ORDINARY MEETING AGENDA 18 DECEMBER 2014
Boundary Encroachments
7. Certification must be submitted to Council from a Licensed Surveyor which certifies
that:
a. all constructed access and roadworks (including associated fill batters and
retaining walls) are fully contained within a dedicated reserve or registered
easement
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included
within an easement
c. all retaining walls and structures are fully contained within the lot they retain
d. any fill, including fill batters, are wholly contained within the subject site and not
on adjacent properties
Water & Sewer Connections
8. An underground connection to reticulated water and sewerage must be provided to
each lot in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
9. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to each lot.
Performance Bond
10. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, prior to the issue of a Development Permit for Operational Works. The cash
bond or trading bank guarantee will be returned on performance of the conditions of
approval less any costs incurred by Council in respect of enforcing performance of
this permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Landscaping & Ecology
11. Lot 15 must be removed from within the Riparian Buffer Overlay of The Noosa Plan
and the boundary setback a minimum of 10 metres from the top of bank, whichever is
the greater. The area removed from the lot must be rehabilitated in accordance with
the conditions of this Decision Notice.
12. Landscaping and rehabilitation works must be undertaken in accordance with an
Operational Works approval and Planning Scheme Policy - PSP 3 Landscaping
Plants and Guidelines and must include an ecological rehabilitation and landscaping
plan, prepared by a suitably qualified person* and must include in particular:
a. the area to be rehabilitated and re-vegetated must be generally in accordance
with the approved Revegetation & Rehabilitation Management Plan – Eastern
Tributary Stage 5 & 6
b. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
c. a maintenance period of no less than 3 years
d. a species palette and densities table incorporating the species selection of only
native indigenous species
Page 16 of 67