubator thereby adding to Peregian’s growing
reputation as Australia’s Silicon by the Sea.
Page 56 of 67
Section 57
ORDINARY MEETING AGENDA 18 DECEMBER 2014
In order to coordinate the development of the Rufous Street Precinct and integrate this
development into other Council initiatives in the vicinity it is proposed that Council establish a
Rufous Street Precinct Project Control Group (PCG).
To advance the development of the Precinct as quickly as possible the PCG will create working
groups to undertake specific tasks and consultations on such issues as the establishment of the
digital hub and the overall precinct design
3. Terms of Reference for the Rufous Street Precinct PCG
It is proposed that the initial terms of reference for the Rufous Street Precinct PCG be as follows:
Purpose:
To work with the community and local businesses to maximise the social and economic benefits
flowing from the redevelopment of Rufous St and the Old Peregian Bowls Club site
Goals:
To safely remove the buildings and asbestos contamination from the bowls club site
To establish uses for the Precinct, including consideration of the following options:
o Sport, recreational and community uses
o The creation of a digital hub/incubator
o Parking
o Linkages with the Peregian Village
To consider the whole of life financial implications of any proposed development including net
community financial impact of identified options
To define the scope and staging of potential works required to develop the Rufous Street
precinct
4. Membership of the Rufous Street Precinct PCG
The proposed membership of the Rufous Street Precinct PCG is:
Alan (Fox) Rogers, Director Community Services (Chair)
Cr Frank Wilkie
Adam Britton, Project Coordinator, Project Design and Delivery
Alison Hamblin, Community Development Coordinator
Clint Irwin, Property and Facilities Manager
Phil Parkman, Manager Procurement/Fleet
Nick Wellwood, Infrastructure Planning and Design Manager
Michael Shave, Director Corporate Services (as needed for financial analysis)
Page 57 of 67
Section 58
ORDINARY MEETING AGENDA 18 DECEMBER 2014
5. Proposed 6 month work schedule for the PCG
The following is a draft work schedule for the development of the Rufous Street Precinct over the
next six months:
December 2014
Finalise purchase of the site
Confirm the extent of the Rufous St Precinct project area
Report to Council seeking funds for:
o building demolition and asbestos removal,
o concept design, and
o consultation
January 2015
Demolish the old Bowls Club buildings and remove asbestos contamination from the site
Finalise 12 month project plan
February 2015
Commence initial consultation with local businesses and potential partners regarding the
Digital hub
Hold a public meeting to discuss the suite of initiatives proposed in the Peregian Master Plan
and the Rufous St Precinct development
March 2015
Prepare a 2105/16 budget bid for design of the Precinct and lodgement of MCU
Continue consultation with the community on the uses of the Rufous St Precinct
May 2015
Complete consultation with the community regarding:
o Retention of Open space
o Sport, recreation and community activities on site
o Linking the precinct into the Peregian Village
o Parking
Complete consultation with the business and community regarding the potential for creating a
digital hub/incubator on the site
June 2015
Finalise the concept design for the Precinct
Prepare a Regional Development Australia grant application including:
o Overall project assessment
o Evaluation of financial options
Page 58 of 67
Section 59
ORDINARY MEETING AGENDA 18 DECEMBER 2014
6. Demolition of buildings and removal of asbestos contamination on the Peregian
Bowls Club site
A report prepared for the Peregian Bowls Club in October 2010 by Gary Zealand and Associates
identified that the buildings on the site contained asbestos fibrous cement sheeting and fibrous
cement castings in the roof, guttering, drains and walls of the buildings as well as fibrous cement
casting on the bowling green gutter edging and blackboard.
The presence of asbestos was known before the offer to purchase was made and the price paid
by Council reflected that fact.
An inspection by Council’s Environmental Health Officers on December 4, 2014 identified
evidence of broken pieces of asbestos guttering and sheeting lying on the ground next to one of
the buildings.
