Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2016-01-11 General Committee Agenda

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


             Monday, 11 January 2016

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Bob Abbot, Sandy Bolton,
             Joe Jurisevic, Frank Pardon, Noel Playford, Tony Wellington



   “Engagement with our community to protect and enhance our lifestyle”
Log in to download the original file

2016-01-11 General Committee Agenda(PDF, 4MB).pdf · 4.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 49 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                              11 JANUARY 2016


TABLE OF CONTENTS

ITEM                                                                     PAGE


ATTENDANCE & APOLOGIES                                                       -
PRESENTATIONS                                                                -
REPORTS DIRECT TO GENERAL COMMITTEE                                         3
1      COMMUNITY JURY RECOMMENDATIONS ON MANAGING THE NOOSA
       RIVER                                                                3
2      COMMUNITY JURY PILOT PROCESS                                        13
3      SUNRISE NEIGHBOURHOOD SHOPS - SHOPS 1 & 2 PROPOSED LEASE
       AGREEMENTS                                                          21
4      NOOSA HOLIDAY PARKS - FEES AND CHARGES UPDATE                       26
5      FINANCIAL PERFORMANCE REPORT - DECEMBER 2015                        30
6      NATURAL AREAS BUSHLAND       REGENERATION    AND   ECOLOGICAL
       MAINTENANCE SERVICES                                                37
7      DEVELOPMENT PERMIT FOR OPERATIONAL WORK PLACING AN
       ADVERTISING DEVICE - SIGNAGE AT 78-80 RENE STREET, NOOSAVILLE -
       OPW15/0214                                                          40
8      PLANNING & ENVIRONMENT COURT APPEAL D171/15 FOR A MATERIAL
       CHANGE OF USE FOR CULTIVATION TYPE 2 - INTENSIVE (GREENHOUSE)
       & RECONFIGURING A LOT (ACCESS EASEMENT) SITUATED AT 271 & 305
       LAKE MACDONALD DRIVE, LAKE MACDONALD (MCU14/0039 & REC15/0012)
                                                                           45
CLOSED SESSION                                                         -




                                                                   Page 2 of 50

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                                   11 JANUARY 2016


REPORTS DIRECT TO GENERAL COMMITTEE


1                        COMMUNITY JURY RECOMMENDATIONS ON MANAGING THE NOOSA RIVER
DOCUMENT INFORM AT ION




Author                               Manager Planning & Environment, Kerri Coyle
                                     Planning & Infrastructure Department

Index                                ECM/ Subject/ Community Jury

Attachments                          1.   Noosa River Community Jury Final Report
                                     2.   Jury Report - Supporting Document


EXECUTIVE SUMMARY
Nil.

RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the General Committee
Meeting dated 11 January 2016 regarding the Noosa River Community Jury Final Report, and
A.                       Thank the Community Jury members for participating in the Community Jury Process, for
                         their dedication and time attending meetings, researching material and finalising their Report
                         and Recommendations to Council;
B.                       Agree in principle with the Jury recommendation that Noosa Council should take on the
                         responsibility of managing anchoring, mooring, commercial uses and jetty leases for the
                         Noosa River;
C.                       Write to the Department of Transport and Main Roads and Department of Natural Resources
                         advising them of the Jury’s recommendation for Noosa Council to manage on-river and
                         foreshore activities, seeking their support to establish an acceptable process for both parties
                         to transfer management responsibilities for the Noosa River to Council; and
D.                       Agree in principle to the remaining 12 Jury recommendations and refer them to a Council
                         workshop to consider the best legislative options, how they may be implemented and how
                         they may be funded through a user pay system.



REPORT
Background

Council resolved at its Ordinary Meeting on 2 July 2015 to adopt the question for the second
Community Jury as:

“How can we manage the Noosa River better? What role should Council play and what resources
should Council apply?”

The Noosa River has particularly high environmental and scenic values, and is a much sought after
recreational, tourism and fisheries resources that makes a substantial contribution to the local
Noosa economy. The community have a strong association with the Noosa River and it is a
significant issue due to ongoing concerns regarding:



                                                                                                          Page 3 of 50

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                 11 JANUARY 2016


 Abandoned or derelict vessels;
 Pollution and clutter in the river – particularly in the lower estuary which is the busiest section
   of the river;
 Changes to lease conditions and potential intensification of uses;
 Commercial activities occurring outside the jetty lease areas, such as public foreshores and
   public boat ramps which also raise issues of concern given the area’s high usage.

All these on-river activities are currently under State Government control with several key pieces
of legislation providing the head of power to the Departments of Transport and Main Roads
(through Maritime Safety Queensland), and foreshore activities (i.e. leases) to the Department of
Natural Resources and Mines. Compliance with these laws and regulations is managed via a
system of complaint and information referrals to other State agencies. These agencies include the
Boat Harbours Team, Queensland Boating and Fisheries Patrol, and the Queensland Police
Service. This is a complex and often confusing arrangement for the community and a state-wide
management approach may not be the best option to address local issues and ensure the Noosa
River is protected for future generations.

Establishment of a Community Jury

A second Community Jury was established by Council in August 2015 and asked to examine the
question. The Jury commenced its deliberations on 22 August 2015 and met monthly. At the
outset an information pack was provided to the Jury and a presentation provided by officers on
current issues around the Noosa River, current legislation provisions, and potential management
options for the Noosa River. The Jury was advised that the following matters were in scope:

    Anchoring, mooring and living on board watercraft in the Noosa River.
    Commercial use of the river and commercial Jetty leases occupying the Noosa River
      foreshore.

A number of matters were also identified as being out of scope of the topic, including commercial
and recreational fishing, riverbank erosion and riverbank restoration since these matters were
being separately reviewed by State Government and Council.

A report and a series of recommendations were finalised by the Jury on 11 December 2015 with a
further explanatory document provided by Jury members on 18 December 2015. The majority of
the Jury considered that Council should take over the authority and finances from the State
Government for managing the moorings, anchoring, living on board and commercial use of the
river on the basis it would be a user pays system funded through alternative means to rates. The
Jury did not reach a consensus on this, with 18 members in support of Council becoming manager
of the Noosa River and six members not in support.

Those in support of Council becoming manager of the Noosa River viewed that:
   The State Government had been unable to effectively manage the river.
   Any cost to Council could be offset by user pays revenue.
   Bringing management of the river closer to the Noosa community would see it run better.

Those who did not support this view considered that:
   Management would be too big an issue for Council.
   There may not be enough revenue to cover the costs to Council and that ratepayers should
     not have to pay higher rates.
   There was significant risk involved.
   It is a role that should be undertaken by State Government authorities.
   Noosa is a small community and should not have to take on this responsibility.
   The river is still one of the best in the country.

                                                                                        Page 4 of 50

Section 5

GENERAL COMMITTEE MEETING AGENDA                                               11 JANUARY 2016


The Jury did reach consensus on 12 recommendations for the Council to consider. A copy of the
Community Jury Verdict and explanatory document are included as Attachments 1 & 2.

To progress management of the Noosa River by Noosa Council, the State government has advised
there are a number of legislative options available and a case will need to be presented to the
Minister requesting amendment where local laws are not suitable. The State has also advised that
they will require a commitment from Council to implement and enforce any new provisions.

Previous Council Consideration

Ordinary Meeting 2 July 2015, Item 1, Page 13

That Council note the report by the Chief Executive Officer to the Ordinary meeting dated 2 July
2015 regarding the Council’s second Community Jury Project and adopt the question for the
second Community Jury as: “How can we manage the Noosa River better? What role should
Council play and what resources should Council apply?”

Finance & Risk

The Jury’s recommendations require legislative amendments and support for these changes from
State Government. On this basis many of the recommendations will take some time to implement
– with a potential time frame estimated of July 2017.

As part of the Background Information Pack, an estimated budget for Noosa Council to take on the
responsibility as anchoring and mooring manager was provided to the Jury:
 Initial setup $260,000
 Ongoing $160,000 per annum

Notably, initial set up refers to procurement costs + 1 year operational activities + $30,000 for
removal of derelict vessels. Ongoing refers to ongoing operational costs per annum. It was also
noted that these costs may be offset by the ability to collect revenue, with net costs dependent on
the level of fees set. A further $5,000 was estimated for Council to manage commercial uses and
jetty leases.

The Jury’s recommendations will also need to be considered carefully with regard to the best
legislative options; how they may be implemented and funded through a user pay system.

The most suitable method of considering the recommendation is to refer to them to a Council
workshop where the details required to implement the recommendations can be considered further.

Consultation

External Consultation - Community & Stakeholder

The background document was posted on Council’s online community engagement tool, Your Say
Noosa, along with a forum consisting of five key questions to assist the jury with commenting in
scope. 88 responses were received and these comments were made available to the Jury to inform
their deliberations and will be provided to Councillors to inform their future workshops.

Two stakeholder briefings were held on Monday August 21, 2015 prior to the first meeting of the
Jury. Both were well attended by approximately 40 Noosa community members. Three ‘pop up’
booths were also manned at the library during the Jury’s deliberations from August to December
2015.




                                                                                     Page 5 of 50

Section 6

GENERAL COMMITTEE MEETING AGENDA                                                       11 JANUARY 2016


Council officers attended each of the Jury’s meetings and were available for questions from the
Jury.

These Jury also invited a number of guest speakers to attend their meetings and present to the
Jury including: Professor Stuart Bunn, Director Australian Rivers Institute; Paul Grossman,
President Noosa Commercial Boatman’s Association; Helene Gulash representing the Kabi Kabi
community; Tony Haslam from Noosa Integrated Catchment Authority and Commander Allan Hall
from Noosa Coastguard.

Internal Consultation

Departments/Sections Consulted:

     Chief Executive Officer                    Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

 x   Executive Office                       x   Planning & Infrastructure
 x   Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             x   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                               Page 6 of 50

Section 7

Page 7 of 50

ATTACHMENT 1

Noosa River
Community Jury
Final Report
December 2015

The randomly selected Noosa River Community Jury was charged with providing recommendations on the following
topic:

    e   How can we manage the Noosa River better?
    e   What role should Council play and what resources should Council apply?

Issues within the Jury’s scope were:

    e   Anchoring, mooring and living on board watercraft in the Noosa River.
    e   Commercial use of the river and commercial Jetty Leases occupying the Noosaville foreshore.

Issues outside the Jury’s scope were:

    e   Commercial and recreational fishing (this is a separate issue with the State Government currently running a
        State-wide review process).
    e   Riverbank erosion.
    e   Riverbank restoration.

The 24-member Jury met five times from August-December 2015, and at their final meeting reached the following
conclusion and recommendations.

The Jury considered the proposition that Council should take over the authority and finances from the State
Government for managing the moorings, anchoring, living on board and commercial use of the river on that basis
that it would be a user pays system funded through alternative means to rates.

The Jury did not reach a consensus on this proposition, with 18 members in support the proposition and six
members not in support of the proposition.

Those who supported the proposition viewed that:

    e   The State Government had been unable to do a good job managing the River.

                                                                                                Page 7 of 50

Section 8

Page 8 of 50

e   Any cost to Council could be offset by revenue.
    e   Bringing management of the River closer to Noosa would see it run better.

Those who did not support the proposition viewed that:

    e   Management would be too big an issue for Council.
    e   There may not be enough revenue to cover the costs to Council and that ratepayers should not have to pay
        higher rates.
    e   There was significant risk involved.
    e   lItisarole that should be undertaken by State Government authorities.
    e   Noosa is asmall community and should not have to take on this responsibility.
    e   The River is still one of the best in the country.

The Jury agreed to note both sets of views in this report.

The Jury did reach consensus on the following recommendations for Council to implement:

    1.  Review, update and implement the Noosa River Plan in a new framework and have it ratified with a formal
        status to ensure it has authority (recognising that is not currently a legal document). Ensure the Plan is
        clearly linked to relevant cultural, social and, transport strategies and plans.

    2.  Undertake effective monitoring and facilitation of waste removal/disposal, for example through use of
        rebates for compliance or outsourcing to a third party on a user pays basis.

    3.  Establish an effective duty of care (as per Cultural Heritage Act) with respect to sites of cultural heritage and
        ensure a specific policy or strategy on cultural matters including effective indigenous engagement on all
        aspects of river management.

    4.  |Implementa role similar to a park ranger (for example a national park model) with authority on the river
        around compliance and monitoring.

    5.  Maintain present river catchment protections.

    6.  Review fees for moorings and anchoring noting the Jury’s support for Council to levy rates for commercial
        jetties.

    7.  Lead the establishment of a Noosa River Management Coordination Committee to be chaired by an
        independent river management specialist to monitor and oversight river management.

    8.  Pursue legal authority to remove (following appropriate notification and legal requirements) abandoned,
        unattended, unauthorised, derelict and unsafe vessels from the river to an impound area, noting that there
        would then be an opportunity to auction unclaimed vessels.

