Council archive · source document
Development Application part 1 IDAS Forms 1, 6 & IDAS Checklist - OPW12/0353
..---
SCRC CORRESPONDENCE
.
eV
-
/cDr~"’elnr’ C.unter
I I,
~~,!~!~I~I ~’"
1 3 SfP
201l _,
TeitV ntin T~I~ IS THE NEXT PART OF A
MUt LE PART RECORD
Part \ Of ~
Application number: aPlAJ I::J-!OJSJ
T:\I&AM\BCS IAMIlNFORMATION MANAGEMEN1\RECORDS MANAGEMEN1\Conlrol ofRecordslEDRMSlMulti Part R=rd Cover Sheet NEXT PART.xls
.
r;- .?I~I~ .~ 10 _j
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 13 pages
Page 2
IIIIII Integrated Development Assessment System form ;
.
".
... "~~
~-
-
,,;’
Application Details IDAS form 1 -
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
.
complete this form (Application details -
IDAS form 1)
. complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Applicant details (note:the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on alllDAS applicati"On forms is
correct. Any development permit or preliminary approval that may be issued aJ; a consequence of this application will
be issued to the applicant.)
Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Namels (individual or company name in full) IPILE-IT PTY LTD riA NOOSA JETTY BUILDERS
For companies,contact name IDANNY REED
Postal address !PO 299
BOX NOOSAVILLE QLD 4566
Contact phone number 10408 137 526
Mobile number (non-mandatory)
Fax number (non-mandatory) 1075474 3480
e-mail address (non-mandatory) [email protected]
1.What is the nature of development proposed? (tick all applicable boxes) ."?:f
;..~f-~~ ~
.~i ~.~~J~ l’~ ,:~:;~~.:~_
o material change of use of premises
o building work
IZI operational work
o reconfiguring a lot Deve\opment Counter
’
.
1 3 SEP 2012 j; ~
.
,
.
Tewantin
.
Department of Infrastructure and Planning
.
_.
.
QPlan 1/
"
’,"-~
r~’:\. \
l
Queensland
,’\. Government
V’
Page 3
ODD
.
’,.,.
1:~’ ~ ~","~_~~~’-’\
.
’" ,’, r_~
;:~.J’}.~ ~
2. What type Qf approval is being sought? .~..!I.’ 3;.,oI! J ~
:~-~ ’,y",
~,.,’.,~J:_~,~.’, ~’l:.~.~. , ’,’"’~
~.
~ ".-
’
J fj~,."l 1,- _
~
""
. ;l_~_ ,~,
iI’3i ~ -;~r~ ""
" "
IZI development permit
o preliminary approval
o both provide details below
-
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
I
-
~
’!1
;’},-
,~:;
.,,,if-
1f.’
~~’,’
..
,
’Y.I 11._. M
’" :’
~ No
DYes complete table A and then go to question 5
-
4_location of the premises (complete table 8 and/or table C as applicabJe.ldentify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
lot on plan
Street Address
description
local government area
Unit Street Street name and official Post Plan type (e.g. Logan,Cairns)
lot No.
No. No. suburb/locality name code and plan no.
sunshine coast regional
1 13 Sea Horse Place, Noosaville 4566 312 rp 895073
council
oStreet address flot on plan
Street address flot on plan for the land adjoining or adjacent to the premises (appropriate for development in
IZI water
e.g. jetty, pontoon)
Table C -
premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note:place each set of
coordinates in a separate row) Zone Local government
Datum
reference area (If applicable)
Easting Northing Latitude Longitude
DGDA94
DWGS84
1
o other
"0;-- ’",
5.Total area of the premises on which the development is proposed (indicate hectares or m2)
~>;",\-
710m2
6. Current use/s of the premises (e.g.vacant land, house, apartment building, cane farm, etc.) :.- ’,’
~’ ’~.,~,!~,i,
.;(,;
j.,,"
"
11 1 house
7. Provide a brief description of the proposal (e.g.six unit apartment bui~ding, 30 lot residential subdivision etc.)
timber jetty
Application Details -
IDAS form 1
Version 1.018 December 2009
Page 4
.om
8. Is owner’s consent required for this application? {refer to Mtes at the end of this form fqr more information)
o No
C?SI Yes -
complete either table D, table E or table F as applicable
Table D (note:do not complete this table if lodging the application on-line using Smart eDA)
Name of ownerls of the land
IlWe, the above-mentioned ownerls of the land, consent to the making of this application.
