Skip to the record
Every meeting, every word.

Original source · versioned page text

2022-11-08 Planning & Environment Meeting Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 8 NOVEMBER 2022


paddle boards (SUP’s) from the site. A site office/shopfront, pontoons and jetty exist on site. A fuel
bowser is situated at the jetty head. Refer Figure 6 – subject site.




                                        Figure 6 - Subject site

2.3. Surrounding Land Uses
The site is located on Noosa River adjacent to and partly within Pelican Beach Park. The tennis
courts are situated directly south of the site and Noosa North Shore is located on the opposite side
of the river to the north. Immediately west (upstream) is a timber jetty adjacent to Peter Park along
with a public boat ramp and pontoon facility. Directly east (downstream) is the Ely Park public jetty.
This area of the Noosa River has a variety of commercial water-based operations.
3.    ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
•     State Planning Policy;
•     South East Queensland Regional Plan;
•     Planning Regulation 2017;
•     Noosa Plan 2020.
3.2. State and Other Statutory Instruments
State Planning Policy
Noosa Plan 2020 is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Regional Landscape and Rural Production Area of the SEQ Regional
Plan. The proposal is consistent with the regional policies of the SEQ Regional Plan.


                                                                                      Page 12 of 89
Log in to download the original file

2022-11-08 Planning & Environment Meeting Agenda(PDF, 5MB).pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.