ORDINARY MEETING AGENDA 18 DECEMBER 2014
Landscaping & Ecology
12. Landscaping and rehabilitation works must be undertaken in accordance with
an Operational Works approval and Planning Scheme Policy - PSP 3
Landscaping Plants and Guidelines. An ecological rehabilitation and
landscaping plan must be submitted, prepared by a suitably qualified person*
and must include in particular:
a. Western Tributary - the area to be rehabilitated must be generally 10m
from the top of bank of the western tributary and the whole of The Noosa
Plan’s mapped Riparian Buffer area to the western side of the western
tributary.
b. Eastern Tributary - the area to be rehabilitated must be generally in
accordance with the approved Revegetation & Rehabilitation
Management Plan – Eastern Tributary Stage 5 & 6
c. details of the treatment to all batters, armoury, plantings, weed treatment,
location of services/utilities and rehabilitation.
d. a maintenance period of no less than 3 years
e. a species palette and densities table incorporating the species selection
of only native indigenous species
f. measurable and achievable criteria on which the performance of the
floristic and structural component of the re-vegetation strategy can be
assessed annually over three years, including no weeds at the end of the
re-vegetation period
g. provision of 1 street tree with a minimum pot size of 100 litres planted
within the road reserve for every 8 metres of road frontage including
around the cul de sac’s
h. control of all weeds species listed in the following standards and
legislation:
i. declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. Council Listed Environmental Weeds, Exotic Grasses and other
plants identified in writing by Council (*refer to Advisory Note)
13. All rehabilitation and re-vegetation of the eastern tributary (waterway) must be
completed prior to Council endorsement of the Plan of Survey.
Dedication of Land as Reserve
14. The area identified as lot 100 Park must be dedicated to the Crown as a
reserve for Park purposes. The land to be dedicated is “non-trunk
infrastructure” for the purposes of the Sustainable Planning Act 2009.
Active Park
15. Active park embellishments must be provided generally in accordance with
drawing number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land
Development Concept Plan, prepared by Play Environment Consulting dated
13.05.14 and 14/005-S01 and 14/005-S02, titled Erindale Park, Cooroy
Proposed Park Land Development Concept Plan, prepared by Play
Environment Consulting dated 17.11.14. All works to be dedicated are “non-
trunk infrastructure” for the purposes of the Sustainable Planning Act 2009.
Page 8 of 67