Skip to the record
Search everything, all in one place.

Original source · versioned page text

2023-03-13 General Committee Meeting Agenda

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


         General Committee
              Meeting


              Monday, 13 March 2023

                 commencing at 12.30pm
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2023-03-13 General Committee Meeting Agenda(PDF, 5MB).pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 43 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                              13 MARCH 2023


TABLE OF CONTENTS


ITEM                                                                   PAGE

1.     ATTENDANCE & APOLOGIES                                               3

2.     CONFIRMATION OF MINUTES                                              3

3.     PRESENTATIONS                                                        3

4.     DEPUTATIONS                                                          3

5.     ITEMS REFERRED FROM COMMITTEES                                       3

       1   SHORT STAY LETTING OR HOME HOSTED ACCOMMODATION LOCAL LAW –
           12 MONTH REVIEW                                             3

       2   NOOSA COUNCIL THREATENED FAUNA RECOVERY ROAD MAP                  3

6.     REPORTS DIRECT TO GENERAL COMMITTEE                                  4

       3   NOOSA HEADS LIONS PAID PARKING – EXTENSION OF PARKING TO 1 MAY
           2024                                                              4

       4   HEALTHY LAND AND WATER FUNDING CONTRIBUTION                      10

       5   FINANCIAL PERFORMANCE REPORT – MARCH 2023                        27

       6   NOOSA COUNCIL BRAND REFRESH                                      41

7.     CLOSED SESSION                                                 44

       7   VOLUNTARY FLOOD RECOVERY
           PROPERTY ACQUISITION                                         44




                                                                 Page 2 of 50

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                 13 MARCH 2023


1.   ATTENDANCE & APOLOGIES




2.   CONFIRMATION OF MINUTES
     The Minutes of the General Committee Meeting held on 13 February 2023 be received and
     confirmed.




3.   PRESENTATIONS
     Nil.




4.   DEPUTATIONS
     Nil.




5.   ITEMS REFERRED FROM COMMITTEES


     PLANNING & ENVIRONMENT COMMITTEE



     1      SHORT STAY LETTING OR HOME HOSTED ACCOMMODATION LOCAL LAW
            – 12 MONTH REVIEW
            (Planning & Environment Committee Agenda, 7 March 2023, Item 3, Page 21)
            Reason for referral – significance of the issue.



     2      NOOSA COUNCIL THREATENED FAUNA RECOVERY ROAD MAP
            (Planning & Environment Committee Agenda, 7 March 2023, Item 4, Page 32)
            Reason for referral – significance of the issue.



     SERVICES & ORGANISATION COMMITTEE

     Nil




                                                                                       Page 3 of 50

Section 4

GENERAL COMMITTEE MEETING AGENDA                                               13 MARCH 2023


6.   REPORTS DIRECT TO GENERAL COMMITTEE



3    NOOSA HEADS LIONS PAID PARKING – EXTENSION OF PARKING TO 1 MAY 2024

Author           Adam Britton, Project Manager Special Projects
                 Infrastructure Services Department

Index            ECM/ Project and Contract / Noosa Transport Strategy / Car Parking
                 Management
                 ECM/ Properties (T1) / 0 Noosa Parade, Noosa Heads
                 ECM/ Subject / Transport / Car Parking

Attachments      Nil

EXECUTIVE SUMMARY
The Noosa Heads Lions Park greenspace has been used as an overflow car park during the
Queensland school holidays and long weekends throughout the public health declaration of the
COVID-19 pandemic.
The Tewantin Noosa Lions Club have put forward dates for the continuation of paid car parking at
Lions Park over all Queensland school holidays and long weekends until 1 May 2024.
Whilst use of the park for car parking is inconsistent with the Department of Resources park
designation, the Noosa Design Principles, the Noosa Plan and The Transport Strategy, it is
recommended that Council approve a 12-month extension to allow for community engagement on
the use of the park for car parking through the proposed Destination Management Plan.

RECOMMENDATION
That Council note the report by the Project Manager Special Projects to the General Committee
Meeting dated 13 March 2023 and
A.   Approve the use of the Noosa Heads Lions Park Reserve for paid parking on a temporary
     basis for a further 12 months, with delegation to the CEO to reduce the days subject to
     weather, over the following periods:
          Queensland June/July school holidays from 24 June to 9 July 2023;
          Queensland September school holidays including the King’s Birthday public holiday
           from 16 September to 2 October 2023;
          Queensland Christmas school holidays including Saturday 9, Sunday 10, Saturday 16,
           Sunday 17, Saturday 23 and Sunday 24 December 2023, Tuesday 26 December 2023
           to Sunday 14 January 2024, Saturday 20 to 21 January 2024;
          Australia Day long weekend from Friday 26 to Sunday 28 January 2024;
          Queensland Easter school holidays from Friday 29 March to Sunday 14 April 2024;
          ANZAC Day public holiday and unofficial long weekend from Thursday 25 April to
           Sunday 28 April 2024;
          Labour Day long weekend from Saturday 4 to Monday 6 May 2024.
B.   Write to the Department of Resources to inform of the intended use of Noosa Heads Lions
     Park Reserve for peak period parking during the above-mentioned periods, and that
     community engagement and future use of the park is proposed to be undertaken as part of
     Noosa Council’s Destination Management Plan;

                                                                                   Page 4 of 50

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                13 MARCH 2023


C.   Approve allocation of 50% of the car parking revenue after GST to the Tewantin Noosa Lions
     Club and the remaining revenue towards Go Noosa initiatives and park remediation;
D.   That an amount equivalent to 50% of Council’s share of the ‘profit’ from car parking in the
     Noosa Heads Lions Park Reserve be held ‘in reserve’ and allocated to recreational
     improvements in Noosa Heads Lions Park for residents and visitors alike, noting that the
     term ‘profit’ refers to Council’s share of the revenue less costs associated with parking on
     the reserve; and
E.   Seek community feedback on the use of Noosa Heads Lions Park for car parking as part of
     the proposed Destination Management Plan.

REPORT
The purpose of this report is to seek Council approval to operate paid parking on the Noosa Heads
Lions Park reserve over the Queensland school holidays and long weekends from 24 June 2023
to 6 May 2024.
The report also seeks to confirm dates for the Tewantin Noosa Lions Club who operate the paid
parking.
1.   Background
The Noosa Heads Lions Park (Lions Park) was set aside as a reserve for recreation in 1982
following a land reclamation scheme. The 1-hectare (approximately) reserve is owned by the State
Government’s Department of Resources with Noosa Council as public trustee in control of the site.
Noosa Heads Lions Park is one of the Shire’s premier recreation assets, is highly valued by
residents, tourists and families and provides an attractive and vegetated entry statement into the
Hastings Street precinct, symbolic of Noosa’s environmental stewardship.
For over twenty years the Noosa Heads Lions Park greenspace has been used as an overflow car
park during the Christmas and Easter School holidays. In September 2020 the use of the park for
car parking was expanded in duration to include all Queensland school holidays and long
weekends during the public health declaration of the COVID-19 pandemic.
The Federal Government COVID-19 Declaration is still in place as at 1 March 2023, however, the
Queensland Government lifted its Public Health Directions as at 31 October 2022.
The Tewantin Noosa Lions Club, who have continuously managed and operated the paid parking,
have requested to continue to operate paid car parking at Noosa Heads Lions Park over all
Queensland school holidays and long weekends until 1 May 2024.
This report seeks Council consideration of an extension to the paid parking period, along with the
other factors such as the use of the area as a park for recreation.
2.   Car park operations
Paid parking on Noosa Heads Lions Park is managed by the Tewantin-Noosa Lions Club through
its volunteer members on behalf of Council, with the revenue shared equally between the
Tewantin-Noosa Lions Club for their charitable works and the remaining revenue returned to
Council to fund park refurbishment and traffic management costs.
The Tewantin-Noosa Lions Club operate the temporary car park from 8:30am to 5.30pm on the
designated days subject to weather. Vehicles are charged a flat rate of $20 (incl. GST) per day or
part thereof.
Council’s agreement with Tewantin Noosa Lions Club currently covers the Easter school holidays
and long weekends until the 2 May 2023.
Table 1 shows the usage of the car park from 2018/19 to present. As identified in the table, the
patronage and revenue has increased significantly, which aligns with the additional days the park
has been used as a carpark.


                                                                                    Page 5 of 50

Section 6

GENERAL COMMITTEE MEETING AGENDA                                               13 MARCH 2023


Table 1: Number of vehicles parked in Lions Park

     Holiday Periods      QTY      Revenue      Year     No. days     QTY      YOY        Change
                        vehicles   incl. GST   range     used as    vehicles    +/-      compared
                         parked                          car park                         to 2018-
                                                                                            2019
 Christmas 2018-2019     6,676                 2018-          26
                                   $147,200                          7360        -       -
 Easter 2019              684                  2019            6
 Christmas 2019-20       3,990                 2019-          24
 Easter 2020               -       $126,720    2020            0     6336      -14%          -14%
 September 2020          2,346                                17
 Christmas 2020-21       4,670                                22
 Easter 2021             1,363                                17
 ANZAC Day long
                          454                  2020-           3
 weekend 2021                                                                   +40
                                   $176,580    2021                  8829                    +20%
 May Day long                                                                    %
                            -                                  0
 weekend 2021
 July 2021                373                                  8
 September 2021          1,969                                15
 Christmas 2021-22       4,175                                25
 Easter 2022             2,702                                17
 ANZAC Day and May
                                               2021-
 Day long weekends        652      $238,000                    5     11900      +35          +62%
                                               2022
 2022
 July 2022                991                                 11
 September 2022          3,380                                15
 Christmas 2022-23       7,293                                27
                                               2022-to
 Australia Day long                $157,320                          7866
                          573                   date           4
 weekend 2023
 Total                   42,291    $845,820                  242


                Number of vehciles parked Christmas 2018/19 to 2022/23
 10,000
  8,000
  6,000
  4,000
  2,000
     -




                                                 QTY


Previous Council Consideration
Ordinary Meeting Minutes, 17 September 2020, Item 8, Page 16
That Council note the report by the Project Manager Transport Innovation to the General
Committee Meeting dated 14 September 2020 and:
A.    Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2020/21
      Christmas holiday period from 14 December 2020 to 27 January 2021 with delegation to the
      CEO to reduce the days subject to weather and advice from the Council COVID Safe team;
B.    Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2021

                                                                                     Page 6 of 50

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                    13 MARCH 2023


     Easter holiday period from 2 April 2021 to 18 April 2021 with delegation to the CEO to reduce
     the days subject to weather and advice from the Council COVID Safe team;
C.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over the 2020
     September holiday period from 19 September 2020 to 5 October 2020 with delegation to the
     CEO to reduce the days subject to weather and advice from the Council COVID Safe team;
D.   Write to the Department of Natural Resources, Mines and Energy and seek Ministerial
     Approval for an inconsistent secondary use of the Noosa Heads Lions Park (Lot 117 on
     SP108103) for paid car parking during school holidays and long weekends for the period of
     the public health declaration for the COVID-19 pandemic; and
E.   That an amount equivalent to 50% of Council’s share of the ‘profit’ from car parking in the
     Noosa Heads Lions Park Reserve be held ‘in reserve’ and allocated to recreational
     improvements in Lions park for residents and visitors alike, noting that the term ‘profit’ refers
     to Council’s share of the revenue less costs associated with rectifying any damage/impact
     from parking on the reserve, the hire of temporary fencing to protect children at the
     playground & BBQ area, parking signage at Lions Park, the printing of tickets and the use of
     traffic control to assist in the movement of pedestrians from Lions Park.
Ordinary Meeting Minutes, 21 November 2019, Item 4, Page 14
That Council note the report by the Director Infrastructure Services to the Services & Organisation
Committee Meeting dated 12 November 2019, and:
A. Approve the use of the Noosa Heads Lions Park for paid parking as part of Go Noosa Christmas
   2019/20 (14 - 15 December 2019, 21 - 22 December 2019, 26 December 2019 – 12 January
   2020, 18 - 19 January 2020, and 25 – 26 - 27 January 2020) and Easter 2020 (4 - 5 April 2020,
   10 - 13 April 2020 (Easter long weekend) and 18 - 19 April 2020).; and
B. Approve 50% of the car parking revenue to go to the Tewantin-Noosa Lions Club and the
   remaining revenue to go towards Go Noosa initiatives.
Finance
Vehicles are charged a flat rate of $20 (incl. GST) per day or part thereof. Revenue is equally
shared between the Tewantin-Noosa Lions Club and Council excluding GST.
Council’s share of the revenue from paid parking funds goes directly towards:
    rectification of any damage/impact from parking on the reserve;
    the hire of temporary fencing at the playground & BBQ area;
    parking signage at Lions Park;
    printing of tickets.
The funds also contribute to the wider Transport Strategy initiatives including:
     the use of traffic control to assist in the movement of pedestrians from Lions Park;
     Free Bus programs.
As demonstrated in Table 1 above, the revenue varies greatly from year to year based on the
approved dates of operation and weather.
Risks & Opportunities
Opportunities
As stated above, Council’s share of the revenue contributes to Transport Levy funded initiatives.
The Tewantin Noosa Lions Club’s (TNLC) fifty percent share benefits the wider Noosa community
through the Club’s activities and administration. An example of a recent TNLC initiative is the
installation of the all-abilities beach mat at Noosa Main Beach.
Preparation of the Destination Management Plan and the Shire wide traffic study will reach a point
of completion and critical nexus over the next 12-18 months. This will enable Council to make a
long-term decision about the future use of the park for car parking during peak periods.