Following settlement on Wednesday 10 December Council’s Project Coordinator, Project Design
and Delivery inspected the site with an approved asbestos removal contractor with the aim of
obtaining an estimate for the safe removal of asbestos on the site and demolition of the old bowls
club buildings.
Following this visit the Project Coordinator, Project Design and Delivery has arranged for the
removal of any broken asbestos sheeting or guttering lying on the ground on the site.
The contractors estimate to remove the asbestos and demolish the buildings is $75,000.
It is recommended that quotes now be sought for the demolition of the buildings ideally before
school returns in late January 2015.
Previous Council Consideration
Ordinary Meeting, 23 October 2014, Item 1, Page 10
“That Council note the report by the Chief Executive Officer to the Ordinary Meeting dated 23
October 2014 and authorise the Chief Executive Officer to:
A. Proceed with the proposed course of action as outlined in the report; and
B. Make public the contents of this report once it has been implemented.”
Finance & Risk
Finance
There is currently no capital budget allocation for the Rufous Street Precinct Project in the
2014/15 original budget due to the emerging nature of this project.
However because of the opportunities that this project presents for both Council and the
community this report seeks an initial capital budget allocation of $100,000 to be sourced in
Budget Review 3 to undertake the following activities:
the safe removal of the buildings and asbestos contamination from the Bowls Club site
(estimated cost $75,000) ; and
concept design and consultation (estimated cost $25,000)
The works are considered capital in nature and funds are to be sourced from the existing capital
program, with no net cash flow impact if possible.
Page 59 of 67
Section 60
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Risk
The buildings on the Peregian Bowls Club site contain asbestos fibre cement sheeting and
fibrous cement castings. There is also evidence of broken asbestos sheeting and guttering lying
on the ground on the site. This presents a known public health risk which Council must deal with
as soon as possible.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
CEO
Director Corporate Services
Infrastructure Planning and Design Manager
Coordinator Project Design and Delivery
Community Development Coordinator
Property and Facilities Manager
Manager Procurement/Fleet
Project Coordinator Project Design and Delivery
Environmental Health Officer
Departments/Sections Consulted:
x Community Services x Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities Asset Design & Investigations
Asset Planning
Civil Operations
Environment
x Executive Office x Corporate Services
Community Engagement Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 60 of 67
Section 61
ORDINARY MEETING AGENDA 18 DECEMBER 2014
ATTACHMENT 1
Page 61 of 67
Page 61 of 67
ee os dl if a a:
) eae Pe. Sy
rs i ; | pee :
5 y iL. | Pe Va E:
S , oe, al 7a i boa pa Ksstiaid
Ss * im ed
é io ‘ . : f / ~.
: at 5] | A | 4 > =
bs . # Pe Ff P| 4 J if a
' a ae h
8 fe : * | me f a . iu
ee aes th) ety
eS « ‘ f P sg « ae ae
N pron ey + KX, as SS SI Sil ee > oa
Teka A OS SE rn
) 4 ial , <i ; x ~\. Y \ \ k a - VN aN a Ss ? 9
Ri, a 7. A Ne
3. PE ASS SS re < \ ag ae e)
PS pe OF N AX 2H b Dp a!
“is "at IN RE Re gt
ah yest: SSSS RSS OA ai A
= ~ Po 4 7 = - é Ae SSS y ge 4 vd Ke ws x
8 Me <r H if . a 3 i \ ES 5 vA ‘i @ 2
Bef ie, r = Se * oa, Stee 0 Ges & 4~ ~
OS dy | et eR RD 7
., 22 Se Sige <a; ree we Th ee A 4 . ee
8 ol , age Nl” es tee po Mag + Py}
8 — ae cee CN ee ee — = —— 3 = A AK Ai Raia a \> \ .