Signature of ownerls of the land
Date
Table E
Name of ownerls of the land
o The owner’s written consent is attached or will be provided separately to the assessment manager
Table F
Name ofowner/s of the land Kesby ,Jim & Glenys
By making this application, I, the applicant, declare that the owner has given written consent to the making of
[8] the
application.
,..’
9. Does the application involve a state resource? (e.g.the application involves state land, OJ taking quarry
~-!.:
materials. Refer to the notes at the end of this form for more~information)
~’Il:
~
.r~:t’:f’" i-Ol_ ""~ >0
:"II. ,Ll~,’
r
jgj No DYes -
complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es.) "~:~S.:J~;!’;,’~;’ clj’ ’:i~
’
C?SI adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) complete table H
-
o on strategic port land under the Transport Infrastructure Act 1994 complete table I
-
o in a tidal water area -
complete table J
Table H Name of water body, watercourse or aquifer
11 Noosa Waters Canal
11. Are there any eXisting e.asements on the premises? (e.g.for vehicular access, electricity, overland flow,
,
water, etc.) ’r-
,~
(’8jNo 0Yes -
ensure the type, location and dimension of each easement is included in the plans submitted
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 5
000
12. Does the proposal include new building work or operational work on the premises? (including any
services) ..
II
FI!
~
ONo (gJ Yes -
ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
end of this form for more information)
[gI No -
Go to question 15 DYes
15. Has the local government agreed to apply a superseded planning scheme to this application under "..,
section 96 of the Sustainable Planning Act 2009? ,,’
[8l No
DYes provide details below
-
16. List below all of the forms and supporting informatjon that accompany this application (include alllDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
;’- ~
Method of lodgement to
Description of attachment or title of attachment
assessment manager
1 Form 6 over the counter
2 Checklist over the counter
3 John Norden Plans over the counter
117. Applicant’s declaration ~>
By making this application, I declare that all information in this application is true and correct (note:it is
~ unlawful to provide false or misleading information).
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 6
.000
Notes for completing this fonn
Question 8:
. Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263,then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
. Owner’s consent is not required for a mobile and temporary ERA.
Question 9:
. Section 264 of the Susfa;nable Plann;ng Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
. The Building and Construction Industry (Portable Long Service Leave)Act 1991 prescribes when the portable
long service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
. The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
. Building and Construction Industry Notification and Payment Forms are available from
any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.Qleave.Qld.goy. au. For further information contact QLeave on 1800803481 or www.Qleave.Qld.goy.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP)in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received
I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To:
I Council. r have been engaged as the private certifier for the
building work referred to in this application.
Date of BSA Certification Building
Name
engagement license number classification/s
Application Details -
IDAS form 1
Version 1.0 18 December 2009
Page 7
ODD
.
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount form sighted by Name of officer who
Description of the work Date paid
Number paid ($) assessment sighted the form
manager
11
The Sustainable Planning Act 2009 (SPA)is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.
Application Details -
/DAS form 1
Version 1.018 December 2009
Page 8
Building or operational work assessable
against a planning scheme ICAS form 6 -
(Sustainable Planning Act 2009 version t.O effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
. complete Applicant details IDAS form 1
-
. complete any other forms relevant to your application
. provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment aga nst a planning sc.heme? (tick applicabl box/es)
~ building work complete table A
-
ooperational work complete table B
-
Table A
What is the nature ofthe building work made assessable in the planning scheme (e.g.building, repairing, altering,
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
~ development permit o preliminary approval
Are there any current approvals associated with this application? (e.g. material change of use)
~No DYes -
provide details below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour) $18,500
~
Department of Infrastructure and Planning OPlan
/\-~\.,
.’,
’’:’-~
Queensland
""Government
Page 9
’ODD
3. Confirm the following mandatory supporting information accompanjes this appfication
Confirmation
Method of lodgement
of rodgement
An applications for operational works
site plans drawn to scale whioh sh.ow the f.oll.owing:
. the l.ocati.on and site area .of the land t.o which the applicati.on relates
(relevant land)
. the n.orth p.oint
. the b.oundaries .of the relevant land
. the aIJotment layout showing existing lots, any proposed lois (including
the dimensi.ons .ofth.ose l.ots), existing.or pr.op.osed r.oad reserves, [8J c.onfirmed .over the c.ounter
building envel.opes and existing.or prop.osed .open space (n.ote:
numbering is required f.or alll.ots)
.