    9.  Review mooring and anchor locations and type of moorings to take account of all relevant cultural and
        environmental factors, with new locations to be assessed against these factors on a rolling basis and made
        more environmentally friendly.

                                                                                                    Page 8 of 50

Section 9

Page 9 of 50

10. Pursue options to implement lighting and marker options for boats and beacons to address safety issues,
    noting relevant environmental and legal (national and international) parameters which must be considered.

11. Implement stricter management of acceptable commercial uses of river and assume control of commercial
    leases/uses on river including all recreational rentals, house boat rentals etc.

12. Determine a cap and locations (based on the Noosa River Plan evidence base) for live-a-boards allowing
    them to continue as long as they comply with guidelines, permits and operate on a user pays basis noting
    that failure to comply to result in lease being terminated.

                                                                                               Page 9 of 50

Section 10

Page 10 of 50

ATTACHMENT 2
Community Jury Report — supporting explanations for recommendations
Compiled by a working group of 3 jurors on December 18, 2015

Each supporting explanation relates to jury discussions about a specific recommendation stated in
 the Noosa River Community Jury Final Report, December 2015. Each is numbered according to how
each appears in the report.

 1.    Review, update and implement the Noosa River Plan in a new framework and have it ratified with a
       formal status to ensure it has authority (recognising that is not currently a legal document). Ensure the
       Plan is clearly linked to relevant cultural, social and, transport strategies and plans.
       e     The jury discussed that they wanted the Noosa River Management Plan to be a document that
             the community was involved in on an ongoing basis
       e     The main focus was that the jury wanted the community to continue to have a say on The
             Noosa River Plan with a community engagement process like Council currently undertakes
             when developing any of its major plans such as the Local Economic Plan, the Social Strategy
             etc. And adopted as an official Council document that informs other Council plans and
             strategies.

2.     Undertake effective monitoring and facilitation of waste removal/disposal, for example through use of
       rebates for compliance or outsourcing to a third party on a user pays basis.
       e     We have had guest speakers present who suggested that illegal dumping from boats occurs on
             the river
       e     One of the jurors confirmed that one of his friends did it (illegal discharge of waste from a vessel
             in the river)
       e     Anecdotal evidence that illegal dumping does take place
       e     A third party to be employed to carry out the removal of waste from vessels was discussed
       e     The discussion was that perhaps the current facilities are too hard/inconvenient to use by vessel
             owners
       e     Concerns about revenue- raising prompted a discussion about raising the LOB fees. It was
             suggested that a rebate could be awarded to vessel owners if they fully complied with all
             regulations - specifically being able to present receipts/log book as evidence of pump —outs.

3.     Establish an effective duty of care (as per Cultural Heritage Act) with respect to sites of cultural
       heritage and ensure a specific policy or strategy on cultural matters including effective indigenous
       engagement on all aspects of river management.
       e     Guest speakers advised that there is not currently a process in place for  consultation with
             cultural leaders about cultural heritage sites (Kabi elders) on the river
       °     The jury felt that these groups should be included in the determination of location of
             moorings/anchorings/jetties and other works such as boat ramps and any other developments
             that may impact on these sites

4.     Implement a role similar to a park ranger (for example a national park model) with authority on the
       river around compliance and monitoring.
       e     The jury saw that such a ranger role had existed in the past but they also discussed how this
             role did not have any authority and that is why they wanted a role similar to a park ranger —
             someone with authority

                                                                                            Page 10 of 50

Section 11

Page 11 of 50

6.     Review fees for moorings and anchoring noting the Jury’s support for Council to levy rates for
       commercial jetties.
       e     The jury supports that Council is now able to rate commercial jetties
       e     The jury thought that there was room for a user-pays system, similar to the commercial jetty rate
             payments, for mooring and anchoring. The principle is that people should pay for the value they
             receive when anchoring and mooring on the river. Some rate payers felt that they should not
             have to pay for something that only the vessel owners received.
       °     Others thought that everyone received value from the river so that they did not mind that
             ratepayers contributed.
       e     If there are new zones for anchoring or temporary moorings developed, then cultural heritage
             groups should be consulted (Kabi elders)

7.     Lead the establishment of a Noosa River Management Coordination Committee to be chaired by an
       independent river management specialist to monitor and oversight river management.
       °     The term “management” came from the Noosa River Management Plan.
       e     The feeling was that this group would operate in an advisory capacity and would be comprised
             of a group of stakeholders rather than have any operational/management role
       e     Stakeholder involvement was a key element of discussions in any future local management of
             the river using The Noosa River Management Plan as a guiding document
       e     We had a lot of discussion about key business people/clubs/social groups etc who should be on
             such an advisory committee
       e     The “independent river management specialist” was discussed in relation to a River Ranger
             who would provide reports to the advisory committee in addition to whichever entity he/she was
             employed by. The “chaired” is probably an erroneous word and was taken down by the scribe
             as their interpretation of what was actually meant. The River Ranger was discussed as
             someone who had “powers” like a park ranger and be appropriately qualified. This person would
             have the best opportunity to report back the reality of what was really happening on the river.

8.     Pursue legal authority to remove (following appropriate notification and legal requirements)
       abandoned, unattended, unauthorised, derelict and unsafe vessels from the river to an impound area,
       noting that there would then be an opportunity to auction unclaimed vessels.
       e     The jury was not sure how a vessel was currently deemed abandoned/derelict and what steps
             were then taken to remove a vessel
       e     The jury felt that Council could investigate further how they could ensure that vessels that were
             derelict were removed
       e     There was a lack of understanding as to the legal process of vessel removal
       °     The discussion about auctioning unclaimed vessels arose because the jury was trying to come
             up with ways to defray the high cost of vessel removal
       e     The impound area was suggested as a gesture of goodwill to vessel owners to give them a
             chance to rectify the situation and avoid Council having to pay the removal costs. The actual
             impound area location was not discussed and it was thought that only if this was practical and
             did not cost too much.
       e     The impound area was also suggested so that offending vessels were taken out of the public
             eye and Council would be seen as solving the problem.

 9     Review mooring and anchor locations and type of moorings to take account of all relevant cultural and
       environmental factors, with new locations to be assessed against these factors on a rolling basis and
       made more environmentally friendly.
       e     This was discussed as a process of consultation with relevant stakeholders rather than a
             scientific survey or high cost exercise for every anchoring and mooring location.
       °     The intention was a practical process rather than an onerous technical exercise

                                                                                            Page 11 of 50

Section 12

Page 12 of 50

10.   Pursue options to implement lighting and marker options for boats and beacons to address safety
      issues, noting relevant environmental and legal (national and international) parameters which must be
      considered
      °     The concept of illuminated channel markers for improved safety for vessels had been discussed
            and it related to The Noosa River becoming a Category 1 river and derelict boats posing a
            navigation safety issue.
      e     The jury thought that even if the state authorities did not act then perhaps Council could develop
            lighting for the river that complied with national and international marine laws.
      e     This came up during discussion of river users and safety for users at night given some vessels
            were not lit
      e     This led to a recommendation that Council consider undertaking this as an initiative

11.   Implement stricter management of acceptable commercial uses of river and assume control of
      commercial leases/uses on river including all recreational rentals, house boat rentals etc.
      °     This discussion arose because the jury felt that there should be control of people who had
            leases for an “acceptable commercial use”    and who were then subletting to other people/
            businesses for commercial uses unrelated to the original lease
      e     The jury thought that there should be clearly defined areas with physical markers to define
            physical areas of jetty lease commercial operations. This was to demonstrate where commercial
            operations area encroaching on public land, to make it easier to police.
      °     The jury thought that much stricter of control of where these businesses operate was required.

12.   Determine a cap and locations (based on the Noosa River Plan evidence base) for live-a-boards
      allowing them to continue as long as they comply with guidelines, permits and operate on a user pays
      basis noting that failure to comply to result in lease being terminated.
      °     The jury thought that many of the current LOBs were not complying with legislation and they
            thought that this should be rectified.
      °     There were jurors who thought that some LOBs contributed to the local economy
      °     There was discussion about the eyesore nature of the LOBs and that moving them to where
            they were less visible and away from busy, prime locations , was a possibility — creation of
            specific zones for LOBs.
      °     The jury were clear that non-compliance with regulations would result in the removal of a permit.
            This example may make other LOB owners improve their compliance

                                                                                              Page 12 of 50

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                                11 JANUARY 2016



2                        COMMUNITY JURY PILOT PROCESS
DOCUMENT INFORM AT ION




Author                              Community Engagement Manager, Debra Bambrook
                                    Executive Office

Index                               ECM/ Subject/ Community Jury

Attachments                         Nil


EXECUTIVE SUMMARY
The 12 month Community Jury Pilot Project has been successfully completed. Two Juries whose
members are representative of the Noosa Shire community (comprising over 50 community
members) have valued being involved in Council’s decision-making process.

The cost of hosting the two juries was not significant compared to the size and potential costs of
the issues deliberated upon. The experience and information gained by Council, plus the potential
savings to the community gained through more highly informed decision-making, are invaluable.

The two reports prepared by each Jury reflect what two groups of residents from all areas of the
Shire, (including a mix of genders and age groups) can form consensus upon regarding two major
issues that affect everyone in the Shire.

The juries’ reports provide an insight into what residents want, and what they think is reasonable,
when it comes to future organic waste management and future management of the Noosa River.

The Jury process provides Council with an understanding of residents’ concerns and sensitivities,
reasons for resistance to change, what considerations should be included in final decision-making
and what communications should focus upon once decisions have been made.

The Noosa Community Jury trial has highlighted that media interest in the process is strong. Jury
deliberations provide significant opportunities to “bring the community along on the journey”; to
inform, educate and involve residents in complex decisions that face Council and require
widespread community input and support for outcomes to succeed.


RECOMMENDATION
That Council note the report by the Community Engagement Manager to the General Committee
Meeting dated 11 January 2016 and:
A.                       Note the outcomes of the 12 month Community Jury Trial as set out in that report; and
B.                       Retain the Community Jury as a tool in Council’s community engagement framework to be
                         used if and when an appropriate as major issue arises in the future.




                                                                                                     Page 13 of 50

Section 14

GENERAL COMMITTEE MEETING AGENDA                                               11 JANUARY 2016


REPORT
1.    Background

This report reviews the Noosa Council Community Jury Pilot Project process which consisted of
two consecutive Community Juries held in 2015. The Community Jury pilot was designed to assist
Council with its strategic goal of working in partnership with our community and support the value
of “As one with our community” (as identified in the Noosa Council Corporate Plan 2014-2019).

The first Jury deliberated upon the future management of Noosa’s organic waste and consisted of
six meetings held over six months. A final report including nine key recommendations was
presented to Council in August 2015.

The second Jury was about the future management of the Noosa River and consisted of five
meetings held over five months. A final report including 12 recommendations was presented to
Council in January 2016.

The members for each Jury were selected from the same 230 positive responses to 3,000
invitations sent out to residents who had been randomly selected from the State Electoral roll in
November 2014.

Each jury followed the newDemocracy Foundation (nDF) blueprint and was overseen by nDF at
every meeting. The first Jury’s meetings were overseen by the Executive Director of nDF and the
second Jury’s meetings were overseen by a Program Manager for nDF.

In addition, nDF recruited jurors; worked with the facilitator and Council officers to finalise run
sheets; facilitated all communications with jurors; assisted with obtaining speakers and research
data as the Jury requested and posted data on Your Say Noosa.

Council officers supplied the initial background document for each Jury; recruited the facilitator;
provided comprehensive research data, speaker contacts and other information upon request from
the Jury; arranged catering and the logistics for each meeting; worked with the facilitator and nDF
personnel to finalise run sheets prior to each meeting; attended each meeting; provided set up and
summary updates on Your Say Noosa and compiled media releases after each Jury meeting.

Both juries were facilitated by the same independent facilitator.

The report evaluates the newDemocracy style of Community Jury process as conducted during
the 12 month trial, compares both juries and focuses on lessons learned by Council from its
experience and from stakeholder feedback. In doing so, it attempts to weigh up benefits and costs
of the Community Jury Pilot to determine its future worth as a community engagement tool.

This report will have a more detailed focus on the second Jury which provided a new set of
learnings in addition to those acquired during the first Community Jury. The Council had already
received a report on the first Community Jury process.

2.    Community interest, community participation and media coverage.

Media coverage has been considerable for both Juries, reflecting a community interest that has
remained consistently high over the 12 month period. The community has been kept informed
about the process by Council through the media. More of the community has become involved in
the process as Council has become more familiar with the Community Jury process and the use
of Your Say Noosa. There was a higher level of community engagement in the second jury than
the first.



