Skip to the record
The only place to find full transcripts.

Council archive · source document

08/0830 - Operational Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published] · 142008.830

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

ug
INTEGRATED PLANNING ACT 1997 ~ ~ + - - _.. Part £, Version 3.1, 3 March 2008

VAS

  
 
 
 
 

     

cull 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

   
  
 

1. Nature of work that requires assessment against a planning scheme:

 

 

LD Building work - Complete Table A LX] Operational work - Complete Table B
Table B
(i) What is the nature of the operational work?
{J Roadworks (Stormwater (L] Water infrastructure [1] Sewerage infrastructure
Oo Landscaping CO Earthworks (LJ Drainage Works ( Signage
(FD Clearing vegetation under the planning scheme [XJ] Other - Specify below :
New timber jetty

 

 

 

ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
pp Ig Soug you hay ple oper ya
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

[X] Development Permit (7 Preliminary approval . [1 Both (Specify below)

(iii) 1s the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
(XJ No (J Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
@ fot)

[XJ No _[] Yes - Complete Table B(a)

 

 

 

 

 

2. Whatis the dollar value of this operational work? (i. the total value including GST, materials and labour) 1$ 15000

 

 

3. Confirm that the following mandatory information accompanies this application’ :

 

 

eae frmation of #
lodgement

Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
extent of any cut and fil Xe Confirmed”

 

 

 

 

 

over the counter

 

 

OFFICE USE ONLY

 

 

Date Received Reference Numbers [

 

 

 

Advice for completing Part E

General advice
° Part A must also be completed for all IDAS development applications.
je The applicant is responsible for answering all questions fully and correctly, untess foltowing a response there is a statement to go directly to anather question.

 

 

Qi A development permit autharises development to occur, while a preliminary approval is a step in the approval.process and does not authorise dévelopment to occur]

 

 

 

Used in these records

About this file

File size
830 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0830 - Operational Works - Transport Type 5 - Domestic Marine (Private Jetty) [As Published].pdf · 830 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.