aN 5 ts — ———SE Pas ee Sh - Be \
mm fee’ 8 fee = WN A ie ; Nas a oe
= i, <tr th | i me \\ Reg \ a ® a s ad e i 4
a i q. Pa gr eee Lg, eh b
PF iol, o gil te) hae a Gl SS / tae" <a J
sof Hd: fee eee we Po ie e
ra . pe BL S. ge Deel = “tt | ray 7 | <i Je ‘i - ' I = i oh. |
vA ld , i. ak aa SR | ty P| ae
QO PZ J a\ a i li wy. ] eS) ee Pay (s % ‘1
= ; es + gt ie a a saat ~~ a a : a 7 Fe i _ I p roe i ere
2 2 1 ge a ae
D 2A. ae , ss ee
4 244 ae ig. ‘ f ee
a Bs ae. , |
DB boy oe 2 PS "we :
O 5 a as - { b Fed 7 }
2 SP ae eee , x z
Zz AD gf
S 54 aed 4
5 wo x Oe na <7 y ; >
e © cag ae B
u x= oe 7 ah 7 ee =
co) br in ; os — ]
P lol 7 a =
oj! i F gS a
® | nN Mage ok
N FILE:N:\P\\infrastructure\Works in Progress\Peregian Beach\Peregian Village MP 2014.dwg DATE:16/Dec/2014 BY:mellisSection 62
ORDINARY MEETING AGENDA 18 DECEMBER 2014
2 NOOSA BIOSPHERE RESERVE - APPOINTMENT OF DIRECTORS AND AMENDMENT
TO CONSTITUTION
Author Executive Manager
Executive Office
Index ECM/ Subject/ 39.22 EOI for NBR Directors
Attachments Nil.
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Executive Manager to the Ordinary Meeting dated 18
December 2014 and:
A. Agree to the appointment of the following persons to the roles of First Director Noosa
Biosphere Reserve Foundation Ltd for the terms specified:
1. Mayor Noel Playford as the Director appointed by Council in its capacity as the
founding member;
2. Scott Williams and Raul Weychardt for a term of three years ending at the conclusion
of the third AGM;
3. Timothy Smith, Rowland Hill and Peter Hunnam for a term of two years ending at the
conclusion of the second AGM; and
4. Judith Castledine and Oleg Morozow for a one year term ending at the conclusion of
the first AGM: and
B. Authorise the Chief Executive Officer to progress an amendment to the Constitution of
Noosa Biosphere Reserve Foundation Ltd. to give effect to the Council appointed Director
always being an elected Councillor appointed by Council at Council’s discretion and the
other proposed changes identified in the report.
REPORT
The purpose of this report is to obtain Council endorsement to the proposed nominations for the
roles of First Director of the Noosa Biosphere Reserve Foundation Ltd and to authorise the Chief
Executive Officer to amend the Constitution of Noosa Biosphere Reserve Foundation Ltd to
provide for the one Director appointed by the founding member to be always be an elected
member of Council.
Background
In January 2014, the newly de-amalgamated Noosa Council began a review of the governance
structure for the Noosa Biosphere Reserve. On the 21 January 2014, Noosa Council endorsed a
three-step process to reshape the Noosa Biosphere Reserve management arrangements in
order to maximise the potential for community involvement in the Noosa Biosphere Reserve. This
process included a working group, consultation with key stakeholders, workshops, presentations
and the calling for submissions from the community.
Page 62 of 67
Section 63
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Following this process, and in full consideration of all the input received, Council proposed a draft
Noosa Biosphere Reserve Management Model. Input on the proposed model was again sought
from the community and Community Sector Boards through a series of consultations in April
2014.
On 29 May 2014, Council adopted the new Biosphere Reserve Management Model and an
implementation plan. Formal documents for the Noosa Biosphere Reserve Trust and the
Constitution of Noosa Biosphere Reserve Foundation Ltd. were adopted by Council at its
Ordinary Meeting on 20 November 2014.
With the winding up of the previous Noosa Biosphere Reserve (NBR) governance entity, Noosa
Biosphere Limited (NBL) at its AGM on November 24 this year, the focus is now on progressing
the appointment of First Directors of the Noosa Biosphere Reserve Foundation Ltd and to
progress the establishment of the Foundation and Trust.