                                                                                        Page 7 of 50

Section 8

GENERAL COMMITTEE MEETING AGENDA                                                         13 MARCH 2023


Council continues to collaborate with the Department of Transport to increase the mode share of
public transport.
Risks
Council needs to balance community access to public parkland against requests for overflow car
parking and the funds generated from the paid parking on the site. The use of the Noosa Heads
Lions Park Reserve for car parking conflicts with the Department of Resources’ designation of the
park and Council policies as noted in Table 3 below. Moving forward, Council will need to consider
the use of community greenspace against the demand for car parking and undertake community
engagement to determine the preferred use.
Approximately 14,000 vehicles per day enter the congested Noosa Heads precinct during the peak
period. The additional 150-200 overflow car parks are not considered to make a measurable
difference to supply and demand.
In recent years, an arborist’s report cited a significant impact to the melaleuca trees due to vehicles
parking under the trees. The park area also incurs damage to the subsurface drainage as a result
of vehicles parking on the grass area.
At 5.30pm the gates close and any vehicles left in the reserve are locked in. A number is placed
on the entry sign to call to release the vehicle. There is a risk that drivers who do not wish to pay
the call out fee or wait for a Council on-call officer to arrive, may damage the reserve’s infrastructure
to get out.
The Council policies and strategies that identify the conflict of using Lions Park as a car park are
noted in the below table:
Table 2: Policy position of using Lions Park for car parking.
 Document                      Key Principles/Policy
 Department of Resources          The State-owned Lions Park is designated as recreation park. Council
                                   as trustee approving use as car park is contrary with the designation,
                                   noting that the Department of Resources have previously endorsed the
                                   temporary use as a car park with the recommendation to conduct
                                   community consultation to determine the community intentions.
 Planning Scheme                  The park is zoned as open space recreation. Use as a car park as the
                                   dominant use conflicts with the Planning Scheme.

 Noosa Design Principles          Open space will remain a priority even though the demand for car
                                   parking seems limitless (Principle 9, Sensitive Growth and
                                   Development).
                                  Improve access for pedestrians, cyclists and public transport before
                                   using public space for car parking (Principle 8, Our Local Character).
                                  Design a transport network that does not attempt to cater for all peak
                                   traffic and parking loads but provides for a high level of service during
                                   non-peak periods. (Principle 2, Walking, Riding and Driving).
                                  Avoid sacrificing public open space for car parking (Principle 7, Walking,
                                   Riding and Driving).
 Noosa Transport Strategy         Focus on moving people and goods rather than on moving cars.
 2017-2027
                                  Provide infrastructure and services that are designed to give priority to
                                   pedestrians, cyclists, scooters and public transport over private cars.
                                  Address peak time traffic congestion by reducing traffic rather than
                                   increasing road capacity.
                                  Design, encourage and facilitate transport options that reduce the
                                   emissions produced by our community.




                                                                                             Page 8 of 50

Section 9

GENERAL COMMITTEE MEETING AGENDA                                                           13 MARCH 2023


 Document                      Key Principles/Policy
 Events Policy                    The day-to-day recreational use of community land by residents and visitors
                                   will generally take precedence over events.
                                  Events must not adversely impact on the environment, public infrastructure
                                   or other community assets.
                                  Events in locations susceptible to bad weather must provide detailed
                                   contingency plans and meet the cost of any repair and reinstatement of
                                   community assets.
                                  Given the limited available community event space in Noosa’s high use
                                   precincts, Council encourages the identification of alternative locations for
                                   staging events.

Consultation
External Consultation - Community & Stakeholder
Tewantin Noosa Lions Club
Hastings Street Association
Internal Consultation
Departments/Sections Consulted:

 X   Chief Executive Officer       Community Services                          x   Corporate Services
     Executive Support             Director                                    x   Director
                                   Community Development                           Financial Services
                                   Community Facilities                            Fleet
                                   Libraries & Galleries                           ICT
                                   Local Laws                                      Procurement
                                   Waste & Environmental Health                X   Property
                                                                                   Revenue Services

     Executive Services        x   Environment & Sustainable Development       x   Infrastructure Services
     Director                      Director                                    X   Director
     Community Engagement          Building & Plumbing Services                    Asset Management
     Customer Service              Development Assessment                          Buildings and Facilities
     Governance                    Economic Development                        X   Civil Operations
     People and Culture            Environmental Services                          Disaster Management
                               x   Strategic Land Use Planning                 X   Infrastructure Planning,
                                                                                   Design and Delivery




                                                                                                Page 9 of 50

Section 10

GENERAL COMMITTEE MEETING REPORT                                                13 MARCH 2023


4    HEALTHY LAND AND WATER FUNDING CONTRIBUTION

Author           Principal Environment Officer - River Strategy & Engagement, Amy Kimber
                 Environment and Sustainable Development Department

Index            ECM /Subject 63.07 Noosa River Plan

Attachments      1.    Network Member Agreement 2022-2025


EXECUTIVE SUMMARY
Healthy Land & Water has approached Council to request that it enters into a new three-year
funding agreement for delivery of its programs in Noosa Shire.
This includes core funding for the Noosa component of South East Queensland’s Ecosystem
Health Monitoring Program and an annual Report Card on the condition of Noosa’s freshwater and
estuarine environments, in comparison to other major catchments and estuaries in the region.

RECOMMENDATION
That Council note the report by the Principal Environment Officer - River Strategy & Engagement
to the General Committee Meeting dated 13 March 2023 and authorise the CEO to enter a 3 (three)
year Agreement with Healthy Land & Water to June 2025 in accordance with Attachment 1 to the
Report.


REPORT
The purpose of this report is to determine Noosa Council’s ongoing engagement and funding
arrangement with Healthy Land & Water.
Background
Noosa Council has been a member of the Healthy Land & Water network (formerly Healthy
Waterways) for the past 21 years. Healthy Land & Water is an independent organisation dedicated
to improving and protecting South East Queensland’s environment, with technical expertise in
research, monitoring, and evaluation.
In the second half of 2022, negotiations began to renew the Member Agreement, which expired 31
July 2022.
Deliverables of this program include:
    Water quality monitoring in the freshwater creeks and Noosa estuary with the data used to
     inform the annual Report Card;
    Social benefits survey of residents regarding the condition, useability, and accessibility of
     their waterways with data used to inform the community benefits rating;
    Expert advice and oversight of program and policy development;
    Decision support tools for catchment restoration, assessing longer term patterns of change,
     and measuring success;
    Summer social media campaigns for recreational water quality awareness as part of Healthy
     Waterplay program;
    Science and technical support for strategic catchment management including access to
     expert panels; and
    Maintain water quality models for entire Noosa Council catchments.

                                                                                   Page 10 of 50

Section 11

GENERAL COMMITTEE MEETING REPORT                                                  13 MARCH 2023


In 2022 the Noosa River received an B Report Card rating for catchment health for the first time in
the Report Card’s history (normally Noosa scores A-), and 5 stars for its socio-economic rating.
The decline in rating was largely due to an increase in catchment pollutant loads, with sediment
loads increasing from 349kg/ha in 2021 to 1,112kg/ha in 2022, caused by very high rainfall and
river flows experienced over the summer months.
These results have highlighted the importance of advancing urgent and significant investment in
riparian health to build resilience and to better withstand extreme weather events. There is a solid
evidence basis from the long term data collected through the program to help drive this investment.
This requires also the coming together of land managers across the various Natural Resource
Management groups and agencies to establish asset management and investment plans for the
catchments that focus action and funding to priority areas. This is particularly needed in the lead
up to the Olympics and Paralympics where we have the opportunity to present SEQ and Noosa as
a world leader in healthy and sustainable catchment management.
Council is pleased to support the Keep it in Kin Kin project in which Noosa and District Landcare
and rural landholders work together to prevent erosion and sediment runoff in the Noosa River
Catchment.
Council is also pleased to support the many beneficial activities lead by Noosa Integrated
Catchment Association and Mary River Catchment Coordinating Committee and others that add
significant value and improvement to catchment management and health across Noosa Shire.
Based on 2022 results from our socio-economic community survey, extremely high numbers of
residents (83%) are satisfied with the access and usability of their local waterways.
The Healthy Land and Water Ecosystem Health Monitoring Program is regarded as one of the
most comprehensive waterway monitoring programs in Australia.
Previous Council Consideration
In 2019 Noosa Council renewed its Network Member Agreement with Healthy Land & Water,
committing $74,380 over three years.
Ordinary Meeting Minutes, 18 July 2019, Item 8, Page 5
That Council note the report by the Environment Officer (Rivers and Coast) to the Planning &
Environment Committee Meeting dated 9 July 2019 and authorise the CEO to enter into a 3 year
Network Member Agreement with Healthy Land and Water as provided in Attachments 1, 2 and 3.
Ordinary Meeting Minutes, 21 July 2016, Item 11, Page 3
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 12 July 2016 and authorise the CEO to enter into a 3 (three) year Deed
of Agreement with Healthy Waterways.
Finance
The new Network Member Agreement outlines Council’s financial contributions and terms of the
agreement for Council from 1 July 2022 to 30 June 2025 (refer Attachment 1). The agreement will
commence in retrospect from July 2022 to recognise the work that HL&W have already delivered
within this current funding period including launching the 2022 Noosa Report Card, providing
technical input into water quality and wetland workshops and proposals, and collection of data in
the lead up to the next Report Card’s release in November 2023.
The total funding amount requested is $81,170 excluding GST, which is an increase of $6,790 from
the previous 2019-2022 agreement due to increases in the Consumer Price Index.
Council may terminate the agreement if needed subject to Section 2 of the agreement (term and
termination clauses) and may withhold payment of a program contribution where the program has
not been delivered in accordance with the agreement (refer to Annexure 1 in Attachment 1 for
program deliverables).


