Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-12-18 Ordinary Meeting Agenda

of 67

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                   18 DECEMBER 2014


                    iv.   approval of the Traffic Management Control Plan by the Department
                          of Transport and Main Roads (DTMR) for any works on State
                          controlled roads
                    v.    provision for worker car parking
              b.    maintenance and protection of water quality and existing drainage lines
                    through the construction site, through the implementation of appropriate
                    erosion and sediment control measures
              c.    works programme identifying key components of the works and their
                    respective durations
              d.    establishment of a communication protocol with the general public,
                    adjoining owners, emergency services and local businesses to advise of
                    agreed construction times, impacts on traffic, services and other relevant
                    issues
              e.    identification of complaint management procedures including:
                    i.    contact details for the on-site manager
                    ii.   dispute resolution procedures
              f.    details on the location of external fill sites/sources, the haulage route,
                    type of vehicle to be utilised during filling operations and frequency of
                    usage. NB any damage to the existing road system as a result of
                    haulage operations shall be fully repaired at the applicant’s expense
              g.    it is acknowledged that the preliminary Construction Management Plan
                    will be a draft document requiring finalisation upon appointment of the
                    Principal Contractor employed to construct the works and a final
                    document will be required to be submitted at the Pre-Start Meeting for the
                    project.
         UNITYWATER
         7.   Connection to the Unitywater live water supply and live sewerage system must
              be undertaken by Unitywater at the applicant’s cost.
    B.   Include the following property notes:
         REC13/0146 – Stormwater Treatment Device
         The following notation applies to approved lots 26, 27 and 28:
         “A private stormwater treatment device is located within this allotment and the owner
         is responsible for any maintenance”
         “This property contains a stormwater treatment device protected by a covenant, and
         a maintenance handbook is available under separate application which outlines the
         maintenance requirements.”




                                                                               Page 14 of 67
Log in to download the original file

2014-12-18 Ordinary Meeting Agenda(PDF, 2MB).pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.