Selection and nomination of First Directors
The role of Director is to provide strategic direction and governance (including financial
responsibility) to the organisation to achieve its primary objective of protecting and enhancing the
natural environment.
The Constitution provides for the appointment of at least six and not more than eight Directors of
which a majority must be “Publicly Responsible Persons”. The First Directors will be those
persons decided by Council and named as Directors in the application for incorporation of the
company. First Directors will be eligible for re-appointment at conclusion of the initial term.
The First Directors will be comprised of:
(1) two Directors who will have a term of one year;
(2) three Directors who will have a term of two years;
(3) two Directors who will have a term of three years, and
(4) one Director appointed by the Founding Member (Noosa Council).
An Expression of Interest for the roles of First Directors was advertised in the Noosa News on 18
November 2014 and closed on 5 December 2014. Interested persons were asked to make
application to Council detailing their personal particulars, qualifications, affiliations, skills, areas of
expertise and reasons for applying. Twenty three applications were received and assessed on
the basis of the applicant’s professional and interest skills including but not limited to the areas
of:
Professional leadership experience;
Business management experience;
Acumen in economics;
Scientific expertise or understanding, particularly in biological or earth sciences;
Experience or understanding of sustainability measures;
Community engagement experience;
Experience in media and communications; and
Awareness or understanding of the Noosa locality, its history, culture and nature.
Consideration was also given to the requirement for the majority of Directors to be Publicly
Responsible Persons. A Publicly Responsible Person is one who has a degree of responsibility
within the community and satisfies the requirements within Taxation Ruling TR95/27 Income Tax.
There was a particularly strong group of candidates that submitted Expressions of Interest will
augers well for the future of the Biosphere governance arrangements.
Page 63 of 67
Section 64
ORDINARY MEETING AGENDA 18 DECEMBER 2014
The following persons are recommended for appointment to the First Director roles of the Noosa
Biosphere Reserve Foundation Ltd.
Noel Playford
o Mayor, Noosa Council
Scott Williams
o Professional qualifications in Economics;
o Experience - small business management, local government, Member of several
university boards, Chair Noosa Council Audit Committee;
o Key expertise - business management, governance.
Raul Weychardt
o Professional qualifications in Regional and Town Planning, Environmental Studies;
o Experience - town planning and environment, river and coastal management. Previously
chairperson of NBR;
o Key Expertise - town planning and environment.
Timothy Smith
o Professional qualifications in Philosophy (Geography), Applied Science (Coastal
Management and Conservation Technology);
o Experience - management, sustainability research, scientific research coastal and
catchment waterways and rivers;
o Key expertise - sustainability and climate change.
Rowland Hill
o Professional qualification in Journalism;
o Experience - Director charitable organisation, executive committee management,
journalism.
Peter Hunnam
o Professional qualifications in Ecology and Natural Resources;
o Experience - international development assistance management, nature conservation,
strategic management waterways and catchment management;
o Key expertise - strategic planning and management, program and project planning,
capacity building.
Judith Castledine
o Professional qualification in Engineering;
o Experience - senior management experience in environment health and safety
organisation, international environmental management, chemical engineering, industry
representative, cleaner production;
o Key expertise - environmental management, research and operations, media relations,
community engagement.
Oleg Morozow
o Professional qualifications in Sociology, qualified Director;
o Experience - member of various high level forums and committees relating to
sustainability, environmental management and energy;
o Key expertise - cultural heritage management.
In accordance with the Expression of Interest documentation appropriate ASIC and Australian
Financial Security Authority searches were undertaken.
Page 64 of 67
Section 65
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Constitution of Noosa Biosphere Reserve Foundation Ltd.