                                                                                     Page 11 of 50

Section 12

GENERAL COMMITTEE MEETING REPORT                                                  13 MARCH 2023


Risks & Opportunities
If Council does not enter into the agreement with Healthy Land & Water, Noosa Council will no
longer be included in South East Queensland’s Ecosystem Health Monitoring Program, which has
been running for 21 years to date. This is currently the primary way water quality is monitored and
reported on in the Noosa River Catchment, although considerable progress has been made in
developing Council’s integrated water quality monitoring program and collating data collected by
citizen scientists through Noosa’s Natural Resource Management groups, to allow localised
reporting.
There is also significant opportunity to leverage funding through this network ahead of the
Olympics. Healthy Land and Water can have an important role in advocating on behalf of local
governments alongside the Council of Mayors, providing the scientific and technical expertise to
help guide the allocation and prioritisation of on-ground action and restoration.
Consultation
External Consultation - Community & Stakeholder
Council staff have had detailed discussions with Healthy Land and Water over recent months about
the Member Agreement and Healthy Land and Water’s value proposition to ensure deliverables
match Council’s key management priorities and needs. This includes the role of the organisation
in supporting and applying for funding opportunities on Council’s behalf and providing ongoing
technical support for priority streams in Noosa’s catchments.
Internal Consultation
Departments/Sections Consulted:

    Chief Executive Officer       Community Services                       Corporate Services
    Executive Officer             Director                                 Director
    Executive Support             Community Development                    Financial Services
                                  Community Facilities                     ICT
                                  Libraries & Galleries                    Procurement & Fleet
                                  Local Laws                               Property
                                  Waste & Environmental Health             Revenue Services

    Executive Services        X   Environment & Sustainable Development    Infrastructure Services
    Director                      X Director                               Director
    Community Engagement          Building & Plumbing Services             Asset Management
    Customer Service              Development Assessment                   Buildings and Facilities
    Governance                    Economic Development                     Civil Operations
    People and Culture            X Environmental Services                 Disaster Management
                                  Strategic Land Use Planning              Infrastructure Planning,
                                                                           Design and Delivery




                                                                                      Page 12 of 50

Section 13

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023


                                     Attachment 1




                                     Page 13 of 50

GENERAL COMMITTEE MEETING REPORT                                                             13 MARCH 2023

                                                                                                Attachment 1

                                                                        q F. Headlin
                                                                          4 land &watet )

       HLW Network Member Agreement

       Agreement Schedule

      PROGRAM            SEQ Monitoring Program: Delivery of the Report Card for South East Queensland (SEQ) and
                         the Ecosystem Health Monitoring Program (EHMP)
                          (HLW Partnership Agreement Program)

      HLW                HEALTHY LAND AND WATER LTD
                         ACN 115 662 989
                         Level 19, 160 Ann Street
                         BRISBANE QLD 4000

      NETWORK            NOOSA COUNCIL
      MEMBER             ABN 97 969 214 121
                         PO BOX 141
                         TEWANTIN QLD 4565

      COMPLETION DATE    Ol   30 JUNE 2023 (1 YEAR)
                         O    30 JUNE 2024 (2 YEARS)
                         Ol   30 JUNE 2025 (3 YEARS)

      DELIVERABLES & KEY
      PERFORMANCE        Specific deliverables are set out in Annexure 1 to this agreement.
      INDICATORS

      PROGRAM                        vo                   og.       :     .
      CONTRIBUTION       Noosa Council will pay the contribution to HLW in the instalments and on the dates(s) set
                         out in the table below:
                                                       CONTRIBUTION SCHEDULE

                           FINANCIAL     ee              2023-2024 | 2024-2025
                              YEAR
                            PROGRAM          $26,000      $27,050   $28,120
                            FUNDING
                              TOTAL          $26,000      $27,050   $28,120

               1 | Network Member Agreement -— Noosa Council

                                                                                                Page 13 of 50

Section 14

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 14 of 50

GENERAL COMMITTEE MEETING REPORT                                                    13 MARCH 2023

                             INSTALMENT DESCRIPTION        AMOUNT (EXC GST)     PAYMENT DUE DATE
                      a
                        2022/2023 Program Funding — PAYMENT 1   $26,000           31 March 2023
                                                            ES
                      a |                                                    |

                       ee |

              2 | Network Member Agreement — Noosa Council

                                                                                       Page 14 of 50

Section 15

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 15 of 50

GENERAL COMMITTEE MEETING REPORT                                                                  13 MARCH 2023

       EXECUTED AS AN AGREEMENT
       ACKNOWLEDGEMENT
       The parties acknowledge and agree that they will contribute to the Program in accordance with this
       agreement.

       Signing page
       Signed for HEALTHY LAND & WATER LTD
       by an authorised officer in the presence
       of
                                                      Signature of Chief Executive Officer

       Signature of witness                           Name of Chief Executive Officer (print)

       Name of witness (print)

       DATE:

       Signed for NOOSA COUNCIL by an
       authorised officer in the presence of
                                                      Signature of Officer

       Signature of witness                           Name of Officer (print)

       Name of witness (print)                        Office held

       DATE:

                3 | Network Member Agreement — Noosa Council

                                                                                                     Page 15 of 50

Section 16

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 16 of 50

GENERAL COMMITTEE MEETING REPORT                                                                          13 MARCH 2023

        Background                                                         After Termination or Expiry
                               —       :                           2.3     Termination of this agreement for any reason
         A     HLW h        rt      del      if the P      ;
                      as expertise in delivery oF he rrogram               will be without prejudice to the continuing
         B     The Network Member wishes to engage HLW to                  enforceability of any rights or obligations of the
               deliver the Program under the terms of this                 parties accrued at the time of termination.
               agreement.                                                                        ;              a
                                                                   2.4     Unless agreed otherwise, upon termination of
         Cc    The parties wish to record the terms and                    this agreement the parties will continue to be
               conditions in this agreement, which consists of:            bound     by   the    obligations,  given   in
                  A         t Schedule;                                    clauses 5 (Confidentiality),   8.5 (Insurance),
              a     Aurearenischeeluly                                     9 (Disputes) and any other clauses which, by
              (b) the Agreed Terms;                                        their nature, are intended to survive termination.
                  Al        1-P          Deliverables.
              a     ae:          rogram   Meiverabres              3      Payment and Program Contributions
        Agreed terms                                               3.1.  The Network Member must pay to HLW the
                                                                          Program Contribution in accordance with the
         1       PROGRAM                                                  Contribution Schedule.
         1.1     In consideration of the payment of the Program    Sas eerie) seat            oy    a       ee eee
                 Contribution to HLW by the Network Member                Nestea   Oust: ee aed mens ee eae et Ee
                 under clause 3, HLW will deliver the Program in          mIVOIOS Gale
                 accordance with the Agreement Schedule and        3.3.   Payments from the Network Member will be
                 these Terms.                                             deemed received when the funds are credited to
                                                                          HLW’s nominated bank account and must be
         2       TERM AND TERMINATION                                     payable by cheque or electronic funds transfer.
                 Term                                              3.4    Without limiting other rights available to the
                   ;                                                      Network Member at law or under this agreement,
         2.1     This   agreement     commences      on __ the           the Network Member may withhold payment of a
                 Commencement Date and ends on the Expiry                 Program Contribution for any future payment
                 Date unless:                                             dates identified in the Contribution Schedule
                 (a)    the  Network Member      gives  written          where the HLW have not delivered the Program in
                         notice to HLW prior to the Written               accordance with this agreement.
                         Notice Date that it wishes to terminate
                        the   agreement    (in   the   Network     4       INTELLECTUAL PROPERTY
                         Member's absolute discretion); or                 Existing Material
                 BP     Ht terminated earlier In SiGeanTeT ce at   4.1     Unless  otherwise   expressly  stated  in this
                                us                                         Agreement, no Intellectual Property Rights in the
                 (c)     mutually  agreed   by   the  Network              Existing Material of either party is assigned or
                         Member and HLW.                                   otherwise transferred.
                 Termination for Breach                            4.2     HLW    grants  to  the  Network   Member    an
         2.2     A party may terminate this agreement by written          lites,        Veanshiis Ge, nies,        meayally
                 notice to the other party if:                             free, non-exclusive licence to use, reproduce,
                                   P      .                                adapt, distribute and communicate (and do all
                 (a) the other party breaches a term or condition          such other things as are necessary or convenient
                     of this agreement and fails to remedy that            in order for the Network Member to exercise its
                     breach within 7 days of receiving notice              rights under this agreement) the Intellectual
                     requiring it to do so; or                             Property Rights in HLW's Existing Materials,
                 (b) an Insolvency Event occurs                            including the right to sub-licence to any person.
                 then the party may terminate this agreement by    ae      Ts Retinitis Peniber ‘(raots ti Hse a NG0-
                 written notice to the other party, in which case          SalI, rayalty      ineé,. HORPCenSeranNe, ars
                 this agreement will terminate immediately.                feyndaiie Tmabee: fot ae Ta fa Tes Gite
                                                                           Intellectual Property Rights in the Network
                                                                           Member's Existing   Material supplied by the
                                                                           Network Member to HLW, solely to the extent

                 4 | Network Member Agreement — Noosa Council

                                                                                                              Page 16 of 50

Section 17

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 17 of 50

GENERAL COMMITTEE MEETING REPORT                                                                           13 MARCH 2023

                 required for HLW to perform its obligations        6      PUBLICATION
                 under this agreement.
                                                                    6.1     Subject to clauses 6.2, a Party may publish or
                 Program Outcomes                                           disclose Program Outcomes.
         4.4     The Program Outcomes will be owned, on their = 6. — The Network Member acknowledges that, from
                 creation, as follows:                                     time to time, all or party of the Program
                 (a) the Reports and copyright in those Reports             Outcomes may be subject to restrictions on
                     will be owned by HLW; and                              publication or disclosure and   agree to the
                                                                           following procedure prior to publication:
                 (b) all title to and Intellectual Property Rights in                     ;     ;
                     the Deliverables will be owned by HLW.                (a)  — HLW will notify the Network Member of
                      .       .                        ;                           the   restriction on _  publication  or
         45      Notwithstanding Part VII of the Copyright Act                     disclosure and the time period in which
                 1968 (Cth), publication of any Deliverable in                     that  restriction applies  (restriction
                 accordance with this agreement, shall not affect                 period);
                 ownership   of Existing  Material or  Program                         ;                 .       ;
                 Outcomes as provided in this clause 4.                    (b)     During   the   restriction period  the
                                                                                   Network Member must obtain HLW’s
         5        INFORMATION                                          consent  prior to any publication    or
                                       TTT                                         disclosure of the Program Outcomes,
                Obligations                                                        which will not be unreasonably withheld.
         Mick,   SST pay ABE                                        7      NO AGENCY AND NO USE OF MARKS
                 (a) keep confidential, and not use or disclose,
                      other than as permitted by this agreement,           No Agency
                      any Confidential Information of the other     7.4     Each party:
                      party; and
                                                                           (a)     must not represent itself or allow itself
                 (b) ensure that the Confidential Information of                   to be represented as an employee, agent
                     the other party is used, copied, supplied or                  or partner of the other party; and
                      reproduced only as reasonably necessary                      .                               ;
                     for the purposes of this agreement.                   (b)     is not and does not become, by virtue of
                       .                                                           this agreement, an employee, agent or
                 Security and Control                                              partner of the other party.
         9.2     Each party must:                                   7.2     In carrying out the Program, HLW must not:
                 (a)  keep the Confidential Information secure             (a)  incur any financial or other obligation on
                      and comply with any security measures                     behalf of the Network Member; or
                      established by the other party, from time to
                     time;                                                 (b)  make any representation on behalf of the
                                                                                Network Member,
                 (b)  immediately notify the other party of any                     ;         ;    .            .
                      suspected or actual unauthorised use, copy           except with the prior written permission of the
                      or   disclosure   of   the    Confidential           Network Member.
                      Information.                                         No use of the Marks
        5.3      Each   party  must    provide  all  reasonable     73      Each party must not use the trademarks or logos
                 assistance requested by the other party in                 of the other party except as expressly provided
                 relation to any proceedings the other party may            in this agreement or with the other party's prior
                 take against any person for unauthorised use,             written consent.
                 copying  or   disclosure of  the   Confidential
                 Information.                                       8      LIMITATION OF LIABILITY AND
         5.4     The Network Member will not be in breach of its           INSURANCE
                 obligations under this agreement where the                  -.            oe
                 Network Member is required by law to disclose             Limitation of Liability
                 to disclose to a third party any information       8.1   The Liability of HLW to the Network Member
                 relevant to the Program or this agreement.                 arising out  of  the   performance   or  non-
                                                                            performance of the Program whether under law
                                                                            of contract, tort or otherwise is limited to the
                                                                            cost of re-performing the Program which is the
                                                                            subject of the Program Contribution.
                 5 | Network Member Agreement — Noosa Council

                                                                                                              Page 17 of 50

Section 18

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 18 of 50

GENERAL COMMITTEE MEETING REPORT                                                                            13 MARCH 2023