                                                                                    Page 14 of 50

Section 15

GENERAL COMMITTEE MEETING AGENDA                                                 11 JANUARY 2016


Council provided the community with considerably more information and education about the topic
for the Noosa River Jury than it did for the organic waste Jury because of the necessity to introduce,
inform, educate and explain the Community Jury innovation at the outset. In other words, more
energy was expended in the first jury explaining the process while the second jury had less
emphasis on the jury process and more on the subject matter. This was a natural evolution and to
be expected.

There was not enough information for the community in the first jury process about the topic and
towards the end of the organic waste Jury, Council saw the need to take out a full page informative
advertisement in the Noosa News to explain the magnitude of the issue more clearly.

Local news publications devoted several front page stories to key issues highlighted by the Noosa
River Jury. Over 30 articles have been published so far. This has sparked public interest and a
number of letters to the editor and articles from various community groups. Individuals (including
the local MP) and organisations have appeared in front of the jury. Jurors were interviewed by the
media “humanising” the Jury.

In total to date, 62 articles have been published about the organic waste Jury in the local press.
These have continued well beyond the Jury’s completion. References to the organic waste
Community Jury are still appearing more than 6 months later as Council works to implement
recommendations and maintain a high level of community engagement on the topic.

For both juries Council attempted to involve the community in the process through open invitations
to attend stakeholder briefings and Community Jury sessions and by calling for submissions.
Stakeholder briefings were sparsely attended for the organic waste Jury and significantly attended
for the Noosa River Jury.

Observer levels were low for both juries and dwindled after the first two meetings. This could be
attributed to the rules of the process which prevented observers from participating directly in Jury
sessions, but also to the timing of the mid-week evening sessions.

Council increased the number of methods the community could use to get involved in the process
in the second Jury. Council manned several face-to-face “pop ups” at the libraries and opened the
online “forum” and “stories” tools on Your Say Noosa for the Noosa River Jury.

The Noosa River Jury online forum was popular with 90 comments received and 19 community
submissions were also received.

In comparison, 30 community submissions were received for the organic waste Jury with a
percentage of those simply selling organic waste technologies. The number of non-commercial
submissions received was similar for both juries.

There was greater overall community participation in the second Jury process, due, in part to the
extra opportunities provided, but also due to the nature of the issue.

Councillors were kept better informed with run sheets prior to each meeting and media releases
during the second Jury.

The Healthy Waterways report card awarding the Noosa River with a rating of A- appeared in the
media during the Noosa River Jury’s deliberations. This did influence some juror’s thinking
regarding the need for better management of the Noosa River in the future as evidenced in the
Jury’s report.




                                                                                      Page 15 of 50

Section 16

GENERAL COMMITTEE MEETING AGENDA                                                11 JANUARY 2016


3.    Juror feedback

Juror feedback from the first Community Jury about the process was overwhelmingly positive. In
comparison, juror feedback from the second Community Jury about the process was mixed,
although jurors commended Council highly for the Community Jury initiative.

Direct feedback from Noosa River jurors included:

 “I found it a good experience and enjoyed the process. I would recommend attending the
   Community Jury to anyone. Thanks to Council for the opportunity.”

 “I applaud the concept of community involvement in decision making and am sure that the Jury
   process is a precursor to a more general application of this in future political decision making.”

 “Brain-storming continued too long. Bland re-assurances of good progress were offered when
   I and others raised concerns about the lack of meeting structure and lack of a top-down
   approach to identifying inter-dependent decision points.”

 “Some obvious out-of-scope issues were continually raised, discussed and subject to Jury
   presentations when priority in-scope issues had yet to be properly identified and
   addressed. Tighter control of priorities was needed before out-of-scope issues were dealt with
   in such detail.”

 “I have appreciated the opportunity to take part in this Community Jury and have found the
   process interesting and instructive.”

 “An interesting process indicating the difficulties a Council faces when attempting to put a
   process in place to rectify the shortcomings of some State Govt. controls and services at the
   local level.”

 “Had we been able to request information directly from Council staff present, much of the time
   wasted going over and over discussing irrelevant information would have been eliminated.”

 “Personally I think the concept of a Community Jury is very progressive as long as it has a
   guided format. Although, as you know, I found some aspects of the process frustrating, I am
   still very happy to have participated.”

It was clear that five meetings were not sufficient for the second Noosa River Jury to conclude
effectively however the Jury elected to extend the final meeting by one hour rather than return for
a sixth meeting.

Council elected to, and nDF agreed to an additional meeting for a juror working group. This group
was happy with the opportunity provided and produced a supporting document to the Jury’s final
report that reflects the rationale behind the Jury’s set of recommendations.

4.    newDemocracy feedback

The Program Manager from newDemocracy Foundation provided the following feedback:

“The members of this Jury explored the issue very deeply, with their deliberations canvassing the
not inconsiderable nuances, issues and intricacies associated with this highly complex issue.




                                                                                     Page 16 of 50

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                 11 JANUARY 2016


“Jury members were given free range to consider, weigh up and develop their thoughts on the topic
and together with their fellow jurors, this group worked diligently to prepare the recommendations
which are now presented to the Mayor and Councillors.

“There was no draft solution provided to them; they started from a blank sheet of paper and what
the Jury produced has both breadth and clarity of intent.

“The members of the Jury are to be congratulated for their commitment and focus; and Noosa
Council should now be seen as a national and international leader in sharing decision-making
power with the community.”

5.    Independent facilitator feedback

“The Noosa River Jury successfully found areas of priority action that they could agree on. They
also successfully grappled with the question of management- identifying the concerns and risks
from their point of view that meant for some it should stay managed by the existing authorities.

“While this was frustrating for those who saw things differently, it is an indicator of the success of
the process that those who disagreed felt confident enough to still put their views as members of
the community despite some very strongly held views put by others.

“The report provided at the end of the Jury process identifies the areas the group saw as important
for action; however it does not reflect the full process of deliberation undertaken by Jury members.

“An additional session time, ideally a full or half day, would have given the Jury the opportunity as
a whole group to better represent the fullness of their deliberations.”

6.    Council officer feedback

The Planning and Environment Manager provided the following feedback on the Noosa River Jury
process:

“The Jury process is very empowering for the community and our Noosa River Jury did very well
to digest a lot of information, have an understanding of the current complex State legislative
arrangements that exist around the Noosa River and work together to form a recommendation for
Council.

“The process could benefit from more structure at the outset such as clearly defined topics and
goals for each meeting to ensure Jury discussions stay in scope and sufficient time is allocated to
work through the Jury’s final recommendations.”

7.    How we can improve the Community Jury process

Overall the Community Jury process is considered to be a success. The organic waste Jury
reached a consensus and supplied a report that all Jury members could stand by. The Noosa River
Jury reached consensus on 12 recommendations and achieved a majority decision of 75% on the
overarching question of whether Council should begin the process of applying to the State
Government for greater control of the management of the Noosa River.

The community has been provided with complete access to the process and invited to participate
through attending “pop-ups” and Jury meetings, contributing to Your Say Noosa and reading and
responding to media coverage. However, as evidenced by this report, there are still some areas
where the process can be improved upon. In general terms, these are:




                                                                                      Page 17 of 50

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                  11 JANUARY 2016


 A more structured approach to meetings including a more focussed agenda with major decision
   points clearly identified;
 A template for the Jury report would help jurors focus on the decisions required and help juries
   conclude effectively within the time allocated;
 Ensure that juries run over six meetings rather than five to allow time for effective decision-
   making, achieving consensus and report writing using the newDemocracy model
 Ensuring that jurors understand that specific questions can be asked of Council officers during
   the final two meetings to allow proceedings to move forward when discussions become
   gridlocked. Questions could be directed through the facilitator to Council officers to clarify facts
   but not seek opinions.

8.    Community Jury research grant

Inherent to the partnership with newDemocracy Foundation was a requirement to contribute a one-
off lump sum to an academic research project. nDF’s research committee allocated Noosa
Council’s research contribution in August 2015. Four projects are currently underway and one is
researching Noosa’s Community Jury specifically. The research papers will be available upon
completion in 2016.

9.     Future Community Juries

While ultimately a matter for the Council of the day, the two jury trial has demonstrated that a
Community Jury can be an important tool in extending how a Council can engage with its
community on key issues. A community jury is not suitable for every type of community
engagement that a Council needs to undertake. It is best for complex matters that impact across
the community, have a significant resource impact and require some deep analysis over time. In
those circumstances, a community jury is very effective.

As such, the community jury should continue to be an important tool in the overall toolbox of
community engagement tools available to help the Council work with our community.


Previous Council Consideration

Ordinary Meeting, 27 August 2015, Item 12, Page 7
That Council note the report by the Community Engagement Manager to the Planning &
Organisation Committee Meeting dated 18 August 2015 providing an update on the first
Community Jury process.

Finance & Risk

Noosa Council has partnered with newDemocracy for the Community Jury Pilot Project which
came at a financial cost and time imposts, however Council gained in return:
 a year of training for Council officers in operating Community juries;
 a large amount of new information from expert speakers and community considerations about
   organic waste management and river management;
 greater insight into how the community is able to be involved with Council decisions relating to
   changes in waste services and changes to Noosa River management and consequently better
   inform communications;
 greater opportunity for Council to make more fully informed decisions about issues that have
   significant financial and policy implications for the whole of the Noosa community;


                                                                                       Page 18 of 50

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                11 JANUARY 2016


 greater chance of avoiding costly mistakes on future changes to waste management services
   and Noosa River management that require significant community acceptance to be
   implemented successfully and;
 an opportunity for 24-26 everyday citizens who are representative of the Noosa Shire
   community to be involved in the process leading to major decisions.

The Community Engagement Manager is confident that Community Engagement Branch could run
Community juries successfully in the future with some minimal support and guidance from nDF.
For any future juries, it is proposed that juror recruitment is outsourced to nDF and an independent
facilitator appointed to ensure the integrity of the process remains intact.

Both Community juries remained within the budget allocated. Two one-off costs were incurred:
 a one off fee to newDemocracy of $25,000 for employing their model and their management
   support, for a period of 12 months;
 $20,000 one off fee for an academic research project.

Other costs incurred amounting to approximately $40,000 per Jury included:
 the independent facilitator @ $16,000 per Jury,
 catering @ $4,000 per Jury;
 payment to jurors @ $10,400 per Jury;
 travel and accommodation expenses for nDF personnel to attend each Jury session @ $6,000
   per Jury;
 transport hire for site visits @ $1,000 per Jury and;
 stationery, creative design, equipment hire, printing and miscellaneous items @ $2,000 per
   Jury.

Time imposts for Council officers varied between juries, significant for 1-2 key personnel from each
department directly involved. Community Engagement Branch staff spent more time working on
the first Jury, particularly in the early phases, than on the second Jury because staff became more
skilled and experienced with all facets of the Jury process and research requirements differed.

Cross-departmental communications between CE Branch and each department concerned were
considerable but resulted in improved working relationships, the value of which will be more fully
realised when working together on future projects and challenges.

Consultation

External Consultation - Community & Stakeholder

newDemocracy Foundation – Director, Iain Walker;
Program Manager, Georgina Inwood
Creativma – Director/Facilitator Marcia Dwonczyk
Noosa Community Jury members
Noosa Community

Internal Consultation

Planning and Infrastructure Department – Director, Martin Drydale;
Planning & Environment Manager - Kerri Coyle;
Environment Office (Rivers & Coast) - Jan Maddin
Executive Manager – Debra Iezzi
Mayor Noel Playford
Councillors
Community Engagement Branch staff


                                                                                     Page 19 of 50

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                       11 JANUARY 2016



Departments/Sections Consulted:

 x   Chief Executive Officer                    Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

 x   Executive Office                       x   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                                 Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                             Page 20 of 50

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                               11 JANUARY 2016


3                        SUNRISE NEIGHBOURHOOD SHOPS - SHOPS 1 & 2 PROPOSED LEASE
                         AGREEMENTS
DOCUMENT INFORM AT ION




Author                              Property Officer, Michelle Stirling
                                    Corporate Services Department

Index                               ECM/ Subject/ 46.01 Lease / Application No: LEAS13/0012 & LEAS15/0003

Attachments                         1.    Sunrise Shops - Shops 1 & 2 - Aerial Plan & Extract of Shop 1 & 2
                                          Survey Plan


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the by the Property Officer, Property and Facilities to the General
Committee Meeting dated 11 January 2016 and:
A.                       Approve the new lease agreement to Teewah Power Co. Pty Ltd, trading as Sunrise Beach
                         Medical Centre for Shop 1, Sunrise Neighbourhood Shopping Centre for 5 years
                         commencing 1 May 2016 (with a 5 year option);
B.                       Approve the new lease agreement to Sunrise Healthcare Pty Ltd for Shop 2, Sunrise
                         Neighbourhood Shopping Centre for 5 years commencing 1 May 2016 (with a 5 year option);
                         and
C.                       Apply the exception to the requirement for tendering of these leases under section 236 (1)
                         (c) (iii) of the Local Government Regulation 2012 as the lease renewals are to existing
                         tenants.



