ORDINARY MEETING AGENDA 18 DECEMBER 2014
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
32. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they
will serve.
b. An approved water meter for each lot in accordance with Unitywater and
SEQ Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water
main to service located in Blue Wren Place to service each lot within the
proposed subdivision in accordance with Unitywater and SEQ Standard
Drawings.
d. Water meters must be located on alternative boundaries to electrical
pillars
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second
33. Reticulated sewerage must be provided to each lot in the development. This
must include:
a. Ensuring sewer house drains are wholly contained within the Lot they will
serve.
b. Provision of sewerage infrastructure to within the property boundaries of
each Lot within the proposed subdivision.
34. A minimum clearance of 1.5 metres must be maintained between Unitywater
sewers and proposed building envelopes, buildings and other structures
35. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
36. Stormwater retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 metres from Unitywater water supply and sewerage
infrastructure
37. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature
and suitable Unitywater approved varieties.
38. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
Page 12 of 67