08/0830 - Operational Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published] · 142008.830
ug
INTEGRATED PLANNING ACT 1997 ~ ~ + - - _.. Part £, Version 3.1, 3 March 2008
VAS
cull 1 Development Application
Part E
Building &/or operational works assessable
against a planning scheme
1. Nature of work that requires assessment against a planning scheme:
LD Building work - Complete Table A LX] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
{J Roadworks (Stormwater (L] Water infrastructure [1] Sewerage infrastructure
Oo Landscaping CO Earthworks (LJ Drainage Works ( Signage
(FD Clearing vegetation under the planning scheme [XJ] Other - Specify below :
New timber jetty
ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
pp Ig Soug you hay ple oper ya
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[X] Development Permit (7 Preliminary approval . [1 Both (Specify below)
(iii) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
(XJ No (J Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
@ fot)
[XJ No _[] Yes - Complete Table B(a)
2. Whatis the dollar value of this operational work? (i. the total value including GST, materials and labour) 1$ 15000
3. Confirm that the following mandatory information accompanies this application’ :
eae frmation of #
lodgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fil Xe Confirmed”
over the counter
OFFICE USE ONLY
Date Received Reference Numbers [
Advice for completing Part E
General advice
° Part A must also be completed for all IDAS development applications.
je The applicant is responsible for answering all questions fully and correctly, untess foltowing a response there is a statement to go directly to anather question.
Qi A development permit autharises development to occur, while a preliminary approval is a step in the approval.process and does not authorise dévelopment to occur]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0830 - Operational Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 830 KB (small file)
- File type
No other editions are linked here.