REPORT
This purpose of this report is to seek Council approval for new lease agreements at the Sunrise
Neighbourhood Shops for two existing lessees which include:
 Shop 1 – Medical Centre; and
 Shop 2 – Pharmacy.

Both lessees requested consideration be given for a new lease without the requirement for a public
tender process.

The Sunrise Neighbourhood Shopping Centre, at 2 Grasstree Crt, Sunrise Beach, was constructed
on Council freehold land by the Noosa Council in approximately 1996 as Council identified a market
gap in the Sunrise Beach area with respect to local shopping facilities.

The 8 shops in total provide a rentable area of 927m2 and have enjoyed close to 100% occupancy
since construction.




                                                                                                    Page 21 of 50

Section 22

GENERAL COMMITTEE MEETING AGENDA                                              11 JANUARY 2016


Shop 1 – Medical Centre

The lease with Teewah Power Co. Pty Ltd expires 30 April 2016. The lessee has held the lease
since the centre was constructed in 1996 and has maintained an excellent record. The lessee has
agreed to Council’s offer of a 5 year lease with a 5 year option.

The current rental is $42,925 per annum plus outgoings. Savills Valuations undertook an
independent valuation that suggested a rental of $44,481 per annum plus outgoings (with a market
rental range in the order of +/- 5% to 7.5%). The lessee has requested that the rent remain at the
current rate plus outgoings. The lessee has been advised that annual CPI will apply to the current
rental along with a further market valuation in 2020.

Shop 2 – Pharmacy

The lease with Sunrise Healthcare Pty Ltd expires 30 April 2016. The lessee was assigned the
lease on 23 October 2015. The lessee has agreed to Council’s offer of a 5 year lease with a 5 year
option.

The current rental is $29,600 per annum plus outgoings. Savills Valuations undertook an
independent valuation that suggested a rental of $33,435 per annum plus outgoings (with a market
rental range in the order of +/- 5% to 7.5%). Sunrise Healthcare Pty Ltd contacted Council
regarding the proposed 13% increase, and provided a rental offer of $31,800 per annum plus
outgoings. This lessee’s rental offer figure is considered acceptable. The lessee is aware annual
CPI will apply to the current rental along with a further market valuation in 2020.


Previous Council Consideration

Ordinary Meeting, 22 October 2015, Item 9, Page 7
That Council note the report by the Property Officer, Property and Facilities to the Planning &
Organisation Committee Meeting dated 13 October 2015 and approve the assignment of the
existing contract lease arrangement for Sunrise Neighbourhood Shopping Centre, Shop 2 –
Pharmacy, from KA & RJ Teed to Sunrise Healthcare Pty Ltd on or after 23 October 2015.


Ordinary Meeting, 4 June 2015, Item 10, Page 9
That Council note the report by the Property Officer, Property and Facilities to the Planning &
Organisation Committee Meeting dated 26 May 2015; and
1.   Approve the new lease agreement to Sunrise Beach Hair Artistry for Shop 3, Sunrise
     Neighbourhood Shopping Centre for 3 years commencing 9 June 2015 (with a 3 year option);
2.   Approve the new lease agreement to Tom Wilkinson Dental Pty Ltd for Shop 4, Sunrise
     Neighbourhood Shopping Centre for 5 years commencing 1 July 2015 (with a 5 year option)
3.   Approve the new lease agreement with Meats at Sunrise Pty Ltd for Shop 7, Sunrise
     Neighbourhood Shopping Centre for 5 years commencing 8 June 2015 (with a 5 year option);
     and
4.   Apply the exception to the requirement for tendering of the lease under section 236 (1) (c)
     (iii) of the Local Government Regulation 2012 as the renewal is to the existing tenant.




                                                                                   Page 22 of 50

Section 23

GENERAL COMMITTEE MEETING AGENDA                                                      11 JANUARY 2016


Ordinary Meeting, 1 May 2014, Item 11, Page 9
That Council note the report by the Property Officer, Property and Facilities to the General
Committee Meeting dated 28 April 2014; and
1.   Approve the new lease agreement with the Barker Family Trust for Shop 6, Sunrise
     Neighbourhood Shopping Centre for 5 years commencing 28 April 2014;
2.   Approve the CEO to award a subsequent 5 year extension of the lease subject to the lessee
     complying with the terms of the lease; and
3.   Apply the exception to the requirement for tendering of the lease under section 236 (1) (c)
     (iii) of the Local Government Regulation 2012 as the renewal is to the existing tenant.


Ordinary Meeting, 29 May 2014, Item 8, Page 16
That Council note the report by the Senior Property Officer, Property and Facilities to the Planning
and Organisation Committee Meeting dated 20 May 2014; and
1.   Approve the new lease agreement in the new company name of Australian Leisure and
     Hospitality Group Pty Limited, for 5 years commencing 2 January 2015;
2.   Authorise the Chief Executive Office to award a subsequent 5 year extension of the lease
     subject to the lessee complying with the terms of the lease; and
3.   Apply the exception to the requirement for tendering of the lease under section 236 (1) (c)
     (iii) of the Local Government Regulation 2012 as the renewal is to the existing tenant.


Finance & Risk

Revenue may be foregone if the new leases for Shops 1 and 2 are not approved and a public
tender process is required.


Consultation

External Consultation - Community & Stakeholder

CBRE Valuers
Ray White Commercial Real Estate Noosa

Internal Consultation

Manager Property & Facilities


Departments/Sections Consulted:

    Chief Executive Officer                Community Services                     Corporate Services
    Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
    Executive Support                      Community Development                  ICT
                                           Libraries & Galleries                  Procurement & Fleet
                                           Local Laws                         X   Property & Facilities
                                           Waste & Environmental Health           Revenue Services

    Executive Office                       Planning & Infrastructure
    Community Engagement                   Building & Plumbing Services
    Customer Service                       Civil Operations
    Economic Development                   Infrastructure Planning & Design
    Governance                             Planning & Environment
    Human Resources                        Strategic Land Use Planning
    Sustainability


                                                                                            Page 23 of 50

Section 24

GENERAL COMMITTEE MEETING AGENDA   11 JANUARY 2016



                                    ATTACHMENT1




                                      Page 24 of 50

GENERAL COMMITTEE MEETING AGENDA                             11 JANUARY 2016

                                                                ATTACHMENT1
           a     n me    ea                                   he a     a    -
                  &~     \              ,                    ,       wa 4
                                   .                            oe a
                                              if             al             aes

                        2 Grasstree Ct SUNRISE BEACH   o -
                        If Sa x selected, you can click on the map | La & They a x
                        te see more information about what's nearby. e Le bs 4 eS: i
                          s               Clear this marker La ay LTT     1
                         3                       er            Po
5                       .     -                  ”    oy | 4              ™
 /      “                 ,   :             ‘» : Cif    a      i 24 pes}
   +                                           el
             Z                   7          - , ie   ‘rip      aa      e PP
                                                   ar         et       3s
                                  >         |    J                     -   ,
                                   .         —         :    |
                             ‘            /                           & n
                   =                 ah       —         ~ |      A    ‘  i    .
                      /             ,

                                                                   Page 24 of 50

Section 25

GENERAL COMMITTEE MEETING AGENDA   11 JANUARY 2016




                                      Page 25 of 50

GENERAL COMMITTEE MEETING AGENDA                                               11 JANUARY 2016

  QUEENSLAND LAND REGISTRY                     SCHEDULE                               FORM 20 Version 2
  Land Title Act 1994, Land Act 1994 and Water Act 2000                                  Page 33 of 33
  QUEENSLAND LAND REGISTRY                     SCHEDULE                               FORM 20 Version 2
  Land Title Act 1994, Land Act 1904 and Water Act 2000                                  Page 33 of 33
                                         Title Reference 50133930
   SCHEDULE B

                          ann             SCHEDULE B           |        8
                          7                                          RPGOISEs
                        APORID                                               >      5
                Za                   ‘sii                      |             Hs
             a“                                                         °  #           3
                                                               ;       ous.         (
                                                                             jj G
                                                                 \             Li Ss
                                                             Y   |                  DIA ERAN
                                                                  i                 Scale £250
                                             RP9O1384
                                           ee                               *            »
                                             en       Bl
                                              '                             ~
                                       8                                                 f
        .       é     f 5                                                  ~

                                      7       |
                                              |                            S
                                    |         A                    ;       5
                                   is         wes
                                   VIN                    y     }
                                       SALLY
                                            Sate         Vf     |
                                                =p             a)
                                           yi                 “tS
                   [~           ue.                     WF
           _                   -                    COURT
                            $7)
                       GR A s                                     Certificate of Tite References $0339.30
        s0Te                  Thie plon la fer Lecee Purpoeee on meh     NOOSA     MAPPING
       stat ares               Sastre Sorensen                           a aces
        a aren ay ae ows       aoseqrent regutreton of av forvey plone. MS Ph OF £449 9544 fax OF 5440 OF 4?
                  aca   emmerecaarncae PLAN FOR LEASE PURPOSES ONLY     waetsy — WEYVBA
        SE        atl             LEASE   /  (Being Part ofihe Ground   |cowrr ...._Maroh __
               '$ Rae      ~ |  Floor ef a Building erected) on Lot 8   rere een
               ESB]           lowanvae Gacuegs on RP9OISEE              aiaadliemenmamae

                                                                                    Page 25 of 50

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                               11 JANUARY 2016


4                        NOOSA HOLIDAY PARKS - FEES AND CHARGES UPDATE
DOCUMENT INFORM AT ION




Author                              Property and Facilities Property Officer, Michelle Stirling
                                    Corporate Services Department

Index                               ECM: Subject /8.03; 8.06; 8.1 Noosa Holiday Parks Admin

Attachments                         1.    Noosa River – Tourist unpowered non-site location


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Property Officer to the General Committee Meeting dated 11
January 2016 and:
A.                       Set fees and charges for Noosa Holiday Parks to align with the cessation of the July 2017
                         Queensland school holidays; and
B.                       Adopt the Proposed General Cost Recovery Fees and Commercial Charges schedule for
                         Noosa Holiday Parks for the period ending 17 July 2017 as detailed in the table contained
                         within the report.



REPORT
Currently fees and charges for Noosa Holiday Parks (the Parks) are set until the end of the summer
peak season being 31 January 2017. Council maintains an advance fees and charges schedule
for the Parks to allow for the forward booking of sites by customers. Twice yearly Council reviews
and amends the fees if necessary to maintain a forward booking period commensurate with
industry standards. Accordingly, the purpose of this report is to propose the adoption of holiday
park fees and charges until the end of the June - July 2017 school holiday period.

Proposed Fee Changes

A review has been undertaken of the current fee schedule with a view to simplify and consolidate
the fee structure where available. The following changes are recommended to be made to simplify
the General Cost Recovery Fees and Commercial Charges schedule, specifically:
 Fees and charges for weekly stays are deleted as the current weekly rate is simply a
    multiplication of 7 times the daily rate.
 Amend both the ‘Extra Person- Under 16’ fee and ‘Extra Person – 16 & Over’ fee to a single
    flat rate for extra persons over 5 years; and delete references to the current listed Peak and
    Shoulder rates as these are identical to the flat rate.
 Deleting fees and charges for Shoulder periods for Noosa North Shore Campground & Boreen
    Point.

All Council business activities are required to operate on a full cost pricing basis to ensure the
competitive neutrality principle is complied with. Fees have been reviewed and amended to ensure
that cost recovery occurs for the business activity.