         8.2     The maximum liability of HLW to the Network         9.2     A party seeking to resolve the Dispute must
                 Member    out  of the   performance    or  non-             notify the existence and nature of the Dispute to
                 performance of the Program, whether under the               the other party (Notification). On receipt of a
                 law of contract, tort or otherwise, will be to the          Notification, the Parties must refer resolution of
                 value of the Program Contribution.                          the Dispute to their respective chief executive
         8.3.    HLWis discharged from all liability in respect of           officers or their nominees.
                 the Program, whether under the law of contract,     9.3     If the Dispute has not been resolved within 30
                 tort or otherwise, at the expiration of 2 years             days of receipt of the Notification, then any party
                 from the completion of the Program, and the                 to the   Dispute  may   refer the   Dispute  to
                 Network Member (and persons claiming through                mediation and must do so before initiating
                 or under the Network Member) is not entitled to             proceedings in a court to resolve the Dispute.
                 commence any action      or claim whatsoever
                 against HLW (or any employee of the HLW) in         9.4     A Dispute which is referred to mediation will be
                 respect of the Program after that date.                     referred to the Resolution Institute and be
                                 .                                           conducted in accordance with the Resolution
         8.4     HLW does not give any warranty nor accept any               Institute’s mediation and conciliation rules.
                 liability in relation to the performance or non-
                 performance of the Program except to the            9.5     If the Dispute has not been resolved within 60
                 extent, if any, required by the law or specifically         days of referral to the Resolution Institute, a
                 provided for in this agreement. If apart from this          party is free to initiate proceedings in a court.
                 clause any warranty would be implied whether
                 by law, custom, or otherwise, that warranty is to   10      NOTICES
                 be the full extent permitted by law hereby                     .                     .
                 excluded. Nothing in this clause will be read or    ao       eee between the parties are deemed to be
                 applied so as to purport to exclude, restrict or            given.   |.                       .
                 modify   or  have   the  effect  of  excluding,             (a)  if delivered by hand — upon written
                 restricting or  modifying   the  application  in                    eon of oes by an officer or
                 relation to the supply of any goods and services                other   ne _ if he employee, ageuk a
                 pursuant to this agreement of all or any of the                  Fiber r bes ore D dananieede           h:
                 provisions of the Competition and Consumer Act              (|     | lvered  by post —/  days after dispatch,
                 2010 (Cth).                                                     ane                 ,
                                                                             (c)  if delivered by e-mail — upon receipt of an
                 Insurance                                                       e-mail or other proof of completion of an e-
         8.5     HLW must maintain, at all times during the term                  mail in accordance am the Electronic
                 of, and for 3 years following the expiry or                      Transactions (Queensland) Act 2001,
                 termination of this agreement, the insurance                but if the delivery, receipt or transmission is not
                 policies:                                                   on a business day or is after 5.00pm on a
                 (a)  professional indemnity insurance to the                business day, Notice is taken to be received at
                      value of $10 million dollars per claim and             9.00am on the next business day.
                      $20 million in the aggregate;                  14      FORCE MAJEURE
                 (b)  public liability insurance to the value Of (7
                      $20 million per claim; and                     11.1    Neither party will be:
                 (c)  workers compensation    insurance for an               (a)  in breach of this agreement as a result of;
                      amount required by Queensland legislation.                 or
        8.6      HLW must, if requested by the Network Member,               (b)  liable for,
                provide proof that it has obtained and maintains             any failure or delay in the performance of its
                 the insurances required by clause 8.5.                      obligations under this agreement to the extent
                                                                             that such failure or delay is wholly or partially
         9       DISPUTES                                                    caused, directly or indirectly, by a Force Majeure
         9.1     If a dispute arises between the parties out of or          Event.
                 relating to this agreement (Dispute), any party
                 seeking to resolve the dispute must do so strictly go      ROSTSAND TAXES
                 in  accordance with    the provisions   of this             Costs payable by each party
                 clause 9. Compliance with this clause9 is a = 49.4 __ Each party bears its own costs in relation to the
                 condition precedent to seeking relief in any court          preparation and signing of this agreement.
                 or tribunal in respect of the Dispute.
                  6 | Network Member Agreement — Noosa Council

                                                                                                                Page 18 of 50

Section 19

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 19 of 50

GENERAL COMMITTEE MEETING REPORT                                                                            13 MARCH 2023

                 GST                                                 14.5    A clause or part of a clause of this agreement
         12.2.   Any words capitalised in this clause 12 and not             that is illegal or unenforceable may be severed
                 already defined in clause 15.1 have the meaning             from this agreement and the remaining clauses
                 given to those words in the GST Act.                        or parts of the clause of this agreement continue
         12.3.   Except under this clause 12, the consideration              in force.
                   4 i Spal iid unset sit Hi GBR St                  14.6    This   agreement    supersedes    all  previous
                 this agreement does not include GST.                                             :      ,                ‘
                                           ;         ;    :    :             agreements   about   its subject  matter.  This
         12.4    If a supply made under or in connection with this                              :            :
                            ;                                                agreement   embodies   the   entire agreement
                 agreement is a taxable supply, then at or before            between the aries
                 the time any part of the consideration for the                           P     ,
                 supply is payable:                                  14.7.   To the extent permitted by law, any statement,
                 (a)  the recipient must pay the supplier an                 representation  or   promise   made    in  any
                      amount equal to the GST payable for the                negotiation or discussion, is withdrawn and has
                      supply, in addition to, and in the same                no effect except to the extent expressly set out
                      manner as the consideration      otherwise             or incorporated by reference in this agreement.
                    LS        under   TRIE SAQRERIIGHE. “fB* “Chat   14.8    Each  party acknowledges and      agrees that,
                        PPly); a          .          ra                      except as specified in this agreement, it does not
                 (b)  the supplier must give the recipient a tax               ;           :      d                  ion b
                      invoice for the supply.                                rely on any prior con uct or representation  y
                                                                             the other party in entering into this agreement.
         ae       ae   SlSrIEy,. WE   arneunit  payable    anger     14.9    The failure of a party to require full or partial
                 clause 12.4  is  correspondingly  increased  or                                    —          :
                                                 :                           performance of a provision of this agreement
                 decreased by any subsequent adjustment to the                                   :                       ,
                                                             ‘               does not affect the right of that party to require
                 amount of GST payable for the supply for which
                          5  cai il                                          performance subsequently.
                 the supplier is liable, however caused.
         12.6    Where a supply made under or in connection          14.10   A single or partial exercise of or waiver of the
                   .    :             :           :         nor              exercise of any right, power or remedy does not
                 with this agreement is a progressive or periodic                                              :
                                         :                                   preclude any other or further exercise of that or
                 supply, clause 12.4 applies to each component                          3
                                ;        2  Hi          et                   any other right, power or remedy.
                 of the progressive or periodic supply as if it were
                 a separate supply.                                  14.11   A right under this agreement may only be
                                                                             waived in writing signed by the party granting
         13      AUTHORITY                                                   the waiver and is effective only to the extent
                                                                             specifically set out in that waiver.
         13.1    The persons signing on behalf of the parties                          .                       .
                 warrant and represent that they have authority      14.12   Any variation or amendment to this agreement
                 to execute this agreement on behalf of the party            must be in writing and signed by the parties.
                 for whom they have signed.
                                                                     15      DEFINITIONS AND INTERPRETATIONS
         WWJ            EEE                                               Definitions
         14.1    The laws of Queensland, Australia govern this       15.1  In this agreement: unless the context otherwise
                 agreement.                                                requires, the following definitions apply:
         14.2.   Each party irrevocably submits to the non-                Budget means the budget for the Program
                 exclusive   jurisdiction of   the   courts   of           which is set out in Annexure 2;
                 Queensland, Australia and courts competent to
                 hear appeals from those courts.                           Commencement         Date    means   the   date
                                                                           specified in the Agreement Schedule;
         14.3.   Where HLW may exercise any right or discretion                      .
                 or make any decision under this agreement,                Completion Date means the date for the
                 HLW may do so in its absolute discretion,                 completion   of the  Program set out in the
                 conditionally or unconditionally, and without             Agreement Schedule;
                being required to give reasons or act reasonably.          Confidential Information of a party means
                 This  clause  applies  unless  this  agreement            the existence of and terms and conditions of
                 expressly requires otherwise.                             this agreement and any information:
         14.4    The Network Member must not assign, in whole                (a)  relating to the business and affairs of a
                 or in part, or novate the Network Member's                      party;                   ,
                 rights and obligations under this agreement                 (b)  relating to a party's, clients, employees,
                 without the prior written consent of HLW (such                  sub-contractors or other persons doing
                 consent not to be unreasonably withheld).                        business with a party;
                  7 | Network Member Agreement — Noosa Council

                                                                                                                Page 19 of 50

Section 20

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 20 of 50

GENERAL COMMITTEE MEETING REPORT                                                                            13 MARCH 2023

                 (c)  which is by its nature confidential;                   (b)  if a controlling trustee is appointed to, or
                 (d)  which is designated as confidential by a                   over, any of the property or undertaking of
                      party; or                                                  the party; or
                 fel  whl this other   Rarky SCE GF Bagi te                  (c) the party is unable to pay its debts when
                      know, is confidential,                                                                   .
                                                                                 they become due and payable;
                 and   all trade  secrets,  knowhow,    financial                 :                                .
                 information    and    other    proprietary   or             (d) if the party ceases to carry on business.
                 commercially valuable information of a party;             Parties mean the parties to this agreement and
                 and includes HLW Material.                                ‘party’ means any one of them;
                Deliverables means the deliverables of the                 Program means the Program to be carried out
                Program set out in Annexure 1;                             on in accordance with these Terms and the
                Existing Material means any material of a party                        ee
                (whether belonging to that party or a third party)         Program       Contributions       means __ the
                which is supplied or otherwise made available by           contributions  described   in  the   Agreement
                that party to the other party under this agreement         Schedule;
                and which is either:
                          —     :                   .                      Program Outcomes means the outcomes of
                 (a)  existing prior to the agreement; or                  the Program;
                 (b)  subsequently brought into existence other                        ’
                      than in the course of this agreement.                Term means the term contemplated by clause 2;
                Force Majeure Event means an event that is                 Written Notice Date means the date identified
                outside  the  reasonable  control  of a_  party            in the Agreement Schedule.
                including  fire,  storm,   flood,  earthquake,
                explosion, war, invasion, rebellion, sabotage,             Interpretation
                epidemic, labour dispute, labour shortage, failure   15.2  In this agreement, unless the contrary intention
                or delay in transportation and any act or omission         appears:
                (including laws,  regulations, disapprovals  or
                failure to approve) of another person (including             (a)  headings are for ease of reference only and
                subcontractors,  governments   or government                     do   not   affect the   meaning    of  this
                agencies;                                                        agreement;
                Intellectual Property includes all copyright, all            (b) the singular includes the plural and vice
                rights  in  relation to  inventions  (including                  versa and words importing a gender include
                patents), registered  and   unregistered  trade                  other genders;
                marks   (including service  marks),  registered              (c) other grammatical forms of defined words
               designs, confidential information and all other                   or    expressions    have    corresponding
                rights resulting from intellectual activity in the                meanings;
                industrial, scientific, literary or artistic fields and
                all other rights with   respect to   intellectual            (4) a   reference  to   a  clause,  paragraph,
                property as defined in Article of the Convention                 schedule or annexure is a reference to a
                establishing the  World   Intellectual Property                  clause or paragraph of or schedule or
                Organisation of July 1967;                                       annexure to this agreement and a reference
                                                             .                   to this agreement includes any schedules
                Insolvency Event means any of the following                      and annexures;
                events concerning a party, unless the events take
                place  as  part  of  a  solvent   reconstruction,            (e) a reference to a document or agreement,
                amalgamation, merger or consolidation on terms                    including this   agreement,   includes  a
                approved by the other party before it takes place                 reference to that document or agreement
                and the implementation of the reconstruction,                    as notated, altered or replaced from time to
                amalgamation, merger or consolidation complies                   time;
                with the terms of the approval:                              (f. words and expressions importing natural
                 (a)  if an administrator,  liquidator, receiver,                 persons   include   partnerships,  bodies
                      receiver and manager or other controller                   corporate, associations, governments and
                      (as defined in the Corporations Act) is                    governmental and     local authorities and
                      appointed to, or over, any of the property                 agencies;
                      or undertaking of the party;                           (g) a reference to any legislation or statutory
                                                                                  instrument or regulation is construed in
                                                                                 accordance with the Acts Interpretation Act
                  8 | Network Member Agreement — Noosa Council

                                                                                                                Page 20 of 50

Section 21

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 21 of 50

GENERAL COMMITTEE MEETING REPORT                                                                              13 MARCH 2023

                      1901    (Cth)  or  the   equivalent   State
                      legislation, as applicable;
                 (h)  a reference to a specific time for the
                      performance of an obligation is a reference
                      to that time in the State, Territory or other
                      place  where   that  obligation  is  to  be
                      performed; and
                 (i)  areference to a party includes its executors,
                      administrators, successors and permitted
                      assigns.

