ORDINARY MEETING AGENDA 18 DECEMBER 2014
3335. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
3436. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Street and Pathway Lighting
3537. Street lighting and pathway lighting throughout the subdivision shall have a high
energy efficient rating to the reasonable satisfaction of Council and shall
generally be provided in accordance with the principles of Council’s Planning
Scheme Policy 5.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted at
[email protected]
Water and Sewerage
3638. Reticulated water must be provided to each lot in the development. This must
include:
a. Ensuring that internal water pipes are wholly contained within the lot they
will serve.
b. An approved water meter for each lot in accordance with Unitywater and
SEQ Standard Drawings.
c. Provision of a water service from the existing 100mm diameter water
main located in Blue Wren Place to service each lot within the proposed
subdivision in accordance with Unitywater and SEQ Standard Drawings.
d. Water meters must be located on alternative boundaries to electrical
pillars.
e. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
3739. Reticulated sewerage must be provided to each lot in the development. This
must include:
a. Ensuring sewer house drains are wholly contained within the Lot they will
serve.
b. Provision of sewerage infrastructure to within the property boundaries of
each lot within the proposed subdivision.
3840. A minimum clearance of 1.5 metres must be maintained between Unitywater
sewers and proposed building envelopes, buildings and other structures
3941. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
Page 35 of 67
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.