                                                                                                   Page 26 of 50

Section 27

GENERAL COMMITTEE MEETING AGENDA   11 JANUARY 2016




                                      Page 27 of 50

GENERAL COMMITTEE MEETING AGENDA                                        11 JANUARY 2016

             31 Jan 2017 till 18 July 2017 Fee's & Charges Price Schedule -
                                  Noosa Holiday Parks
         DESCRIPTION                 OFF PEAK           SHOULDER

 TOURIST POWERED SITES
                                 $ 36.00/$     31.00]       |       sd $ +—48.00| $ 35.00
  Noosa North Shore              $ 36.00/$     3500];      |         | $   48.00{ $40.00
                                 $ 50.00|%$    45.00] $  60.00] $ 5200] $ 70.00|  $60.00
  TOURIST UNPOWERED CAMP SITES
  Boreen Point                   $ 3000/$      2500]       &#3x|      [| $ 41.00[ $30.00
  Noosa North Shore              $ 30.00}$     2700;     °° °+&#2|   | $ 41.00]   $33.00
                                  $ 40.00  [$  37.00|$   50.00| $ 43.00| $ 60.00/ $50.00
  OTHER NOOSA RIVER
  Noosa River - tourist unpowered
 camp waterfront                 $ 50.00}  %$  43.00}$  55.00] S$ 50.00|$ 65.00]  $58.00
  Noosa River - Tourist Unpowered
 Non-site                        $ 30.00             $  30.00           $ 30.00
  TOURIST POWERED SITES - LONG RV
                                 $ 50.00|$     39.00|$  60.00| $ 47.00|$ 70.00 | $55.00

 OTHER CHARGES                       All Periods
 EXTRA PERSONS - OVER 5 years
 Boreen Point & Noosa North Shore | $ 13.00     $13.00 over 16yrs, & $10.00 under 16yrs
                                  $ 15.00        $13.00 over 16yrs,& $10.00 under 16

  Long Term Sites - Storage Weekly 5 sooo! $2400
 Boreen Point & Noosa North Shore | $ 50.00} $ 24.00
 Extra Vehicles - nigh            $  500}$      5.00
 Public Use of Amenities - perday | $ 4.00
 Group Fee (20+) - per booking    $ 12.00|$    12.00
 Late Check Out                 PS 16.00 $ 16.00
 WASHING MACHINECHARGES | =| |
 Boreen Point, Noosa River &
 Noosa North Shore                $  400}$      4.00
 DRYINGMACHINECHARGES          [|      |         |
 Boreen Point & Noosa River       $  200|%$     2.00

                                                                            Page 27 of 50

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                         11 JANUARY 2016


Proposed New Fee

The Noosa River Holiday Park has received interest from overnight van stay patrons
(predominately backpackers) to stay at the site at a reduced rate. The Manager of the site has
identified five car spaces adjacent to the boat ramp (see Attachment 1) that would be appropriate
for overnight van stays (typically a backpacker van). On consultation with the Manager of the site
it is proposed that a fee of $30 be included in the General Cost Recovery Fees and Commercial
Charges schedule. This fee is a 25% discount off the ‘Tourist Unpowered Site Rate’, and is
designed to assist with reducing illegal camping within the shire.


Previous Council Consideration
Ordinary Meeting, 18 December 2014, Item 9, Page 47
That Council note the report by the Property Officer to the Planning & Organisation Committee
Meeting dated 9 December 2014 and:
A.      Set fees and charges for Noosa Holiday Parks to align with the cessation of June/July 2016
        Queensland school holidays; and
B.      Adopt the Proposed General Cost Recovery Fees and Commercial Charges for Noosa
        Holiday Parks for the period ending 10 July 2016 as detailed in Attachment 1 to report.


Finance & Risk

Nil.

Consultation

External Consultation - Community & Stakeholder
Noosa River Holiday Park – Manager
Boreen Point Campground – Manager
Noosa North Shore Campground – Manager
Director, Massey Online – Digital Marketing Service for Holiday Parks across Queensland and the
Northern NSW Coast.

Internal Consultation
Director Corporate Services
Property and Facilities Manager

Departments/Sections Consulted:

       Chief Executive Officer                Community Services                 X   Corporate Services
       Executive Officer to the Mayor & CEO   Community Facilities                   Financial Services
       Executive Support                      Community Development                  ICT
                                              Libraries & Galleries                  Procurement & Fleet
                                              Local Laws                         X   Property & Facilities
                                              Waste & Environmental Health           Revenue Services

       Executive Office                       Planning & Infrastructure
       Community Engagement                   Building & Plumbing Services
       Customer Service                       Civil Operations
       Economic Development                   Infrastructure Planning & Design
       Governance                             Planning & Environment
       Human Resources                        Strategic Land Use Planning
       Sustainability




                                                                                               Page 28 of 50

Section 29

ATTACHMENT 1




  Page 29 of 50

ATTACHMENT 1

  aaa                         NCO 10 So¥>                                             :
        eee                                                          Holi
     A                                                                              o
   @                                                                  A Noosa Council $

                            All Visitor Parking       Harbours &   BBQ
                             and additional          Marine Dept        Day Picnic Area
SITE LEGEND                  in Russell Street        —
                            Trailer Parking is
                            there is NO parking                         Allocated parking onl
                           oveilable within the     ©     aera            =     ¥ =e
       Unpowered              Holiday Park.                            kaa
      Waterfront Sites                      Entrance/Exit D nccconicn  CAPB/C/DLED
       Powered                                     =        rT                 as  |
                                                              -                7     re
       Slab Sites                                             ||                ae
                                                      || o                     a6 | 53
a Powered                                            a    |,  O           y|   ee
             i                              2        6 | |\2| amenities   |z2/| 44 | 55
       Tent Sites                           5      ==   |      _—vea           eal ES
                                            &      ;    7 |=              v        ;
                                                     B    3    _      3   a    A;    ;
       Unpowered                                   =e]    |O|  (soem!     IS       a
|      Sites                                       a             ame              ee
                                            -                   }    3         ,
                                            @                                         fs
  @    Laundry                                       1          3 | a          -
  és,  Disabled                                   is                    =            Playgr
       Facility                                      2                             Park
  ’   Fire                                                   Ne
       Extinguisher                                     Ba
                                                        +                               <
  BH   Dump Point                                                                     -
   For all Non-medical
   emergencies after 8pm
   call 5447 7566          Moos
                                  ads
4	1	1	1	38	0	383	2576	1538	47	-1	
5	1	1	1	38	1	383	2578	135	37	96	Phone
5	1	1	1	38	2	533	2576	83	45	29	(07)
5	1	1	1	38	3	632	2578	239	38	29	54497050
5	1	1	1	38	4	935	2578	115	37	81	Email
5	1	1	1	38	5	1067	2577	854	46	91	[email protected]
4	1	1	1	39	0	380	2645	1486	45	-1	
5	1	1	1	39	1	380	2646	27	36	96	4
5	1	1	1	39	2	423	2645	148	38	95	Russell
5	1	1	1	39	3	587	2645	51	41	96	St,
5	1	1	1	39	4	655	2645	225	38	95	Noosaville
5	1	1	1	39	5	895	2645	75	43	81	Qld
5	1	1	1	39	6	985	2646	114	37	81	4566
5	1	1	1	39	7	1161	2645	705	45	86	www.noosaholidayparks.com.au
4	1	1	1	40	0	1954	3315	289	44	-1	
5	1	1	1	40	1	1954	3315	106	44	96	Page
5	1	1	1	40	2	2074	3315	49	35	96	29
5	1	1	1	40	3	2138	3315	43	35	96	of
5	1	1	1	40	4	2194	3315	49	35	96	50

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                                11 JANUARY 2016



5                        FINANCIAL PERFORMANCE REPORT - DECEMBER 2015
DOCUMENT INFORM AT ION




Author                           Manager Financial Services, Wayne Jensen
                                 Corporate Services Department

Index                            ECM / Subject / 22.09 – Monthly Financial Performance Report

Attachments                      1.     Statement of Comprehensive Income
                                 2.     Statement of Financial Position


EXECUTIVE SUMMARY
Year to date financial performance to 31 December 2015 is generally in accordance with budget
forecasts. Budgets will be reviewed utilising the December revenue and expenditure actuals to
determine whether year-end forecasts require change, and to also incorporate recent Council
decisions that impact on the budget.

                  Financial Performance Summary to 31 December 2015
                                          Current YTD Actual      Variance           Variance      Status
                                             YTD           $m           $m               YTD
                                          Budget                                           %
                                              $m
                  Recurrent Revenue         $44.9        $45.9         $1.0             2.3%      On track
                  Recurrent Expense         $42.0        $40.0         $2.0             4.7%      On track

                  Net Capital Revenue          $1.7        $3.4               $1.7      102%      On track
                  Capital Expenditure         $10.2       $11.4               $1.2     11.7%      On track

Financial statements including Statement of Comprehensive Income and Statement of Financial
Position are included as attachments for information of Council.

Figure 1: Actual Performance Compared to YTD Budget

               $50
               $45
               $40
               $35
               $30
               $25
               $20
               $15
               $10
                $5
                $-
                                YTD Budget ($m)                YTD Actual ($m)

                                  Operating Revenue   Operating Expenditure




                                                                                                    Page 30 of 50

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                11 JANUARY 2016


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 11 January 2016 providing the December monthly financial performance report for the
2015/16 financial year.


REPORT
Recurrent Revenue (YTD Benchmark 50%)

Council has received 52% ($45.9 million) of its recurrent revenue budget of $87.5 million as at the
end of December 2015. Commentary on each recurrent revenue type is provided below:

 Rates and Levies – $30.2m (50%) of the annual budget of $60.5m has been recorded.
 Fees and Charges – Fees and charges earned ($3.6m) totals 76% of the full year forecast.
   Favourable variances exist for cemetery operations, parking, and development related fees.
   All variances will be monitored to determine whether further adjustments should be made as
   part of the December quarter budget review.
 Interest Received – Currently 4.6% above forecast levels due to higher cash balances than
   originally estimated.
 Dividend and Tax – Dividends and the payment of tax equivalent from Unitywater are generally
   in line with budget forecasts.
 Other Revenue – areas including waste fees are marginally above budget predictions, with sale
   of recyclable materials currently below forecasts. All variances will be investigated to determine
   whether adjustments should be made as part of the next budget review.
 Grants and Subsidies – Overall receipts for operational grants are generally in accordance with
   the revised budget forecast with variances due to additional funding received not included in
   the original budget.

Figure 2: Recurrent Revenue Position by Type (Excluding Rates)

 $6.0

                                  YTD Budget ($m)
 $5.0
                                  YTD Actual ($m)
 $4.0

 $3.0

 $2.0

 $1.0

 $0.0
                                                         Other
            Fees




                                                                    Grants
                       Dividend




                                               Tax
                                    Interest




                                                                                      Page 31 of 50

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                         11 JANUARY 2016


Recurrent Expenditure (YTD Benchmark 50%)

Operating expenditure is currently 46% of the full year budget forecast. Areas of significant
variance will be monitored for possible adjustments as part of the December quarter budget review.
Detailed commentary for significant items appears below.

 Employee Costs – Actuals of $12.8m against the YTD budget of $13.1m and equates to 46%
   of the full year budget. Though there is a favourable variance in this area, all areas will continue
   to be monitored.
 Materials and Services – 44% of the full year budget ($17.5m) has been expended compared
   to the YTD budget of $19.2m. Variances generally relate to an under-expenditure against
   contract services, maintenance and special levies, with some works deferred until after the
   holiday period. As with employee costs, all variances are subject to ongoing review.
 Finance Costs – generally in accordance with budget.
 Depreciation expenses are currently running in accordance with budget forecasts.
 Other Expenses – generally in accordance with budget.

Figure 3: Recurrent Expenditure Position by Type

 $25

                                                        YTD Budget ($m)
 $20
                                                        YTD Actual ($m)
 $15


 $10


  $5


  $0
                          Materials




                                        Finance Costs




                                                                  Depreciation
             Employees




                                                                                 Other




Capital Revenue

YTD revenue received includes cash contributions from developers ($2.1 million), together with
($1.3 million) received for transport infrastructure capital grant funding. Year-end forecasts will be
considered for possible adjustment as part of the December quarter budget review.

Capital Works Program

Actual capital expenditure (excluding commitments) is $11.4 million against the revised full-year
budget of $32.4 million. Committed expenditure totals a further $10.9 million bringing the total of
actual and committed funds to $22.3 million (68.8% of the total program. Detailed discussion of
progress in the delivery of the capital works program is provided quarterly to the Infrastructure and
Services Committee.




                                                                                            Page 32 of 50

Section 33

GENERAL COMMITTEE MEETING AGENDA                                              11 JANUARY 2016


Cash Management and Investment Performance

Council funds are invested in accordance with the adopted Investment Policy. Total cash on hand
as at 31 December 2015 was $56.7 million. The cash balance includes constrained funding carried
forward for capital projects still under construction, plus unspent funds from special rates and
levies.

Council’s investment portfolio is balanced across a number of agencies, as shown in the graph on
the left. The graph on the right shows the current risk profile using industry credit ratings.

                Bendigo
                  7%
                                                                       A2
                                                                       7%
                                                                A1
                Suncorp                                        18%
                                                                                   A1+
                 18%               QTC                                            (QTC)
      Westpac                      48%                                             48%
       3%
                NAB                                               A1+
                11%                                              (Other)
                          CBA                                     27%
                          13%



The actual interest revenue for the month was $136,026 with a weighted average yield of 2.62%
against the industry benchmark (Bloomberg AusBond Bank Bill Index) of 2.27%.


Previous Council Consideration

Nil

Finance & Risk

Monthly financial performance is monitored across all operational areas to ensure Council’s
forecast operating result is achieved.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All areas of Council are consulted as part of the regular monitoring of budget performance.