any existing .or pr.op.osed easements .on the relevant land and their
functi.on
.
any access limitati.on strips
. all existing and pr.op.osed roads and access p.oints .on the relevant land
a statement ab.out h.ow the pr.op.osed devel.opment addresses the l.ocal
g.overnment’s planning schemes and any other planning d.ocuments Dc.onfirmed over the c.ounter
relevant t.o the applicati.on
Applications for operational works involving earthworks (filling and excavating)
drawings sh.owing:
.
existing and pr.op.osed c.ont.ours
.areas to be cut and filled
. the l.ocati.on and level .of any permanent survey marks .or reference
stati.ons used as datum f.or the w.orks oconfirmed electr.onic
. the l.ocati.on .of any pr.op.osed retaining walls .on the relevant land and
their height
. the defined flo.od Jevel (if applicable)
. the defined fill level (if applicable)
Applications for operational works involving roadworks
drawings sh.owing:
. existing and prop.osed cont.ours
. the centreline or construction line showing chainages, bearings, .offsets
if the c.onstructi.on line is not the centreline .of the r.oad and all
intersecti.on p.oints
. inf.ormati.on for each curve including tangent point chainages and
offsets, curve radii, arc length, tangent length, superelevation (if
applicable) and curve widening (if appl cabte)
.kerb lines including kerb radii (where not parallel t.o centreline) and
tangent p.oint changes (where n.ot parallel t.o centreline)
.edge .ofpavement where kerb is n.ot c.onstructed Dc.onfirmed
.p.ositi.on and extent .of channelisati.on
.l.ocati.on and details .of all traffic signs, guidep.osts, guardrail and .other
street furniture
.
pavement markings including details .on raised pavement markers
. catch pit, manh.ole and pipeline l.ocati.ons
.drainage details (if applicable)
.cr.oss r.oad drainage culverts (if applicable)
.concrete footpaths and cycle paths
.l.ocation and details for access p.oints, ramps and invert cr.ossings
.
changes in surfacing material
. .
Buildmg and operational work assessable against a planning scheme IDAS form 6
-
Version 1.0 18 December 2009
Page 10
’ODD
Confirmation
Method of lodgement
of lodgement
AppJications for operationaJ works invoJving stormwater drainage
drawings showing:
. existing and proposed contours
. drainage locations, diameters and class of pipe, open drains and
easements
oconfirmed
. manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels
. infet pit locations, chainage and offset or co-ordinates and invert and
k~rb levels
Applications for operational works involving water reticulation
drawings showing:
. kerb lines or edge of pavement where kerb is not constructed
. location and levels of other utility services where affected by water
reticulation works
.
pipe diameter, type of pipe and pipe alignment
. water main alignments
o confirmed
. water supply pump station details (if applicable)
. minor reservoir details (if applicable)
. conduits
. location of valves and fire hydrants
. location ot house connections (ifapplicable)
. location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation
drawings showing:
. location of all existing and proposed services
. location of all existing and proposed sewer lines and manhole locations
. location of all house connection branches
. kerb lines or edge of pavement where kerb is not constructed
. chain ages
Dconfirmed
.
design sewer invert levels
.
design top of manhole levels
.type of manhole and manhole cover
.pipe diameter, type of pipe and pipe alignment
.location of house connections (if applicable)
.sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
. location of all light poles and service conduits
. location of all other cross road conduits
.
