ORDINARY MEETING AGENDA 18 DECEMBER 2014
b. maintenance and protection of water quality and existing drainage lines
through the construction site, through the implementation of appropriate
erosion and sediment control measures
c. works programme identifying key components of the works and their
respective durations
d. establishment of a communication protocol with the general public,
adjoining owners, emergency services and local businesses to advise of
agreed construction times, impacts on traffic, services and other relevant
issues
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route,
type of vehicle to be utilised during filling operations and frequency of
usage. NB any damage to the existing road system as a result of haulage
operations shall be fully repaired at the applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan
will be a draft document requiring finalisation upon appointment of the
Principal Contractor employed to construct the works and a final
document will be required to be submitted at the Pre-Start Meeting for the
project.
Property Notes
4. The following property notes shall be placed against the relevant lots advising
the following:
A Rail and Traffic Noise Study has been undertaken for new buildings on
this property. New buildings shall be constructed in accordance with the
conclusions of the study and the Queensland Development Codes (QDC)
MP 4.4 – Building in a Transport Corridor (or equivalent codes/guidelines
at the time of building).
No direct vehicular access to Elm Street is permitted.
Development Compliance Inspection
5. Prior to the commencement of the use, please contact Council to arrange a
Development Compliance Inspection.
Unitywater
6. Connection to the Unitywater live water supply and live sewerage system must
be undertaken by Unitywater at the applicant’s cost.
Infrastructure Charges
7. This Development Permit triggers an “Infrastructure Charge Notice” to be
issued in for Council “trunk” infrastructure in accordance with Council’s
“Adopted Infrastructure Charges Resolution” under the State Planning
Regulatory Provision (Adopted Charges) and the Sustainable Planning Act
2009.
Page 37 of 67