Skip to the record
Beware of cheap imitations.

Original source · versioned page text

DA Form 1 and Plan

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

  

parts?

   

Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

 

Number of parts created

 

12) Boundary realignment

   

12.1) What are the current and proposed areas for each lot comprising the premises?
Current lot Proposed lot

Lot on plan description Area (m?) Lot on plan description Area (m?)

 

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment?

 

 

    
 

     
 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
(attach schedule if there are more than two easements)
Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

     

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?

LJ Road work C1 Stormwater LJ Water infrastructure
L] Drainage work CJ Earthworks CL Sewage infrastructure
C Landscaping LJ Signage C1 Clearing vegetation
Other — please specify: Placome Oo Fat lLeftirg Dariw
14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
L] Yes — specify number of new lots:

(ZINo

14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)

 
    

  
   
  

 

      
  

   
   

    

 

     

    
 

 

   
 

 

      
 
 

 

PART 4 —- ASSESSMENT MANAGER DETAILS

15) Identify the assessment manager(s) who will be assessing this development application

   
 

    

{P) y
16) Has the local government agreed to apply a superseded planning scheme for this development application?

LJ Yes — a copy of the decision notice is attached to this development application
L The local government is taken to have agreed to the superseded planning scheme request — relevant documents

attached
ZNo

       
   

 

Page 5
DA Form 1 — Development application details
Version 1.2— 7 February 2020
Log in to download the original file

DA Form 1 and Plan.pdf · 5.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.