type of wattage and lighting
oconfirmed
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal alignment
. detai~s of lighting levels
Building and operational work assessable against a planning scheme -)DAS form 6
Version 1.018 December 2009
Page 11
’ODD
Confirmation
"
>
Method of lodgement
of lodgement
Applications for operational works involving public utility services
drawings showing:
.
any existing light poles and power poles
.
any existing underground services Oconfirmed
. details of proposed services
. alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
. the location of proposed plant species
.a plant schedule indicating common and botanical names, pot sizes
and numbers of plants
.planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and Oconfirmed
garden edge
.the location and type of any existing trees to be retained
.construction details of planter boxes, retaining walls and fences
.the proposed maintenance period
. irrigation system details
Notes for completing this form:
. This form can also be used for development applications for building works or operational works assessable
against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received I Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme IDAS form 6
-
Version 1.0 18 December 2009
Page 12
Development assessment checklist IDAS -
checklist 1
(Sustainable Planning Act 2009, version 1.018 December 2009)
This checklist applies to the carrying out of development generally.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
whether you need to make a development application for the proposed development
if a development application is required, the relevant IDAS forms you need to complete as part of your application
whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change ofuse IDAS checklist 2, Reconfiguring a lot IDAS checklist 3or Operational
- -
works IDAS checklist 4, as applicable.
-
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning’s website at www.dip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
.
Part 1 - General questions .....,~~" :~ m
~,’;f J!1l,~1;: ~.~, ...,~ ;; ir’ ’,~_ ;0; ~~.~~~ ~:-~ ~i._,~’ ’7.’~i<~)_’ ~~ ;.:.’i ~t~::’ j~",~
,::
1.1 Have yo received.a referral agency response in relation to this proposed development prior tQ making
an application? .~
~No
. To assist you in preparing your application, completing Referral agency responses -
IDAS checklist
DYes
6 is recommended
1.2- 00 you wish the proposed development to be assessed against a superseded planning scheme?
",
~ No
. You must complete Request to apply a superseded planning scheme -
Sustainable Planning Act
DYes form 2and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details -
IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?
!ZINo
DYes . It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensland Heritage Act 1992? ,l’:!
!ZI No
DYes . It is recommended that you complete part 3 of this checklist
Department of Infrastructure and Planning QPlan ;~~\J Queensland
,
l_\’’\ Government
Page 13
ODD
1.5 Does the proposal involve development on a local heritage place?
rgJ No
DYes . It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity,.~ther than an agricultural ERA,a mining
activity or a chapter SA activity? J
I:8J No
DYes . It is recommended that you complete part 5 of this checklist
1.7 Is any part of the d~velopm nt on strategic port land orairporfrap ’(other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)
IZINo
DYes . It is recommended that you complete part 6 of this checklst
1.8 ls any part of the deve]opmenf on land below a high water mark ’within the limits o(~ port uncler thQ
Transport Infrastructure Act 1994?
lZINo
DYes . It is recommended that you complete part 7 of this checklist
,’" .. ,f. -"t,...."
,~:{
1.9 Is any part of the premises designated for community infrastru.cture? -
"’-"
-
’l; .,-T.’ ,.
~~ .r.’\"’
.,-_ :~_1’;:1. .-,,’ i
,
r h._--~::_-I_
1ZI No
DYes . It is recommended that you complete part 8 of this checklist
oJ.,
1.10 Does the proposal involve the establishment or expansion of a~wa${ewater dispoS’~d system? rO.t; (.-
I2JNo
DYes . It is recommended that you complete part 9 of this checklist
1.11 Is the development on hmd that adjoins a declared fish habitai1trea u,nder the Fish~ries Act 1994?
IZINo
DYes . It is recommended that you complete part 10 of this checklist
Privacy please refer to your assessment manager for further details on the use of information recorded in
-
this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP)believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
Development application assessment checklist -
IDAS checklist 1
Version 1.018 December 2009
Page 14
ODD
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning.
Development application assessment checklist -
IDAS checklist 1
Version 1.018 December 2009
Used in these records
Development Application part 1 IDAS Forms 1, 6 & IDAS Checklist - OPW12/0353Related documentApplication case desk ↗
About this file
- File size
- 8.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.