Council at its Ordinary Meeting on the 20 November 2014 previously considered the proposed
legal documents for the Noosa Biosphere Reserve Trust and the Constitution of Noosa
Biosphere Reserve Foundation Ltd. As a result of further review of the documents, an
amendment to Clause 8 of the Constitution is proposed to give effect to the Council appointed
Director always being an elected Councillor appointed by Council. Further, it is intended that the
Councillor would only hold that role of Director while they were still a Councillor (i.e. if the person
no longer held the office of Councillor, they would no longer hold office as the Council
representative on the Board). To ensure that the role of the Council representative on the board
is periodically reviewed, it is also intended that the appointment to the Board as the Council
representative would be required to be reviewed by the Council every three years.
Approval is sought for the Chief Executive Officer to be authorised to liaise with Council’s legal
representatives to effect the proposed amendment and finalise the documentation.
Previous Council Consideration
Ordinary Meeting, 29 May 2014, Item 4, Page 20
That Council note the report by the Noosa Biosphere Reserve Working Group to the General
Committee meeting dated 26 May 2014 in relation to the review of the Noosa Biosphere Reserve
Management Model and:
A. Note the feedback from the community consultation;
B. Adopt the proposed Noosa Biosphere Reserve Management Model as set out in the report
by the Noosa Biosphere Reserve Working Group;
C. Request the Chief Executive Officer to develop a proposed implementation plan to
transition to the new Noosa Biosphere Reserve Management model;
D. Authorise the Chief Executive Officer to commence implementation and transition to the
proposed Noosa Biosphere Reserve Management Model; and
E. In relation to the Noosa Biosphere Ltd, Council:
1. Wind up the Noosa Biosphere Ltd following its AGM as part of the transition to the
new Noosa Biosphere Reserve Management model;
2. Request the Noosa Biosphere Ltd to focus on finalising current budgeted projects
until that time including undertaking the Noosa Biosphere Day; and
3. Thank the Noosa Biosphere Ltd Board members for their contribution to the Noosa
Biosphere Reserve.
Docum ent in for matio n
Ordinary Meeting, 20 November 2014, Item 1, Page 19
That Council note the report by the Executive Manager, Executive Office to the General
Committee Meeting dated 17 November 2014 and the Further Report by the Executive Manager,
Executive Office to the Ordinary Meeting dated 20 November 2014 and
A. Adopt the Noosa Biosphere Reserve Trust as set out in Attachment 1 and the Constitution
of Noosa Biosphere Reserve Foundation Ltd as set out in Attachment 2; and
B. Authorise the CEO to make any minor amendments as required to enable registration of
the Constitution and Trust.
Page 65 of 67
Section 66
ORDINARY MEETING AGENDA 18 DECEMBER 2014
Finance & Risk
Expressions of Interest were reviewed and evaluated by the Mayor, Councillors and the Chief
Executive Officer.
Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Nil.
Departments/Sections Consulted:
Community Services Planning & Infrastructure
Disaster Management & Public Order Building & Plumbing Services
Waste & Environmental Health DA Planning
Community Facilities Strategic Land Use Planning
Cultural Facilities Asset Design & Investigations
Asset Planning
Civil Operations
Environment
x Executive Office Corporate Services
Community Engagement Finance
Customer Service ICT
Executive Support Procurement & Fleet
Governance Property & Facilities
Human Resources Revenue Services
Page 66 of 67
Section 67
ORDINARY MEETING AGENDA 18 DECEMBER 2014
7 PETITIONS
8 CLOSED SESSION
1 PLANNING & ENVIRONMENT
COURT APPEAL 1648 OF 2014 – NOOSA ON WEYBA DEVELOPMENT
APPLICATION FOR PRELIMINARY APPROVAL FOR A MIXED USE COMMUNITY
TITLE DEVELOPMENT
LATE REPORT: to be tabled at the meeting
9 NEXT MEETING
The next Ordinary Meeting will be held on 15 January 2015 in the Council Chambers,
9 Pelican Street, Tewantin commencing at 6pm.
10 MEETING CLOSURE
Page 67 of 67