                  9 | Network Member Agreement — Noosa Council

                                                                                                                  Page 21 of 50

Section 22

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 22 of 50

GENERAL COMMITTEE MEETING REPORT                                                         13 MARCH 2023

             Annexure 1

             Program Deliverables and Key Performance Indicators

             Deliverables for Noosa Council
             Summary of activities in Program for 2022-2023

              Ecosystem Hedith Monitoring Program ond Report Cad                26,000
              Core
              Progran Govemance, Science Cormittes, Exsert Panels, Monitoring      %
              and Evaluation Steering Cornmnitte=
              Facilitate independent @pert acvice and oversight [program ond       ¥
              policy developrnent
              Chorac terse condition -— Event monitering cand Annual catehrment
            -polluteintlocies                                                      Ys
             _Cherac terse condition - Annual Etucrine mearne weter queili         v
              Cherac terse condition - Annual Freshwater strecrn health            ¥
             _ Cherce terise condition — Riporicn extent                           ¥
              Cherac terse condition - reshweoter and Coastal wetland extent       7
              Cherac terse condition - Seagrass extent and Sengrass depth range    we
              Cherac terse condition - Vud content and sediments in Moreton Ba     ¥
              Cherac terise condition — Coastal bidlogical cornmunities [fish, c crcl
              Cherac terse community benefit - social benefit / social sure ace    ¥
             _Chercac tense community benefit — ec cnorric benefit
              Bata and Model Actninistration cand Developrment                     ¥
              Translate EHMP related cate into Decision Support Tools              ¥
              Engagement and compounic ation - Annual delivery of the Report      mw
              Cord
              Engagement and communication -— Repcrt Cord welosite,                ¥
              communication products
             — Engagement and compmunic ation — Data and eecutive briefings        ¥
              Engagement and compounic ation — Progren health check (every         ¥
              three yecrs
              Research and Development (Program Evolution
              Pilot Receiving Environment Monitoring Program (near-field           a
             requirements |                           _
              Pilot Freshwater Strearn Health Vodel cna Predictors [integration of 3 ¥
             party dete)                 _                      ee                  —
              Repert Cerd caind Comprounication Development [align with Future     ¥
             Cord)       7                         ‘
              Develop methodolocy for lon ger-tenn pattems of change               v
              Develop methods for Action and Bfort recognition (Bfert Micpping     ¥
              Additional Activities
              Water by Design Program Suppert -Steering Committee meetings,        ¥
             Website upkeep including maintenance of Guicelines
              Coordn ated summer social mecica carmpaign for recreational weter    ¥
              quality awareness based on key messages from Hecdithy Wieterslay
              Program
              Science and technic al support for strategic cate hrrent management  a
              Tote!                                                               6,000
                   40 Helwart Member Agreement —Naass Caunal

                                                                                            Page 22 of 50

Section 23

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 23 of 50

GENERAL COMMITTEE MEETING REPORT                                                                13 MARCH 2023

              Specific Deliverables of the Ecosystem Hedth Monitoring Progam
              .    Access to Science Corrmittee and Scientific Eqoert Panes [roocelling, social science,
                   environmental monitoring | meeting up to 4 times per year made up of leading loc al and
                   notional scientists aveailcéle to advise Nocea Council projects.
              .    Up to four meetings of the Monitcring and Evalucition Steering Corrrmittee (MESC) and
                   Water by Deagn Steering Committee (WED) per year to provide input into the direction
                   of associated programs and to access project infomnation from other mernber
                   orgenisations.
              .    Monitoring of estucrine weoter quality [physical, nutients cid phytoplcnk ton parcarneters }
                   in Noosa Council Catchments.
              .    Monitering of freshwater bidlogical hecdith ffish cormnunities, rooacroinvertebrate
                   communities,   physico-chemical,  key aquatic processes] in the Noosa       Council
                   Catchments.
              .    Monitcting of the estucrine fish cornmunities in estuciries cind how they cre affected by
                   land use changes and habitat ave céoility.
              .    HL wall roaintein integrated catchment and receiving water quality models for the
                   entire Nocea Council Catchrnents for use by Noosa Council, cine its service provicers.
                   This provides Nocea: Council with the tools to enable forecasts of water quality under
                   different catchment menagernent scenciice.
              .    Access to annual tend cnalyas of catchment health that inc corporates all monitoring
                   data relevant to Noosa Council.
              .    Coordinate 1 regional social survey per year, and access to social data collec ted fran
                   residents in the Nocear Council Catchments. hfomncation includes the frequency and
                   type of weternwoyboased recrecntion, the bariers that prevent wotennerys recrection,
                   respondent's perception of the condition of their woterncys, their satisfaction with the
                   condition, useability and accessibility of their waternncys, their thoughts on the key issues
                   facing waternays and their willingness to irnprove condition of waternncrys,
              .    Identification of  the  highest  risk woter   woy   reaches   and    lend  uses  in
                   all catchment creas for sediment erosion (chonne, hillslope cind gully).
              .    Development and mein tenonce of online tools for easy caecess to all dete inclucing the
                   annual modeled outputs from the freshwoter catchments and estuaries of cil
                   catchments. (specifically maintenance and upkeep of Report Card 2021 htercactive
                   Nicgo
                   https fseqcatc hrents mops cre os.c omfapps! webcpp viewerso/ index hil 3ca=3F 163
                   Zélecesb Selb JobtadteOrsedda and SEQ       Natural  Resource   Monagerment    Plon
                   Aélocki49-4701493.59 70082c1 cf 51)
              .    Annual Report Card release which includes detailed briefings to Noosa Council officers
                   and executives.
              .    Support for media releases focusing on Noosa Council projects but leveraging off the
                   Repert Cord relecse.
              .    Input into the review of the Eoceystern Health Monitoring Program cand Future Monitcring
                   Froarneworks.
              .    Annual Report for SEQ Monitoring Progrerm ond core corrponents.

                     1  Netwart Member Agreement —Naass Caunal

                                                                                                   Page 23 of 50

Section 24

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 24 of 50

GENERAL COMMITTEE MEETING REPORT                                                              13 MARCH 2023

              Program Background

              The Ecosystem Health Monitoring Program [EHMP) is one of the mest comprehensive
             freshwater, estucrine cind merine monitcring programms in Australia. The Program monitors the
              ecological hedith of South East Queensland's wotenneys cind provides a crowing
              scientifically 20-year dataset and overview of catchrnent health.
              The EHiVP reports on progress towards the Water Quality Objectives and Environmental
              Values listed under the Queensland Govemment Environmental Protection Act 1994.
              Components of Md and Forfield Receiving Environment Monitoring Prograrn [REWP]
              requirernents for Environmented Activities (EA’s) cre achieved through the programm, cis well cis
              some federally listed conditions under the Environmental Protection cnd Biodiversity
              Conservation Act 1999.

              The program is funced by state and local govemment and the local utilities through a
              nehwork merrbership funcing model. Funding contibutions are leveraged to deliver c
              comprehensive procrarn for the South Bast Queensland region that meets the needs and
              Prictities of the stckeholcers and decision rmakers.
              The program is quided closely via oversight from top scientific eqoerts from the Queen dand
              Govemment, acaderria cand consulting, vic a series of field specific scientific eqert ponds,
              to ensure the program delivers the highest caliber of science cand is seen as ci lecicler in its
             field.

              The yearly released Report Cord uses data collected through the EHIVP to calculate scores
              and orades for waterway and catchment ecosystem health. The repert card incorporates:
                 ©   date from 76 monitored freshweter sites;
                 e = date from 182 estuarine and rocrine sites;
                 ¢   event monitoring cata from 6 sites for sedirnent and nutrient locicls reporting
                 ¢   data on key habitats including rparicn vegetation extent, freshwater cand estuctine
                     wetlands, secorass caind mud mapping;
                 *   social ond econemic data including yecry social surveys;
                 ©   oupderting cind running of yearly cotchment mocels; cine
                 ¢   releted science projects and leamings.
              Healthy Lone cine wWerter (HL) coordinates the program cnd oversees the site monitoring
              undertaken by the Departrent of Environment ond Science, Environmental Monitoring cine
              Assesanent Science. Other prograrn cormponents include analysis and synthesis of dete
              (dete analytics), incic ator reperting, catchment orades, data and executive briefings, key
              messaging, online data dashboards ond interac tive mapping. The network members hove
             full aecess to all EHMP related data cand modelling products, as well as access to HL
              Science Comrrittee, Steering Comrrittees ond Exoert Poneds.

              Through the current merrbership roodel mace up of state and local govemments, woter cand
              weiste utilities, the program leverages over $2.5 million per year to deliver a comprehensive
              and scientific aly rigorous monitering cand reporting program.
              The Ecosystem Health MVonitcring Program moniter cand reperts on the mid ond far-field
              Receiving Environment Monitcing Program conditions ond yearly trajectories of meeting
              Woter Quality Objectives in relation to Nocea’ Council activities (gure 1).

                    2   Helwart Member Agreement —Naass Caunal

                                                                                                  Page 24 of 50

Section 25

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 25 of 50

GENERAL COMMITTEE MEETING REPORT                                                          13 MARCH 2023

             Figure 2 - Map showing EXMP sites (upstream and downstrean) rstaung to Noose Counc.

               EHMP Monitoring Sites                                  Te aecenstene es
               Leacnd                                                                            j
               id od
                O E.tosrykFuie
                D Poet nal                                      hrc tS
                Bo beter                                       rh      ;   rR
                & Sagan Bath Rage                              3            '
                 | Wanersedis                        .      at
                                                   oto Ne
                                                  F                        :
                                                  ?           =      «
                                                 /                  %     ,
                 !                              :           “    2.      I
                                               /           NOOSA Fe
                                            ye                  a     o  '
                                            4               i         e   Yee
                                             %               &        feo,    |
               i                               ‘           _ panes           ‘
                                               '        ee              '
                                            Fhe       ye                Z
                                           Pe    ee                     = E
                    é                      ,                  s
                    ;                   os 2           ty                   %
                                      we                     .               :
              EAS sneer acnte       rt                     *        e  *%,
                  7;       ¥    eeaciest
                          {       om                                    e
                           '                                    a      =
                           !                    es       weap          Re
                          é                   | SUNSHIKL COASI         =
                   .    <                         REO SONAL        2          Na
                        In.                          fe                      »
                          5                                                  as ]
                             oe                            .             .
                                as                                     ge       |
                                   |                         a                  .
                                         tore)    5              -               ci
                                   2 “AN      he:                              , oe
                                   -            5      ‘                   <<  _e
                                   i              pe             a         a
                     2                               ass                       ;
                                    4    ,     ’ ,  a              -         ie.
                                 ass |               4                    yi" ®
                                    =                zy                  4
                            2                        1,              a.
                             ey                             “SF
                              APRS=T §  iHORLION BAY                               .
                            EGICNA. §) ® REGIONAL                                   e
                                             sal    &     ESRI Austratia  | ova. ii it ale oot
              Rostra ten vt path a             aA         see   fica      SNE         Pewraret ene
               Caele Son cnr Someta? Cemmcwnare ages beans Her                 ene   Se

                sR ieeeenireigeiemenie

                                                                                             Page 25 of 50

Section 26

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023




                                     Page 26 of 50

GENERAL COMMITTEE MEETING REPORT                                                                13 MARCH 2023

              Benefits of the Program
              Ecosystem senices derived from the region ’s netural cisset howe been valued at over $37
              billion per year, using the Constanza et al. global wolucitions. The EHIVP monitors cind helps
              inforn better management of weaternwoys ond catchments that support these ecosystem
              services. It helps infonn decision making which can improve these ecosysterrs and ensures
              their econornic value is not lost.

