Ref: 205-002-2015-002L 10 March 2015 RPS Australia Asia Pacific PO Box 149 Wurtulla QLD 4575 Attention: Brad Williams Dear Sir RESPONSE TO MCU APPLICATION – INFORMATION REQUEST FOR APPLICATION MCU14/0083, 178 EUMUNDI NOOSA ROAD, NOOSAVILLE In response to your Information Request Notice dated 11th November 2014, we provide the following responses for approval. ISSUE The submitted management plan includes assumptions of the downstream drainage system and the applicant has not demonstrated that the downstream drainage system has the capacity to cater for the proposed development. 4. Information Required Demonstrate that the downstream drainage system has the capacity to cater for the proposed development in accordance with Council’s Planning Scheme Policy 5 and QUDM or provide amended plans that indicate the necessary on site detention system. Response: Please find attached the drainage catchment plan and drainage calculation table (provided by Council on 26th February 2015) that demonstrates the existing system has the capacity to accommodate the post development flows from the site as described below. With reference to the attached catchment plan, the site’s discharge point to the underground drainage system is at is at Pit 9, which then joins Pit 5. The calculations table shows the design flows in this reach of the system to be 32l/s with a capacity within this reach of 161l/s. The stormwater quantity analysis within the Stormwater Management Plan provided with the application, estimates a pipe flow from the proposed development in the order of 69l/s. As such, flows from the proposed development (69l/s) and the catchment (32l/s) are accommodated within the existing system (161l/s). ISSUE The applicant has not submitted the MUSIC model files for assessment. Council also has concerns with the potential future costs of maintaining the proposed system.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 1 page
Page 2
5. Information Required
Provide the MUSIC model data files for assessment.
Response:
The MUSIC model data files are attached to the email with this RFI response and need to be forwarded
to Council for assessment.
6. Information Required
Provide a copy of a quotation for the ongoing maintenance of the proposed stormwater quality system.
Response:
Please find attached the quotation from Stormwater 360 for the ongoing maintenance of the stormwater
quality device proposed for the site.
ISSUE
Council has concerns with the proposed entry point on the eastern side of the site. The applicant has
not provided an indication of the expected number of heavy vehicle movements or whether the intent is
to also provide access for customers.
7. Information Required
In regard to the eastern access driveway provide an indication of the expected number of heavy vehicle
movements and indicate whether the intent is to also utilise this access for customers.
Response:
One MRV is expected to service the site per day with 2 delivery vans expected per day. Our client does
not intend to limit customer entry to the site from the east.
We look forward to your favourable consideration of the responses provide. Please progress with the
assessment of this application.
Should you have any queries, please contact Mr Kai Pelgrave of this office.
Yours faithfully,
KAI PELGRAVE
Principal Designer
Enc. Existing stormwater drainage system catchment plan and calculations table.