Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2023-01-16 General Committee Meeting Agenda

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                                    16 JANUARY 2023




                     Figure 4 – Existing Sealed Portion of Shared Access Driveway


Condition 15
The development must be provided with a potable water supply connected to each cabin. The
storage capacity of the potable water supply must be a minimum of 5000 litres per guest. The
storage capacity of the potable water supply must be a minimum of 4000 litres per guest
bedroom/unit/cabin.
Applicant’s Representation
Condition 15 as currently worded is not relevant to the approved development and existing
dwelling. It is proposed that the Condition be amended as per below.
It is proposed that Condition 15 of the Decision Notice is amended to read as:
15.   The development must be provided with a potable water supply. The storage capacity of the
      potable water supply must be a minimum of 5,000 litres per guest.
Assessment of Representation
After further consideration it is noted that the wording of the condition concerning potable water
supply is unclear regarding the minimum amount of water to be supplied for each guest. As such,
the condition has been amended to clearly state the minimum water supply needed for the
approved 10 guests.
It is recommended that the requested changes to the condition be agreed to and condition 15 to
read as follows:
15.   The development must be provided with an approved reticulated potable water supply. The
      storage capacity of the potable water supply must be a minimum of 50,000 litres (e.g., 1 x
      50,000 litre tank or 2 x 25,000 litre tanks).
      There is to be an adequate quantity of water to be made readily available for the number of
      guests for the duration of the booking.


                                                                                       Page 41 of 122
Log in to download the original file

2023-01-16 General Committee Meeting Agenda(PDF, 10MB).pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.