ORDINARY MEETING AGENDA 18 DECEMBER 2014
Approved Plans
2. Development undertaken in accordance with this approval must generally
comply with the approved plans of development. The approved plans are listed
below and as may be amended by the conditions herein.
Plan No. Rev. Plan/Document Name Date
13-3461AB - Plan of Proposed (Temporary) Short-Term, Self- 04/07/14
Contained RV Stop at Lot 2 on RP893989 prepared
by Max Watterson + Associates
Nature and Extent of Approved Use
3. No more than 20 Recreational Vehicles (RV’s)(caravans, motorhomes or the
like) may stay at the site at any one time.
4. Visitor stays shall not exceed 14 consecutive days 4 consecutive nights.
5. All RV’s shall be fully self-contained and must retain all grey water and black
water via holding tanks.
6. No on-site release of grey water is permitted.
Visitor Education
7. Visitors must be advised of the following requirements:
a. No on-site release of grey water or other waste
b. Location of nearest dump point and potable water supply
c. All dogs must be on a leash when walked in the area and must be
restrained at all times during the stopover period
d. Owners must pick up and collect their dogs’ faeces
e. Consideration be given for residents and road users when walking in the
area
f. Noise must be minimised after 8.30pm
Street Identification
8. The street address of the development must be clearly visible from the Holts
Road frontage of the site by the provision of a street number.
9. Access to the site must be clearly signed with a sign of up to 1m 2.
Temporary Development Approval
10. This temporary development approval expires in two (2) years on 18 December
2016. Upon request, Council may provide written consent to extend the
approval on an annual basis having regard to the status of the adjacent mining
lease, the degree of compliance with the approval conditions herein and the
complaint history relating to the development.
ENGINEERING
General
11. The developer must meet any costs to repair damage to any Council or public
asset during construction, where damage is a result of the development works.
Damage to assets must be repaired immediately where it creates a hazard to
the community. In circumstances where the damage does not create a hazard
to the community, it must be repaired immediately on completion of the works
associated with the development. A condition report including photographs of
the frontage of the site should be completed and kept for future reference and
made available to Council if required.
Page 51 of 67