                                                                                   Page 33 of 50

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                           11 JANUARY 2016


Departments/Sections Consulted:

 x   Chief Executive Officer                x   Community Services                 x   Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
     Executive Support                          Community Development                  ICT
                                                Libraries & Galleries                  Procurement & Fleet
                                                Local Laws                             Property & Facilities
                                                Waste & Environmental Health           Revenue Services

 x   Executive Office                       x   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                                 Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability




                                                                                                 Page 34 of 50

Section 35

ATTACHMENT 1




Page 35 of 50

ATTACHMENT 1
Noosa Council
Statement of Comprehensive Income
For the Year Ended 30 June 2016
As at 31-Dec-2015
                                                        Current             Current
                                                        Budget               Budget              Actual            Percentage
                                                          2016               YTD                 YTD             Annual Budget
                                                            $                   $                   $                   %

Revenue
      Recurrent Revenue
      Rates, levies and charges                            60,463,174          30,231,587          30,260,936                50%
      Fees and charges                                      4,738,448           3,236,597           3,600,821                16%
      Dividend income                                       1,925,140             962,570             962,612                50%
      Interest received                                     4,568,059           2,330,931           2,437,569                53%
      Tax equivalents                                       1,088,812             500,581             563,754                52%
      Sale of Goods and Major Services                      7,408,961           3,925,017           4,055,481                55%
      Sale of Contract & Recoverable Works                     15,364               7,682              (8,465)              -55%
      Rental & Lease Income                                 1,173,953             586,977             616,693                53%
      Other income                                           710,063              383,893             546,846                77%
      Grants, subsidies, contributions and donations        5,414,017           2,743,660           2,890,056                53%
                                                           87,505,992          44,909,495          45,926,302                52%
Expenses
      Recurrent Expenses
      Employee benefits                                    27,646,927          13,132,079          12,844,373                46%
      Materials and services                               39,401,146          19,163,779          17,484,112                44%
      Finance costs                                         2,686,315           1,330,657           1,327,936                49%
      Depreciation and amortisation                        16,630,163           8,315,081           8,316,465                50%
      Other expenses                                          105,993              47,692              48,890                46%
                                                           86,470,544          41,989,288          40,021,776                46%

Operating Result                                            1,035,448           2,920,206           5,904,526
Capital Revenue
      Capital contributions and donations                   1,606,029           1,223,245           2,119,717               132%
      Grants, subsidies, contributions and donations        2,791,696            431,170            1,304,346                47%
      Other capital revenue                                         -                   -                   -
Total Capital Revenue                                       4,397,725           1,654,415           3,424,063

                                                                                                           Page 35 of 50

Section 36

ATTACHMENT 2




  Page 36 of 50

ATTACHMENT 2

Current Assets
      Cash and cash equivalents                                    36,759,172               54,120,122              50,891,174
      Trade and other receivables                                   8,072,958                5,424,740               5,794,388
      Inventories                                                     104,038                  208,611                 104,038
      Other current assets                                            657,006                2,053,798               3,097,262
                                                                   45,593,174               61,807,271              59,886,862
      Non Current Assets held for sale                                       -                       -                        -
Total Current Assets                                               45,593,174               61,807,271              59,886,862
Non Current Assets
      Trade and other receivables                                  49,217,517               49,217,517              49,217,517
      Other non current Assets                                               -                       -                        -
      Investments                                                 60,978,225                60,978,425              60,978,225
      Investment property                                            3,831,234               3,831,234               3,831,234
      Property, plant and equipment                               924,908,040             890,202,469              887,078,579
      Intangible assets                                              2,873,146               2,611,025               2,701,457
Total Non Current Assets                                        1,041,808,162            1,006,840,670           1,003,807,012
Total Assets                                                    1,087,401,336            1,068,647,942           1,063,693,873

Current Liabilities
      Trade and other payables                                      4,316,797                7,277,953               8,100,894
     Borrowings                                                      2,854,619               1,341,844               2,633,065
      Provisions                                                     5,013,310               8,817,860               4,114,390
     Other                                                            380,497               (5,857,499)              1,082,497
Total Current Liabilities                                          12,565,223               11,580,159              15,930,845

Non Current Liabilities
      Trade and other payables                                               -                       -                        -
     Borrowings                                                    35,247,498               36,747,480              36,747,480
      Provisions                                                    8,210,644                8,194,924               8,194,924
Total Non Current Liabilities                                      43,458,142             44,942,404                44,942,404
Total Liabilities                                                  56,023,365               56,522,563              60,873,249
Net Community Assets                                            1,031,377,971            1,012,125,378           1,002,820,624

Community Equity
      Asset Revaluation Surplus                                    36,519,656               14,334,106              14,334,106
      Retained Surplus / (Defeciency)                                        -                       -                        -
      Shire Capital                                               994,858,315             988,486,518              973,851,849
      Current Year Net Earnings                                              -               9,446,901              14,634,670
Total Community Equity                                          1,031,377,971            1,012,267,526           1,002,820,625

                                                                                                             Page 36 of 50

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                            11 JANUARY 2016



6                        NATURAL AREAS BUSHLAND REGENERATION AND ECOLOGICAL MAINTENANCE
                         SERVICES
DOCUMENT INFORM AT ION




Author                             Parks and Natural Areas Coordinator, Sara Cooke
                                   Planning & Infrastructure Department

Index                              ECM/ Subject/ 15.07 Environmental Management
                                   ECM/ Subject/ 15.12 Parks and Reserves
                                   ECM/ Subject/ 15.21 Contract Register
                                   ECM/ Subject/ 32.01 Parks

Attachments                        1.    Tender evaluation spreadsheet


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Parks and Natural Areas Coordinator to the General Committee
Meeting dated 11January 2016 and approve the engagement of the following preferred vendors
for Natural Areas bushland regeneration and ecological maintenance services:
A.                       For Zone 1 North of Cooroy Noosa Road – Noosa and District Landcare; and
B.                       For Zone 2 South of Cooroy Noosa Road – Bushland Conservation Management.



REPORT
Noosa Council has management responsibility for approximately 3,000 ha of bushland reserves.
These diverse vegetation communities provide fauna habitat as well as provide important social,
environmental and economic values within the Shire. These reserves and natural areas are
impacted by various land use encroachments, recreational use, and interference with native
vegetation, weed invasion, inappropriate fire regimes, feral animals and environmental
degradation. Ongoing maintenance of these areas is required to ensure environmental and social
values are maintained or enhanced to continue to provide these natural environmental values.

Tenders were sought via an open market Invitation to Tender process, to provide bushland
regeneration and ecological maintenance services in two zones. Zone 1 includes areas roughly
north of the Cooroy Noosa Road and Zone 2 includes areas roughly south of this road.

The services included in this scope of work includes are but not limited to;
 Regeneration works to return bushland to a healthy diverse, representative and largely self-
   sustaining condition.
 Staged removal of weeds including weed trees, vines, cacti, succulents, shrubs, grasses and
   aquatic plants from environmental reserves
 The use of small machinery including bush cutter and chain saw,
 The use of hand tools and chemical or non-chemical weed control techniques.




                                                                                                    Page 37 of 50

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                             11 JANUARY 2016


Zone 1 involves a larger geographical footprint but requires approximately 250 labour days to
implement. Zone 2 involves a smaller area but is more labour intensive and will require
approximately 500 labour days.

An evaluation team assessed the submitted tenders from eight (8) tenderers which included the
assessment of the equivalent services, plant and equipment. This allowed for a fair evaluation of
all tenderers. A copy of the evaluation spreadsheet is provided at Attachment 1.

The evaluation process identified the tenderer with the highest score being Bushland Conservation
Management and the second highest being Noosa and District Landcare. As a result, the two top
tenderers are being recommended as the successful suppliers for the two zones.

The preferred arrangement is that two local companies be engaged (rather than creating any local
monopoly). Not only does this meet Contracting Principals, but will also allow for the ability to work
concurrently and hence more efficiently.

Previous Council Consideration

Nil.

Finance & Risk

Provision has been made within the Civil Operations budget in the Natural Areas portion for the
services to be supplied under this arrangement.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

The following branches were consulted during the procurement process.

Departments/Sections Consulted:

       Chief Executive Officer                    Community Services                 x   Corporate Services
       Executive Officer to the Mayor & CEO       Community Facilities                   Financial Services
       Executive Support                          Community Development                  ICT
                                                  Libraries & Galleries              x   Procurement & Fleet
                                                  Local Laws                             Property & Facilities
                                                  Waste & Environmental Health           Revenue Services

       Executive Office                       x   Planning & Infrastructure
       Community Engagement                       Building & Plumbing Services
       Customer Service                       x   Civil Operations
       Economic Development                       Infrastructure Planning & Design
       Governance                             x   Planning & Environment
       Human Resources                            Strategic Land Use Planning
       Sustainability




                                                                                                   Page 38 of 50

Section 39

ATTACHMENT 1




   Page 39 of 50

0S 30 6€ ebeg
                                                                ee       raunjeuBbis s,10jye.qs!uupy e.nUOD                                   (a1qeaydde 41) G34¥DSHD 3DN39N vsao
                                                                            sBunyBiem aaoge ay} suuyuCs so;eSIURUpY JIEHUOD ey] BOYO SHENUOD PUE S34      y Jequiew joued yuawsessy
                                                                                     Qeaysyom uogeunoyuy Ao;epuEyy, UO “GN J2ss24) JB0WQ ABS PUE YBESH WOM € Jaquiaw jsued juswsessy
                                                                                                                             J30Q WSlolg SEaty [EIEN      Z saquiaw jeued juawsessy
                                                                                                                          JOJEUIPIOND SESTy [EEN pue SES   } Joquiaw jaued juawsessy
                                                                                                                                                                    S1¥i30 43HLO
                                                                                                                                                         ud wou pur soud yo 21005 1
                                                                                                                                                                  a) INS Sug pews
                      43             88             8             08            001             638             z8             be                              (ug) asc0g soug PasyEULON
                     66             Zi             90              16            rit           Zot             £8              +3                                         Budo SOU
                                                                                                                                             eros       woommnnnnnnog (ae) S83 SBesany
                    sols           Orr's         See's          sels            Bir ls         Qo Ls          oor 1s         0081S             01                       (9g) $334 EOL
                                                                                  Beue                                      Wd SSH
                dnoig azeopue] | pip sey wNoS               PH] Ag suognjos                               =
                                              uogesoges|OI3                  uogevasucd =| aeopue] Gunueg  sp        as   leyuawuosAUR                           quawas oud - g INWd
               fo lopti“‘i]:SCSC“‘(‘#$S CG™CUTCCC“‘(t™€CUTDCi‘(éG®S™CUTCt“‘(éOSTLUCUTCCiésGC (§B®:ti“‘sLSOCOC“‘( G:C] s$wCEC‘C‘i*C                         (UL) aucog jeouypa | pasyeuuoN
         PSC                       TO                           TO                         cer                czop ee   |    cz ze    CS     %09                  BOOS JENIUYIS | [EVOL
               | eser |         Zz          Prue            | ss |                                    pt                | oo |          a
                | se          | st8         | ce |          | 8                          | ss |          | ss |                  |e |Ramrrmersns irwoumonn
                | ce          | 8                           | v8          | sce |        | 8 |          | es |          | se                 a                  ee
                  7           | + |         | se            | sce         | se |        | se |                                          Psa
                               | sve |       | se |        | es |         | se |         | es |         | sce |                                   ee
                Ea            | +            | + |          | sce         por             | oe           | oe           | = |           a                  ee
                                   |                         aase |                       Pszewe | oeee | see |                             a
                          a                                                                          ee
                fsrarrecn| emmy | mmo [eniecames| SEES |emerenen| cero |                                                     ci
                                                                             quaweGeuey                                     Id ssques
                dnoig azespuez | pip seg unos               PIT Ag suognjos                                  SPUuepeM
                                              uogQEIOgrRIOD3S               UOgEAIISUOD    qweopue7 Gurueg                /BuewuasAauz                       SQuewajs soud uON - ¥ INWd
                   8              Zz            3              ¢              v              €               z              t
                                                        =   PaJENJEAR ssspuay Jo sequin                                                                SYSONIL SNINSOINOD-NON
                                                                                                                                                                                   i
                                                                                                                                                                                 ds
                                                                                 “Burcu 40; BugyBien uans ue uo yoes Buneld                                                      ds
                                                 - YES o} USnB Usaq Sey |¢ Jo BuDud e “sisiapuay USsNusg Awenbs pur sssuiey ainsus oO) eS
                                     “Sa}Ey 40 ainPayps papNUgns sjasapua| UO Paseq “Ap sNoge| sNOY-g UOSTad-p © UO PaJE;Ng|E> Buu “BN .. PT —SSSTTTTCOC~CSY
                                                                                                                              es
                                         FreSCEHENDE 20 UE CUBURENS | Fre WiRy 5 SURUT HE wy UO TWUORT 24.0 tuRUED au — /SUEGSSOKS = (paUDUTU-su0) OO4 « C—O TTC
                                                  TNOSORUENOS PUL DUMDUTIS YE\Y © 70 S| SUSILD JEU] 20) WOYTT PUGS Sun yO JUGUOD sua — DODD fUsy\ = (/Gues) OB « poorer eC TC“ trs—C~‘“‘CSC#CINOUE) BIEDNUET] URSIG F ESOON| F
                                                DSRUDINE 4 DSUCHUOL 39 Oh STU [BM DUT SIQEAISU 5) CUSqUD FOU 2Op UOYSTILUNS Suy JO BUS WD Su — POO] = (Mes) OS « Oris PID SES YMOS 40 SPURL SANEN| 2
                                                      eu simsapoui © S9z06 pus SxeSuGuIUN 5 SARL WU Jj YORE WETS aun fo WURUOD 2uy— J004 = (MUCH) OF «                              9
                                                       Su Ulry DUR BURDURES MO} & JO F) BSSBIO FOG 205 LOPE HWUQNS ayy JO wSWOD 3 — 3005 AS = (USN) OF + selis.”™~—‘“SCS*sdYSOS~sSSSTCOCCSCtC‘(«*‘t*‘*‘éi TA SOTO sOWMSS spuwieD] S
                                                                             4EU SWISS PUT USI FOU AO) WG) © — SIQRITSIISUN = (Cuz) O- eleusSDEUEYY UOQENISSUOD PUEIYSNG| 7
                                                                                                          ssBuges Sut    orgs                                         EU] Gurr]
                                             pesneg      wep An         oo            td         rio hn      wanes      oozes                                       SUE RE UENERSTY] Z
                                                                                                                |              70 9x9)                            USYSONSL 30 SWYN| ON
                                                                                                                             «= 30rd
   | ANSIWHOVLLV                                                                                                           crnaonivmeramevenn| —_ aaueneo
                                                                                                                                      | rouonsh |                        ON ERUIOD|
                                                                                    yeauspeaids UOHeNleAR sinquny peyBbiem