              Waterways provide high social value to local cornmnunities. Annucd social surveys cre
              conducted to monitor the comrreunities perc ved valucition of SEQ woaternweys. Recent
              surveys have found that wotenneys cind notural crecs are more important than ever,
              reportedly having a calrring, thercpeutic and restorative effect on people curing
              challenging times of drought, bushfires, and C OVID- 19.
              Healthy Lond cine Weter is comrritted to understanding the pressures facing our wotenworys
              and catchments so we con better protect therm, cind the benefits they provicte, for future
              generations. This will attract people and new investment as livechility is boosted acros the
              recjon.
              The Report Card provides an annual assessment of the ecosystem health of South East
              Queensland's wotennerys vier A-F health grades. The release of the Repert Card results is the
              culmination of twelve months of scientific ronitcting at up to 312 freshwater, estucirine,
              roarine cand event monitoring ates throughout the region. Snce 2015, the Report Card also
              inc corporates the social and econornic benefits that waterways provide to local corrrmunities
              through a 1-5 star rating.

              Financial Benefit of Membership
              The network membership roodel that funds the EHIVP and Report Card attracts over $2.5
              rrillion f yecr of investment for program delivery. This investrrent leverages a further $4.1
              trillion frorm State Govemment and Utilities through monitoring infrastuc ture ane fercilities.
              Verrbership commitnent and contribution of tre to Cornmittees and Eqoert Panels is
              estimated at over $300,000 / year.
              Science supported projects for South East Queensland through the ARC linkage program
              encourages the transfer of skills, knowdedge cind ices cis ci bosis for securing cormercicd
              and other benefits of research. Current portfolio of science projects totals over $1 rrillion
              furthering knowledge in catchment resilience, mangrove conservation, new technologies in
              water quality monitcing, future proofing woter supply, analysing wastewater, nutient
              offsetting and nutrient moarkets.
              The total leveraged investment of the program is up to $7.9 rrillion / yecir.

                     4  Helwart Member Agreement —Naass Caunal

                                                                                                   Page 26 of 50

Section 27

GENERAL COMMITTEE MEETING REPORT                                                                 13 MARCH 2023


5       FINANCIAL PERFORMANCE REPORT – MARCH 2023

Author               Financial Services Manager (Acting), Pauline Coles
                     Corporate Services Department

Index                ECM/ Subject / 22.09 – Monthly Financial Performance Report

Attachments          1.     Statement of Income and Expenditure (Profit & Loss and Capital)
                     2.     Statement of Financial Position
                     3.     Statement of Cash Flows
                     4.     Summary of Materials and Services Expenditure


EXECUTIVE SUMMARY
Year-to-date (YTD) performance against current budget as at 28 February 2023 is positive with
operating revenues outperforming forecast. Operating expenditure is under forecast YTD, with an
underspend in Employee Costs currently offsetting an overspend in Materials and Services. Capital
revenues are above forecast while capital expenditure is below forecast due to timing of project
delivery.
    YTD Financial Performance Summary
                                    Budget             Actual         Variance      Variance
                                                                                                       Status
                                       $m                 $m               $m             %
    Operating Revenue                $104.3            $109.6                $5.2         5.0%    Above Budget
    Operating Expense                 $75.5             $75.2                $0.3         0.4%      On Track
    Operating Position                $28.8             $34.3                $5.5        19.2%
    Capital Revenue                    $7.7             $21.4               $13.7       177.2%    Above Budget
    Capital Expenditure*              $38.6             $33.4                $5.2        13.5%    Below Budget
* Reflects constructed assets and intangibles only (excludes contributed)

The $5.5 million YTD operating surplus comprises $4.6 million general operating surplus from
activities that are funded through Council’s general rate, regulatory fees and sales of goods and
services; as well an additional $0.7 million from waste operations and $0.2k in unspent levy and
separate charge funds which are constrained in reserve for future use. The general operating
surplus position is also augmented by a number of incomplete grant-funded programs.
                                                                              Budget         Actual       Variance
 Item                                                                            YTD            YTD           YTD
                                                                                  $m             $m             $m
 General business operating position (unconstrained funds)                     $22.9          $27.5            $4.6
 Unspent levies (constrained funds)                                            ($0.5)         ($0.3)           $0.2
 Waste operations                                                                $6.4           $7.1           $0.7
 Total Council Operating Position                                              $28.8          $34.3            $5.5
Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.




                                                                                                   Page 27 of 50

Section 28

GENERAL COMMITTEE MEETING REPORT                                                        13 MARCH 2023


Figure 1: Actual Performance Compared to Budget




Council’s performance against key measures of financial sustainability has been calculated as at
February 2023. These statutory indicators enable the reader to assess Council’s success in
managing its budget, cash and debt as well as undertaking sustainable asset management. The
table below contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                                       Current
                                      Target                         Actual YTD          Status
                                                       Budget
 Operating Surplus Ratio              0-10%             -0.6%           31.3%           On Track
 Net Financial Liabilities Ratio      <60%               1.0%           -49.6%          On Track
 Cash Cover Ratio                   3 months          6.7 months     15.4 months        On Track
 Asset Sustainability Ratio           > 90%            188.0%           117.0%          On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services (Acting) to the General Committee
Meeting dated 13 March 2023 outlining February 2023 year to date financial performance against
budget, including changes to the financial performance report with the inclusion of key financial
sustainability indicators.

REPORT
Operating Revenue (YTD Benchmark 66.67%)
Council has received 92.5% ($109.6 million) of its operating revenue budget ($118.4 million).
Commentary on each revenue category is provided below.

 Category             Summary                  Comments
 Rates and Levies     $83.2 million               General rate (net of discounts) $341.3k above YTD
                      (100.9%) of the              budget (100.6% or $62.9 million of $62.6 million annual
                      annual budget of             budget earned)
                      $82.5 million has           Waste utility charges $329.1k above YTD budget
                      been earned                  (102.3% or $14.6 million of $14.3 million annual budget
                                                   earned)
 Fees and             $5.8 million (65.6%)        Property and Facility fees $105.3k above YTD budget
 Charges              of the annual budget         (82.8% or $424.9k of $514k annual budget earned)
                      of $8.9 million has         Plumbing fees $164.7k above YTD budget (81.7% or
                      been earned                  $942.6k of $1.1 million annual budget earned)
                                                  Waste Management fees $38.6k above YTD budget
                                                   (59.9% or 131.1k of $219.0k annual budget earned)

                                                                                           Page 28 of 50

Section 29

GENERAL COMMITTEE MEETING REPORT                                                   13 MARCH 2023


Category        Summary                Comments
                                        Cemetery fees $19.0k above YTD budget (72.9% or
                                          $223.3k of $306.4k annual budget earned)
                                        Local Laws $42.2k below YTD budget (61.3% or $1.2
                                          million of $1.7 million annual budget earned)
                                        Revenue Services $61.5k below YTD budget (50.2% or
                                          $235.2k of $383.5k annual budget earned)
                                        Development Assessment $149.8k below YTD budget
                                          (50.2% or $1.4 million of $2.8 million annual budget
                                          earned)
                                        Building fees $154.4k below YTD budget (46.1% or
                                          $478.3k of $1.0 million annual budget earned)
Sale of Goods   $9.2 million (74.4%)      Holiday Park revenue $435.5k above YTD budget
and Services    of the annual budget       (82.3% or $2.9 million of $3.5 million annual budget
                of $12.3 million has       earned). Any revenue upside will be generally offset by
                been earned                a corresponding increase in associated operating costs
                                          Community Facility fees $339.8k above YTD budget
                                           (77.5% or $2.2 million of $2.8 million annual budget
                                           earned)
                                          Waste disposal fees $328.6k above YTD budget (70.4%
                                           or $2.9 million of $4.2 million annual budget earned)
                                          Sales of Recyclables $61.4k below YTD budget (60.7%
                                           or $906.8k of $1.5 million annual budget earned)
Interest        $2.7 million              Interest revenues are tracking above budget YTD due to
Received        (308.5%) of the            economic pressures driving investment rates up.
                $870k annual budget        Accordingly, Council has invested surplus cash in higher
                has been earned            yielding term deposits to maximise the return on its cash
                                           holdings.
Other Revenue   $1.6 million (55.7%)      Waste Management royalties $32.5k above YTD budget
                of the $2.8 million        (187.7% or $47.2k of $25.1k annual budget earned)
                annual budget has         Community Facility revenue $40.6k above YTD budget
                been earned                (71.0% or $274.6k of $386.5k annual budget earned)
                                          Properties & Facilities revenue $137.2 below YTD
                                           budget (55.13% or $948.6k of $1.7 million annual budget
                                           earned)
                                          Local Laws revenue $54.2k below YTD budget (25.9%
                                           or $51.9k of $200.0k annual budget earned)
Operating       $3.4 million (67.2%)      Operating Grants and subsidies are above YTD budget
Grants,         of the $5.1 million        expectations due to the receipt of a QRA Local
Subsidies       annual budget has          Economic Recovery Grant, QRA Emergent Works and
                been received              Disaster Funding, Queensland Arts Showcase Program
                                           Grant, Illegal Dumping Grant, Eco-Certified Tourism
                                           Destination Program and Public Health Network Grant.
                                          75% ($1.9 million) of the financial assistance grant was
                                           prepaid in June 2022 and may impact on Council’s
                                           2022/23 final operating position if the prepayment
                                           approach is discontinued by the Australian government.
                                           Council has also been advised that its allocation of future
                                           year financial assistance grants is likely to decrease,
                                           which has the potential to further impact Council’s
                                           operating result.
Unitywater      On track                  Unitywater distributions are fixed each year so there is
Distributions                              limited budget variance risk




                                                                                      Page 29 of 50

Section 30

GENERAL COMMITTEE MEETING REPORT                                                      13 MARCH 2023


Figure 2: Operating Revenue Position by Type (Excluding Rates)




Operating Expenditure (YTD Benchmark 66.67%)
Actual operating expenditure is currently 63.1% ($75.2 million) of full year budget ($119.1 million).
Detailed commentary for each expenditure category is provided below.

 Category            Summary             Comments
 Employee Costs      $25.7 million          YTD under expenditure for permanent staff salaries and
                     (60.6%) of the          wages ($1.8 million) due to position vacancies, partially
                     annual budget of        offset by additional spend on casual staff and external
                     $42.3 million has       labour hire ($871.8).
                     been expended          Training costs $25.6k under YTD budget (51.3% or $191.9k
                                             of $374.0k annual budget spent)
                                            Council’s Certified Agreement annual salary increase was
                                             due in late February 2023 and is linked to the CPI Brisbane
                                             Dec Qtr index. Council’s current budget includes provision
                                             for a 5.0% CPI increase however the actual CPI for the Dec
                                             Qtr was 7.7%. As such the actual financial impact will be
                                             higher than originally forecast. This shortfall will be offset
                                             against current year employee cost savings and will be
                                             reflected in the March 2023 reports.
 Materials and       $35.5 million          Civil Operations $551.6k over YTD budget (72.6% or $6.1
 Services            (63.7%) of the          million of $8.4 million annual budget spent)
                     $55.7 million          Holiday Parks $296.3k above YTD budget (85.9% or $1.8
                     annual budget has       million of $2.0 million annual budget spent) – offset by
                     been expended.          additional revenue.
                                            Environment & Sustainable Development Management
                                             $179.9k over YTD budget (816.4% or $191.9k of $23.5k
                                             annual budget spent)
                                            Community Facilities $213.5k over YTD budget (73.5% or
                                             $1.7 million of $2.3 million annual budget spent)
                                            CEO Office $100.3k over YTD budget (112.8% or $514.3k
                                             of $414.0k annual budget spent)
                                            Fleet $70.8k over YTD budget (68.64% or $922.0k of $1.4
                                             million annual budget spent)
                                            Insurance Costs $51.2k over YTD budget (106.3% or
                                             $777.1k of $730.9k annual budget spent)
                                            Asset Management $163.7k below YTD budget (34.9% or
                                             $525.4k of $1.5 million annual budget spent)
                                            Development Assessment $121.3k below YTD budget
                                             (46.0% or $638.8k of $1.4 million annual budget spent)

