PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA   8 NOVEMBER 2022




                                                      Page 28 of 89

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                               8 NOVEMBER 2022

                  [email protected] or mailed to:
                    Department of Environment and Science
                    Permit and Licence Management
                    Implementation and Support Unit
                   GPO Box 2454
                    Brisbane Qid 4001
           Note: Appropriately qualified person means a person or persons who has
           professional qualifications, training, skills and experience relevant to soil
           chemistry or acid sulfate soil management and can give authoritative
          assessment, advice and analysis in relation to acid sulfate soil management
           using the relevant protocols, standards, methods or literature.
    Planning Regulation 2017, Schedule 10, Part 17, Division 3, Table 2 — Tidal works or work in a coastal
    management district — The chief executive administering the Planning Act 2016 nominates the
    Director-General of the Department of Transport and Main Roads — Maritime Safety Queensland to be
    the enforcement authority for the development to which this development approval relates for the
    administration and enforcement of any matter relating to the following conditions:
          The operational work must be carned out generally in accordance For the duration of the
           with the following plan:                                     works
               e Cover Page, prepared by Edge Consulting Engineers, dated
                  2/11/21, reference 34680-01, revision O
               e Existing Structures Plan, prepared by Edge Consulting
                  Engineers, dated 13/10/21, reference 34680-02, revision A
               ¢ Existing Structures Plan, prepared by Edge Consulting
                  Engineers, dated 13/10/21, reference 34680-03, revision A
               e New Site Plan, prepared by Edge Consulting Engineers,
                  dated 13/10/21, reference 34680-04, revision A
               e Vessel Mooring Site Plan, prepared by Edge Consulting
                  Engineers, dated 13/10/21, reference 34680-05, revision D
               e Pontoon Layout Details, prepared by Edge Consulting
                  Engineers, dated 13/10/21, reference 34680-06, revision A
               e Elevations, prepared by Edge Consulting Engineers, dated
                  13/10/21, reference 34680-07, revision A
               e Pile Setout, prepared by Edge Consulting Engineers, dated
                  13/10/21, reference 34680-08, revision A.
           All vessels, structures, plant and equipment associated with the While the works are
           construction of the approved works must be lit/marked in accordance | occurring
           undertaking the construction works does not cause a risk to the safe
           navigation of ships:
               (a) any anchors deployed must be marked with yellow buoys
                  and fitted with FL yellow lights fitted
               (b) lighting provided must not obscure, disguise or otherwise
           The structure must be lit/marked in accordance with the following At all times
           specifications, such that it does not cause a risk to the safe
           navigation of other ships:
               (a) pedestrian style lighting to gang way and/or retro reflective
                  tape on pontoon piles
               (b) lighting provided must not obscure, disguise or otherwise
                  interfere with the effectiveness of navigational lighting.
           The construction, operation or maintenance of the structure and any | At all times
           ship moored at this structure, must not impede the safe navigation of
           other ships or restrict safe access to or from neighbouring structures.
               (a) Any debris or similar obstruction encountered whilst (a) and (b) At all times
                  undertaking the work must be disposed of at the applicant's

    State Assessment and Referral Agency                                             Page 4 of 9

                                                                                    Page 28 of 89
Log in to download the original file

2022-11-08 Planning & Environment Meeting Agenda(PDF, 5MB).pdf · 5.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.