Section 40

GENERAL COMMITTEE MEETING AGENDA                                                                 11 JANUARY 2016



7                        DEVELOPMENT PERMIT FOR OPERATIONAL WORK PLACING AN ADVERTISING
                         DEVICE - SIGNAGE AT 78-80 RENE STREET, NOOSAVILLE - OPW15/0214
DOCUMENT INFORM AT ION




Author                              Manager Planning & Environment, Kerri Coyle
                                    Planning & Infrastructure Department

Index                               ECM/ Application/ OPW15/0214

Attachments                         Nil



                  APPLICATION DETAILS

                  Applicant                       Storage First

                  Proposal                        Development Permit for Operational Works Placing an Advertising
                                                  Device - Signage

                  Properly Made Date              12 November 2015

                  Decision Due Date               19 January 2015



                  PROPERTY DETAILS

                  Property Address                78-80 Rene Street, Noosaville

                  RP Description                  Lot 279 CP 865180
                  Land Area                       10920m²

                  Existing Use of Land            Industrial Warehouse (Self Storage Facility)



                  STATUTORY DETAILS

                  SEQRP Designation               Urban Footprint
                  Locality                        Noosaville

                  Zone                            Industry

                  Assessment Type                 Code

RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the General Committee
Meeting dated 11 January 2016 regarding Application No. OPW15/0214 for a Development Permit
for Operational Works - Signage situated at 78-80 Rene Street, Noosaville and refuse the
application for the following reasons:
1.                       The application proposes signs in excess of 4m2 sign face area and total signage area on
                         the premise in excess of 10m2 , which are inconsistent with the Overall Outcomes of The
                         Noosa Plan’s Advertising Devices Code;
2.                       The proposal represents excessive signage for a single business that will result in
                         unnecessary visual clutter and dominate the streetscape.
3.                       The signage is incompatible with the existing and preferred streetscape character and is
                         contrary to the Advertising Devices Code.


                                                                                                       Page 40 of 50

Section 41

GENERAL COMMITTEE MEETING AGENDA                                             11 JANUARY 2016


REPORT
1.   PROPOSAL
The application seeks approval for a Development Permit for Operational Works for additional wall
signs at the existing commercial premises. The signs comprise two panels at 6.70m in length and
1.50m in width with a combined sign face area of 12m2. Both signs have a font area of 5723mm x
1053mm, equating to 6.0m2, and are to be fixed to an existing building fronting Rene Street.

The site has 5.97m2 of existing signage associated with the approved development on the site.
Cumulatively, the existing and proposed advertising devices will have a total sign face area of
17.97m2. The signs read “Storage First” and “Self Storage” as shown in the applicant’s mock-up
in Figure 1 below. Existing advertising devices on the site are shown in Figures 2 & 3. The
application is before Council because it is recommended for refusal.




                             Figure 1 - Proposed Signage Mock-Up




                                                                                  Page 41 of 50

Section 42

GENERAL COMMITTEE MEETING AGENDA                                            11 JANUARY 2016




Figure 2 - Existing advertising device          Figure 3 - Advertising device at entrance


2.   SITE DETAILS
2.1. Site Description
The site has a road frontage of approximately 78 metres to Rene Street, with no secondary road
frontage. The land is predominately flat. An aerial photograph of the site and its surrounds is
shown below in Figure 4 below.




                                 Figure 4 – Aerial Photograph of Site



                                                                                 Page 42 of 50

Section 43

GENERAL COMMITTEE MEETING AGENDA                                                   11 JANUARY 2016


2.2. Surrounding Land Uses
A mix of industrial uses is adjacent to the site to the north, east and west within the industry zone.
Nearby uses include mechanical workshops, manufacturing, service industries, warehouses and
some heavy/noxious industries.
3.    ASSESSMENT
3.1. Statutory Instruments – Planning Scheme
The applicable planning scheme for the application is The Noosa Plan (16 September 2013). The
following sections relate to the provisions of the Planning Scheme.
Advertising Devices Code
The application raises planning concerns because it proposes signage in excess of as-of-right
limits allowed under Specific Outcome O2 of the Code, being 4m2 for any single sign and a total of
10m2 for any premise. Specific Outcomes O1 of the Code also seeks to prohibit signage in excess
of the as-of right limits, stating:
O1 The following advertising devices are inconsistent with the overall outcomes sought by this
Code and are not located in the former Noosa Shire—
…
g) Signs with a sign face area exceeding 4m2;
…
j) any combination of signs on one premise with a combined sign face area of more than 10m2.


The applicant submits the following in support of a relaxation of the Code provisions:
The subject site is located within close proximity to another self storage facility with signage that
has been recently approved (refer OPW14/0276), and is considered a similar scale, size and
outcome to the proposed fence signs.
The site has a frontage of 78m to Rene Street and has a total area of 1.092ha. The scale,
proportion and siting of the proposed signage is consistent with the size of the site, neighbouring
development and the commercial character of the locality. The site has the ability to be subdivided
in accordance with the minimum lot requirements for the Industry Zone in Table 14-68 of the
Reconfiguring a Lot Code, which would facilitate signage of 20m2 for the existing frontage area.
The existing and proposed signage is spread across the frontage consistent with what would be
evident if separate lots existed.
In accordance with the overall outcomes of the Code the proposed signage:
    Will not detract from the desirable characteristics of the natural and built environment in which
      the advertising devices are exhibited, being the Industry Zone;
    is designed, sited and integrated so as not to contribute to the proliferation of visual clutter;
    will not detract from the visual amenity of the major road network nor from the rural or
      residential amenity enjoyed by residents of and visitors to Noosa; and
    will be safely constructed and secured and will not create a hazard.
Despite the applicant’s submission the site could be reconfigured into multiple premises, the Code
is clear in applying a 4m2 limit per sign and 10m2 sign face area limit overall for a premise. The
building facing Rene Street does have a long frontage to the street but is low rise and required to
be screened by a 5m landscaped setback by the existing development’s MCU approval.




                                                                                        Page 43 of 50

Section 44

GENERAL COMMITTEE MEETING AGENDA                                                       11 JANUARY 2016


Whilst the applicant makes reference to the recent appeal for the development at 44-46 Rene
Street (Sharpe Enterprises Pty Ltd vs Noosa Council), the basis for the appellant’s success in
overturning Council’s refusal of additional signage in that case was founded on a constrained
assessment against a different code (the Business Uses Code) and the presence of two large
buildings (premises) fronting Rene Street. As such, the circumstances for this application are
significantly different.
Approval of additional signage beyond code limits is broadly undesirable and conflicts with the
overall outcomes of the Code, as stated in O1 of the Code. The Code’s intent is to apply
prescriptive signage limits to specifically limit the size and proliferation of signs in the Noosa area.
The application is considered to conflict with the outcomes and purpose of the Code.
3.2. Other Planning Considerations – Draft Planning Scheme Amendments
Proposed amendments to the Noosa Plan will result in various changes to the Advertising Devices
Code. The amendments apply a further reduced limit to smaller sites (such as strata titled
developments), where total signage will be limited to the frontage width x 0.75m. The
amendments, however, do not significantly amend the assessment criteria for this application and
maintain the 4m2 and 10m2 limits for a single premise.
4.    CONSULTATION
4.1. IDAS Referral Agencies
Not applicable.
4.2. Other Referrals
Not applicable.
5.    CONCLUSION
The proposed signage raises planning concerns because it seeks advertising devices in excess of
code limits. The Advertising Devices Code seeks to apply prescriptive sign size and total sign face
area limits for a premise to limit advertising devices within Noosa, avoid visual clutter and ensure
signage is unobtrusive. The Code is clear that signage in excess of these limits conflicts with the
outcomes sought for the Noosa area. The application is therefore considered to conflict with the
provisions of The Noosa Plan and is recommended for refusal for the following reasons:
    The application proposes signs in excess of 4m2 sign face area and total signage area on
      the premise in excess of 10m2 , which are inconsistent with the Overall Outcomes of The
      Noosa Plan’s Advertising Devices Code;
    The proposal represents excessive signage for a single business that will result in
      unnecessary visual clutter and dominate the streetscape.
    The signage is incompatible with the existing and preferred streetscape character and is
      contrary to the Advertising Devices Code.

Departments/Sections Consulted:

     Chief Executive Officer                    Community Services                 Corporate Services
     Executive Officer to the Mayor & CEO       Community Facilities               Financial Services
     Executive Support                          Community Development              ICT
                                                Libraries & Galleries              Procurement & Fleet
                                                Local Laws                         Property & Facilities
                                                Waste & Environmental Health       Revenue Services

     Executive Office                       X   Planning & Infrastructure
     Community Engagement                       Building & Plumbing Services
     Customer Service                           Civil Operations
     Economic Development                       Infrastructure Planning & Design
     Governance                             X   Planning & Environment
     Human Resources                            Strategic Land Use Planning
     Sustainability



                                                                                             Page 44 of 50

Section 45

GENERAL COMMITTEE MEETING AGENDA                                                                  11 JANUARY 2016


8                        PLANNING & ENVIRONMENT COURT APPEAL D171/15 FOR A MATERIAL CHANGE
                         OF USE FOR CULTIVATION TYPE 2 - INTENSIVE (GREENHOUSE) & RECONFIGURING
                         A LOT (ACCESS EASEMENT) SITUATED AT 271 & 305 LAKE MACDONALD DRIVE,
                         LAKE MACDONALD (MCU14/0039 & REC15/0012)
DOCUMENT INFORM AT ION




Author                             Development Planner, Jack Lewis
                                   Planning & Infrastructure Department

Index                              ECM / Application / MCU14/0039 & REC15/0012

Attachments                        Nil


                  APPLICATION DETAILS

                  Applicant                     Como Glasshouse Pty Ltd C/- Martoo Consulting

                  Proposal                      Development Permit for Material Change of Use - Cultivation Type 2 –
                                                Intensive (Greenhouse); and
                                                Development Permit for Reconfiguring a Lot (Access Easement)
                  Appeal Filed                  1 December 2015



                  PROPERTY DETAILS

                  Property Address              271 & 305 Lake Macdonald Drive, Lake Macdonald
                  RP Description                Lots 1 & 2 on SP 108094

                  Land Area                     Lot 1 - 33.4 ha & Lot 2 - 14.14 ha

                  Existing Use of Land          Turf farm, associated sheds and detached house



                  STATUTORY DETAILS

                  SEQRP Designation             Regional Landscape & Rural Production

                  Locality                      Cooroy & Lake Macdonald

                  Zone                          Rural

                  Overlays                      Biodiversity (Riparian Buffer & Environmental Protection)

                  Assessment Type               Code


RECOMMENDATION
That Council note the report by the Development Planner to the General Committee Meeting dated
11 January 2016, regarding Planning & Environment Court Appeal D171/15 and agree to defend
the appeal.