                                                                                         Page 30 of 50

Section 31

GENERAL COMMITTEE MEETING REPORT                                                         13 MARCH 2023


 Category           Summary               Comments
                                           Libraries & Galleries $95.2k below YTD budget (46.37% of
                                             $953.4k of $2.1 million annual budget spent)
                                           Waste Management $91.9k below YTD budget (64.1% or
                                             $8.5million of $13.1 million annual budget spent)
                                           Infrastructure Planning, Design & Delivery $80.9k below
                                             YTD budget (9.6% or $41.3k of $429.9k annual budget
                                             spent)
                                           Cemeteries $49.9k below YTD budget (37.1% or $64.9k of
                                             $175.1k annual budget spent)
 Finance Costs      Currently on track          Whilst existing loan borrowings are set with fixed interest
                                                 rates, any further RBA rate rises will impact finance costs
                                                 on new loan borrowings.
 Depreciation       Currently on track          Current inflationary conditions for construction inputs will
                                                 continue to impact the value of Council’s infrastructure
                                                 assets and depreciation. The annual asset revaluation cycle
                                                 will quantify the financial risk by end of financial year.
 Other Expenses     Currently on track    Nil

Figure 3: Operating Expenditure Position by Type




Tourism and Economic Development Investment Summary
Council resolved to report on a monthly basis, investment details for tourism and economic
development. Expenditure at 28 February 2023 is outlined below:
 Expenditure                  Annual Budget               YTD Budget          YTD Actual      YTD Variance
                                        $m                       $m                  $m
 Payment to Tourism Noosa                $2.65                   $2.65               $2.65                  -

 Economic Development                    $1.20                   $0.64               $0.63             $0.01

 Total                                   $3.85                   $3.29               $3.28             $0.01

All instalments payable under the Tourism Noosa agreement for the 2022-23 financial year have
been made. Work on the renewal of the current agreement, which was extended for 12 months to
30 June 2023, has commenced and will be finalised in the coming months.
Economic Development expenditure is on track with the development of the Destination
Management Plan underway.
Tourism and economic development activity is funded through the general rate, with 5.8% of the
annual general rate committed towards tourism and economic development. Should actual general
rate revenue fall below budget, this does not impact Council’s contractual commitment to fully fund

                                                                                             Page 31 of 50

Section 32

GENERAL COMMITTEE MEETING REPORT                                                      13 MARCH 2023


its contribution to Tourism Noosa and all associated tourism activity. Any general rate revenue
shortfall is funded through other general revenue sources to ensure all planned activities are
undertaken in full.
Capital Revenue
YTD capital revenue of $21.4 million received comprises cash contributions from developers ($1.4
million) and capital grants ($19.8 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.
Council has received funding approval from the Queensland Reconstruction Authority for
reconstruction works relating to the Black Mountain landslip and several other flood impacted sites,
which occurred during the February 2022 rain event. Following this approval, Council received
upfront payments of $13.2 million to fund the commencement of these works.
Figure 4: Capital Revenue by Type




Capital Program
Actual capital expenditure (excluding commitments) is $33.4 million (YTD budget $38.6 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate quarterly report by the infrastructure team.

Figure 5: Capital Program Delivery Performance




Cash Management and Investment Performance
Total cash on hand at the end of February was $125.8 million. Included in this balance are funds
held in trust and for restricted purposes (e.g. unexpended levy and grant funds), prepaid grants
including the financial assistance grant, QRA disaster funding and other capital works grants,
prepayment of Waste Levy subsidy (4 years), and unspent monies committed for funding capital
projects which are underway and will continue during the financial year.
The following pie charts present the mix of cash held at February 2023 by agency (graph on the

                                                                                         Page 32 of 50

Section 33

GENERAL COMMITTEE MEETING REPORT                                                   13 MARCH 2023


left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating




The following chart monitors the 12 month trend on total cash and the agencies invested. Payments
received in February from bi-annual rates generated a significant increase in cash holdings. To
maximise the return on in its cash holdings Council currently has $50 million invested in higher
yielding term deposits. These investments were made in line with Council’s Investment of Surplus
Funds policy.

Figure 7: 12 Month Trend of Cash Invested by Agency




Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding
performance noting the early stage of the financial year.




                                                                                      Page 33 of 50

Section 34

GENERAL COMMITTEE MEETING REPORT                          13 MARCH 2023


Category                           Comments
Operating Surplus Ratio             Intent: Identifies the extent to which
                                     revenues cover operational expenses,
                                     to ensure community equity is not
                                     degraded
                                    Target: 0 – 10%
                                    Result: 31.3%
                                    Comment: The ratio is at the second
                                     peak for the year following the issue of
                                     rates and levies in January. This ratio
                                     will slowly decline as expenditure on
                                     operations occurs through to the end of
                                     the financial year at 30 June 2023.

Cash Expense Cover                  Intent: Indicates how long council can
                                     continue paying its day-to-day
                                     expenses from cash at bank without
                                     needing additional cash flows
                                    Target: > 3 months
                                    Result: 15.4 months
                                    Comment: Council is forecast to
                                     remain above target for the financial
                                     year. Business as usual expenditure
                                     through to 30 June 2023 will continue
                                     to diminish Council’s cash holdings,
                                     albeit not below the target range of 3 –
                                     6 months.
                                      Cash balances are also enhanced with
                                      Grant and Waste Levy subsidy
                                      prepayments (held as restricted cash)
                                      and QRA payments for disaster
                                      projects
Asset Sustainability Ratio          Intent: Measures the extent to which
                                     assets are being replaced as their
                                     condition degrades to ensure service
                                     potential is maintained
                                    Target: 90% of depreciation budget
                                     spent on renewals annually
                                    Result: In line with budget
                                    Comment: The ratio will progressively
                                     increase each month as expenditure on
                                     renewals occurs as part of the capital
                                     works program.




                                                             Page 34 of 50

Section 35

GENERAL COMMITTEE MEETING REPORT                                                     13 MARCH 2023


 Category                                                    Comments
 Net Financial Liabilities Ratio                              Intent: Outlines the level that net
                                                               Council debt can be serviced by
                                                               operating revenues. A ratio below zero
                                                               implies that liabilities are less than cash
                                                               (and other current assets) and there is
                                                               adequate borrowing capacity available
                                                               if needed.
                                                              Target: less than 60%
                                                              Result: -49.6%
                                                              Comment: Council has low debt levels
                                                               and strong cash holdings. The January
                                                               rates revenue also inflates the YTD
                                                               actual outcome.
 Investment Return                                            Intent: Ensure appropriate return on
                                                               investment yield for cash at bank.
                                                              Target: 0.25% above current
                                                               Bloomberg commonwealth 10-year
                                                               bond rate yield (3.08%)
                                                              Result: 3.28%
                                                              Comment: With bond rates rising,
                                                               Council has invested surplus cash in
                                                               higher yielding term deposits to
                                                               maximise returns. Council’s investment
                                                               returns when averaged are showing
                                                               slightly under target for the month due
                                                               to the significant increase in cash
                                                               holdings from the second rates run
                                                               received later in February.
 Rates in Arrears                                             Intent: Ensuring that the amount of
                                                               unpaid rates remains sustainable and
                                                               does not negatively impact cash flows
                                                              Target: 5% industry benchmark
                                                              Result: 10.7%
                                                              Comment: Rates arrears are at its bi-
                                                               annual peak following the due date for
                                                               the January rates issue. This ratio will
                                                               continue to decline from the high point
                                                               in the cycle as payments are received.
                                                               Recovery action may be considered
                                                               where appropriate.


Previous Council Consideration
Nil.
Finance
As above.
Risks & Opportunities
Council’s risk register identifies a number of risks that could impact on its ongoing financial
sustainability. In order to manage and mitigate these risks Council uses various tools which include
monthly ongoing financial reporting to identify and address emerging issues, conservative
budgeting, compliance with the Financial Sustainability Policy, regular budget reviews, effective
liquidity management to ensure sufficient fiscal flexibility, as well as adhering to the Reserves and


                                                                                        Page 35 of 50

Section 36

GENERAL COMMITTEE MEETING REPORT                                                         13 MARCH 2023


Restricted Cash policy which requires that Council maintains both a disaster management reserve
and a minimum 3 months cash cover to fund emergent matters.
Some examples of potential risks that may impact on Council’s operational performance, capital
program delivery, cashflow and cash reserves include:
        Substantial damage to or failure of Council infrastructure due to natural disaster or other
         emergent issue that may require significant unplanned investment;
        Closure of Council facilities due to ongoing Covid 19 restrictions;
        A prolonged IT system failure affecting Council’s ability to deliver services or issue rates
         notices;
        Economic conditions affecting ratepayers’ ability to pay rates;
        Market driven increases in construction and operational costs significantly above estimates;
        Labour and material shortages and delays.

Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

    X   Chief Executive Officer   X   Community Services                      X   Corporate Services
        Executive Support             Director                                X   Director
                                      Community Development                   X   Financial Services
                                      Community Facilities                        Fleet
                                      Libraries & Galleries                       ICT
                                      Local Laws                                  Procurement
                                      Waste & Environmental Health                Property
                                                                                  Revenue Services

    X   Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
        Director                      Director                                    Director
        Community Engagement          Building & Plumbing Services                Asset Management
        Customer Service              Development Assessment                      Buildings and Facilities
        Governance                    Economic Development                        Civil Operations
        People and Culture            Environmental Services                      Disaster Management
                                      Strategic Land Use Planning                 Infrastructure Planning,
                                                                                  Design and Delivery




                                                                                             Page 36 of 50

Section 37

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023


                                     Attachment 1




                                     Page 37 of 50

GENERAL COMMITTEE MEETING REPORT                                                                        13 MARCH 2023

                                                                                                           Attachment 1

      Profit and Loss Statement
      Revenue
         Recurrent Revenue
         Rates, levies and charges                        82.490         82,485          83,229           744       101%
         Fees and charges                                   8,800         5,761           5,832            71       68%
         Interest received                                  870            606           2,684         2,078       308%
         Sale of Goods and major services                 12.200          8,079           9,134          1,055      74%
         Sale of contract and recoverable works               2              11            33              2        148%
         Rental & lease income                              1751           1,284          1,160          (124)      68%
         Other income                                       1,063           640           827             77        78%
         Grants, subsidies, contributions and donations     5,073         2,245          3,410           1,165      67%
         Unitywater Distributions                           5,950         3.220          3,257             7        55%
                                                          118,417       104,340        109,566          3,226       93%
      Expenses
         Recurrent Expenses
         Employee benefits                                42.348         26,614         25,666           o48        61%
         Materials and                                    55,663          W856          35,474          (618)       “ee
         Finance costs                                      1214           790            863            (72)       71%
        Depreciation                                      19.654          13,103         13,103             -       67%
        Other expenses                                       256            161            112            40        44%
                                                          119.135        75,524         73,218           306        63%
     OperatingResult                                        ty           28       TS
      Summary of Capital Expenditure and Funding
      Capital Funding
         Capital cash contributions and infrastructure charges 1,505       1,278          1,409           130       os
         Contributed assets                                 1,500           374           232            (142)      15%
         Capital grants and subsidies                     17,620           6,080        19,779          13,698      112%
         Cash / revenue                                   32,219          31,234        13,023        (18,210)      40%
         New loan borrowings                                5758              -              -              -       om
        Other capital revenue                                   -             -             18             18       o%
    Total Capital Funding                                 SBS             BSE TS
      Capital Expenditure
         Contributed assets                                 1,500           374           232            (142)      15%
         Capital works - constructed assets                51,353        36,361         31,432         (4,922)      61%
         Capital works - other capital                      4758           1,228           oe           (274)       20%
         Loan redemption                                    1,003          1,003          1,003             -       100%
        Other fa Ex seodture                                    -             -            840           840        O%

                                                                                                           Page 37 of 50

Section 38

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023


                                     Attachment 2




                                     Page 38 of 50

GENERAL COMMITTEE MEETING REPORT                                                             13 MARCH 2023

                                                                                                Attachment 2

                                                                                    ee
          Cash and cash equivalents                           64,834            125,791            98,501
         Trade and other receivables                           11,153            13,551            10,507
         Inventories                                             144               148               143
         Contract Assets                                            -                 -                 -
          Other current assets                                  3,425             3,844             2,898
                                                              79,557            143,334           112,049
          Non Current Assets held for sale                          -                 :                 -
    Total Current Assets                                      79,557            143,334           112,049
    Non Current Assets
         Trade and other receivables                          49,468             49,343           49,343
          Other non current Assets                                  -                 -                 +
         Investments                                          92,433            96,515             96,515
          Investment property                                  2,900              3,300             3,300
          Property, plant and equipment                     1,040,203         1,200,611         1,182,177
          Right of Use Assets                                     89                64                64
          Intangible assets                                     3,125             572                392
    Total Non Current Assets                                1,188,218         1,350,405         1,331,791
   TotalAssets                                             4 2677S            1,493,738        1,443,840
    Current Liabilities
         Trade and other payables                              7,968             18,965            15,982
          Contract Liabilities                                  4,377             3,830             3,830
         Borrowings                                             1,237                 -             1,186
          Lease Liablities                                       25                26                 26
         Provisions                                             8,103             7,125             9,758
        Other                                                   3,998             3,592             7,803
    Total Current Liabilities                                 25,708            33,538             38,585
    Non Current Liabilities
         Borrowings                                           28,835            24,114             24,114
          Lease Liabilities                                       66                41                41
         Provisions                                            16,555           22,466             22,466
        Other                                                       -             8,826             8,826
    Total Non Current Liabilities                             45,456            55,446             55,446
   TotalLiabilities |                                         TAGE             8898S              94,032

    Community Equity
         Asset Revaluation Surplus                            144,628           321,755           321,755
          Retained Surplus / (Defeciency)                           -                 -                 -
         Shire Capital                                      1,051,982         1,028,053         1,010,093
          Current Year Net Earnings                                 -           54,946             17,960

                                                                                                Page 38 of 50

Section 39

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023


                                     Attachment 3




                                     Page 39 of 50

GENERAL COMMITTEE MEETING REPORT                                                                       13 MARCH 2023

                                                                                                           Attachment 3

      Cash flows from operating activities
           Cash Flows from Operating Activities
          Receipts from Customers                                              103,948            98,285             116,636
           Payments to Suppliers and Employees                                  (97,165)         (68,775)            (87,449)
                                                                                 6,783            29,510              29,187
           Investment and Interest Revenue Received                              3.470              3.671              2,813
           Rental Income                                                          1,739             1,160              1,810
           Non Capital Grants and Contributions                                  4.838              3,410              8,910
           Income Tax Equivalent Received                                         1,200             1,118              1,913
           Income from Equity investments                                       2,150               1,152              1,717
           Payments:
           Borrowing Costs                                                           -                  -                  -
           Interest Expense                                                       (613)               (84)              (156)
          ‘Net Cash Inflow/{Outfiow) from Operating Activities ==               19,568           99.9376 19
      Cash Flows from Investing Activities

           Proceeds of Sale of Property, Plant and Equipment                         -                3                  356
           Grants, Subsidies, Contributions and Donations                       15,675             21,188             14,745
           Payments:
           Payments of Property, Plant and Equipment                            (40,801)         (32,144)            (36,315)
           Payments for Intangible Assets                                         (220)              (194)              (182)
           Net Movement in Loans and Advances                                        -                125                125
          ‘Net Cash Inflow{Outfiow) from Investing Activities ==              (25.346)           (10.995)            21.2841)
      Cash Flows from Financing Activities
           Receipts:
          Proceeds from Borrowings                                               5,759                  -              4.859
           Payments:
          Repayment of Borrowings                                                (1,022)           (1,652)            (1,288)
          ‘Net Cash Inflow(Qutfiow) from Financing Activities ==                  TST             (8.652)             3.5
          ‘Net Increasel{Decrease) in Cash and Cash Equivalentsheld =          (4.041)            27.289             28.473
           Cash and Cash Equivalents at the beginning of the reporting period  65,875             98,501              70,028

                                                                                                           Page 39 of 50

Section 40

GENERAL COMMITTEE MEETING REPORT   13 MARCH 2023


                                     Attachment 4




                                     Page 40 of 50

GENERAL COMMITTEE MEETING REPORT                                                                                  13 MARCH 2023

                                                                                                                      Attachment 4

         Materials and services
        Advertsing and Marketing                            247            238             154           11              B       47%
        Administration Suppiles and Consumables             651             B15          477            443              xs      54%
        Audt Expenditure                                    170             185            24            50            (26)      27%
        (Communications and IT                              928             B48            526           514            12       61%
         (Commission Paid                                  1,449           1339          ges            1,106          (161)     83%
         (Consultancy Services                             1,598          2.191          1,080          1,086            8       50%
        Contract Services                                24,698          27,164         16,628        16,957           (128)     62%
         Contributions, Donations, Sponsorship and Prizes  3,532          3,699         3,502          3,449           (147)     33%
         Blectrioity                                       1,654          1,753          1,160          1,024           135      58%
         intemal Fleet Costs and Extemai Plant Hire        1,995           1,762         1,133          1,323          (190)     75%
         Grants Paid t0 Community Organisations            1,573           1,771         1,184          1,260          (76)      71%
        Insurance                                           668            77s            Te             T77            (13)    100%
         Legal Expenses                                    1,741           1,244          610           600             10       48%
         (Operating Leases and Rentais                      305            373            273            258              5      72%
         ‘Sofware and Maintenance                          2,144          2,372          1314           1,480          (165)     62%
         ‘Subscriptions and Registrations                    cI            322             191           236            (45)     73%
        Waste Levy Payments                                1,645           1539          1,026         1,264          (238)      82%
        Water and Sewerage Charges                          8s4            1,204         797            eso            148       54%
         All Other Materials and Services                 4054            6,070          3,056          2,877           189      47%
                                                          ‘50,292        55,663         ‘34,856       ‘35,474         (618)      64%

                                                                                                                      Page 40 of 50

Section 41

GENERAL COMMITTEE MEETING REPORT                                                   13 MARCH 2023


6     NOOSA COUNCIL BRAND REFRESH

Author            Communications & Community Engagement Manager, Ken Furdek
                  Office of Mayor and CEO

Index             ECM / Subject / 38.7 Branding

Attachments       1.    Council Brand Refresh (43 page attachment provided separately to this
                        agenda)


EXECUTIVE SUMMARY
This report seeks Council approval to implement a refresh of the existing Council brand across the
organisation.
Council’s current corporate logo and brand were designed and implemented in 1990 by a then
local professional graphic designer to replace the original Coat of Arms. The approved brand
represents a listed vulnerable plant the Boronia Keysii (commonly known as Keys’ Boronia).
In 2014, Council invested funds to develop a revised colour palette of primary and secondary
colours to complement the existing Council brand.
While the current logo/brand has served the organisation well, given the revised strategic approach
as part of Noosa 2.0 program, it is timely to evolve the Council image and identity, while respecting
the past.
This brand refresh respects the integrity of the iconic Boronia flower, which is central to the 1990
design, however modernises its look to create a meaningful and long term legacy of the unique
wildflower.
The introduction of a new font, specifically created for Noosa Council, clearly portrays a modern
and agile council brand which is reflective of Council’s modern, professional approach.
The refresh also aligns to the values that sets Noosa apart from other local government areas.
This work has been achieved in collaboration with the new Corporate Plan 2023-2028 and within
current budgets.

RECOMMENDATION
That Council note the report by the Communications and Community Engagement Manager to the
General Committee dated 13 March 2023 and approve the refreshed brand and associated
elements, colour palette and typography provided in Attachment 1 to the Report.

REPORT
The existing Council logo/brand designed by a local resident, was approved by Council in 1990.
Since then, it has altered slightly, including a change in colour to the wildflower emblem Keys’
Boronia.
Council’s brand brings together how we conduct our business and showcases our organisation.
The Council brand refresh demonstrates Council’s standards for consistency, quality and
professionalism.
To complement the development of the Corporate Plan, through a competitive Interest to quote
process, Council officers engaged Peregian Beach creative studio Saturate to conduct an
extensive brand audit of all Council brands and consider a refresh of the existing corporate brand.
The process included in-depth research and analysis of many strategic documents, including
Noosa Design Principles, the Corporate Plan, Liveability Survey results plus regular consultation
and workshops with Councillors, the Executive and key stakeholders in the organisation.
                                                                                     Page 41 of 50

Section 42

GENERAL COMMITTEE MEETING REPORT                                                    13 MARCH 2023


The brief was to respect the integrity of the Keys’ Boronia as its emblem, which is still considered
an endangered species and now protected within national parks.
The purpose was to produce a modern, simplified brand, revised colour palette and typography
that captured the essence of the organisation and the shire.
The tagline ‘Different by Nature’ has also been retained and will be used for specific branding
purposes.
The refreshed look aims to be more digital friendly, reflect the future strategy of the Council, be
versatile and provide consistency in all strategic publications and digital platforms.
This new brand and the associated branding designs will provide new energy and impetus for
Council and its facilities.
Previous Council Consideration
The brand refresh was one of the key recommendations in the CEO Roadmap for the Organisation
Noosa 2.0.
Finance
Expenditure was within the existing Corporate Plan budget. The total cost for this brand refresh
and associated review of the Council’s facility brands was $60,000 plus GST.
The brand refresh is initially a digital rollout, but moving forward there will be cost implications as
the brand refresh is progressively rolled out. This includes uniforms, car decals and signage as
required. This will be dependent on available budget in future years.
Risks & Opportunities
Whilst the existing Council brand has a connection to the community and organisation, it’s time for
Council to move forward to modernise and refresh its corporate identity.
The brand refresh has been designed to respect the integrity of the iconic boronia and provide a
clear visual link to the existing brand.
It will become highly recognisable, modernise Council’s identity, is a flagship for organisational
pride and morale and provides a new way forward in promoting our shire as an attractive place to
live, work and invest.
Consultation
External Consultation - Community & Stakeholder
Design consultant Saturate engaged key strategic marketing experts as part of the process.
Internal Consultation
The brand has been developed in consultation with staff across Council, including representatives
from the following areas
     Community Development
     Financial Services
     Noosa Aquatic Centre
     Noosa Leisure Centre
     Noosa Library staff
     Noosa Regional Gallery
     The J Noosa
     Executive Team
     Communications and Community Engagement staff
     Councillors




                                                                                       Page 42 of 50

Section 43

GENERAL COMMITTEE MEETING REPORT                                                      13 MARCH 2023


Departments/Sections Consulted:
 x   Chief Executive Officer   x   Community Services                      x   Corporate Services
     Executive Support             Director                                    Director
                                   Community Development                       Financial Services
                                   Community Facilities                        Fleet
                                   Libraries & Galleries                       ICT
                                   Local Laws                                  Procurement
                                   Waste & Environmental Health                Property
                                                                               Revenue Services

 x   Executive Services            Environment & Sustainable Development   x   Infrastructure Services
     Director                      Director                                    Director
     Community Engagement          Building & Plumbing Services                Asset Management
     Customer Service              Development Assessment                      Buildings and Facilities
     Governance                    Economic Development                        Civil Operations
     People and Culture            Environmental Services                      Disaster Management
                                   Strategic Land Use Planning                 Infrastructure Planning,
                                                                               Design and Delivery




                                                                                          Page 43 of 50

Section 44

GENERAL COMMITTEE MEETING REPORT                                                13 MARCH 2023


7.   CLOSED SESSION

7    VOLUNTARY FLOOD RECOVERY
     PROPERTY ACQUISITION

Author           Community Connections Manager, Alison Hamblin
                 Community Services Department

Index            ECM/Subject: Disaster Management/18.15 Recovery

Attachments       Nil


REASON FOR CLOSED SESSION
This report was considered in closed session in accordance with Section 254J (3) of the Local Government
Regulation 2012, which permits the meeting to be closed to the public for business relating to the
following:
(h) negotiations relating to the taking of land by the local government under the Acquisition of
      Land Act 1967.




                                                                                   Page 44 of 50

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.