                                                                                                       Page 45 of 50

Section 46

GENERAL COMMITTEE MEETING AGENDA                                                 11 JANUARY 2016


REPORT
A report on the development application for Material Change of Use for Cultivation Type 2 –
Intensive (Greenhouse) & Reconfiguring a Lot (Access Easement) at 271 & 305 Lake Macdonald
Drive, Lake Macdonald was considered at its Ordinary Meeting on 19 November 2015. Council
resolved to approve the application, subject to conditions.

Under the Sustainable Planning Act 2009, the applicant has the option to make representations to
the development approval and negotiate changes to the conditions. In this instance, no
representations to the development approval were made and the applicant lodged an appeal with
the Planning and Environment Court on the 1 December 2015.

The appeal seeks the Court amend or delete conditions 1, 5, 6, 7, 9, 13, 16, 17, 18, 19, 20 and 21
of the Development Permit for Material Change of Use, and condition 1 of the Development Permit
for Reconfiguring a Lot. The condition changes mainly relate to flooding and water quality
management, onsite access upgrades, and an increase in the timeframe to remove fill on the site.

A ‘without prejudice’ conference has been set for 21 January 2016 to narrow and resolve the issues
relating to conditions imposed in the decision notice. It is in order for Council to defend the appeal
and the recommendation is worded accordingly.

Previous Council Consideration
Ordinary Meeting, 19 November 2015, Item 3, Page 56
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 13 October 2015 regarding Application No. MCU14/0039 &
REC15/0012 for a Development Permit for Material Change of Use - Cultivation Type 2 – Intensive
(Greenhouse) & Development Permit for Reconfiguring a Lot (Access Easement) situated at 271
& 305 Lake Macdonald Dr, Lake Macdonald and:
A.   Approve the applications in accordance with the following conditions:
Development Permit for Material Change of Use - Cultivation Type 2 – Intensive
(Greenhouse)
     PLANNING
          When Conditions must be Complied With
     1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
          prior to the use commencing, and then compliance maintained at all times while the
          use continues.
          Approved Plans
     2.   Development undertaken in accordance with this approval must generally comply with
          the approved plans of development. The approved plans are listed in the following table
          unless otherwise amended by these conditions.
              Plan No.          Rev.    Plan/Document Name                          Date
              D-01569-06-B              Site Plan drawn by Martoo Consulting        23/06/2015
      3.    The development must be undertaken and operated in a manner that causes no
            detrimental effect upon the amenity of the neighbourhood by reason of the creation of
            excessive noise, lighting nuisance or other emissions.
            Building Height
      4.    The maximum height of the development must not exceed 8 metres above the finished
            ground level and the natural ground level.




                                                                                      Page 46 of 50

Section 47

GENERAL COMMITTEE MEETING AGENDA                                            11 JANUARY 2016


       Performance Bond
   5.  Security in the form of a cash bond or trading bank guarantee to the sum of $20,000
       must be submitted to Council, to secure performance of all conditions of this approval,
       prior to the issue of a Development Permit for Operational Works. The cash bond or
       trading bank guarantee will be returned on performance of the conditions of approval
       less any costs incurred by Council in respect of enforcing performance of this permit.
       Council reserves the right to call upon the bond or guaranteed sum to effect compliance
       with conditions.
   6.  All grow media, grow bags and plants within the greenhouse shall be raised above the
       10% AEP flood level. Any structures supporting the crop (including the building frame)
       shall be designed to withstand minimum velocities associated with a 1% AEP Flood.
       Certification confirming the heights and strength of the structures must be submitted to
       Council from a suitably qualified professional (RPEQ) prior to the issue of an
       Operational Works approval. The elevated planting system must be installed prior to
       planting the next crop.
   7.  The use must be undertaken in accordance with the Flood Management Plan R01 v02,
       by Water Technology and dated 31/08/2015, subject to the following amendments;
       a.     A nominated flood warden be on site at all times during operation hours of the
              facility;
       b.     A contingency for a flood refuge area must be defined in the strategy in the event
              that persons become trapped on site. The flood refuge area should be suitable
              for safe refuge during an extreme flood event.
       c.     Flood warnings issued by the Bureau of Meteorology and/or Council must be
              added as a trigger, in addition to the site's flood gauge.
       The amendments must be incorporated into an amended Flood Management Plan
       which must be submitted to Council prior to the issue of an Operational Works approval.
       Waste
   8.  The developer must provide waste storage and disposal facilities in accordance with
       Planning Scheme Policy 9, Waste Management, including a waste storage area large
       enough to accommodate all potential sources of contamination, including hazardous
       materials, chemicals, used grow media (including plastics) and waste bins located well
       above the 1% AEP flood level.
   ENGINEERING
       Site Access and Driveways
       Lake Macdonald Drive frontage
   9.  An access driveway to service the existing dwelling must be provided extending from
       the formation of Lake Macdonald Drive to the property boundary. The works must be
       undertaken in accordance with an Operational Works approval and must include in
       particular a driveway crossover generally in accordance with IPWEAQ standard
       drawing 056.
   10. This access driveway is to be used only for the residential use on the site. This access
       may be used for access for the agricultural use on the site (passenger and heavy
       vehicles) in an emergency situation when the heavy vehicle access through the
       property to the south is not accessible. When used during an emergency situation,
       suitable Traffic Control measures must be employed. The type and extent of Traffic
       Control measures must be included in the Operational Works application for the
       construction of the access driveway.




                                                                                 Page 47 of 50

Section 48

GENERAL COMMITTEE MEETING AGENDA                                              11 JANUARY 2016


         Access driveway through the adjoining property (271 Lake Macdonald Dr/Lot 2
         SP108094)
   11.   An access driveway to service the agricultural use must be provided extending from
         the formation of Lake Macdonald Drive to the greenhouse. The works must be
         undertaken in accordance with an Operational Works approval and must include in
         particular:
         a.     an access and internal driveway generally in accordance with the report prepared
                by TTM Consulting Pty Ltd dated 2 July 2015 reference 15SCT0024.
         b.     a driveway constructed with a suitable “all weather” surface that can cater for the
                effects of occasional inundation by flood waters.
         c.     a driveway that does not create any additional flooding of Lot 2 SP108094 or any
                adjoining property.
   12.   Approval of the driveway design from the owner of Lot 2 SP108094 must be submitted
         to Council with the Operational Works application.
         Car Parking
   13.   A minimum of 30 car parking spaces must be provided on the site for the agricultural
         use. The works must be undertaken in accordance with an Operational Works approval
         and must include in particular:
         a.     a carparking area constructed with a suitable “all weather” surface that can cater
                for the effects of occasional inundation by flood waters.
         b.     a carparking area that does not create any additional flooding on any adjoining
                property.
         Stormwater Drainage
   14.   Stormwater runoff from the development must be disposed of on-site without causing
         scour, entraining and transporting sediments in the stormwater or damage to the
         subject site or any adjoining property.
   15.   All roof runoff not reused for site operations must be treated within natural stormwater
         quality treatment strategies prior to release from the site.
   16.   The use must be undertaken in accordance with the Stormwater Management Plan
         Rev a, by O2 Environmental and dated 07/10/2015, subject to the following
         amendments;
         a.     the infiltration basin must be located outside of the Riparian Buffer Area;
         b.     The proposed filter media basin must be designed to hold water for no longer
                than the time period modelled in the MUSIC model Stormwater Management
                Plan Rev a, by O2 Environmental and dated 07/10/2015. Where groundwater
                recharge is expected, a Geotechnical Engineer must provide certification to
                confirm that the permeability of soils underlying the proposed location for the
                media filtration system exceed the proposed permeability of the filter media
                treatment system.
         c.     Include an Operational Phase Water Quality Monitoring Plan, prepared in
                accordance with the Environmental Protection (Water) Policy 2009 Monitoring
                and Sampling Manual. The Operational Phase Water Quality Monitoring Plan
                must be sufficient to demonstrate that a flood event does not cause the release
                of fertiliser, prescribed water contaminants, or other nutrient laden waters from
                the operation of the Greenhouse into surrounding waterways. Monitoring
                methods must not put any lives at risk during a flood event.
         The amendments must be incorporated into an amended Stormwater Management
         Plan and submitted to Council prior to the issue of an Operational Works approval.




                                                                                   Page 48 of 50

Section 49

GENERAL COMMITTEE MEETING AGENDA                                             11 JANUARY 2016


   17.   Water quality monitoring results must be analysed by a suitably experienced water
         quality specialist and identify whether or not nutrient increases within the receiving
         waterways were associated with the release of nutrients from the Greenhouse during
         a flood event. The analysis must be provided to Noosa Council officers within 30
         business days following inundation of the site Greenhouse with flood waters.
   18.   Where the results of the Operational Phase Water Quality Monitoring demonstrates
         there are nutrient increases associated with the release of nutrients from the use during
         a flood event, the operator must identify and rectify the cause of the release, and
         include appropriate mitigation works to prevent future releases in flood events as far
         as practicable. The operator then must demonstrate to Council that appropriate
         measures have been incorporated into operations, to prevent a release of nutrients to
         the receiving waters in future flood events.
         Earthworks and Retaining Walls
   19.   All earthworks must be undertaken in accordance with an Operational Works approval,
         and contained entirely within the site, unless written permission from the respective
         landowner(s) is provided to Council.
   20.   Bund 1 & 2 indicated on the Site Layout Plan drawn by Water Technology and dated
         01/07/2015 must be removed and the existing levels reinstated within 2 weeks of this
         approval date.
   21.   Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
         01/07/2015 must be relocated a minimum of 5m away from the root zones of the
         existing vegetation adjacent the creek. The new bund and area between it and the
         waterway shall be revegetated with suitable species and densities in accordance with
         Planning Scheme Policy 3 – Landscaping Plants & Guidelines. The earthworks and
         landscaping must be undertaken in accordance with an Operational Works approval
         and be lodged within 1 month of the Material Change of Use approval date.
         Damage to Services and Assets
   22.   Any damage caused to existing services and assets as a result of the development
         works must be repaired at no cost to the asset owner at the following times:
         a.     where the damage would cause a hazard to pedestrian or vehicle safety,
                immediately; or
         b.     where otherwise, upon completion of the works associated with the development.
         Any repair work which proposes to alter the alignment or level of existing services and
         assets must first be referred to the relevant service authority for approval.
   Development Permit for Reconfiguring a Lot (Access Easement)
   PLANNING
       When Conditions must be Complied With
   1.  Unless otherwise stated, all conditions of this Decision Notice must be complied with
       prior to the use commencing, and then compliance maintained at all times while the
       use continues.
       Approved Plans
   2.  Development undertaken in accordance with this approval must generally comply with
       the approved plans of development. The approved plans are listed in the following table
       unless otherwise amended by these conditions.
           Plan No.             Rev.    Plan/Document Name                           Date
           D-01569-06-B                 Site Plan drawn by Martoo Consulting         23/06/2015




                                                                                  Page 49 of 50

Section 50

GENERAL COMMITTEE MEETING AGENDA                                                    11 JANUARY 2016


             Easements
       3.    An easement for access purposes must be registered against the title of Lot 2
             SP108094 in favour of Lot 1 SP108094. The easement must be a minimum of 10m
             wide and widened where necessary to wholly include passing bays and any associated
             banks or batters.
       4.    Unless otherwise agreed in writing by the relevant service provider, any public or third
             party infrastructure located on the subject site must be placed within an easement
             registered against the title of the property.
       5.    All easements must be designed in accordance with the planning scheme and granted
             at no cost to the Grantee. Where the Grantee is Council or a service authority, the
             easement documentation must be in accordance with the Grantee’s standard
             easement terms. Draft easement documentation must be submitted to Council for
             endorsement.
       6.    All works must be kept clear of any existing or proposed easements on the subject
             land, unless agreed otherwise in writing by the Grantee.
B.     Give notice to the property owner to remove bunds 1 & 2, and reinstate the areas back to its
       original condition to the reasonable satisfaction of Council within 2 weeks of this decision.

Finance & Risk

There will be costs for Council involved in defending the appeal and it is premature to advise on
the appeal prospects at this stage.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Departments/Sections Consulted:

      Community Services                        X   Planning & Infrastructure
      Disaster Management & Public Order            Building & Plumbing Services
      Waste & Environmental Health              X   DA Planning
      Community Facilities                          Strategic Land Use Planning
      Cultural Facilities                           Asset Design & Investigations
                                                    Asset Planning
                                                    Civil Operations
                                                    Environment

      Executive Office                              Corporate Services
      Community Engagement                          Finance
      Customer Service                              ICT
      Executive Support                             Procurement & Fleet
      Governance                                    Property & Facilities
      Human Resources                               Revenue Services




                                                                                       Page 50 of 50

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.